Objective:-
A position in the field of Mechanical Engineering where Endeavor to
Achieving challenging innovative career opportunity where my actual
experience ,educational background and skills could be employed further
developed; therefore leading me to better career in this field.
Main Experiences:-
Able to handle the operations of mechanical engineering.
Ensuring construction activities are carried out in accordance with the
Codes, procedures and specifications.
Dealing with many mechanical systems from variables international
suppliers and vendors.
Define the routine maintenance activities.
Leading workshops fabrication works.
Optimize operation in accordance with the production and work.
The ability to deal and convince the client.
Leading services teams.
Manage and follow up client requirements to solving the technical problems.
Using international standards and regulations for mechanical engineering.
Installing and maintaining variable kinds of machines and equipment.
Adaptable to a multinational environment with a wide exposure to various cultures and
customs.
Working Experiences :-
GS E&C, from October 2014 till now as a Piping Engineer Assistant
Manger for the project of EGYPTIAN REFINING COMPANY (ERC)
Duties including
Supervision/monitoring all subcontractors’ site activities.
Verify all material specifications with material coordinators prior to deliver for
fabrication.
Review the drawings through 3D Modeling, ZWCAD, and ProCAD&Cadworx.
Revisie the drawings and check all material take off.
Ensure that all construction contractors’ supervision and manpower are
instructed in and comply with all aspects of Health, Safety, Environment and
Security (HSES) policy, site regulations, permit to work procedures and
instructions and Client requirements
Ensure that construction contractors working within his discipline adhere
strictly to the latest Approved for Construction (AFC) project drawings,
Specifications, ITP’s, Procedures and Site Instructions
Responsible for the HSES and quality aspects of the work within assigned
2. areas and for ensuring construction contractors complete their work in
accordance with the project schedule
Review and monitor the availability of drawings, specifications, job
instructions, material deliveries and tools applicable to his/her particular
discipline and area of work
In conjunction with the contractors’ supervision, planning engineers and the
Construction Engineer, develop detailed daily and weekly work plans in
accordance with the overall planning schedule
Inform the Discipline Superintendent on specific areas where the
programme needs to be adjusted in accordance with site conditions and
material deliveries
Responsible for monitoring the discipline and timekeeping of contractors’
staff and labour in a defined work area, identifying any disciplinary action
required, and informing the relevant Discipline Superintendent
Review the received drawings P&ID, GA, Isometrics, Above/underground
piping.
Monitoring the Fabrication shop activities via daily productivity report.
Orascom construction Industries, from October 2013 till October
2014 as a Site Team Leader,Piping Superintendent and Deputy
Construction Manager for Rehabilitation and Adaptation project
Algiers refinery, Algeria
CLIENT: Sonatrach
ENGINEERING AND DESIGN: Technip
Duties including all Piping activities
Supervision of various mechanical erection works
Supervision and quality control of erection activities in accordance with
approved HSE and method statement / shop drawings and recording any
non-conformance.
Review erection planning, work procedures, inspection test plans, safety
plans
Ensure that all quality related aspects are in line with the project
requirements
Inspection of delivered materials as per specification, quantity and approval,
Attend weekly progress meeting and prepare minutes of meeting,
Maintain the site daily with erection progress records, quantum of work
done, prepare daily reports in line with project procedure,
Maintain site inspections and tests records, etc.
3. INITEC Energía “Turnkey” Energy, from December 2012 till October
2013 as a senior mechanical engineer, Piping Superintendent for
Giza North Power Plant compined cycle 1500 MW Project, Egypt
Client: Cairo Electricity Production Company (CEPC)
Design& Engineering : PGESCO
Duties including following up the sub-contactor for all Piping activities in
ModuleӀ , ModuleӀӀ as :
Manufacture and erection of piping for services and process units and
systems as
Natural gas, steam (high, medium and Low Pressure),instrument air &
service air, Nitrogen, Lubricating Oil systems, fire fighting systems, cooling
systems, and water treatment Systems ….etc.
Installation for variable kinds of pipe supports.
Using international standards and regulations for mechanical and piping
activities as API, ASME, DIN.
Prepare site surveys, reports and documents for assigned Projects in
accordance with relevant standards.
Optimize site modifications in accordance with design requirements.
Proceed Hydro-Test activities.
Orascom construction Industries, from May 2009 till December
2012 as a senior mechanical construction engineer and piping
deputy manger for Sorfert Fertilizer Complex for AMONIA and
UREA Project ,Algeria, Under supervision of Uhde (ThyssenKrupp).
CLIENT: Sorfert Algeria
ENGINEERING AND DESIGN: Uhde
MAIN CONTRACTOR: Orascom construction industries
Contract Value : $ 2200 Million
Duties including all Piping activities in Amonia trane I & trane II as :
Manufacture and erection of piping for services and process units and
systems as
Natural gas, steam (high, medium and Low Pressure),CO2, Ammonia Liquid
& Ammonia Vapor Synthesis Gas, polished water, instrument air & service
air, Chemical Dosing, Nitrogen, Lubricating Oil systems, fire fighting systems,
cooling systems, and water treatment Systems ….etc.
Installation for variable kinds of pipe supports.
Using international standards and regulations for mechanical and piping
activities as API, ASME, DIN.
Prepare site surveys, reports and documents for assigned Projects in
accordance with relevant standards.
4. Determine the manpower needed in accordance with available jobs and
relevant to time schedule for each job.
Optimize site modifications in accordance with design requirements.
Proceed Hydro-Test activities.
Proceed pre-commissioning tasks as air blowing, water flushing and steam
blowing in accordance with engineering specifications.
PETROJET The Petroleum Projects and Technical Consultations
company,from January 2006 to May 2009 as a mechanical
construction engineer and shared in the construction of the
following projects :-
Saqqara Onshore Reception- Ras Shouqair
CLIENT : (GUPCO/ BP)
ENGINEERING AND DESIGN: KBR
MAIN CONTRACTOR: Petrojet
Duties included
Erection of the Piping( above/ under) ground.
Steel structures- Fabrication / Erection- (Pipe Racks-Access platforms-
Shelters- Pipe supports)
Erection of the Fire water tank.
Erection of the Equipments ( Vessel (tanks/ towers) - Flare-Air coolers- Oil
heater- Pumps).
Reinstatement for the tested loops
Morgan Receiving Facility -Ras Shouqair
CLIENT : (GUPCO/ BP)
ENGINEERING AND DESIGN: Enppi
MAIN CONTRACTOR: Petrojet
Duties included
Erection of piping , pig receiver,pipe supports and making the TIE IN with
the offshore lines.
New Compression Area Project El Gameel Plant
Power Generation Upgrade project.
Denise "A" project.
3rd
L.T.S project.
4th
L.T.S project.
CLIENT : Belayim Petroleum Company "PETROBEL- Eni"- Port said
ENGINEERING AND DESIGN: Enppi
MAIN CONTRACTOR: Petrojet
Duties included :-
Erection of the Piping( above / under) ground.
5. Steel structures- Fabrication / Erection- (Pipe Racks-Access platforms-
Shelters- Pipe supports).
Erection of the Equipments ( Turbines- Comprsessors – Air Coolers)
Reinstatement and final check for the tested loops.
United Distributors (trading and agencies company). from January
2003 to December 2005 as a Construction, piping,service and
material engineer.
Duties included the installation, erection, commissioning and maintenance of
the following systems:
Fuel Dispensing Pumps -Submersible Pumps-High flow rate Pumps- ATG
(Automatic Tank Gauging)systems-MLLD (Mechanical Line Leak
Detection)systems- Pump Controllers- ALLD (Automatic Line Leak
Detection)systems .
Erecting the sites under and above ground piping - Loading arms-Hoses-
Nozzles. Installed equipments (Fuel Dispensing Pumps- Submersible Pumps-
Automatic Tank Gauging systems….etc.) for clients as Exxon Mobil-Shell-
Cheveron- Emarat Misr- Watanya- CO-OP- Misr Petroleum.
The Egyptian International company from January 2002 to December 2002
as a mechanical piping engineer duties included fabrication and erection for
above and under ground piping systems for clients as Gupco, Eni and bp .
Courses & Training :-
Design of Plumbing Systems (syndicate of engineering) september 2012.
API (American petroleum institute) Q1-E8 specs at Petrojet Company by Moody
international.
General English program at the British council Helioplis from the first of 2005 till
the end of 2006.
Administration and Communication skills program at the Career Development and
Consultations Academy (CDC) at May 2007.
Design and Selection of Fluid Power Pumps and Motors at the American University
in Cairo (AUC) at June 2007.
Computer Skills: -
Operating Systems (Win98-Win2000-WinXP)
Fully Package of Microsoft office (Word-Excel-Access-Power point).
AutoCAD.
Adobe Photo Shop.
Internet Skills.
Language: -
Arabic: mother tongue.
English: fluent (Certified British Council courses)
German: fair.
6. Personal Data:-
Date of birth: 28th, June 1978.
Place of birth: Cairo.
Nationality: Egyptian.
Martial status: Married and have two kids.
Address: 7 EL- Horya Street, EL-Matarya, Cairo.
Military status: Completed.
Skills: -
Presentation: Developed ability to produce reports and presentations to a professional
standard.
Organizational: Effective at time management and prioritizing tasks to achieve deadlines.
Interpersonal/Communication: Strong team working, leadership and communication
skills.
Educational Details: -
1993-1996 High school (91%) Ibn Khaldoon Secondary School.
1996-2001 Helwan University – Faculty of Engineering – EL- Matarya.
Mechanical Power Engineering Dept. Accumulative (final) Grade (B.Sc.Pass).
Graduation Project: - Investigation of the Effect of Blade Angles and Different Inlet
Straighteners on Fan Performance.
Grade: - Excellent.
Final year Grade: - Good.
Training Experience : -
Cairo North combined Power Station.
Shoubra Steam Power station.
Cairo West combined Power Station.
References and copies of all certificates are available upon request