Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Upcoming SlideShare
ORGB 300 Group 2 - Midterm Project
Next
Download to read offline and view in fullscreen.

0

Share

Download to read offline

upinder_CV

Download to read offline

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

upinder_CV

  1. 1. CURRICULUM VITAECURRICULUM VITAE 1. Personal and Professional Details1. Personal and Professional Details Name : Upinder Kumar DOB / Age : 12-07-1977 /37 years. Address (corr.) : C-203, Mangalaya Residency, Opp. GEB Substation, Dahej Bypass Road, Bharuch ( Gujarat) -392001, Address (Permanent) : Kothi No. 138, 22 Acre Scheme, Barnala-Punjab-148101. Contact phone number : 09662526275 Email address : upindermahajan@rediffmail.com Qualifications : B.E. (Chemical) with hons. 71.85. % (1998), Panjab University, Chandigarh PGDBA in operations management from Symbiosis institute of Management,Pune Experience : 17 years. (Oil &Gas) Objective at work : Safety and quality. 2. At Petronet LNG Limited New Delhi2. At Petronet LNG Limited New Delhi Current position –Chief Manager -Technical & Projects ,Current position –Chief Manager -Technical & Projects , Currently At Dahej (from April 2015) • Working as MR& A (Management representative) for Petronet LNG Dahej terminal reporting to plant head. • Acting as Head Operations • Working as Operation and maintenance Coordination • Audit compliance for the whole company At Delhi Office ( From 2013 to 2015) • Responsible for Project Management for Dahej LNG terminal expansion project including safety studies like HAZID, QRA, Hazop and SIL etc. • Responsible for DFR and FEED verification and working with consultants. • Prequalification of Bidders for Gangavaram LNG terminal. • Preparation of FEED and Technical Bid document for Booster Compressor Procurement for Kochi. • Working as Corporate Safety Manager and expertise in statutory safety compliance. • Member of standard review committee of OISD 192 and 207
  2. 2. • Member in framing PNGRB Rules and regulations for LNG industry. • Dealing with Indian government authorities like PESO (petroleum and explosive safety organization) and OISD ( Oil Industry Safety Directorate) for project approvals and further audits. • Business Development activities like new business Taral for PLL to supply LNG as liquid through road tankers and LNG reloading to ships project.( Tolling model for LNG) At Dahej Site Working as a group leader • Lead and Motivate a team of Engineers & operators to beat the best achieved. • Main Coordinator for Plant shutdown planning and execution. • Mentor and trainer to new joined Engineer trainees. • Coordinator for Quality circle movement in plant. • Coordinator for Sap PM and HSE module development. HSE Functions • Looking after HSE functions. Coordinate between Operations, safety, and maintenance for ensuring safe handover of equipments for maintenance. • Knowledge of relevant HSE standards in LNG field. • Working on Process safety Implementation in Plant. • Developing and maintain Operations procedures that is fluid lock out procedures, SOPs, Operating guidelines. • Maintenance of quality system (ISO-9001, ISO -14001 etc) in the department. • Hazop team member for LNG terminal phase-2 of Petronet LNG. • Group leader for Hazop on India’s First LNG truck loading facility at Petronet LNG. Coordinate with CCOE for this facility approval. Plant Energy Optimisation • Production planning and control function. • Suggestions related to Power saving (pump over sizing to be corrected by Small pump as per NPSH requirement) has been provided by me and implementation on this is in progress. • Key member of committee to decide on energy saving suggestions coming from Engineers and staff. Major training related to LNG Attended state of the art training of CFAFG France on all topics related to LNG like Storage tanks/Materials in LNG/Cryogenic pumps, compressors/LNG safety/Liquefaction plants operation etc. from leaders of Industry. Other Areas of Experience
  3. 3. • Participated actively in the commissioning 1st and 2nd phase terminal. • LNG eulage management as per customer demands. • Scheduling of cargoes and gas send out. • Experience in Gas metering like turbine flow and ultrasonic metering and Gas chromatographs. • Experience in Gas balancing and handling various customer demands. • Experience in unloading operations of LNG from cargo, operation High pressure centrifugal pumps, reciprocating compressors. • Support Projects during development, execution and commissioning, and provide Operational inputs at all stages. Team member for project execution during Phase- 2 Plant construction and erection. • Conduct root cause analysis on process incidents and process inducted mechanical failures and recommend corrective actions to permanently eliminate them. • Experience in the operation of the utilities like N2, PA, IA and Glycol water. • Striving and achieving the pre set production targets within time. 3. At Chambal Fertilisers And Chemicals Ltd.(Last position –Senior Engineer,3. At Chambal Fertilisers And Chemicals Ltd.(Last position –Senior Engineer, Process-AMMONIA PLANT) Oct98- Apr-04Process-AMMONIA PLANT) Oct98- Apr-04 Major responsibilities/activities include:  Smooth and safe start-up, shutdown & normal efficient running of plant  Erection, Precommisioning, Commissioning & operation experience of 1500 MTPD state of the art Kellogg’s dual feed & fuel AMMOINA plant.  Monitoring & Optimization of process parameters through subordinates to achieve lowest energy consumption.  Issuing safety work permit and ensuring safe hand over of machine / equipment to maintenance for carrying out maintenance and modification jobs  Coordination with Technical & Maintenance Staff for expediting all types of maintenance jobs to reduce shutdown period.  Operation of rotary and stationary machines / equipment like compressors, high- pressure pumps, Reformer (hydrogen unit), distillation column and absorbers, catalyst handling etc.  Naphtha sweetening sulphur removal Unit Operational experience.  Operations Purview: Turbines, Centrifugal Compressors ,Reciprocating Compressors, Centrifugal Pumps , , Distillation Column, Reactors, Different types of exchangers, Re Boiler, Separators, Replacement and loading of catalyst in Reformer ,Regenerators and reformer tubes, high pressure (150ksc) Synthesis loop, 2 high- pressure steam boilers from waste heat with a capacity of 220 T/hr at Pressure 110 ksc and at temp. 510 DegC, PLC based cryogenic unit for Hydrogen Recovery, Cooling Towers etc.
  4. 4. 4. OTHER AREA  Good Computer proficiency in Microsoft Word, Excel, Power point, Visual Basic  Conversant with NFPA, OISD LNG related standards.  Well familiar with ISO-9001/14001 & 1800 systems 5. Supervised Erection & Commissioning of following major projects  Involved in Project and Hazop Studies for India’s First LNG truck loading facility.  Involved in guarantee test for the same plant along with vendor TEC JAPAN  Supervision of Reactor catalyst loading and distillation columns tower packing  Commissioning, Operation, annual maintenance and troubleshooting in 160 TPH water tube boiler supplied by TBW.  Erection, Precommisioning, Commissioning of India’s first LNG receiving and gasification terminal of Petronet LNG Limited.  Supervision and hands on Experience on yokogawa centum CS DCS, Gus based DCS and PLC of Tata Honeywell.  Working knowledge of SAP PM and materials management modules.  Had a good chance interacting with external agencies like CCOE/DMC and municipal authorities. 6. Other Qualifications and Trainings  BOE (BOILER OPERATING ENGINEER) from RAJASTHAN BOILER BOARD.  Attended two weeks training of CFAFG Paris on LNG liquefaction and LNG terminal design.  Attended world’s largest Gas meet related to LNG and LPG industries Gastech-2009 in Abu Dhabi.  2 months’ professional training at Southern Petrochemicals Industries Corporation (SPIC), TUTICORIN.  4 days seminar on GAS and Liquid fuel fired boilers by THERMAX BABCOCK AND WILCOX.  LNG Fire and Safety training in Montua Terminal of GAS DE FRANCE in France.  Three months to Doha Qatar for LNG ship custody transfer.LNG quantity and quality ensuring. 7. Current CTC : INR 30 Lakh Per annum7. Current CTC : INR 30 Lakh Per annum 8. Computer Skills : Excel, Word, Power point, Emails8. Computer Skills : Excel, Word, Power point, Emails ExpertiseExpertise 9. Expected CTC : Negotiable9. Expected CTC : Negotiable
  5. 5. Upinder KumarUpinder Kumar
  6. 6. Upinder KumarUpinder Kumar

Views

Total views

416

On Slideshare

0

From embeds

0

Number of embeds

143

Actions

Downloads

3

Shares

0

Comments

0

Likes

0

×