SlideShare a Scribd company logo
1 of 3
Download to read offline
Nader Rady Kamal Abdelgayed
Palestine St- Behind Marriott hotel- Jeddah- Saudi Arabia
Contact numbers: 00966561726037 KSA
00201066080130, 00201151764500 Egypt
Email address: nader.elgayed@gmail.com
Personal Information:
• Gender : Male
• Birth Date : July 8th
, 1981
• Nationality : Egyptian
• Religion : Muslim
• Marital Status : Married
• Military Status : Exempted
• Qualification : Alwerdian Advanced Technical School
of Five Years 2001
Job History:
• 10/2012 until now (Senior Operator of Oil Movement- Loading Area)
Cooperative of Oil Petroleum- Egypt
• 5/2008 to 9/2012 (Plant Operator of C4 Alkylation department)
Rabigh Refining & Petrochemical Co (PETRORabigh) – KSA
(Saudi Aramco &Sumitomo Chemicals JV)
• 11/2006 to 5/2008 (Field Operator of Hydrocracker unit)
MIDOR Refining Company- Egypt
Work Experience:U
• COOP Company Cooperative of Petrol Company for Oil Distribution
Alexandria- Egypt- Oil Movement Area, Designation: Senior Operator
• PETRORabigh Refinery& Petrochemical Company, Capacity: 400000
BPSD (Joint venture of Saudi Aramco- Sumitomo Chemical- Saudi
Arabia-C4 -Alkylation (Monomer department)
Designation: Plant Operator – C4- Alkylation (Monomer department)
C4 - Alkylation Unit:
• Licensors – DuPont Technology – Stratco Process
• Capacity- 22611 BPSD
• Catalyst – Liquid 99.5 wt % H2SO4
• Gas Centrifugal Compressor is steam turbine driven type of 121772
m3/hr capacity
• Product- Alkylate that is used as a premium gasoline blending stock.
Isomeraization Plant
• Licensors- Axens • Capacity-22700 BPSD
• Product- Iso Butane from N- Butane
Sulphuric Acid Refreshment Plant (SAP):
• Licensors- Monsanto Enviro Chem Systems- Lurgi Process
• Capacity- 160 MT/day • Product- 99.5 wt % Sulphuric acid
• MIDOR Refinery (Egypt- Alexandria- Free zone)
Designation: Field Operator of Hydrocracker Unit:
•Licensors: Universal Oil Products (UOP)
•Capacity: 32000 BPSD =220 fresh m3/hr.
•Products: Unconverted oil, Diesel, Kerosene, Naphtha and LPG.
My Responsibilities Include:
• Rotating equipment emergency shutdown and start up procedure
• Reviewing, comments and suggestion or modification on operation
manual, P& ID, PFD
• Translating operation manual to Arabic language
• Preparing training manual and presentation for new operators and
training them.
• Look after pre-commissioning and commissioning activities
• Maintained records of daily works, process reading, lists of pending
work, maintenance or repair of machines, log-books of machines,
planning and material stock
• To maintain safe, reliable and smooth operation, optimization of unit
operations and plant capabilities.
• Prepare and handover equipment for maintenance so as the job will
carry timely and safely.
• Multitasking (instrument, electrical and mechanical)
Critical Equipment/Operation Handled:
• High pressure (165 kg/cm2) Three stages double acting reciprocating
compressor
• High capacity centrifugal compressor 190 kg/cm2
• High capacity centrifugal pumps eight stages which discharging
(190 kg/ cm2)
• Contactor reactors of Alkylation unit (eight reactors) which running
with very high concentrate sulfuric acid 98.2%
Training & Specialized Courses:
• First Aid, MIDOR refinery training center
• Firefighting course, MIDOR refinery training center
• Sample Collection, MIDOR refinery training center
• Refinery Operators Training, MIDOR refinery training center
• Pumps Technology, Oil & Gas Skills Company, MIDOR training center
• Centrifugal Compressor, O&G Skills Company, MIDOR training center
• Reciprocating double compressors, MIDOR refinery training center
• Emergency Response Team training, PETRORabigh company
• Basic Life Support (BLS), PETRORabigh company training center
• Heart Attack Prevention, PETRORabigh company training center
• Firefighting, PETRORabigh company fire station
• Advance Industrial Firefighting, PETRORabigh company
• Confine Space Entry Training. PETRORabigh company
• Practical Firefighting & Safety Procedure PETRORabigh company
• Hydrogen Sulfide Course, PETRORabigh company training center
• Industrial Basic Safety Awareness, PETRORabigh training center
• First Aid For Sulfuric Acid Burns, PETRORabigh (Alkylation Unit)
• Hazard Recognition (HR) PETRORabigh company training center
• Gas Testing Course, PETRORabigh company training center
• Scaffolding Safety Awareness, PETRORabigh company training center
• Optimizing Steam Boilers Operation and Preventive Maintenance,
PETRORabigh company
Some Achievements:
• Success involved in shutdown, maintenance and startup of
Hydrocracker unit during planned refinery general shutdown in year
2006
• Expert field operator of project management team for documentation
& commissioning of C4 Alkylation, Isomerization and Sulfuric Acid plants
in 2008
• Safe commissioning for Alkylation, SAP and Isom units in 2009
• Pre-commissioning and commissioning and operation of all three units
• Successfully involved in Alkylation, Isomerization and Sulfuric Acid
units during plant turnaround in 2011
• Member of general 2011 T&I for Alkylation, SAP and Isom units

More Related Content

What's hot (20)

Application for, Refinery Operator.
Application for, Refinery Operator.Application for, Refinery Operator.
Application for, Refinery Operator.
 
CV MUHAMMAD ZAHID with Skp
CV MUHAMMAD ZAHID with SkpCV MUHAMMAD ZAHID with Skp
CV MUHAMMAD ZAHID with Skp
 
Ghulam Farid cv
Ghulam Farid cvGhulam Farid cv
Ghulam Farid cv
 
My cv
My cvMy cv
My cv
 
RASHID JALAL CV 1512
RASHID JALAL CV 1512RASHID JALAL CV 1512
RASHID JALAL CV 1512
 
SURESH CCR & FIELD OPERATOR
SURESH CCR & FIELD OPERATORSURESH CCR & FIELD OPERATOR
SURESH CCR & FIELD OPERATOR
 
CV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P JoyCV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P Joy
 
Process plant operator Shabeer Ahmad
Process plant operator Shabeer AhmadProcess plant operator Shabeer Ahmad
Process plant operator Shabeer Ahmad
 
MANIKANDAN KOTHANDAN_original
MANIKANDAN KOTHANDAN_originalMANIKANDAN KOTHANDAN_original
MANIKANDAN KOTHANDAN_original
 
chinna terminal operator.
chinna terminal operator.chinna terminal operator.
chinna terminal operator.
 
VETRI CV
VETRI CVVETRI CV
VETRI CV
 
remesh new
remesh newremesh new
remesh new
 
RAJU LETEST UTILITY RESUME
RAJU LETEST UTILITY RESUMERAJU LETEST UTILITY RESUME
RAJU LETEST UTILITY RESUME
 
JPE.doc
JPE.docJPE.doc
JPE.doc
 
FINAL CV
FINAL CVFINAL CV
FINAL CV
 
Anandakrishnan-resume s
Anandakrishnan-resume  sAnandakrishnan-resume  s
Anandakrishnan-resume s
 
shivpratapshukla 6906
shivpratapshukla 6906shivpratapshukla 6906
shivpratapshukla 6906
 
Cv Rafee
Cv Rafee Cv Rafee
Cv Rafee
 
Kolli Ramesh Babu cv
Kolli Ramesh Babu cvKolli Ramesh Babu cv
Kolli Ramesh Babu cv
 
Raiyani cv
Raiyani cvRaiyani cv
Raiyani cv
 

Viewers also liked

Viewers also liked (12)

Bansil Resume field operator
Bansil Resume field operatorBansil Resume field operator
Bansil Resume field operator
 
R Rao CV update
R Rao CV updateR Rao CV update
R Rao CV update
 
RickyNelson CV
RickyNelson CVRickyNelson CV
RickyNelson CV
 
Field Operator Resume
Field Operator ResumeField Operator Resume
Field Operator Resume
 
My CV
My CVMy CV
My CV
 
Цифровой НПЗ
Цифровой НПЗЦифровой НПЗ
Цифровой НПЗ
 
Tankfarm terminal operator
Tankfarm  terminal operatorTankfarm  terminal operator
Tankfarm terminal operator
 
cv aggiornato sturlese
cv aggiornato sturlesecv aggiornato sturlese
cv aggiornato sturlese
 
1 cv
1 cv1 cv
1 cv
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
asad latest cv (1)
asad latest cv (1)asad latest cv (1)
asad latest cv (1)
 
Davor Glavan Curriculum Vitae
Davor Glavan Curriculum VitaeDavor Glavan Curriculum Vitae
Davor Glavan Curriculum Vitae
 

Similar to 1Nader-SeniorOperator-CV

Similar to 1Nader-SeniorOperator-CV (20)

HAREESH PILLAI S
HAREESH PILLAI SHAREESH PILLAI S
HAREESH PILLAI S
 
Chidambaram_cv
Chidambaram_cvChidambaram_cv
Chidambaram_cv
 
Ram resume
Ram resumeRam resume
Ram resume
 
Chidambaram_cv sr,mech
Chidambaram_cv sr,mechChidambaram_cv sr,mech
Chidambaram_cv sr,mech
 
Khan Bahadar CV
Khan Bahadar  CVKhan Bahadar  CV
Khan Bahadar CV
 
شريف عبد الجواد احمد
شريف عبد الجواد احمدشريف عبد الجواد احمد
شريف عبد الجواد احمد
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New Resume
 
ahmed rashad new cv
ahmed rashad new cvahmed rashad new cv
ahmed rashad new cv
 
ASSET_Company Presentation 02112020.pptx
ASSET_Company Presentation 02112020.pptxASSET_Company Presentation 02112020.pptx
ASSET_Company Presentation 02112020.pptx
 
Nasser Rabie Resume
Nasser Rabie ResumeNasser Rabie Resume
Nasser Rabie Resume
 
Hazem Gobran CURRICULUM VITAE
Hazem Gobran CURRICULUM VITAEHazem Gobran CURRICULUM VITAE
Hazem Gobran CURRICULUM VITAE
 
samircv
samircvsamircv
samircv
 
Mahmoud
MahmoudMahmoud
Mahmoud
 
Ongc ppt
Ongc pptOngc ppt
Ongc ppt
 
Shalechem
Shalechem Shalechem
Shalechem
 
Amr Hendia CV
Amr Hendia CVAmr Hendia CV
Amr Hendia CV
 
ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...
 
CTM
CTMCTM
CTM
 
ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...
 
Resume1
Resume1Resume1
Resume1
 

1Nader-SeniorOperator-CV

  • 1. Nader Rady Kamal Abdelgayed Palestine St- Behind Marriott hotel- Jeddah- Saudi Arabia Contact numbers: 00966561726037 KSA 00201066080130, 00201151764500 Egypt Email address: nader.elgayed@gmail.com Personal Information: • Gender : Male • Birth Date : July 8th , 1981 • Nationality : Egyptian • Religion : Muslim • Marital Status : Married • Military Status : Exempted • Qualification : Alwerdian Advanced Technical School of Five Years 2001 Job History: • 10/2012 until now (Senior Operator of Oil Movement- Loading Area) Cooperative of Oil Petroleum- Egypt • 5/2008 to 9/2012 (Plant Operator of C4 Alkylation department) Rabigh Refining & Petrochemical Co (PETRORabigh) – KSA (Saudi Aramco &Sumitomo Chemicals JV) • 11/2006 to 5/2008 (Field Operator of Hydrocracker unit) MIDOR Refining Company- Egypt Work Experience:U • COOP Company Cooperative of Petrol Company for Oil Distribution Alexandria- Egypt- Oil Movement Area, Designation: Senior Operator • PETRORabigh Refinery& Petrochemical Company, Capacity: 400000 BPSD (Joint venture of Saudi Aramco- Sumitomo Chemical- Saudi Arabia-C4 -Alkylation (Monomer department) Designation: Plant Operator – C4- Alkylation (Monomer department) C4 - Alkylation Unit: • Licensors – DuPont Technology – Stratco Process • Capacity- 22611 BPSD • Catalyst – Liquid 99.5 wt % H2SO4 • Gas Centrifugal Compressor is steam turbine driven type of 121772 m3/hr capacity • Product- Alkylate that is used as a premium gasoline blending stock.
  • 2. Isomeraization Plant • Licensors- Axens • Capacity-22700 BPSD • Product- Iso Butane from N- Butane Sulphuric Acid Refreshment Plant (SAP): • Licensors- Monsanto Enviro Chem Systems- Lurgi Process • Capacity- 160 MT/day • Product- 99.5 wt % Sulphuric acid • MIDOR Refinery (Egypt- Alexandria- Free zone) Designation: Field Operator of Hydrocracker Unit: •Licensors: Universal Oil Products (UOP) •Capacity: 32000 BPSD =220 fresh m3/hr. •Products: Unconverted oil, Diesel, Kerosene, Naphtha and LPG. My Responsibilities Include: • Rotating equipment emergency shutdown and start up procedure • Reviewing, comments and suggestion or modification on operation manual, P& ID, PFD • Translating operation manual to Arabic language • Preparing training manual and presentation for new operators and training them. • Look after pre-commissioning and commissioning activities • Maintained records of daily works, process reading, lists of pending work, maintenance or repair of machines, log-books of machines, planning and material stock • To maintain safe, reliable and smooth operation, optimization of unit operations and plant capabilities. • Prepare and handover equipment for maintenance so as the job will carry timely and safely. • Multitasking (instrument, electrical and mechanical) Critical Equipment/Operation Handled: • High pressure (165 kg/cm2) Three stages double acting reciprocating compressor • High capacity centrifugal compressor 190 kg/cm2 • High capacity centrifugal pumps eight stages which discharging (190 kg/ cm2) • Contactor reactors of Alkylation unit (eight reactors) which running with very high concentrate sulfuric acid 98.2%
  • 3. Training & Specialized Courses: • First Aid, MIDOR refinery training center • Firefighting course, MIDOR refinery training center • Sample Collection, MIDOR refinery training center • Refinery Operators Training, MIDOR refinery training center • Pumps Technology, Oil & Gas Skills Company, MIDOR training center • Centrifugal Compressor, O&G Skills Company, MIDOR training center • Reciprocating double compressors, MIDOR refinery training center • Emergency Response Team training, PETRORabigh company • Basic Life Support (BLS), PETRORabigh company training center • Heart Attack Prevention, PETRORabigh company training center • Firefighting, PETRORabigh company fire station • Advance Industrial Firefighting, PETRORabigh company • Confine Space Entry Training. PETRORabigh company • Practical Firefighting & Safety Procedure PETRORabigh company • Hydrogen Sulfide Course, PETRORabigh company training center • Industrial Basic Safety Awareness, PETRORabigh training center • First Aid For Sulfuric Acid Burns, PETRORabigh (Alkylation Unit) • Hazard Recognition (HR) PETRORabigh company training center • Gas Testing Course, PETRORabigh company training center • Scaffolding Safety Awareness, PETRORabigh company training center • Optimizing Steam Boilers Operation and Preventive Maintenance, PETRORabigh company Some Achievements: • Success involved in shutdown, maintenance and startup of Hydrocracker unit during planned refinery general shutdown in year 2006 • Expert field operator of project management team for documentation & commissioning of C4 Alkylation, Isomerization and Sulfuric Acid plants in 2008 • Safe commissioning for Alkylation, SAP and Isom units in 2009 • Pre-commissioning and commissioning and operation of all three units • Successfully involved in Alkylation, Isomerization and Sulfuric Acid units during plant turnaround in 2011 • Member of general 2011 T&I for Alkylation, SAP and Isom units