Projects Construction Engineer (Pipeline & Piping)
PERSONAL AND CONTACT INFORMATION
Mohamed Ramadan Awad Allah
Date of birth: 18-Jan-1984 44511 (Egypt)
Nationality: Egyptian (+2) 01002919336
moh.ramadan.projectsengineer@gmail.com
PERSONAL STATEMENT
Ten years of experience on pipelines and piping for oil and gas industries at Khalda
Petroleum Company a joint venture between Apache Corporation and the Egyptian
General Petroleum Corporation (EGPC), Projects General Division in the Western
Desert of the Arab Republic of Egypt.
My objective To obtain a meaningful and challenging position as Projects Engineer where I can
improve and use my skills in the best possible way for achieving the company’s goals.
EDUCATION
Bachelor of mechanical engineering (mechanical power engineering - 2006), Zagazig university
General Grade: Good
CERTIFICATION
▪ Project management professional (PMP-PMI) certification number:1935237
▪ Certified welding inspector (CWI) certificationnumber:16043051
▪ ISO 9001-2015 qualitymanagement system (Leadauditor)
▪ NEBOSH (IGC)international general certificatein occupational health and
safety (waitingexam result)
2. 2 of 5
COURSES
▪ Pipeline construction
▪ Piping design (specificationand sizing)
▪ Piping stressanalysis by CaesarII
▪ Welding engineering
▪ Auto cad2D and 3D
▪ Economicsand feasibility studies
▪ Material selection, receiving andreview mill test certificates
▪ ASME B31.3(process piping)
▪ Radiographic testing (RT) inaccordance to SNT-TC-1A
▪ Magnetic particle testing (MT) in accordanceto SNT-TC-1A
▪ CWI (certifiedweldinginspector) exam preparation course
▪ PMP (professional management projects) exam preparation course
▪ NEBOSH (IGC) international general certificate preparation course
▪ ISO 9001-2015quality management system
▪ Introductory moduleto theoil andgas industry from 20/10/2013 to 27/3/2014
PROFESSIONAL EXPERIENCE
Management Experience
Ten years in construction field of oil and gas work as site engineer, senior engineer where I lead
different projects with different sizes, this experience represented in the following points:
- Certified project management professional PMP Number: (1935237)
- Knowledge and awareness of Project Management principles, documents and plans.
- Team Leadership great ability to plan, organize, direct and control individuals or groups of
people to achieve company goal.
- Interpersonal skills: Leadership, Team building, Motivation, Decision making, Political and
cultural awareness, Negotiation, Trust building, Conflict management.
- Communication skills: great ability to monitor and control communications throughout the
entire project with all stakeholders.
- Managing the day-to-day operational aspects of a project.
- Submitting progress reports to stakeholders and senior managers.
- Ensuring that all relevant processes are followed on projects.
- Managing project personnel to achieve project objectives.
- Ensuring that the highest quality standards are met.
- Organizing the various professional people working on a project.
- Language Skills: Arabic (Mother Tongue) and English (fluent).
3. 3 of 5
Quality Management Experience
Projects engineer with good knowledge and experience in quality management system:
- Certified lead auditor in ISO 9001 2015 quality management system.
- Involved in preparing system for Khalda Company to comply with ISO specification.
- Oversee effective implementation of the Quality Management System throughout the
company.
- Maintain the Quality Manuals andQuality Proceduresandensurecontentsareappropriatefor
company strategy goals.
- Able to Organize and manage internal audit system and the corrective action reporting.
- Host external Quality System audits.
- Contribute to continuous improvement activities.
- Monitoring performance by gathering relevant data and producing statistical reports.
Safety Experience
- Extensive knowledge of safety and health standards, rules, regulations, and proficiency in
applying them to projects.
- Safety goals are achieved on every project.
- Ensure employees have a positive attitude toward safe work practices.
- Ensure employees are well educated in safe practices and have all the resources necessary to
work safely.
- Observe and practice all governmental safety regulations, project requirements and company
safety policies.
- Conduct project safety inspections at the jobsite, intervene where imminent danger to life or
property exists, ensure that deficiencies are addressed and corrected by superintendent.
- Maintain and track employee’s certifications to insure all employees remain up to date.
- Review and update all Safety Policies and Manuals as necessary.
- Prepare, submit and maintain all safety records.
Technical Experience
- Preparing and reviewing piping and pipeline specifications in accordance with the company
standards and general codes.
- Preparing a fabrication plan & material estimation.
- Preparing and reviewing valves datasheets, vendor technical specifications and quotations.
- Providepiping technical input to P&IDs including piping classes,valve types and special items.
- Preparing& checking of equipment’s orientation, Considering spacing, accessibility, operation
and maintenance requirements.
- Handling all piping technical queries and investigating all field pipe work related problems,
including the drawing of field sketches when necessary.
- Monitoring piping and pipeline construction and fabrication activities insuring quality and
taking necessary actions to maintain satisfactory standards.
- Construction supervision on site and providing redesign solutions for the field problems or
changes.
- Carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling
commissioning and Pre-Commissioning requirements for the project.
- Monitoring the daily work activities and updating Progress Reports.
- Reviewing all site work and prepare the punch list for the construction contractor.
4. 4 of 5
WORK EXPERIENCE
Hydra Gas Facility
Hydra is a hot, normally pressured gas condensate field located in the western desert of EGYPT that
is being developed by Khalda Petroleum Company (KPC), Hydra facilities constructed in two phases
accommodate the fluids only in early field life where the pressures are sufficiently high enough to
free flow to the host facilities. Fluids will be cooled and separated via a three-phase separator.
Hydra Phase IIID (Pipeline)
This project consists of installation of two new 12" CS schedule 80 pipelines with total length 44 km
buried and all related above ground piping such as launcher, receiver, tie ins, shutdown system,
utilities system, ….) To flow gas and recombined condensate between Hydra Facility and Shams
Manifold with export compression and condensate pumping at Hydra Facility.
Akik Gas Plant
Akik Gas Plant Relocation from Alameen site to Salam Base new location and Tie-In with the Salam
gasplant train 1&2 in lead theproject throughdifferentphasessuchas planning, construction, testing
andpre-commissioning in orderto ensureproperorganizationofworkactivities, andreasonableness
of time frames and lead commissioning team in to order to achieve the plant first gas in and start up.
Gad and Maggie Field Gas Development Project
The project includingabout twentyhigh pressure gasduplex(22% Cr) buried flow lineswith total 120 km
length 8" diameter with gas requirement equipment.
Kahrman Oil Facility And Water Flood
ExtensionofKahrman Oil Facility byaddingtwo new trainswith shipping pumps areaand2500 BBL tank
Adding fivehighpressure waterdisposal pumps ,15000 BBL /day with two disposal tanksand all related
auxiliaries and control system.
Abu Gharadik 18" Strategic Line 206km
- Inspection for 206 km gas line 18" diameter using intelligent pig.
- Detect damage and defects point along 206 km line and perform all required maintenance.
- Chemical cleaning, Hydro test the whole line, dewatering and draying.
- Construct and install new launcher and receiver.
- Construct new metering system and all required tie in with trunk line.
- Commissioning with nitrogen and start up.
Qasr Power Station
Engineering,planning and construction of QasrGas PowerStationwith mobile gas turbine(3 each) and
achieve the interconnecting piping required with all required accessories.
Salam Gas Plant Filter Coalscer and Metering Skid
Fabrication and installation of six units with all interconnection piping of filter coalscer and mercury
removal fabrication and installation for metering system for Salam gas plant (400 MMCFD).
Qasr Gas Field Development Project
The project including about thirty highpressuregasduplex(22% Cr)flow lineswith total 100km with gas
requirement equipment.
5. 5 of 5
Chelsea Gas Field Development Project
Construction fortrunk lines and flow lines with total 90 km carbonsteel materialswith all gas facilities
included (manifolds, separators, Gas compressors…)
Tarek Trunk Lines
Approx.(30km)carbonsteel 12" linewith three wells(medium pressure) andall requiredmodificationfor
gas plant (tie in point) .
Emergency and Planned Shut Down
Responsible for all planned and emergency shutdown maintenance and modification work for five gas
plants (Salam, Tarek, Qasr, Hydra and Khepri gas plant).