PROFILE
Looking a greatest opportunity to work as Commissioning and shut down/start
up in reputed company. I have total 12+ years of experience in Oil/Gas facilities.
Pre-comm. Commissioning & plant operation in EPC / PMC Project work.
JOB RESPONSIBILITY IN PRE- COMMISSIONING AND COMMISSIONING
 Preparations for the Commissioning and pre-commissioning procedures and
operation manual.
 Function test and commissioning and pre-commissioning P&ID and procedure
preparation.
 Organize and perform activities on commissioning and testing of all
construction projects carried out by the Construction team.
 Develop programs and calendar schedules of commissioning work and testing,
agree them with management.
 Run in of rotating equipment by bengin fluid, Final leak test, DCS emergency
shutdown Testing. Punch listing before RFSU and Co-ordination with HSSE.
JOB RESPONSIBILITY IN START-UP AND NORMAL OPERATION
 As a supervisor field and Panel Operation for Daily Operations, Maintaining logs
Monitoring process parameters, acknowledging process alarms based on priority,
trends monitoring, maintaining logs, start-up and shutdown of the plant.
 Leading start up, Shut down of plant operations & maintaining documented
records of all operational processes.
 Monitoring and maintaining process parameters (Pressure, Temp., Flow, level) at
all user points and in Plant area.
 Managing & ensuring smooth operation of varies compressors and pumps in
plant.
 Detecting gas leakage at user points with the help of hi-tech instruments.
 Issue the permit to work (PTW) and closed as per producers.
COMMISSIONING ACTIVITIES
Page 2 of 4
 Checking instrument and equipment’s as per P & I Diagram.
 Vessel/column internal inspection
 Water flushing/Air blowing
 Cardboard flushing
 Leak test of the system
 Nitrogen purging for removal of oxygen from the system
 Making of punch points list & rectification of the points in co-ordination with
maintenance
 Carrying out trail runs of all the rotary equipment
 Lining up the plant for smooth & safe start up.
EXPERIENCE IN
 Sulfur Recovery Unit
 Acid gas Enrichment Unit
 Well head operation
 Gas plant operation
 Glycol Dehydration Unit
 Oil and Gas Gathering Station
 Amine regeneration unit
 Utilities
SULFUR RECOVERY UNIT
 Acid gas knock out drum and fuel gas knock out drum, Air Blower 65000Nm3/hr.
(HowdenProcess compressor) & Acid gas condensate pumps.
 Combustion Air/Acid gas preheaters. Blow down cooler.
 Main Burner (Duiker LMV 1900 System), Reaction furnace.
 Advanced Burner control system (ABC)
 Boiler feed water system, Waste heat Boiler & H.P steam Network system. Steam
Condensate H.P & L.P Flash drums system. Boiler feed water dosing system
 Sulfur reheaters, Vent condensers, Acid gas flare system.
 Three stages Claus & one stage super Claus Reactor (Dutch development).
 Super Claus reactor selective oxidation (selox) Air control system.
 Sulfur condensers. Super Claus sulfur condenser, Boiler feed water condenser.
 Sulfur coalescer, Sulfur Degassing contactors, IA receiver. Atmospheric
Blowdown drum.
 Incinerator Air Blower, Thermal incinerator (oxidizer).
Sulfur storage vessel & Rundown assembly Condenser to sulfur pit.
ACID GAS ENRICHMENT UNIT
 Gas Absorber out let off gas capacity 42114Nm3/hr & H2S content 250 to 400
Page 3 of 4
ppm.
 Generation column with shall nap in valve and chimney tray type.
 Regeneration column Total 18 no’s of trays & 4 No’s of wash water trays.
 Lean solvent & Rich solvent circulation pumps.
 High-pressure reboliers & Reflux Drum and Reflux Low head Low pressure
pump.
 Plate & frame type heat exchangers & Active carbon, Guard & Cartridge filters.
Anti-foam & phosphoric acid dosing system.
 MDEA solvent storage tank & solvent pump. Acid gas Flare system.
WELL HEAD OPERATION
Inspection and operation of Christmas tree and flow line check up for leaks, flow line
flushing jobs. Pig launching & handover for well services like perforation, acid jobs, and
wire line operation such as coil tubing, Gauge survey, SSV & SSSV operations, well head
panel operations, flow line choke changing, orifice plate changing, STHP, FTHP, well
equalizing, annulus pressure bleeding, safety valve testing, Water & Gas injection, etc.
GAS PLANT OPERATION
Worked in gas gathering stations, gas compression facilities, gas plant etc.Handled
different types of gas compressors (reciprocating & centrifugal), sweet gas purging of
H2S gas compressors, isolation & deisolation of compressors, heat exchangers etc.
Gas plant operations, free water knock out drums, degassing vessels.
GLYCOL DEHYDRATION UNIT
Familiarization of gas dehydration unit startup and shut up of gas dehydration unit
handling of inlet coalscer separator, glycol contacts tower, glycol overhead scrubber,
and gas / glycol heat exchanger (Tube and Shell type), monitoring and controlling of
contactor pressure, glycol level and temperature, flow rate of lean glycol.
Glycol regeneration unit- Handling of Re-boiler, Lean /Rich glycol heat exchanger,
glycol storage tank, operation glycol re-circulation pump operation of glycol flash drum,
glycol filter, active carbon filter, reflux coil, still column, stripping column, monitoring
and controlling of stripping gas, maintaining of Re-boiler temperature & pH value.
Checking of pH twice a month. Avoiding the glycol loss and maintain the dew point
temperature.
OIL AND GAS GATHERING STATION
Page 4 of 4
Operation and control of wells through different headers for optimum production. Oil
manifolds, gas lift manifolds, surge tanks, separators (Two/three phase), dehydration
tanks, water disposal pumps, crude transfer pumps, chemical injection. Gas
compressors, inter-stage scrubbers, gas treatment, glycol contractors, glycol
regeneration unit, gas export, crude stabilization unit, storage tank.
COMPUTER SKILLS
Good knowledge in computers on MS Word, Excel, PowerPoint, & Outlook in Windows
Amine Regeneration Unit
Co2 removal by amine, acid gas absorber, acid gas inlet separator, lean amine pumps,
activated carbon filter, lean amine pre-filter, rich amine flash drum, lean amine cooler,
amine regenerator, regenerator condenser, regenerator reflux drum, lean amine booster
pumps, lean/rich amine exchanger, regenerator reflux pumps, amine regenerator
reboiler, amine storage vessel, amine transfer pump, amine recovery filter, recovered
amine pumps, amine drain drum.
UTILITIES
Operating of power generators, Synchronizing generators, flare ignition unit, Operations of
Instrument air Compressors and utility air compressors, Operating centrifugal pumps for
fire water systems. Nitrogen generation unit operation and boiler operation.
SAFETY AND WORK PERMIT SYSTEM
 Familiar with Selection of PPEs, Operations Safety, Safety Training
Observation Program (STOP), and H2S gas monitoring.
 Maintaining records for Multi lock systems & Lock-open/Lock-close
(LOTO) valves record.
 Preparation of Standard Operating Procedures and Job Safety Analysis.
 Actively participated in on-site & off-site emergency plan, firefighting
mock drill, Evacuation drill, tool box talks.
 Responsibility includes monitoring of Fire water system, Checklist
updating & weekly trial of Fire hydrant system and Fire extinguishers.
 Handling of Fire hydrant, Fire hose, Fire monitors, and all type of Fire
extinguishers and handling of all Safety equipment’s. Handling of
Emergency shutdown (E.S.D).

More Related Content

What's hot

production operator
production operatorproduction operator
production operatorGURU JOY
 
Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor NewJoseph Jaiwin Das
 
Senior Water Treatment Plant Operator
Senior Water Treatment Plant Operator Senior Water Treatment Plant Operator
Senior Water Treatment Plant Operator YPIC
 
Tankfarm terminal operator
Tankfarm  terminal operatorTankfarm  terminal operator
Tankfarm terminal operatorKamlesh Bhatt
 
bismilla operation & comissioning
bismilla operation & comissioningbismilla operation & comissioning
bismilla operation & comissioningBismilla Syed
 
Subbiah May 16
Subbiah May 16Subbiah May 16
Subbiah May 16subbiah as
 
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesCritical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesGerard B. Hawkins
 
MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012Minnal Mani
 
Air / Steam Regeneration Procedure for Primary Reforming Ccatalyst
Air / Steam Regeneration Procedure for Primary Reforming CcatalystAir / Steam Regeneration Procedure for Primary Reforming Ccatalyst
Air / Steam Regeneration Procedure for Primary Reforming CcatalystGerard B. Hawkins
 
Edta cleaning procedurefor_150mw[1]
Edta cleaning procedurefor_150mw[1]Edta cleaning procedurefor_150mw[1]
Edta cleaning procedurefor_150mw[1]Vishal Modi
 
Abdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application EngineerAbdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application EngineerAbdelaziz Ibrahim
 

What's hot (20)

saravanan WHOP
saravanan WHOPsaravanan WHOP
saravanan WHOP
 
Antro
AntroAntro
Antro
 
Updated CV
Updated CVUpdated CV
Updated CV
 
production operator
production operatorproduction operator
production operator
 
Ebrayeem cv
Ebrayeem cvEbrayeem cv
Ebrayeem cv
 
Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor New
 
Senior Water Treatment Plant Operator
Senior Water Treatment Plant Operator Senior Water Treatment Plant Operator
Senior Water Treatment Plant Operator
 
Tankfarm terminal operator
Tankfarm  terminal operatorTankfarm  terminal operator
Tankfarm terminal operator
 
CV operator Oil movement
CV operator Oil movementCV operator Oil movement
CV operator Oil movement
 
remesh new
remesh newremesh new
remesh new
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
 
bismilla operation & comissioning
bismilla operation & comissioningbismilla operation & comissioning
bismilla operation & comissioning
 
Bfwp
BfwpBfwp
Bfwp
 
Subbiah May 16
Subbiah May 16Subbiah May 16
Subbiah May 16
 
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesCritical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
 
Production Operator
Production OperatorProduction Operator
Production Operator
 
MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012
 
Air / Steam Regeneration Procedure for Primary Reforming Ccatalyst
Air / Steam Regeneration Procedure for Primary Reforming CcatalystAir / Steam Regeneration Procedure for Primary Reforming Ccatalyst
Air / Steam Regeneration Procedure for Primary Reforming Ccatalyst
 
Edta cleaning procedurefor_150mw[1]
Edta cleaning procedurefor_150mw[1]Edta cleaning procedurefor_150mw[1]
Edta cleaning procedurefor_150mw[1]
 
Abdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application EngineerAbdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application Engineer
 

Similar to JPE.doc

Chlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsChlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsSURESHKUMAR MUTHURAMALINGAM
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CVkalki selvan
 
Abbasi experience presentation
Abbasi experience presentationAbbasi experience presentation
Abbasi experience presentationAbu Abbasi
 
Guidelines for Charging Primary Reforming Catalyst via Wet Method
Guidelines for Charging Primary Reforming Catalyst via Wet MethodGuidelines for Charging Primary Reforming Catalyst via Wet Method
Guidelines for Charging Primary Reforming Catalyst via Wet MethodGerard B. Hawkins
 
Reactor & Impeller Design in Hydrogenation
Reactor & Impeller Design in Hydrogenation Reactor & Impeller Design in Hydrogenation
Reactor & Impeller Design in Hydrogenation Gerard B. Hawkins
 
(AGRU) ACID GAS SOUR SHIFT: CASE STUDY IN REFINERY GAS TREATMENT
(AGRU) ACID GAS SOUR SHIFT: CASE STUDY IN REFINERY GAS TREATMENT(AGRU) ACID GAS SOUR SHIFT: CASE STUDY IN REFINERY GAS TREATMENT
(AGRU) ACID GAS SOUR SHIFT: CASE STUDY IN REFINERY GAS TREATMENTGerard B. Hawkins
 
Refluxing Condensation Systems (Dephlegmators)
Refluxing Condensation Systems (Dephlegmators)Refluxing Condensation Systems (Dephlegmators)
Refluxing Condensation Systems (Dephlegmators)Gerard B. Hawkins
 
Gea evaporation technology-brochure_en_tcm11-16319
Gea evaporation technology-brochure_en_tcm11-16319Gea evaporation technology-brochure_en_tcm11-16319
Gea evaporation technology-brochure_en_tcm11-16319hung do
 
Naphtha Steam Reforming Catalyst Reduction by NH3 Cracking
Naphtha Steam Reforming Catalyst Reduction by NH3 CrackingNaphtha Steam Reforming Catalyst Reduction by NH3 Cracking
Naphtha Steam Reforming Catalyst Reduction by NH3 CrackingGerard B. Hawkins
 
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSSTEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSGerard B. Hawkins
 
CURRICULUM VITAE OF ERNESTO N. VALERIO 1
CURRICULUM VITAE OF ERNESTO N. VALERIO 1CURRICULUM VITAE OF ERNESTO N. VALERIO 1
CURRICULUM VITAE OF ERNESTO N. VALERIO 1ERNESTO VALERIO
 

Similar to JPE.doc (20)

Chlor alkali 2016
Chlor alkali 2016Chlor alkali 2016
Chlor alkali 2016
 
Chlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant OperationsChlor alkali plant Control room operator & Plant Operations
Chlor alkali plant Control room operator & Plant Operations
 
VETRI CV
VETRI CVVETRI CV
VETRI CV
 
Field Production Operator CV
Field Production Operator CVField Production Operator CV
Field Production Operator CV
 
PRODUCTION&WELLHEAD
PRODUCTION&WELLHEADPRODUCTION&WELLHEAD
PRODUCTION&WELLHEAD
 
afri-cv
afri-cvafri-cv
afri-cv
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
ammoniautility operator
ammoniautility operatorammoniautility operator
ammoniautility operator
 
ammonia&utility operator
ammonia&utility operatorammonia&utility operator
ammonia&utility operator
 
Abbasi experience presentation
Abbasi experience presentationAbbasi experience presentation
Abbasi experience presentation
 
Guidelines for Charging Primary Reforming Catalyst via Wet Method
Guidelines for Charging Primary Reforming Catalyst via Wet MethodGuidelines for Charging Primary Reforming Catalyst via Wet Method
Guidelines for Charging Primary Reforming Catalyst via Wet Method
 
shivpratapshukla 6906
shivpratapshukla 6906shivpratapshukla 6906
shivpratapshukla 6906
 
Reactor & Impeller Design in Hydrogenation
Reactor & Impeller Design in Hydrogenation Reactor & Impeller Design in Hydrogenation
Reactor & Impeller Design in Hydrogenation
 
(AGRU) ACID GAS SOUR SHIFT: CASE STUDY IN REFINERY GAS TREATMENT
(AGRU) ACID GAS SOUR SHIFT: CASE STUDY IN REFINERY GAS TREATMENT(AGRU) ACID GAS SOUR SHIFT: CASE STUDY IN REFINERY GAS TREATMENT
(AGRU) ACID GAS SOUR SHIFT: CASE STUDY IN REFINERY GAS TREATMENT
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 
Refluxing Condensation Systems (Dephlegmators)
Refluxing Condensation Systems (Dephlegmators)Refluxing Condensation Systems (Dephlegmators)
Refluxing Condensation Systems (Dephlegmators)
 
Gea evaporation technology-brochure_en_tcm11-16319
Gea evaporation technology-brochure_en_tcm11-16319Gea evaporation technology-brochure_en_tcm11-16319
Gea evaporation technology-brochure_en_tcm11-16319
 
Naphtha Steam Reforming Catalyst Reduction by NH3 Cracking
Naphtha Steam Reforming Catalyst Reduction by NH3 CrackingNaphtha Steam Reforming Catalyst Reduction by NH3 Cracking
Naphtha Steam Reforming Catalyst Reduction by NH3 Cracking
 
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTSSTEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
STEAMING PROCEDURE FOR VULCAN STEAM REFORMING CATALYSTS
 
CURRICULUM VITAE OF ERNESTO N. VALERIO 1
CURRICULUM VITAE OF ERNESTO N. VALERIO 1CURRICULUM VITAE OF ERNESTO N. VALERIO 1
CURRICULUM VITAE OF ERNESTO N. VALERIO 1
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

JPE.doc

  • 1. Page 1 of 4 PROFILE Looking a greatest opportunity to work as Commissioning and shut down/start up in reputed company. I have total 12+ years of experience in Oil/Gas facilities. Pre-comm. Commissioning & plant operation in EPC / PMC Project work. JOB RESPONSIBILITY IN PRE- COMMISSIONING AND COMMISSIONING  Preparations for the Commissioning and pre-commissioning procedures and operation manual.  Function test and commissioning and pre-commissioning P&ID and procedure preparation.  Organize and perform activities on commissioning and testing of all construction projects carried out by the Construction team.  Develop programs and calendar schedules of commissioning work and testing, agree them with management.  Run in of rotating equipment by bengin fluid, Final leak test, DCS emergency shutdown Testing. Punch listing before RFSU and Co-ordination with HSSE. JOB RESPONSIBILITY IN START-UP AND NORMAL OPERATION  As a supervisor field and Panel Operation for Daily Operations, Maintaining logs Monitoring process parameters, acknowledging process alarms based on priority, trends monitoring, maintaining logs, start-up and shutdown of the plant.  Leading start up, Shut down of plant operations & maintaining documented records of all operational processes.  Monitoring and maintaining process parameters (Pressure, Temp., Flow, level) at all user points and in Plant area.  Managing & ensuring smooth operation of varies compressors and pumps in plant.  Detecting gas leakage at user points with the help of hi-tech instruments.  Issue the permit to work (PTW) and closed as per producers. COMMISSIONING ACTIVITIES
  • 2. Page 2 of 4  Checking instrument and equipment’s as per P & I Diagram.  Vessel/column internal inspection  Water flushing/Air blowing  Cardboard flushing  Leak test of the system  Nitrogen purging for removal of oxygen from the system  Making of punch points list & rectification of the points in co-ordination with maintenance  Carrying out trail runs of all the rotary equipment  Lining up the plant for smooth & safe start up. EXPERIENCE IN  Sulfur Recovery Unit  Acid gas Enrichment Unit  Well head operation  Gas plant operation  Glycol Dehydration Unit  Oil and Gas Gathering Station  Amine regeneration unit  Utilities SULFUR RECOVERY UNIT  Acid gas knock out drum and fuel gas knock out drum, Air Blower 65000Nm3/hr. (HowdenProcess compressor) & Acid gas condensate pumps.  Combustion Air/Acid gas preheaters. Blow down cooler.  Main Burner (Duiker LMV 1900 System), Reaction furnace.  Advanced Burner control system (ABC)  Boiler feed water system, Waste heat Boiler & H.P steam Network system. Steam Condensate H.P & L.P Flash drums system. Boiler feed water dosing system  Sulfur reheaters, Vent condensers, Acid gas flare system.  Three stages Claus & one stage super Claus Reactor (Dutch development).  Super Claus reactor selective oxidation (selox) Air control system.  Sulfur condensers. Super Claus sulfur condenser, Boiler feed water condenser.  Sulfur coalescer, Sulfur Degassing contactors, IA receiver. Atmospheric Blowdown drum.  Incinerator Air Blower, Thermal incinerator (oxidizer). Sulfur storage vessel & Rundown assembly Condenser to sulfur pit. ACID GAS ENRICHMENT UNIT  Gas Absorber out let off gas capacity 42114Nm3/hr & H2S content 250 to 400
  • 3. Page 3 of 4 ppm.  Generation column with shall nap in valve and chimney tray type.  Regeneration column Total 18 no’s of trays & 4 No’s of wash water trays.  Lean solvent & Rich solvent circulation pumps.  High-pressure reboliers & Reflux Drum and Reflux Low head Low pressure pump.  Plate & frame type heat exchangers & Active carbon, Guard & Cartridge filters. Anti-foam & phosphoric acid dosing system.  MDEA solvent storage tank & solvent pump. Acid gas Flare system. WELL HEAD OPERATION Inspection and operation of Christmas tree and flow line check up for leaks, flow line flushing jobs. Pig launching & handover for well services like perforation, acid jobs, and wire line operation such as coil tubing, Gauge survey, SSV & SSSV operations, well head panel operations, flow line choke changing, orifice plate changing, STHP, FTHP, well equalizing, annulus pressure bleeding, safety valve testing, Water & Gas injection, etc. GAS PLANT OPERATION Worked in gas gathering stations, gas compression facilities, gas plant etc.Handled different types of gas compressors (reciprocating & centrifugal), sweet gas purging of H2S gas compressors, isolation & deisolation of compressors, heat exchangers etc. Gas plant operations, free water knock out drums, degassing vessels. GLYCOL DEHYDRATION UNIT Familiarization of gas dehydration unit startup and shut up of gas dehydration unit handling of inlet coalscer separator, glycol contacts tower, glycol overhead scrubber, and gas / glycol heat exchanger (Tube and Shell type), monitoring and controlling of contactor pressure, glycol level and temperature, flow rate of lean glycol. Glycol regeneration unit- Handling of Re-boiler, Lean /Rich glycol heat exchanger, glycol storage tank, operation glycol re-circulation pump operation of glycol flash drum, glycol filter, active carbon filter, reflux coil, still column, stripping column, monitoring and controlling of stripping gas, maintaining of Re-boiler temperature & pH value. Checking of pH twice a month. Avoiding the glycol loss and maintain the dew point temperature. OIL AND GAS GATHERING STATION
  • 4. Page 4 of 4 Operation and control of wells through different headers for optimum production. Oil manifolds, gas lift manifolds, surge tanks, separators (Two/three phase), dehydration tanks, water disposal pumps, crude transfer pumps, chemical injection. Gas compressors, inter-stage scrubbers, gas treatment, glycol contractors, glycol regeneration unit, gas export, crude stabilization unit, storage tank. COMPUTER SKILLS Good knowledge in computers on MS Word, Excel, PowerPoint, & Outlook in Windows Amine Regeneration Unit Co2 removal by amine, acid gas absorber, acid gas inlet separator, lean amine pumps, activated carbon filter, lean amine pre-filter, rich amine flash drum, lean amine cooler, amine regenerator, regenerator condenser, regenerator reflux drum, lean amine booster pumps, lean/rich amine exchanger, regenerator reflux pumps, amine regenerator reboiler, amine storage vessel, amine transfer pump, amine recovery filter, recovered amine pumps, amine drain drum. UTILITIES Operating of power generators, Synchronizing generators, flare ignition unit, Operations of Instrument air Compressors and utility air compressors, Operating centrifugal pumps for fire water systems. Nitrogen generation unit operation and boiler operation. SAFETY AND WORK PERMIT SYSTEM  Familiar with Selection of PPEs, Operations Safety, Safety Training Observation Program (STOP), and H2S gas monitoring.  Maintaining records for Multi lock systems & Lock-open/Lock-close (LOTO) valves record.  Preparation of Standard Operating Procedures and Job Safety Analysis.  Actively participated in on-site & off-site emergency plan, firefighting mock drill, Evacuation drill, tool box talks.  Responsibility includes monitoring of Fire water system, Checklist updating & weekly trial of Fire hydrant system and Fire extinguishers.  Handling of Fire hydrant, Fire hose, Fire monitors, and all type of Fire extinguishers and handling of all Safety equipment’s. Handling of Emergency shutdown (E.S.D).