SUMMARY
I have 7years working experience in commissioning and operation of residual fluid catalytic
cracking (RFCC) plant in a petroleum refinery in Ghana and currently working with ADNOC
subsidiary Abu Dhabi Gas Industry (GASCO) in UAE as a panel operator (DCS). I was part
of the key leading team members in pre-commissioning and commissioning of habshan5
plant from 2012 to 2013.My career objective is to become a successful charted engineer and
to be part of organisation who believes success as a need and work hard to achieve it.
EXPERIENCE
Company:
Subsidiary:
Period:
ADNOC(Group).
Gasco, Habshan5-Abu Dhabi.
April 2012 - present.
Position:
Senior Operator (DCS).
Job purpose & Scope:
Operates, monitors and controls facilities like Gas/Liquid dehydration and De-mercury unit,
NGL recovery unit, Condensate Stabilization unit, Gas compression unit, Sour water
treatment unit, Fuel gas unit, Rich and lean acid gas removal unit, NGL storage and export
unit, Flare system, Pipeline launcher in the respective Plant areas, providing work
instructions, as necessary to operators, take corrective actions during emergency situations
and Plant abnormalities in accordance with standard operating procedure and standing order.
Specific duties:
 Provide work instruction and guidance to assigned operators and ensure their work is
conducted inline with standard operating procedures, established program and
supervisory instructions complying with health safety policy.
 Operate the plant to meet the expectation of the customer in the areas of sales gas,
liquid sulphur and lean gas.
 Controls and monitors plant process instruments such as Pressures, temperatures,
levels, flows etc., and ensures periodic logging of parameters, look out for any
abnormalities for smooth and efficient running of Plant and the equipment’s.
 Perform regular plant maintenance and operations changes with the consent of senior
operation Engineer.
 Minimizing emission and treating process effluent.
 Ensure plant is operated and maintained in compliance with regulatory requirements.
 Carry out plant start-up and shutdown base on standard operating procedure.
 Co-ordinate with other existing plant for feed and product distribution.
 Changing the operating mode to meet NGL product specification demand by
downstream plants.
 Determine Specification of Product in Plant by the help of Gas/Liquids analyser's and
lab results.
 Review, Validate, Sign off existing standard operating procedures.
 Suggests modifications for improvement of overall Plant efficiency
 Isolate systems, Piping and LOTO by co-ordinating with field operators and
maintenance personal.
 Explain/Troubleshoot Plant Process, Compressors, Pumps, Controllers, and BMS
Panels etc.
 Managing the NGL sphere and its export.
 Adjust process parameters base on lab analysis, feed and product analysis if required.
 Ensure proper shift handover as per the standing procedure
 Develop UAE nationals by sharing knowledge and expertise for their integration and
give training to new employees, students or groups on excursion.
 Organize and write field and DCS daily activities for shift controller's report.
 Ensure that work carried out by maintenance personnel is in accordance with the
company safety regulations and standard procedures by coordinating with the field
operator and parties involve.
SIGNIFICANT ACHIEVEMENT IN THIS POSITION:
 I made changes on the plant design process logic to reduce flaring and total plant
shutdown during plant upset and emergencies (AGR and NGL contingency plan).
 Optimized production by improving on design process parameters.(parameters for
NGL recovery and rejection).
 Develop a procedure for propanisation of 3stage propane compressor base on
practical experience.
 Lead a team who help to change systemlogic, start-up and shutdown procedure of
3stage propane compressor base on practical experience.
 Help to reduce the daily alarm received per console through alarm management
to suit the process and operation in other to ensure process flexibility and safety.
 Updated NGL standard operating procedure base on practical experience.
 Part of team who did DCS control logic confirmative for Gas and Liquid dryer
sequence.
 Recovered more than 99% Propane (C3) and 89% Ethane (C2) from natural gas
without expander.
 Lean Amine Units Operation Optimization.
TRAINING
Topic
Trainer Location Period
 Gas and Liquid molecular sieves.
C.Engineering. Habshan5-Abu Dhabi. 3/01/13.
 Expander operation and troubleshooting. Mafi-
Trench Vendor Habshan5-Abu Dhabi. 19/12/12.
 Anti-surge/performance/load shading controller operation. CCC
vendor. Habshan5-Abu Dhabi. 23/11/12.
 Otlorf RSP (NGL recovery and rejection operation and troubleshooting) Otlorf
Vendor. Habshan5-Abu Dhabi. 2012 - 2012.
 Yokogawa centum VP Fundamental for operation Yokogawa
vendor. Musafah-Abu Dhabi. 14/10/12 - 18/10/12.
 Centrifugal compressor familiarization. Ebara
vendor. Habshan5-Abu Dhabi. 29/9/12 - 30/9/12.
 Centrifugal compressor operation. Ebara
vendor. Habshan5-Abu Dhabi. 1/10/12 - 2/10/12.
 Steam turbine operation. Ebara
vendor. Habshan5-Abu Dhabi. 3/10/12 – 4/10/12.
 Steam condensate recovery.
C.Engineering. Habshan5-Abu Dhabi. 30/8/12.
 Gas drying by TEG dehydration.
C.Engineering. Habshan5-Abu Dhabi. 29/8/12.
 Lean Gas Treatment (Acid Gas Removal).
C.Engineering. Habshan5-Abu Dhabi. 2/8/12.
 Rich Gas Treatment (Acid Gas Removal).
C.Engineering. Habshan5-Abu Dhabi. 1/8/12.
 Inlet separation & Condensate stabilization.
C.Engineering. Habshan5-Abu Dhabi. 31/7/12.
 Overall process facility for habshan5 plant.
C.Engineering. Habshan5-Abu Dhabi. 28/7/12 – 29/7/12.
 HSE
C.Engineering. Habshan5-Abu Dhabi. 20/7/12 – 23/7/12.
TRAINING CERTIFICATES
 Certificate of training – Mafi Trench.
 Certificate of training – CCC.
 Certificate of achievement - Otlorf, Habshan-Abu Dhabi, 2012.
 Certificate of training – Yokogawa, Abu Dhabi, 18/10/12.
 Certificate of achievement – Elliot Group-Ebara Corporation. 30/09/12.
 Certificate of achievement – Elliot Group-Ebara Corporation. 5/10/12.
 Certificate of achievement – Elliot Group-Ebara Corporation. 2/10/12.
 Certificate of Attendance – C.Engineering 30/8/12.
 Certificate of Attendance – C.Engineering 29/8/12.
 Certificate of Attendance – C.Engineering 2/8/12.
 Certificate of Attendance – C.Engineering 1/8/12.
 Certificate of Attendance – C.Engineering 31/7/12.
 Certificate of Attendance – C.Engineering 29/7/12.
 Certificate of Attendance – C.Engineering 23/7/12.
HONORS AND AWARDS
Gasco-Habshan5 plant division, 2013. HSE Award for overall Best Performance of the
Year.
Gasco- Habshan5 plant division, April 2014 HSE Award for Man of the month
Gasco- Habshan5 plant division, June 2015 recovered more than 99% Propane (C3) and
89% Ethane (C2) from natural gas without expander.
Gasco- Habshan5 plant division, July 2015 Gasco Energy Award (Lean Amine Units
Operation Optimization).
KNOWLEDGE.
 Distribution control system operation.
 Ortlof suplemental rectification process.
 Oil and gas exploration/production.
TEMA OIL REFINERY, GHANA-TEMA16/01/2006 –15/04/2012
Position: Senior production operator
Plant: RFCC
Unit:
 Reactor and Fractionation unit,Gas Concentration unit,Merox/LPG Extraction
unit,Amine and Sour Water Treatment Unit.
Specific Duties:
 Performs routine checks on process equipment and recommend solutions to any
anomalies.
 Ensures good housekeeping.
 Provides on-the-job training to students on attachment and acts as mentor for skill
development.
 Carry out commissioning activities on RFCC plant according to lay down SOP.
 Supervise chemical handling and its preparations.
 Responsible for lockout and tag out procedures and issues work permit.
 Preparing work area and equipment for maintenance work to start.
 Supervisor and control injection rates.
 Start-up and shut down of the unit.
 Wet gas compressor start up shut down procedure.
 Nitrogen pressure swinging absorber operations.
 Solving the wet gas compressor vacuum loss problem.
 Wet gas compressor ejector change over procedure.
 Supervisor caustic preparation and transfer.
 General starts -up shut down.
 Disulphide oil transfer process.
INDUSTRIAL ATTACHMENT
 Company: Intravenous infusion LTD.
 Department: Engineering and production.
 Period: March, 2003.
NATIONAL SERVICE
 Institution: Afiduase junior high, Koforidua.
 Position: Science tutor.
 Period: 11/2004 – 08/2005
EDUCATION
 Institution: Kumasi
Polytechnic, Ghana.
 Qualification: Higher
national diploma (HND).
 Discipline: Chemical
Engineering.
 Institution: Kwame
Nkrumah University of Science and Technology.
 Qualification: B.Sc.
(completion June.2015 & Certification December.2015).
 Discipline Chemical
Engineering.
REFRENCE:
Name:
Ishak ismael Kissimo.
Position:
Training Supervisor.
Department:
Operation and training.
Contact:
ishak.kissom@gasco.ae
Name:
Haider Mohammed.
Position:
Shift Controller.
Department:
Operation.
Contact:
hmohamed@gasco.ae
Name:
Mrs Brew.
Position:
Human resource Manageress.
Department:
Administration (TOR).
Contact:
+233244503233/+233203296661

More Related Content

What's hot

Arslan Cv OIL&GAS
Arslan Cv OIL&GASArslan Cv OIL&GAS
Arslan Cv OIL&GASRao Arslan
 
Chirag darji resume for production operator (oil & gas)
Chirag darji resume for production operator (oil & gas)Chirag darji resume for production operator (oil & gas)
Chirag darji resume for production operator (oil & gas)CHIRAG DARJI
 
production operator
production operatorproduction operator
production operatorGURU JOY
 
Design and Rating of Trayed Distillation Columns
Design and Rating  of Trayed Distillation ColumnsDesign and Rating  of Trayed Distillation Columns
Design and Rating of Trayed Distillation ColumnsGerard B. Hawkins
 
Troubleshooting of Distillation
Troubleshooting of DistillationTroubleshooting of Distillation
Troubleshooting of DistillationMarcep Inc.
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampGerard B. Hawkins
 
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesCritical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesGerard B. Hawkins
 
Study 5: Pre-commissioning Safety Review
Study 5: Pre-commissioning Safety ReviewStudy 5: Pre-commissioning Safety Review
Study 5: Pre-commissioning Safety ReviewGerard B. Hawkins
 
Process plant operator Shabeer Ahmad
Process plant operator Shabeer AhmadProcess plant operator Shabeer Ahmad
Process plant operator Shabeer Ahmadshabeer ahmad
 
VULCAN Series A2ST Advanced Alumina Support Technology
VULCAN Series A2ST Advanced Alumina Support TechnologyVULCAN Series A2ST Advanced Alumina Support Technology
VULCAN Series A2ST Advanced Alumina Support TechnologyGerard B. Hawkins
 

What's hot (20)

Arslan Cv OIL&GAS
Arslan Cv OIL&GASArslan Cv OIL&GAS
Arslan Cv OIL&GAS
 
Chirag darji resume for production operator (oil & gas)
Chirag darji resume for production operator (oil & gas)Chirag darji resume for production operator (oil & gas)
Chirag darji resume for production operator (oil & gas)
 
production operator
production operatorproduction operator
production operator
 
Kannan resume
Kannan resumeKannan resume
Kannan resume
 
Design and Rating of Trayed Distillation Columns
Design and Rating  of Trayed Distillation ColumnsDesign and Rating  of Trayed Distillation Columns
Design and Rating of Trayed Distillation Columns
 
Troubleshooting of Distillation
Troubleshooting of DistillationTroubleshooting of Distillation
Troubleshooting of Distillation
 
ADNOC
ADNOCADNOC
ADNOC
 
ishtiaq ahmad-cv
ishtiaq ahmad-cvishtiaq ahmad-cv
ishtiaq ahmad-cv
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit Revamp
 
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesCritical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
 
Study 5: Pre-commissioning Safety Review
Study 5: Pre-commissioning Safety ReviewStudy 5: Pre-commissioning Safety Review
Study 5: Pre-commissioning Safety Review
 
Process plant operator Shabeer Ahmad
Process plant operator Shabeer AhmadProcess plant operator Shabeer Ahmad
Process plant operator Shabeer Ahmad
 
5546
55465546
5546
 
1Nader-SeniorOperator-CV
1Nader-SeniorOperator-CV1Nader-SeniorOperator-CV
1Nader-SeniorOperator-CV
 
VULCAN Series A2ST Advanced Alumina Support Technology
VULCAN Series A2ST Advanced Alumina Support TechnologyVULCAN Series A2ST Advanced Alumina Support Technology
VULCAN Series A2ST Advanced Alumina Support Technology
 
pavan_DCS
pavan_DCSpavan_DCS
pavan_DCS
 
MANIKANDAN KOTHANDAN_original
MANIKANDAN KOTHANDAN_originalMANIKANDAN KOTHANDAN_original
MANIKANDAN KOTHANDAN_original
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
Ramesh com (1)
Ramesh com (1)Ramesh com (1)
Ramesh com (1)
 
sengu cv
sengu cvsengu cv
sengu cv
 

Viewers also liked

La Guerra
La GuerraLa Guerra
La GuerraHans127
 
Resume 3-29-2015
Resume 3-29-2015Resume 3-29-2015
Resume 3-29-2015Erik Brandt
 
今を生きるために知っておきたい大正デモクラシー入門【新発見!日本の歴史】
今を生きるために知っておきたい大正デモクラシー入門【新発見!日本の歴史】今を生きるために知っておきたい大正デモクラシー入門【新発見!日本の歴史】
今を生きるために知っておきたい大正デモクラシー入門【新発見!日本の歴史】schoowebcampus
 
Medicines optimisation: sharing best practices
Medicines optimisation: sharing best practicesMedicines optimisation: sharing best practices
Medicines optimisation: sharing best practicesAALForum
 
chronic head trauma in athletes: the debate continues
chronic head trauma in athletes: the debate continues chronic head trauma in athletes: the debate continues
chronic head trauma in athletes: the debate continues Faye Marie Cobcoban
 
Selling Process (Meet & Greet)
Selling Process (Meet & Greet)Selling Process (Meet & Greet)
Selling Process (Meet & Greet)meltalkhawi
 

Viewers also liked (13)

La Guerra
La GuerraLa Guerra
La Guerra
 
Lenguaje
LenguajeLenguaje
Lenguaje
 
Resume 3-29-2015
Resume 3-29-2015Resume 3-29-2015
Resume 3-29-2015
 
Team Work
Team WorkTeam Work
Team Work
 
今を生きるために知っておきたい大正デモクラシー入門【新発見!日本の歴史】
今を生きるために知っておきたい大正デモクラシー入門【新発見!日本の歴史】今を生きるために知っておきたい大正デモクラシー入門【新発見!日本の歴史】
今を生きるために知っておきたい大正デモクラシー入門【新発見!日本の歴史】
 
Medicines optimisation: sharing best practices
Medicines optimisation: sharing best practicesMedicines optimisation: sharing best practices
Medicines optimisation: sharing best practices
 
chronic head trauma in athletes: the debate continues
chronic head trauma in athletes: the debate continues chronic head trauma in athletes: the debate continues
chronic head trauma in athletes: the debate continues
 
Why scrum?
Why scrum?Why scrum?
Why scrum?
 
TOR
TORTOR
TOR
 
Resume
ResumeResume
Resume
 
FTIR Lab Report
FTIR Lab ReportFTIR Lab Report
FTIR Lab Report
 
Selling Process (Meet & Greet)
Selling Process (Meet & Greet)Selling Process (Meet & Greet)
Selling Process (Meet & Greet)
 
Propiedades de los átomos
Propiedades de los átomosPropiedades de los átomos
Propiedades de los átomos
 

Similar to CURRENT CV1 2015

Resume Rakesh Naik
Resume Rakesh NaikResume Rakesh Naik
Resume Rakesh NaikRakesh Naik
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CVRashid Iqbal
 
bismilla operation & comissioning
bismilla operation & comissioningbismilla operation & comissioning
bismilla operation & comissioningBismilla Syed
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CVkalki selvan
 
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...JAGADEESAN MANICKA
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim
 
ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...LalitGoyal27
 
ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...SURENDRASINGH87542
 

Similar to CURRENT CV1 2015 (20)

Resume Rakesh Naik
Resume Rakesh NaikResume Rakesh Naik
Resume Rakesh Naik
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
 
remesh new
remesh newremesh new
remesh new
 
afri-cv
afri-cvafri-cv
afri-cv
 
Pcsb updated cv
Pcsb updated cvPcsb updated cv
Pcsb updated cv
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 
CV3
CV3CV3
CV3
 
bismilla operation & comissioning
bismilla operation & comissioningbismilla operation & comissioning
bismilla operation & comissioning
 
upinder_CV
upinder_CVupinder_CV
upinder_CV
 
CV Dian Risdiana
CV Dian RisdianaCV Dian Risdiana
CV Dian Risdiana
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
 
RASHID JALAL CV 1512
RASHID JALAL CV 1512RASHID JALAL CV 1512
RASHID JALAL CV 1512
 
Mekki cv 2016
Mekki cv 2016Mekki cv 2016
Mekki cv 2016
 
My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ TrainerShahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
Shahbaz Qasim Instrument Technician_Foreman_Supervisor_ Trainer
 
Alaa_Abdul_Aziz_Ibrahim_Zaki_-_CV_GASCO_1_
Alaa_Abdul_Aziz_Ibrahim_Zaki_-_CV_GASCO_1_Alaa_Abdul_Aziz_Ibrahim_Zaki_-_CV_GASCO_1_
Alaa_Abdul_Aziz_Ibrahim_Zaki_-_CV_GASCO_1_
 
Resume Shahid
Resume ShahidResume Shahid
Resume Shahid
 
ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...
 
ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...
 

CURRENT CV1 2015

  • 1. Osumanu Basiru. Ocean Terrace, Al-Reem Island, P.O. Box 665,Gasco, Abu Dhabi, UAE. Cellular 00971509125702 Cellular 00971529120816 Cellular 00233244014293 gimah2013@icloud.com gimah2002@gmail.com Senior Operator (DCS) SUMMARY I have 7years working experience in commissioning and operation of residual fluid catalytic cracking (RFCC) plant in a petroleum refinery in Ghana and currently working with ADNOC subsidiary Abu Dhabi Gas Industry (GASCO) in UAE as a panel operator (DCS). I was part of the key leading team members in pre-commissioning and commissioning of habshan5 plant from 2012 to 2013.My career objective is to become a successful charted engineer and to be part of organisation who believes success as a need and work hard to achieve it. EXPERIENCE Company: Subsidiary: Period: ADNOC(Group). Gasco, Habshan5-Abu Dhabi. April 2012 - present. Position: Senior Operator (DCS). Job purpose & Scope: Operates, monitors and controls facilities like Gas/Liquid dehydration and De-mercury unit, NGL recovery unit, Condensate Stabilization unit, Gas compression unit, Sour water treatment unit, Fuel gas unit, Rich and lean acid gas removal unit, NGL storage and export unit, Flare system, Pipeline launcher in the respective Plant areas, providing work instructions, as necessary to operators, take corrective actions during emergency situations and Plant abnormalities in accordance with standard operating procedure and standing order. Specific duties:  Provide work instruction and guidance to assigned operators and ensure their work is conducted inline with standard operating procedures, established program and supervisory instructions complying with health safety policy.  Operate the plant to meet the expectation of the customer in the areas of sales gas, liquid sulphur and lean gas.  Controls and monitors plant process instruments such as Pressures, temperatures, levels, flows etc., and ensures periodic logging of parameters, look out for any abnormalities for smooth and efficient running of Plant and the equipment’s.  Perform regular plant maintenance and operations changes with the consent of senior
  • 2. operation Engineer.  Minimizing emission and treating process effluent.  Ensure plant is operated and maintained in compliance with regulatory requirements.  Carry out plant start-up and shutdown base on standard operating procedure.  Co-ordinate with other existing plant for feed and product distribution.  Changing the operating mode to meet NGL product specification demand by downstream plants.  Determine Specification of Product in Plant by the help of Gas/Liquids analyser's and lab results.  Review, Validate, Sign off existing standard operating procedures.  Suggests modifications for improvement of overall Plant efficiency  Isolate systems, Piping and LOTO by co-ordinating with field operators and maintenance personal.  Explain/Troubleshoot Plant Process, Compressors, Pumps, Controllers, and BMS Panels etc.  Managing the NGL sphere and its export.  Adjust process parameters base on lab analysis, feed and product analysis if required.  Ensure proper shift handover as per the standing procedure  Develop UAE nationals by sharing knowledge and expertise for their integration and give training to new employees, students or groups on excursion.  Organize and write field and DCS daily activities for shift controller's report.  Ensure that work carried out by maintenance personnel is in accordance with the company safety regulations and standard procedures by coordinating with the field operator and parties involve. SIGNIFICANT ACHIEVEMENT IN THIS POSITION:  I made changes on the plant design process logic to reduce flaring and total plant shutdown during plant upset and emergencies (AGR and NGL contingency plan).  Optimized production by improving on design process parameters.(parameters for NGL recovery and rejection).  Develop a procedure for propanisation of 3stage propane compressor base on practical experience.  Lead a team who help to change systemlogic, start-up and shutdown procedure of 3stage propane compressor base on practical experience.  Help to reduce the daily alarm received per console through alarm management to suit the process and operation in other to ensure process flexibility and safety.  Updated NGL standard operating procedure base on practical experience.  Part of team who did DCS control logic confirmative for Gas and Liquid dryer sequence.  Recovered more than 99% Propane (C3) and 89% Ethane (C2) from natural gas without expander.  Lean Amine Units Operation Optimization. TRAINING Topic Trainer Location Period
  • 3.  Gas and Liquid molecular sieves. C.Engineering. Habshan5-Abu Dhabi. 3/01/13.  Expander operation and troubleshooting. Mafi- Trench Vendor Habshan5-Abu Dhabi. 19/12/12.  Anti-surge/performance/load shading controller operation. CCC vendor. Habshan5-Abu Dhabi. 23/11/12.  Otlorf RSP (NGL recovery and rejection operation and troubleshooting) Otlorf Vendor. Habshan5-Abu Dhabi. 2012 - 2012.  Yokogawa centum VP Fundamental for operation Yokogawa vendor. Musafah-Abu Dhabi. 14/10/12 - 18/10/12.  Centrifugal compressor familiarization. Ebara vendor. Habshan5-Abu Dhabi. 29/9/12 - 30/9/12.  Centrifugal compressor operation. Ebara vendor. Habshan5-Abu Dhabi. 1/10/12 - 2/10/12.  Steam turbine operation. Ebara vendor. Habshan5-Abu Dhabi. 3/10/12 – 4/10/12.  Steam condensate recovery. C.Engineering. Habshan5-Abu Dhabi. 30/8/12.  Gas drying by TEG dehydration. C.Engineering. Habshan5-Abu Dhabi. 29/8/12.  Lean Gas Treatment (Acid Gas Removal). C.Engineering. Habshan5-Abu Dhabi. 2/8/12.  Rich Gas Treatment (Acid Gas Removal). C.Engineering. Habshan5-Abu Dhabi. 1/8/12.  Inlet separation & Condensate stabilization. C.Engineering. Habshan5-Abu Dhabi. 31/7/12.  Overall process facility for habshan5 plant. C.Engineering. Habshan5-Abu Dhabi. 28/7/12 – 29/7/12.  HSE C.Engineering. Habshan5-Abu Dhabi. 20/7/12 – 23/7/12. TRAINING CERTIFICATES  Certificate of training – Mafi Trench.  Certificate of training – CCC.  Certificate of achievement - Otlorf, Habshan-Abu Dhabi, 2012.  Certificate of training – Yokogawa, Abu Dhabi, 18/10/12.  Certificate of achievement – Elliot Group-Ebara Corporation. 30/09/12.  Certificate of achievement – Elliot Group-Ebara Corporation. 5/10/12.  Certificate of achievement – Elliot Group-Ebara Corporation. 2/10/12.  Certificate of Attendance – C.Engineering 30/8/12.  Certificate of Attendance – C.Engineering 29/8/12.  Certificate of Attendance – C.Engineering 2/8/12.  Certificate of Attendance – C.Engineering 1/8/12.  Certificate of Attendance – C.Engineering 31/7/12.  Certificate of Attendance – C.Engineering 29/7/12.  Certificate of Attendance – C.Engineering 23/7/12. HONORS AND AWARDS
  • 4. Gasco-Habshan5 plant division, 2013. HSE Award for overall Best Performance of the Year. Gasco- Habshan5 plant division, April 2014 HSE Award for Man of the month Gasco- Habshan5 plant division, June 2015 recovered more than 99% Propane (C3) and 89% Ethane (C2) from natural gas without expander. Gasco- Habshan5 plant division, July 2015 Gasco Energy Award (Lean Amine Units Operation Optimization). KNOWLEDGE.  Distribution control system operation.  Ortlof suplemental rectification process.  Oil and gas exploration/production. TEMA OIL REFINERY, GHANA-TEMA16/01/2006 –15/04/2012 Position: Senior production operator Plant: RFCC Unit:  Reactor and Fractionation unit,Gas Concentration unit,Merox/LPG Extraction unit,Amine and Sour Water Treatment Unit. Specific Duties:  Performs routine checks on process equipment and recommend solutions to any anomalies.  Ensures good housekeeping.  Provides on-the-job training to students on attachment and acts as mentor for skill development.  Carry out commissioning activities on RFCC plant according to lay down SOP.  Supervise chemical handling and its preparations.  Responsible for lockout and tag out procedures and issues work permit.  Preparing work area and equipment for maintenance work to start.  Supervisor and control injection rates.  Start-up and shut down of the unit.  Wet gas compressor start up shut down procedure.  Nitrogen pressure swinging absorber operations.  Solving the wet gas compressor vacuum loss problem.  Wet gas compressor ejector change over procedure.  Supervisor caustic preparation and transfer.  General starts -up shut down.  Disulphide oil transfer process. INDUSTRIAL ATTACHMENT  Company: Intravenous infusion LTD.  Department: Engineering and production.  Period: March, 2003.
  • 5. NATIONAL SERVICE  Institution: Afiduase junior high, Koforidua.  Position: Science tutor.  Period: 11/2004 – 08/2005 EDUCATION  Institution: Kumasi Polytechnic, Ghana.  Qualification: Higher national diploma (HND).  Discipline: Chemical Engineering.  Institution: Kwame Nkrumah University of Science and Technology.  Qualification: B.Sc. (completion June.2015 & Certification December.2015).  Discipline Chemical Engineering. REFRENCE: Name: Ishak ismael Kissimo. Position: Training Supervisor. Department: Operation and training. Contact: ishak.kissom@gasco.ae Name: Haider Mohammed. Position: Shift Controller. Department: Operation. Contact: hmohamed@gasco.ae Name:
  • 6. Mrs Brew. Position: Human resource Manageress. Department: Administration (TOR). Contact: +233244503233/+233203296661