SlideShare a Scribd company logo
1 of 10
First / Name : Muhammad
Surveyinspector.muhammad@gmail.com /
mahar_amjadlak@hotmail.com
Family / Surname : Amjad
Date of Birth
Passport NO
:
:
09-04-1983
AD 1281443
00966580667473 / 00923007565840
Nationality : Pakistan
Profession
Driving License
:
:
Senior Survey Inspector / Land Surveyor
International Driving License ,( UAE, KSA , Pakistan )
Educational Background : Diploma In Civil Engineering. Govt. College Technology Rasul
: Skills:
Excellent Knowledge of all types of survey instruments using & application e.g.
all type of total station, GPS.
Like a, SOKKIA SET 2010, SET 2030, 510, 1205, 1205, 405, 407, 705, 530,
231, 230, 600,
Expert , NIKON, SET 305, 354, 362, 302,
Expert, TRIMBLE, SET 3600, 3303 etc. +Topcon Instrument. GPS etc.
Expert, Autocad2008.
Basic, Dos, Word perfect, Microsoft Word, Microsoft Excel.
Computer Skills:
Auto -Cad, MS Office, Internet & E-mail applications
Language(s) known : English & Arabic
Summary of Experiences : Senior qualified and experienced Engineering Professional with 15 years
Progressive experience. Expertise in all type of survey, building works Road
works, and Pipe lines works, Seeking assignments in land surveyor with a
reputed organisation preferably in roads, infrastructure and construction industry.
Instruments using total station, GPS, auto level and site management.
Expertise in leveling and setting out horizontal and vertical alignment of roads,
cent reline and re routing of pipeline e.g, sewage, storm water and water supply.
Well versed with architectural & structural drawings exposure in calculating
levels for roads, sewage, storm water irrigation and water supply.
Manage and direct all activities of the survey department.prepare progress report
to project manager.
Schedules survey crews.Establishes and maintain survey crew and technicians
procedure to ensure efficient and productive performance and accurate survey
data transfer to design section.
I've more than 15 years experience an exposure in Water Reservoirs Roads
Bridge, Towers, Building Groups, Crude Oil Pipeline projects, Infrastructure Civil
Oil and Gas Industries. I've made numerous contribution to my previous and
present employer that have gained me professional experience at different
Projects i.e. high rise Towers Crude Oil Pipeline Projects, G L Noble
Denton(Third Party Inspection) and presently working with Dubai Engineering
Consulting Company Jeddah Saudi Arabia.
Page 1 of 9
Details of Experiences:
Company :
‫زززز‬‫ززز‬‫زززززززززز‬‫زززززززز‬
Period :
From: 01 04 2016
To Present
Position : Sr Survey Inspector / Civil Inspector
Project Description : ADMINISTRATIVE COURT JEDDAH SAUDI ARAB
OWNER MINISTRY OF FINANCE
: Project Items: - Sewerage network,
storm water network, Potable Water network, irrigation network Electricity network,
Telephone network, Roads and earthworks, pump stations, and landscape.
Supervise the standard of work being performed and derive the necessary field
calculations from work completed.
Revise the work of the survey crew, evaluate priorities and coordinate and organize the
work efforts.
Supervise the maintenance of instruments and equipment.
Ensure that angles, distances, and other collected information is accurate and conforms to
regulations and standards.
Consult with computer operators and assist the final production of work performed.
Research previous survey evidence maps, deeds, physical evidence, and other records to
obtain data needed for surveys.
Determine methods and procedures for establishing or reestablishing survey control.
Keep accurate notes, records, and sketches to describe work performed.
Complete daily logs and collect and review survey crews’ weekly timesheets and expense
reports.
Establish fixed points for use in making maps, using geodetic and engineering
instruments.
Provide oversight of survey activities by the design & build contractor.
Verify the accuracy of survey data including measurements and calculations conducted at
survey sites.
Record the results of surveys including the shape, contour, location, elevation, and
dimensions of land or land features.
Develop criteria for survey methods and procedures.
Details of Experiences:
Period
From: 31.10.2012
to 19.03.2016
Company
Position
Project Description
:
:
:
:
Al MUHAIDIB CONTRACTING
Sr.Surveyor
STRATEGIC RESERVOIR AT BRIMAN JEDDAH CITY SAUDI ARABIA
A USD 205 strategic civil engineering project for the National
Water Company (NWC) comprising the construction of 11 post
tensioned concrete tanks measuring 120m in diameter and 18m
high with 2 million m3 of combined potable water storage
capacity.
Briman Strategic Reservoir providing engineering construction
Page 2 of 9
Functions &
Responsibilities
services for the National Water Company. This project
constructs 2.0 million cubic meters of water storage in circular
post-tensioned concrete tanks to provide water security for the
City of Jeddah. The project has been listed as the Guinness
World Record for water storage facilities
Keep detailed and accurate records of crew activities,
During my tenure in the Company I was responsible for the
following task and Responsibilities:
Responding immediately to sub-contractors clarification on
drawings/ design deficiencies and monitoring the work
accordingly. Making daily reports, Bi-weekly forecast schedule of
site activities, manpower, equipment’s etc. and monitoring
weekly progress of the project accordingly
Responsible for the site checking ground levels & utilities.
Responsible for the layout & stakeout for drainage by the total
station.
Responsible for the as-built work for the final invoice.
Responsible for the coordination with consultant for the site
inspection
Pressure water line ,
Line layout , Deflection angle ,Chambers steel ( Butterfly valve
chamber , Air release valve chamber , Wash out valve chamber
and Elbows )
Daily & monthly work progress report submitted to the project
engineer
Responsible for any type of correction / modification made in the
Drawings as per requirement at site has to notify the same in
As-Built drawings
Responsible from project inception up to final handing over of
site
Prepare running & final bills of contactors
Check shuttering of columns & Roofs Check steel bars
according to drawings
Managing 4 surveying teams survey data. Study operational
problems and recommend changes. Report on events and
activities which may affect operations. Review blueprints and
legal deeds to survey areas in detail Monitoring and setting out
marine work. setting out of center line for Road works,.Setting
out of box culverts, pipe culverts and slab culverts.To Establish
Main Control Points With GPS FC200 Top Con, System of Using
Rtk Survey Technique.Stake out R.O.W (Right Of Way) With
GPS. To Stake out Center Line for Pipe Line by Total Station.
Calculating All Stakes out Data for R.O.W, Pipe Center Line And
For Haul Road. Making Traverse for Primary Control Points.
Lying Of Control Points along Trench (By Traversing). Receiving
Of Trench from Sub Contractor According To Specification
&Design.To Handle All Matters Related With Survey.Supervise
All Survey Activities & Fix Duties Of Survey Team Making All
Scope. Drawings, Cross Sections and Cut / Fill Quantities of
Haul by auto cad2015.
Provides technical and administrative support for the Land
surveying teams.
Page 3 of 9
Checking the site survey work using the new technology survey
instruments such as Total Station, auto level machine, GPS and
other relevant instruments.
Checking and Preparing all required drawings.
Follow up with consultant, surveying teams and site engineers.
Supervise subordinate staff and actively participates in all survey
&
setting out activities on site as required.
The equipments are calibrated as required and maintained in
good working condition.
Period
From: 24.06.2011
to 22.09.2012
Company : GERMANISCHER LLOYD Industrial Services
Position : TPI – Third party/ PMT Member, Senior Survey Inspector,
Inspection Engineer.
Abu Dhabi Crude Oil Pipeline (ADCOP) Project
Project Description
Functions &
Responsibilities
:
The United Arab Emirates (UAE) authorities assigned
International Petroleum Investment Co. (IPIC) to execute the
Abu Dhabi Crude Oil Pipeline (ADCOP) project which will
facilitate transferring 05~1.5 MMBBLD (1.8 MMBPD with DRA
injection) of crude oil from Habshan production facilities to
Fujairah main oil terminal (MOT)approximately 404 km.
Scope of works at MPS,IPS & MOT Stations are on following
areas: -
Administration building, Workshop Building, Control Building,
Substation building, Clinic Building, Chemical Storage building,
Fire station building, Fire Water Pump House, MOL Pumping
station, PIG Launcher & Receiver Foundations, Anchor Blocks,
Oscillating Monitoring Platform, Buffer Tank Foundation, Pipe
Sleepers Footings, Irrigation Storage Tank Foundation, Utility
water tank Foundation, Fire water tank foundation, Surge Relief
tank foundation, Diesel tank foundation, Pressure Surge Vessel
foundation, Treated Water Pump Foundation, CPI Separator
Foundation, Oil Drain Collection vessel Foundation, Septic Tank
Foundation, Radio Tower (80m) & CCTV Tower (30m),
Installation of Fence, Catch basins, Manholes and Fire Water
Valve Pits, Road works etc.
Checking the Inspection of above activities in every stage of
construction right from Sub-Structure to Super-Structure in
accordance to the approved Construction Drawings and Project
Quality Plan.
Review Method Statements, (ITP) Inspection test plan and
Check lists As per ADCO and Shell dept Standards and
Specifications.
Inspection of materials receiving at site according to project
specifications.
Checking Survey work such as Level and coordinates as per
reference drawings.
Layout Pipe sleeper, Foundations, Anchor bolt, Bend wall, Tank,
Earth bum, Footing, Culverts, Duck Bank, Road Ramp,
Mechanical structure, Pump stations, Control Room, Pipe
Support, Firefighting, Drain, Path way.
Review MRB for Pre-commissioning and also Making Punch list
of each item for finalizing and Handing over the Project.
Submitting daily/weekly/ Monthly reports.
Page 4 of 9
Raise Non conformance Reports (NCRs) and Site Quality Notice
(SQN), when activities deviate from the Contract specifications
or normal construction industry practices.
Senior Surveyor Inspector (UAE) with proven experience in
project management of major engineering works both during
design and construction involving building, structural, landscape
and infrastructure.
Plans, organizes and directs work of one or more survey parties
engaged in surveying projects/ building/ structures, to determine
precise location and measurements of points, elevation, lines,
areas and contours for construction, land division and titles.
Controls accuracy of all the survey operations carried out on the
projects by survey teams of the contactors.
Coordinates finding with work engineering and architectural
personnel, clients and the others concerned with the project.
Ensure full inspection to specification
coordinate and supervise all change to suit site requirements
and /or design changes
Check and coordinate full project building and infrastructure
setting out.
Have a good experience in building and infrastructure projects.
Make As built for existing Road and all services and building
Make shop drawing for all water, sewer, irrigation, Eitc-du, HV,
LV, Road profile, spot level, duct crossings and street light, child
water
Achievements Accomplished Accident free status throughout the
period of Construction of 6kms long Runway, Taxi Bay,
Passenger Terminal Building along with other Ancillary buildings
Electrical
Substation, HV,MV, LV, Ducts, Storm Water, Sewerage,
Irrigation Line and a 22kms long three Carriage way Dual Lane
Road as per Design and Approved Drawings.
Period
From: 01-03-2010
to 23 06 2011
Company
: MAMMUT TECHNOCRETE
Position : LAND SURVEYOR & QC SUPERVISOR
Project Description : EMIRATI HOUSING COMMUNITY PROJECTS 600 VILLAS IN YAS ISLAND
ABU DHABI
Functions &
Responsibilities
: Setting out buildings and levelling.
Co-ordination to consultant Engineer regarding site situation.
Setting out the pipeline & other structures included in the scope
according to the reference points established by the co and
directed by the Engineer for the approval of the same by
Engineer/Owner prior to the commencement of the works.
All type of setting out and levelling the Road works (all type of
curves, horizontal and vertical curves).
All type of calculations, slope and curve.
Fixing of benchmarks & traversing.
Checking of profile, cross section etc.
My responsibilities, preparing work program and follow
subcontractors as per drawing coordination. Layout of palace
project Topographic survey, Control on piles coordinates. Check
sub contractor forcoordination and match all coordinates of
Sewerage drainage, storm water works as per road Map and
site plan.
Page 5 of 9
Handling the job of Earthwork, Road pavement,Structure
service, Site Supervision, Design of Sewerage House
Connection, Drainage and Sewerage pipeline and all kind of
survey Work.
Coordinating With the engineers, managers, project Consultant
and other regarding technicalqueries, clarification and problems
faced in the various stages of project implementation.
Coordinating with the CAD Department regarding shop drawings
approvals.etc.
Period
From
14-06-2009
05-02-2010
Company : Group 3 Engineers Contractors L.L.C. ABU DHABI (U.A.E)
Position : LAND SURVEYOR
Project Description : As a Land Surveyor at N.B.D Bank Tower (4B+G+3P+48 F) at Salam
Street Abu Dhabi
Client Emirates National Investment (ENI)
Consultant Design & Architectural Bureau (DAR)
Functions &
Responsibilities
: Setting out as per coordinate.
Coordinating with existing underground infrastructure and
service in the zones for the purpose of trail excavation.
Setting out & other structures included in the scope according to
the reference points established by the co and directed by the
Engineer for the approval of the same by Engineer/ Owner prior
to the commencement of the works.
Setting out the building & other structures included in the scope
according to the reference points and coordinates,established by
the co and directed by the Engineer for the approval of the same
by Engineer / Owner prior to the commencement of the works.
Execute RE directives to establish coordinates / benchmarks
and ensure the survey activities are in compliance with contract
technical requirements.
Ensure that all personnel engaged on setting out have adequate
training, are using standard methods to indicate the information,
and are monitoring construction based on that information.
Arrange for routine spot checks on work and records. Maintain
all instruments on the contract, and ensure a log book is kept to
record on / off hire.
Identification and tracking of survey instruments and its
calibration status.
Maintaining necessary records/ files (setting out books are
properly¬maintained and filed when complete.
Updating main control for line / level and issuing of latest
information whenever required.
Period
From: 01-03-2007
30-04-2009
Company : OGER Dubai LLC. United Arab Emirates ( U.A.E )
Position : LAND SURVEYOR
Project Description : at Churchill Towers Site (3B+G+3P+42F+56F) at Dubai
Business Bay,
Client Emirates National Investment (ENI)
Consultant Design & Architectural Bureau (DAR)
Project Churchill Towers 42/56 Commercial &
Residential Tower
Page 6 of 9
Functions &
Responsibilities
Providing level data and setting out lines.
Conducting engineering checks on all elements.
Completing relevant inspections & checks as request by
Engineer.
Ensuring the calibration of all survey instruments.
Carrying out complete survey work for project construction.
Performing construction surveys to establish lines and grades
within the construction site.
Performing property boundary surveys, providing topographic
surveys of construction site areas.
Providing surveys of underground pipes and other facilities.
Providing calculations and records in support of all survey
activities.
Coordination surveys with construction execution to expedite the
job.
Coordinating with existing underground infrastructure and
service in the zones for the purpose of trail excavation.
Arrange for routine spot checks on work and records.Maintain all
instruments on¬ the contract, and ensure a log book is kept to
record on / off hire.
Identification and tracking of survey instruments and its
calibration status.
Period
From:
01-02-2005
28-05-2006
Company : HAJI NOOR ENGINEERING & CONTRACTING ( Pvt.) LTD
Position : LAND SURVEYOR
Project Description : Hostel Building in Islamabad sports complex pakistan
Functions &
Responsibilities
: Traversing of control points to maintain networks of survey
control points.
Run and establish benchmarks for control point’s purposes.
Perform topographic survey to check shape, contour, location
and elevation related to project site and construction.
Responsible for processing of as built surveys on excavation &
primary lining.
Handling the job of Earthwork, Road pavement, Structure
service,Site Supervision,Design of Sewerage House
Connection, Drainage and Sewerage pipeline and all kind of
survey Work.
Coordinating With the engineers, managers, project Consultant
and other regarding technical queries, clarification and problems
faced in the various stages of project implementation.
Coordinating with the CAD Department regarding shop drawings
approvals.etc.
As-Built, Settlement Surveys Project Reports.
Performed section break downs and boundary surveys.
Locating of Control points through coordinate method (Northing,
Easting and Elevations)
Locating of benchmarks and leveling for Elevations.
Locating of median or center line of roadway 25m. Interval by
means of total stations.
Staking and leveling for (a). Layer by layer for embankment (b).
Bottom and top of sub-grade
Base course using sensor as string guide for paver.
Dealing with the surveyor consultant for work requests.
Page 7 of 9
(Receiving for item sub-grade and aggregate base course,
checking of elevation for each item)
Site Survey control establishment both Vertical & Horizontal,
High Quality Computer-Aided Drafting & Reporting,
Period
From: 03-05-2002
01-01-2005
Company : NATIONAL ENGINEERING SERVICES PAKISTAN.(CONSULTANT.NESPAK)
Position : Survey Inspector
Project Description : N.H.A Head Office Building with different Projects.
Extension of Super Highway to Motorway M-9 Project
1x46 MW Nishat Coal Based Captive Power Plant
1180 MW RLNG Based Combined Cycle Power Plant
Lake City Housing Scheme, Bella Vista Phase-I Lahore
Functions &
Responsibilities
: Setting out as per coordinate.
Coordinating with existing underground infrastructure and
service in the zones for the purpose of trail excavation.
Preparation & Co-ordinations of layouts and longitudinal profiles
for approval of the pipe routing by the DMW.
Setting out the pipeline & other structures included in the scope
Setting out the building & other structures included in the scope
according to the reference points and coordinates, established
by the co and directed by the Engineer for the approval of the
same by
Layout of roads centerline (curves straight)
Observations of Cross- Sections.
Plotting of cross-sections and Earthwork volume.
Calculating and fixing of slopes-stakes.
Fixing of sensor wore for asphalt work.
Calculating and fixing of invert level of Drainage and Sewer
pipelines.
Handling of all survey work for super structure, finishing of
internal elevations and land escaping.
Supervise the sewerage lines and preparation of parking areas.
Checking layout of sewerage lines, Storm water lines, and
Potable water.
Checking layout for Electrical cables and Trenches and their
Levels.
Supervision of all road works, Related with Survey and
landscape work.
Supervision of Infrastructure work.
Checking R.F.I related with survey activities.
Checking NGLs, excavation, invert, PCC, cover levels and
layout. Irrigation water tank with pumps station & Electrical
substations.
Represent the Engineer of Record, Checking and Approving of
Submittals on Land Survey Work.
Review and Approval of all Layout Drawings, Furthermore
ensuring the Quality of as per Method Statement, and approve
the same as per Supplier's Material Technical Submittals.
Check sub contractor for coordination and match all coordinates
of Sewerage drainage, storm water works as per road Map and
site plan.
Page 8 of 9
Page 9 of 9
Page 9 of 9

More Related Content

What's hot

CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huuhuu ho
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)Dr Orhan Degermenci
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)James Herrmann
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 
Amended CV of Eng. Ibrahim A.A. march 2015
Amended CV of Eng. Ibrahim A.A.   march 2015Amended CV of Eng. Ibrahim A.A.   march 2015
Amended CV of Eng. Ibrahim A.A. march 2015Ibrahim Consultant
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6Mujahid Ali Akhtar
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015Mohd Murtaza
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000daniel cobar
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018SanjuBK
 

What's hot (20)

CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huu
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Amended CV of Eng. Ibrahim A.A. march 2015
Amended CV of Eng. Ibrahim A.A.   march 2015Amended CV of Eng. Ibrahim A.A.   march 2015
Amended CV of Eng. Ibrahim A.A. march 2015
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
New Resume
New ResumeNew Resume
New Resume
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018
 

Viewers also liked

Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCkhursheed aiam
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorsalimmalic
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016Kirana Devasya
 
senior painting-coating-insulation inspector 2016
senior painting-coating-insulation  inspector 2016senior painting-coating-insulation  inspector 2016
senior painting-coating-insulation inspector 2016mostafa mohamed
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last updateMomen Mohamed
 

Viewers also liked (8)

Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
Updated CV - KVRao, Revised
Updated CV - KVRao, RevisedUpdated CV - KVRao, Revised
Updated CV - KVRao, Revised
 
resum Humaun latest1
resum Humaun latest1resum Humaun latest1
resum Humaun latest1
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16Randall McKnight Resume 1-15-16
Randall McKnight Resume 1-15-16
 
senior painting-coating-insulation inspector 2016
senior painting-coating-insulation  inspector 2016senior painting-coating-insulation  inspector 2016
senior painting-coating-insulation inspector 2016
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 

Similar to Amjad survey inspector

Similar to Amjad survey inspector (20)

ENGLISH
ENGLISH ENGLISH
ENGLISH
 
CV
CVCV
CV
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
Rahman cv
Rahman cvRahman cv
Rahman cv
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
r_1
r_1r_1
r_1
 
Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014Hazem Ouda CV 03 2014
Hazem Ouda CV 03 2014
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Mahendran resume updated
Mahendran resume updated Mahendran resume updated
Mahendran resume updated
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 

Recently uploaded

Situational Questions for Team Leader Interviews in BPO with Sample Answers
Situational Questions for Team Leader Interviews in BPO with Sample AnswersSituational Questions for Team Leader Interviews in BPO with Sample Answers
Situational Questions for Team Leader Interviews in BPO with Sample AnswersHireQuotient
 
Intern Welcome LinkedIn Periodical (1).pdf
Intern Welcome LinkedIn Periodical (1).pdfIntern Welcome LinkedIn Periodical (1).pdf
Intern Welcome LinkedIn Periodical (1).pdfmarketing659039
 
Austin Recruiter Network Meeting April 25, 2024
Austin Recruiter Network Meeting April 25, 2024Austin Recruiter Network Meeting April 25, 2024
Austin Recruiter Network Meeting April 25, 2024Dan Medlin
 
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 GurgaonCheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 GurgaonDelhi Call girls
 
Employee Roles & Responsibilities: Driving Organizational Success
Employee Roles & Responsibilities: Driving Organizational SuccessEmployee Roles & Responsibilities: Driving Organizational Success
Employee Roles & Responsibilities: Driving Organizational SuccessHireQuotient
 
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Advantages of Human Resource Management System
Advantages of Human Resource Management SystemAdvantages of Human Resource Management System
Advantages of Human Resource Management SystemHireQuotient
 
The Great American Payday Prepare for a (Relatively) Bumpy Ride.pdf
The Great American Payday Prepare for a (Relatively) Bumpy Ride.pdfThe Great American Payday Prepare for a (Relatively) Bumpy Ride.pdf
The Great American Payday Prepare for a (Relatively) Bumpy Ride.pdfJasper Colin
 
Copy of Periodical - Employee Spotlight (8).pdf
Copy of Periodical - Employee Spotlight (8).pdfCopy of Periodical - Employee Spotlight (8).pdf
Copy of Periodical - Employee Spotlight (8).pdfmarketing659039
 
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...makika9823
 
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...PayScale, Inc.
 
Creative Director vs. Design Director: Key Differences for Recruiters
Creative Director vs. Design Director: Key Differences for RecruitersCreative Director vs. Design Director: Key Differences for Recruiters
Creative Director vs. Design Director: Key Differences for RecruitersHireQuotient
 
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Employee Engagement Trend Analysis.pptx.
Employee Engagement Trend Analysis.pptx.Employee Engagement Trend Analysis.pptx.
Employee Engagement Trend Analysis.pptx.ShrayasiRoy
 
How Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsHow Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsDavid Green
 
Ways to Make the Most of Temporary Part Time Jobs
Ways to Make the Most of Temporary Part Time JobsWays to Make the Most of Temporary Part Time Jobs
Ways to Make the Most of Temporary Part Time JobsSnapJob
 
Intern Exit Interview Questions and Answers
Intern Exit Interview Questions and AnswersIntern Exit Interview Questions and Answers
Intern Exit Interview Questions and AnswersHireQuotient
 

Recently uploaded (19)

Situational Questions for Team Leader Interviews in BPO with Sample Answers
Situational Questions for Team Leader Interviews in BPO with Sample AnswersSituational Questions for Team Leader Interviews in BPO with Sample Answers
Situational Questions for Team Leader Interviews in BPO with Sample Answers
 
Intern Welcome LinkedIn Periodical (1).pdf
Intern Welcome LinkedIn Periodical (1).pdfIntern Welcome LinkedIn Periodical (1).pdf
Intern Welcome LinkedIn Periodical (1).pdf
 
9953330565 Low Rate Call Girls In Vijay Nagar Delhi NCR
9953330565 Low Rate Call Girls In Vijay Nagar Delhi NCR9953330565 Low Rate Call Girls In Vijay Nagar Delhi NCR
9953330565 Low Rate Call Girls In Vijay Nagar Delhi NCR
 
Austin Recruiter Network Meeting April 25, 2024
Austin Recruiter Network Meeting April 25, 2024Austin Recruiter Network Meeting April 25, 2024
Austin Recruiter Network Meeting April 25, 2024
 
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 GurgaonCheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 29 Gurgaon
 
Employee Roles & Responsibilities: Driving Organizational Success
Employee Roles & Responsibilities: Driving Organizational SuccessEmployee Roles & Responsibilities: Driving Organizational Success
Employee Roles & Responsibilities: Driving Organizational Success
 
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Komal 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Komal 💚😋 9256729539 🚀 Indore Escorts
 
Advantages of Human Resource Management System
Advantages of Human Resource Management SystemAdvantages of Human Resource Management System
Advantages of Human Resource Management System
 
The Great American Payday Prepare for a (Relatively) Bumpy Ride.pdf
The Great American Payday Prepare for a (Relatively) Bumpy Ride.pdfThe Great American Payday Prepare for a (Relatively) Bumpy Ride.pdf
The Great American Payday Prepare for a (Relatively) Bumpy Ride.pdf
 
escort service sasti (*~Call Girls in Rajender Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Rajender Nagar Metro❤️9953056974escort service sasti (*~Call Girls in Rajender Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Rajender Nagar Metro❤️9953056974
 
Copy of Periodical - Employee Spotlight (8).pdf
Copy of Periodical - Employee Spotlight (8).pdfCopy of Periodical - Employee Spotlight (8).pdf
Copy of Periodical - Employee Spotlight (8).pdf
 
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
Escorts in Lucknow 9548273370 WhatsApp visit your hotel or office Independent...
 
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
Webinar - Payscale Innovation Unleashed: New features and data evolving the c...
 
Creative Director vs. Design Director: Key Differences for Recruiters
Creative Director vs. Design Director: Key Differences for RecruitersCreative Director vs. Design Director: Key Differences for Recruiters
Creative Director vs. Design Director: Key Differences for Recruiters
 
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Keshav Puram Delhi reach out to us at 🔝8264348440🔝
 
Employee Engagement Trend Analysis.pptx.
Employee Engagement Trend Analysis.pptx.Employee Engagement Trend Analysis.pptx.
Employee Engagement Trend Analysis.pptx.
 
How Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People AnalyticsHow Leading Companies Deliver Value with People Analytics
How Leading Companies Deliver Value with People Analytics
 
Ways to Make the Most of Temporary Part Time Jobs
Ways to Make the Most of Temporary Part Time JobsWays to Make the Most of Temporary Part Time Jobs
Ways to Make the Most of Temporary Part Time Jobs
 
Intern Exit Interview Questions and Answers
Intern Exit Interview Questions and AnswersIntern Exit Interview Questions and Answers
Intern Exit Interview Questions and Answers
 

Amjad survey inspector

  • 1. First / Name : Muhammad Surveyinspector.muhammad@gmail.com / mahar_amjadlak@hotmail.com Family / Surname : Amjad Date of Birth Passport NO : : 09-04-1983 AD 1281443 00966580667473 / 00923007565840 Nationality : Pakistan Profession Driving License : : Senior Survey Inspector / Land Surveyor International Driving License ,( UAE, KSA , Pakistan ) Educational Background : Diploma In Civil Engineering. Govt. College Technology Rasul : Skills: Excellent Knowledge of all types of survey instruments using & application e.g. all type of total station, GPS. Like a, SOKKIA SET 2010, SET 2030, 510, 1205, 1205, 405, 407, 705, 530, 231, 230, 600, Expert , NIKON, SET 305, 354, 362, 302, Expert, TRIMBLE, SET 3600, 3303 etc. +Topcon Instrument. GPS etc. Expert, Autocad2008. Basic, Dos, Word perfect, Microsoft Word, Microsoft Excel. Computer Skills: Auto -Cad, MS Office, Internet & E-mail applications Language(s) known : English & Arabic Summary of Experiences : Senior qualified and experienced Engineering Professional with 15 years Progressive experience. Expertise in all type of survey, building works Road works, and Pipe lines works, Seeking assignments in land surveyor with a reputed organisation preferably in roads, infrastructure and construction industry. Instruments using total station, GPS, auto level and site management. Expertise in leveling and setting out horizontal and vertical alignment of roads, cent reline and re routing of pipeline e.g, sewage, storm water and water supply. Well versed with architectural & structural drawings exposure in calculating levels for roads, sewage, storm water irrigation and water supply. Manage and direct all activities of the survey department.prepare progress report to project manager. Schedules survey crews.Establishes and maintain survey crew and technicians procedure to ensure efficient and productive performance and accurate survey data transfer to design section. I've more than 15 years experience an exposure in Water Reservoirs Roads Bridge, Towers, Building Groups, Crude Oil Pipeline projects, Infrastructure Civil Oil and Gas Industries. I've made numerous contribution to my previous and present employer that have gained me professional experience at different Projects i.e. high rise Towers Crude Oil Pipeline Projects, G L Noble Denton(Third Party Inspection) and presently working with Dubai Engineering Consulting Company Jeddah Saudi Arabia. Page 1 of 9
  • 2. Details of Experiences: Company : ‫زززز‬‫ززز‬‫زززززززززز‬‫زززززززز‬ Period : From: 01 04 2016 To Present Position : Sr Survey Inspector / Civil Inspector Project Description : ADMINISTRATIVE COURT JEDDAH SAUDI ARAB OWNER MINISTRY OF FINANCE : Project Items: - Sewerage network, storm water network, Potable Water network, irrigation network Electricity network, Telephone network, Roads and earthworks, pump stations, and landscape. Supervise the standard of work being performed and derive the necessary field calculations from work completed. Revise the work of the survey crew, evaluate priorities and coordinate and organize the work efforts. Supervise the maintenance of instruments and equipment. Ensure that angles, distances, and other collected information is accurate and conforms to regulations and standards. Consult with computer operators and assist the final production of work performed. Research previous survey evidence maps, deeds, physical evidence, and other records to obtain data needed for surveys. Determine methods and procedures for establishing or reestablishing survey control. Keep accurate notes, records, and sketches to describe work performed. Complete daily logs and collect and review survey crews’ weekly timesheets and expense reports. Establish fixed points for use in making maps, using geodetic and engineering instruments. Provide oversight of survey activities by the design & build contractor. Verify the accuracy of survey data including measurements and calculations conducted at survey sites. Record the results of surveys including the shape, contour, location, elevation, and dimensions of land or land features. Develop criteria for survey methods and procedures. Details of Experiences: Period From: 31.10.2012 to 19.03.2016 Company Position Project Description : : : : Al MUHAIDIB CONTRACTING Sr.Surveyor STRATEGIC RESERVOIR AT BRIMAN JEDDAH CITY SAUDI ARABIA A USD 205 strategic civil engineering project for the National Water Company (NWC) comprising the construction of 11 post tensioned concrete tanks measuring 120m in diameter and 18m high with 2 million m3 of combined potable water storage capacity. Briman Strategic Reservoir providing engineering construction Page 2 of 9
  • 3. Functions & Responsibilities services for the National Water Company. This project constructs 2.0 million cubic meters of water storage in circular post-tensioned concrete tanks to provide water security for the City of Jeddah. The project has been listed as the Guinness World Record for water storage facilities Keep detailed and accurate records of crew activities, During my tenure in the Company I was responsible for the following task and Responsibilities: Responding immediately to sub-contractors clarification on drawings/ design deficiencies and monitoring the work accordingly. Making daily reports, Bi-weekly forecast schedule of site activities, manpower, equipment’s etc. and monitoring weekly progress of the project accordingly Responsible for the site checking ground levels & utilities. Responsible for the layout & stakeout for drainage by the total station. Responsible for the as-built work for the final invoice. Responsible for the coordination with consultant for the site inspection Pressure water line , Line layout , Deflection angle ,Chambers steel ( Butterfly valve chamber , Air release valve chamber , Wash out valve chamber and Elbows ) Daily & monthly work progress report submitted to the project engineer Responsible for any type of correction / modification made in the Drawings as per requirement at site has to notify the same in As-Built drawings Responsible from project inception up to final handing over of site Prepare running & final bills of contactors Check shuttering of columns & Roofs Check steel bars according to drawings Managing 4 surveying teams survey data. Study operational problems and recommend changes. Report on events and activities which may affect operations. Review blueprints and legal deeds to survey areas in detail Monitoring and setting out marine work. setting out of center line for Road works,.Setting out of box culverts, pipe culverts and slab culverts.To Establish Main Control Points With GPS FC200 Top Con, System of Using Rtk Survey Technique.Stake out R.O.W (Right Of Way) With GPS. To Stake out Center Line for Pipe Line by Total Station. Calculating All Stakes out Data for R.O.W, Pipe Center Line And For Haul Road. Making Traverse for Primary Control Points. Lying Of Control Points along Trench (By Traversing). Receiving Of Trench from Sub Contractor According To Specification &Design.To Handle All Matters Related With Survey.Supervise All Survey Activities & Fix Duties Of Survey Team Making All Scope. Drawings, Cross Sections and Cut / Fill Quantities of Haul by auto cad2015. Provides technical and administrative support for the Land surveying teams. Page 3 of 9
  • 4. Checking the site survey work using the new technology survey instruments such as Total Station, auto level machine, GPS and other relevant instruments. Checking and Preparing all required drawings. Follow up with consultant, surveying teams and site engineers. Supervise subordinate staff and actively participates in all survey & setting out activities on site as required. The equipments are calibrated as required and maintained in good working condition. Period From: 24.06.2011 to 22.09.2012 Company : GERMANISCHER LLOYD Industrial Services Position : TPI – Third party/ PMT Member, Senior Survey Inspector, Inspection Engineer. Abu Dhabi Crude Oil Pipeline (ADCOP) Project Project Description Functions & Responsibilities : The United Arab Emirates (UAE) authorities assigned International Petroleum Investment Co. (IPIC) to execute the Abu Dhabi Crude Oil Pipeline (ADCOP) project which will facilitate transferring 05~1.5 MMBBLD (1.8 MMBPD with DRA injection) of crude oil from Habshan production facilities to Fujairah main oil terminal (MOT)approximately 404 km. Scope of works at MPS,IPS & MOT Stations are on following areas: - Administration building, Workshop Building, Control Building, Substation building, Clinic Building, Chemical Storage building, Fire station building, Fire Water Pump House, MOL Pumping station, PIG Launcher & Receiver Foundations, Anchor Blocks, Oscillating Monitoring Platform, Buffer Tank Foundation, Pipe Sleepers Footings, Irrigation Storage Tank Foundation, Utility water tank Foundation, Fire water tank foundation, Surge Relief tank foundation, Diesel tank foundation, Pressure Surge Vessel foundation, Treated Water Pump Foundation, CPI Separator Foundation, Oil Drain Collection vessel Foundation, Septic Tank Foundation, Radio Tower (80m) & CCTV Tower (30m), Installation of Fence, Catch basins, Manholes and Fire Water Valve Pits, Road works etc. Checking the Inspection of above activities in every stage of construction right from Sub-Structure to Super-Structure in accordance to the approved Construction Drawings and Project Quality Plan. Review Method Statements, (ITP) Inspection test plan and Check lists As per ADCO and Shell dept Standards and Specifications. Inspection of materials receiving at site according to project specifications. Checking Survey work such as Level and coordinates as per reference drawings. Layout Pipe sleeper, Foundations, Anchor bolt, Bend wall, Tank, Earth bum, Footing, Culverts, Duck Bank, Road Ramp, Mechanical structure, Pump stations, Control Room, Pipe Support, Firefighting, Drain, Path way. Review MRB for Pre-commissioning and also Making Punch list of each item for finalizing and Handing over the Project. Submitting daily/weekly/ Monthly reports. Page 4 of 9
  • 5. Raise Non conformance Reports (NCRs) and Site Quality Notice (SQN), when activities deviate from the Contract specifications or normal construction industry practices. Senior Surveyor Inspector (UAE) with proven experience in project management of major engineering works both during design and construction involving building, structural, landscape and infrastructure. Plans, organizes and directs work of one or more survey parties engaged in surveying projects/ building/ structures, to determine precise location and measurements of points, elevation, lines, areas and contours for construction, land division and titles. Controls accuracy of all the survey operations carried out on the projects by survey teams of the contactors. Coordinates finding with work engineering and architectural personnel, clients and the others concerned with the project. Ensure full inspection to specification coordinate and supervise all change to suit site requirements and /or design changes Check and coordinate full project building and infrastructure setting out. Have a good experience in building and infrastructure projects. Make As built for existing Road and all services and building Make shop drawing for all water, sewer, irrigation, Eitc-du, HV, LV, Road profile, spot level, duct crossings and street light, child water Achievements Accomplished Accident free status throughout the period of Construction of 6kms long Runway, Taxi Bay, Passenger Terminal Building along with other Ancillary buildings Electrical Substation, HV,MV, LV, Ducts, Storm Water, Sewerage, Irrigation Line and a 22kms long three Carriage way Dual Lane Road as per Design and Approved Drawings. Period From: 01-03-2010 to 23 06 2011 Company : MAMMUT TECHNOCRETE Position : LAND SURVEYOR & QC SUPERVISOR Project Description : EMIRATI HOUSING COMMUNITY PROJECTS 600 VILLAS IN YAS ISLAND ABU DHABI Functions & Responsibilities : Setting out buildings and levelling. Co-ordination to consultant Engineer regarding site situation. Setting out the pipeline & other structures included in the scope according to the reference points established by the co and directed by the Engineer for the approval of the same by Engineer/Owner prior to the commencement of the works. All type of setting out and levelling the Road works (all type of curves, horizontal and vertical curves). All type of calculations, slope and curve. Fixing of benchmarks & traversing. Checking of profile, cross section etc. My responsibilities, preparing work program and follow subcontractors as per drawing coordination. Layout of palace project Topographic survey, Control on piles coordinates. Check sub contractor forcoordination and match all coordinates of Sewerage drainage, storm water works as per road Map and site plan. Page 5 of 9
  • 6. Handling the job of Earthwork, Road pavement,Structure service, Site Supervision, Design of Sewerage House Connection, Drainage and Sewerage pipeline and all kind of survey Work. Coordinating With the engineers, managers, project Consultant and other regarding technicalqueries, clarification and problems faced in the various stages of project implementation. Coordinating with the CAD Department regarding shop drawings approvals.etc. Period From 14-06-2009 05-02-2010 Company : Group 3 Engineers Contractors L.L.C. ABU DHABI (U.A.E) Position : LAND SURVEYOR Project Description : As a Land Surveyor at N.B.D Bank Tower (4B+G+3P+48 F) at Salam Street Abu Dhabi Client Emirates National Investment (ENI) Consultant Design & Architectural Bureau (DAR) Functions & Responsibilities : Setting out as per coordinate. Coordinating with existing underground infrastructure and service in the zones for the purpose of trail excavation. Setting out & other structures included in the scope according to the reference points established by the co and directed by the Engineer for the approval of the same by Engineer/ Owner prior to the commencement of the works. Setting out the building & other structures included in the scope according to the reference points and coordinates,established by the co and directed by the Engineer for the approval of the same by Engineer / Owner prior to the commencement of the works. Execute RE directives to establish coordinates / benchmarks and ensure the survey activities are in compliance with contract technical requirements. Ensure that all personnel engaged on setting out have adequate training, are using standard methods to indicate the information, and are monitoring construction based on that information. Arrange for routine spot checks on work and records. Maintain all instruments on the contract, and ensure a log book is kept to record on / off hire. Identification and tracking of survey instruments and its calibration status. Maintaining necessary records/ files (setting out books are properly¬maintained and filed when complete. Updating main control for line / level and issuing of latest information whenever required. Period From: 01-03-2007 30-04-2009 Company : OGER Dubai LLC. United Arab Emirates ( U.A.E ) Position : LAND SURVEYOR Project Description : at Churchill Towers Site (3B+G+3P+42F+56F) at Dubai Business Bay, Client Emirates National Investment (ENI) Consultant Design & Architectural Bureau (DAR) Project Churchill Towers 42/56 Commercial & Residential Tower Page 6 of 9
  • 7. Functions & Responsibilities Providing level data and setting out lines. Conducting engineering checks on all elements. Completing relevant inspections & checks as request by Engineer. Ensuring the calibration of all survey instruments. Carrying out complete survey work for project construction. Performing construction surveys to establish lines and grades within the construction site. Performing property boundary surveys, providing topographic surveys of construction site areas. Providing surveys of underground pipes and other facilities. Providing calculations and records in support of all survey activities. Coordination surveys with construction execution to expedite the job. Coordinating with existing underground infrastructure and service in the zones for the purpose of trail excavation. Arrange for routine spot checks on work and records.Maintain all instruments on¬ the contract, and ensure a log book is kept to record on / off hire. Identification and tracking of survey instruments and its calibration status. Period From: 01-02-2005 28-05-2006 Company : HAJI NOOR ENGINEERING & CONTRACTING ( Pvt.) LTD Position : LAND SURVEYOR Project Description : Hostel Building in Islamabad sports complex pakistan Functions & Responsibilities : Traversing of control points to maintain networks of survey control points. Run and establish benchmarks for control point’s purposes. Perform topographic survey to check shape, contour, location and elevation related to project site and construction. Responsible for processing of as built surveys on excavation & primary lining. Handling the job of Earthwork, Road pavement, Structure service,Site Supervision,Design of Sewerage House Connection, Drainage and Sewerage pipeline and all kind of survey Work. Coordinating With the engineers, managers, project Consultant and other regarding technical queries, clarification and problems faced in the various stages of project implementation. Coordinating with the CAD Department regarding shop drawings approvals.etc. As-Built, Settlement Surveys Project Reports. Performed section break downs and boundary surveys. Locating of Control points through coordinate method (Northing, Easting and Elevations) Locating of benchmarks and leveling for Elevations. Locating of median or center line of roadway 25m. Interval by means of total stations. Staking and leveling for (a). Layer by layer for embankment (b). Bottom and top of sub-grade Base course using sensor as string guide for paver. Dealing with the surveyor consultant for work requests. Page 7 of 9
  • 8. (Receiving for item sub-grade and aggregate base course, checking of elevation for each item) Site Survey control establishment both Vertical & Horizontal, High Quality Computer-Aided Drafting & Reporting, Period From: 03-05-2002 01-01-2005 Company : NATIONAL ENGINEERING SERVICES PAKISTAN.(CONSULTANT.NESPAK) Position : Survey Inspector Project Description : N.H.A Head Office Building with different Projects. Extension of Super Highway to Motorway M-9 Project 1x46 MW Nishat Coal Based Captive Power Plant 1180 MW RLNG Based Combined Cycle Power Plant Lake City Housing Scheme, Bella Vista Phase-I Lahore Functions & Responsibilities : Setting out as per coordinate. Coordinating with existing underground infrastructure and service in the zones for the purpose of trail excavation. Preparation & Co-ordinations of layouts and longitudinal profiles for approval of the pipe routing by the DMW. Setting out the pipeline & other structures included in the scope Setting out the building & other structures included in the scope according to the reference points and coordinates, established by the co and directed by the Engineer for the approval of the same by Layout of roads centerline (curves straight) Observations of Cross- Sections. Plotting of cross-sections and Earthwork volume. Calculating and fixing of slopes-stakes. Fixing of sensor wore for asphalt work. Calculating and fixing of invert level of Drainage and Sewer pipelines. Handling of all survey work for super structure, finishing of internal elevations and land escaping. Supervise the sewerage lines and preparation of parking areas. Checking layout of sewerage lines, Storm water lines, and Potable water. Checking layout for Electrical cables and Trenches and their Levels. Supervision of all road works, Related with Survey and landscape work. Supervision of Infrastructure work. Checking R.F.I related with survey activities. Checking NGLs, excavation, invert, PCC, cover levels and layout. Irrigation water tank with pumps station & Electrical substations. Represent the Engineer of Record, Checking and Approving of Submittals on Land Survey Work. Review and Approval of all Layout Drawings, Furthermore ensuring the Quality of as per Method Statement, and approve the same as per Supplier's Material Technical Submittals. Check sub contractor for coordination and match all coordinates of Sewerage drainage, storm water works as per road Map and site plan. Page 8 of 9