1. Ramesh.pRamesh.p
Cell No UAE +971-501516425
Cell No IND +919843532841
E-Mail:- pramesh71172@gmail.com
Address: - DESCON Engineering Abu Dhabi, UAE.
Pre commissioning &commissioning supervisor
To obtain a position that will enable me to use my strong Operational/
Maintenance skills with educational background, and ability to work well
with people..
Page 1
Father’s Name PALANISAMY
Date of Birth 15-11-1972
Religion Hindu
Passport # F-8089318
Nationality INDIAN,
Material Status MARRIED
Degree Board/University
DIPLOMA IN MECHANICAL
ENGINEER
STATE BOARD,TAMIL NADU-INDIA
Career Objective
Personal Details
Qualification Details
Position Applied For
2. Employer Larsen & Toubro ECC LTD Petrolem Expansion project
Godimoga, Kakinada, Andhara Pradesh India
Contractor Reliance Petroleum Limited
Position Commissioning Field Operator
Duration 7 AUG 2007 to 20 OCT 2009
Employer Brunel India Ltd, Mangala processing unit
Rajasthan
Contractor cairn india
Position Commissioning Field Operator
Duration 14 MAY 2005 to 22 JUN 2007
Page 2
Employer
. DESCON Engineering Ltd. Ruwais Refinery Expasion
project-1340 Takreer AbuDhabi UAE
client
Daewoo Engineering &company
Position Pre commissioning &commissioning Supervisor
Duration 27 FEB 2013 to still Date
Employer DESCON Engineering Ltd. Integrated Gas Development Project-
1335 Habshan-5 Abu Dhabi UAE.
Contractor Japan Gas Corporation Joint Venture with Tecnimont
Client Abu Dhabi Gas Company Limited
Position Commissioning supervisor
Duration 2 JAN 2012 to 29 JAN 2013
.
Employer Nasar Al Hajiri co Ltd Qatar Gas Slphur Recovery Unit
Contractor
Client
Chiyoda &Technip joint venture
Qatar Gas (S R U)
Position Pre commissioning &commissioning supervisor
Duration 25 NOV 2009 to 16 OCT 2011
3. Employer Sam Fire Serivces
ONGC Mumbai High Offshore Rigs &Platform
Contractor Mumbai India Ltd
Position Commissioning Field Operator
Duration 23 DEC 2003 to 18 MAR 2005
Fire Prevention and Fire Fighting
Proficiency in elementary first Aid
ILM – Silver Certificate (International Leadership Management) by ILM,
London from Qatar
Training Institute.
PTSW (PERMIT TO START WORK)
Computer Based Training & Authorized Gas Tester Training
IIF (INCIDENT INJURE FREE)
FLAWLESS STARTUP
Assisting client and company in commissioning and in start-ups.
Carries out routine Inspection, Servicing and minor Maintenance works on
process
equipment’s like pumps, Exchangers, process flow lines, valves ( Manual and
Instrument),
gauges (pressure, TT Etc..) , Instruments Indicators (pressure, flow and TI Etc..),
Capillary
tubes/Plug/Manifolds and also rectifying any gas/oil leaks on these above
instruments.
Inspecting, servicing, isolating, removing, repairing and installing of variety of
equipment
Page 3
ADDITIONAL QUALIFICATION AND TRAINING
Responsibilities
4. including valves, flanges, metering equipment, flow line, flare lines and chemical
Injection lines.
Responsible to direct the maintenance activities and hand over as per PTW
procedure.
Maintaining continuous contact with various areas of the entire plant to keep
overall operating condition.
Trouble shoots plant operations and taken corrective actions to minimum loss of
production.
Alarm monitoring, Fault diagnosis, Malfunction detection system.
Communication, record keeping, reporting.
Coordination with shift in charge and other process operators for smooth
operation.
Coordinating with service departments for preventive, shutdown and breakdown
jobs.
Shutdown &Startup planning, major maintenance programs and plant
modification work
Punch list checks, pumps and drivers run-in test, commissioning Process and
Utility systems.
Having experience in H2S Awareness and handling all types of fire and safety
equipment’s.
Regular patrol and ensure that equipment performance in the designed safe
manner and that
standby spare equipment are available for immediate use if required.
Participating the first intention team for managing emergencies in the plant
Total Productivity Maintenance(TPM), Training and Implementation
JOB PROBILE
GAS PLANT OPERATIONS
GASCO Habsan- 5
Startup and Operations of Condensate stabilization units, Lean gas Compression, Fuel gas
system and Feed gas Compression Unit.
ORTLOFF Co NGL recovery unit including Molecular sieve gas adsorption (Gas/Liquid
dehydration) and Mercury adsorption.
Demethaniser, Cold box, Turbo Expander and Recompressor cryogenic system.
Propane refrigeration, Residue gas compression and regeneration gas compression
system.
Page 4
5. Sour water treatment Unit start up, shutdown of Clean and Dirty sour water units,
Operations
of flash gas compressor, Pumps and Heat exchangers.
Highly skilled in startup, Trouble shooting and shutdown activities of Centrifugal
compressors
(Motor operated and Steam turbine).
Flare system (Acid, Hydrocarbon and Low temperature flare) commissioning, startup and
operations including flame front generator and vapor recovery package.
GAS AUTHORITY OF INDIA GAIL (INDIA) LTD, PATA
LPG Recovery Plant designed to process 12 MMSCMD of natural gas to produce 258250 TPA
of
LPG cryogenic turbo expansion process
Job role including start up and Operations of the below equipment’s and Units
Feed gas compressor
Gas Drying and regeneration section.
C2/C3 Recovery
Propane Refrigerants
Gas expansion section. (Turbo-expander – make – Atlas Cop co rot flow)
Furnace operations
Propane Unloading and Transfer Operation
REFINERY OPERATIONS
Reliance Industries.
Worked in MAB and Wet gas Compressor Section
Startup, Operation and Shutdown activities of Main Air Blower(Elliot Ebara Compressor)
Startup, Operation and Shutdown activities of Wet Gas Compressor(Elliot Ebara
Compressor)
Maintaining continuous contact with various areas of the entire plant to keep overall
operating
condition.
Trouble shoots plant operations and taken corrective actions to minimum loss of production.
Alarm monitoring, Fault diagnosis, Malfunction detection system.
Communication, record keeping, reporting.
Coordination with shift in charge and other process operators for smooth operation.
Page 5
6. Coordinating with service departments for preventive, shutdown and breakdown jobs.
Shutdown &Startup planning, major maintenance programs and plant modification work
UTILITIES OPERATIONS
Worked in Oxygen and chlorine-dioxide plant, Vapor Absorption Refrigeration system
Production of Oxygen using Pressure Swing Adsorption method Capacity : 4000 NM3/HR
Production of Chlorine dioxide Plant of Capacity : 20 TPD
Vapor Absorption chiller-4 No’s of 550 Tons of Refrigerants
Worked in ABB DCS system
Attended Factories Acceptance Test in ABB India Ltd,Bangalore
Undergone ADVANCED PROCESS CONTROL(APC) Training in YOKOGAWA India Ltd,
Bangalore
As a Team Leader Successfully Implemented APC resulted in Increased in production and
decrease in chemical Consumptions
Air Compressor Operations for Instrument air, Cooling water Towers and Pumps
Operations of Water treatment plants, Sand Filters, Ion Exchange Water treatment Plants.
Laboratory analysis of all types of chemicals and water analysis.
PRE-COMMISSIONING:
Leak testing, All type of cleaning, Steam and Oil flushing, Air blowing, Chemical cleaning,
Tightness
test, card-board blasting, Testing of Gasket. All vessels hydrostatic testing, Pipe line testing,
Inter-lock
checking, PCV stoke checking, Prepare all utility facility like-Instrument air and plant air,
Service
water, Cooling water system, Fuel Gas system, Sewer and Drainage system.
COMMISSIONING :
o Blind checking & Removing, Inert gas charging & Purging, Leak testing, De-
pressurization, Vessel
o entry, Hot and Cold work permit, HC charging/Gas-In, Leak testing up to vessel
Operating pressure,
o Line up the system for Gas-In, Maintenance activities, and Preparation of Blind list,
Isolation plans for
o shutdown activities, Mechanical run of All types of Pumps, Steam turbine and
Compressors.
Page 6
7. DECLARATION
I hereby declare that the above given details are true to the best of my knowledge.
Yours truly,
Page 7
Computer Skills MS Special : Microsoft Visio & Microsoft Project.
MS Office : Professional use of Microsoft Office
2007
.
Languages English, Urdu, Hindi,Tamil,telgu