SlideShare a Scribd company logo
1 of 6
Download to read offline
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 276
Optimum Cost Analysis For Selecting Best Suited Flexible Pavement
Road Type For Reducing Direct Construction Cost Of Road Project
Omkar S.Patil1
Bachelor of Engineering, Dept. of civil Engineering, TKIET, Warananagar, Maharashtra, India.
--------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - The goal of this study is to determine which of
the five flexible road types listedin IRC37-2012 willresult
in the lowest construction costs for a range of CBRs from
2% to 15% and a range of traffic volumecircumstancesin
msa. Based on the district schedule rates the roads
specifications, standards and the proportions of the cost
of the materials, equipment and direct construction
(MORTH Specifications). In order to choose the least
expensive road crust type at a specific location of a
particular CBR, a correlation between the cost, road
forms, CBRs, and traffic volumes is computed.
Key Words: Direct Construction Cost, Road Types, Traffic,
CBRs, and Proportions of Construction Cost.
1. INTRODUCTION
For development of any specific region, wemustunravel one
thing or we should know about primary communication
conveniences of that region. Besidesisitingoodconditionor
not? How can we communicate existing amenitieswiththeir
proper suitability? Else someone can insinuate also. This is
integral part of development of any region that’s why road
construction plays first rated role. There are a lots of road
projects who has been facing various setbacks throughout
their entire project life but yet it posses 3.64% of total GDP
of India. In fact one main challenge is to realize cost
difference which is frequently in increased manner due to
time taking process of planning and during construction
phase. Road construction costs vary on average by 16.73%,
according to observations. Several studies have found that9
out of 10 construction projects ran over budget by an
average of 28%. When opposed to road construction with
larger construction time and budget, smaller road projects
with shorter constructionperiodshavehighercostvariation.
For different combinations of flexible pavement crusts at
different CBRs and different traffic volumes, the least direct
construction cost technique can be employedtocutdown on
the direct construction cost. It is crucial to gather
information on cost overruns at the key construction sites
since changes in the kinds of road crust during ongoing
development have a significant influence on planning for
construction costs.
1.2. DISCUSSION AND OBSERVATION
As per mentioned in IRC-37 (flexible pavement) there are 5
types of flexible pavements. Their suitability depends upon
ground conditions and available construction equipments
for that particular region. It is obligatory that it should low
budgetary with their appropriate functioning hence we
should choose low budget road crust type of flexible
pavement regarding with region on which we have to
construct flexible pavement road. IRC-37 specifies five
distinct types of flexible pavement road crusts. This study
evaluates the effect on direct construction costs owing to
changes in the resultant flexible road crust type of
construction techniques or scope adjustments for any
combination of subgrade CBRs ranging from 3 to 15% and
traffic from 50 to 150 msa. A cost baselinecan be established
or altered based on the cost variation percentagesdescribed
in this article.
1.3. OBJECTIVE
 To study of literature review.
 To calculate direct construction cost of five flexible
road crust types given in IRC 37 for various traffic
volumes and CBRs by using DSR for sample traffic
and CBR of location.
 To obtain low costing best suited road among five
road crust types given at IRC 37 for sample traffic
and CBR of location by using optimum cost analysis
method.
 To calculate the construction cost proportions of
equipment cost, material cost with reference to
direct construction cost so as to make baseline for
budget.
 In case of change in road type due to changeinscope,
finding out cost escalation by calculating cost
variance percentage for all five types of flexible
pavements.
1.4. METHODOLOGY
The following methodology will be adopted -
 Collection of preliminary information through a
literature survey.
 Manifesting of problem statement, objectives, IRC-
37(2012) and analyzing types of flexible
pavements.
 Study of MORTH specification and standards then
collecting appropriate require data for our project
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 277
as well as study of general conditions given in
standard data book published by NHAI.
 Calculation of material cost and direct construction
cost for various flexible pavements given in IRC-37
such as,
1. Granular Base and Granular Sub-base (GB and
GSB).
2. Cementitious Base and Cementitious Sub-base of
aggregate interlayer for crack relief (CB and CSB).
3. Cementitious base and sub-base with SAMI at the
interface of base and the bituminous layer (CB and
CSB with SAMI).
4. Foamed bitumen/bitumen emulsion treatedRAP
or fresh aggregates over 250 mm Cementitious
sub-base (RAP).
5. Cementitious base and granular sub-base with
crack relief layer of aggregate layer above the
cementitious base (CB and GSB with crack relief
layer).
 Finding out parameters for cost reduction and cost
escalation by optimum cost analysismethodandcost
variance method.
 Suggesting the best recommendations for formation
of baseline for low budgeting direct cost of road
construction, material and equipments.
2. TRAFFIC DATA STUDY AND ANALYSIS
The process of designing a highway takes into account the
purpose of the road, the kind and amount of traffic, possible
traffic hazards and safety, capital expenses, maintenance
costs, vehicle operating costs, environmental implications,
aesthetics, and the convenience of the road users. Road
categorization, the horizontal alignment, vertical alignment,
and the road cross-section are the key geometric elements
for achieving these goals. The effectiveness of the pavement
is crucial since it directly affects the economic returns. This
chapter discusses the design process used for the new
roadway's flexible and rigid pavement, as well as the
reinforcement and restoration of the current carriageway.
This chapter also discusses the project corridor's current
state, the pavement option analysis, andtheideal alternative
design. This chapter discusses the design process used for
the new roadway's flexible andrigidpavement,aswell asthe
reinforcement and restoration of the current carriageway.
This chapter also discusses the project corridor's current
state, the pavement option analysis, andtheideal alternative
design.
2.1. COMPUTATION OF DESIGN TRAFFICC
Given equation must be used to calculate thetotal number of
standard axles to be transported during the course of the
road's design life:
Where
N = number of standard axles in terms of msa.
A = Initial traffic measured in commercial vehiclesperday in
the year at the end of construction (CVPD).
D = Lane distribution factor.
F = Vehicle Damage Factor (VDF).
n = years of design life.
The following formula is used to estimate traffic in the year
of completion.
Where,
p= Last counted number of commercial vehicles.
n= Years between the most recent count and the
construction's completion year.
Kodoli - Borpadale road
r=annual growth rate=7.5%
F=vehicle damage factor (VDF) = 3.5
A=645 CVPD
n= Design period in years=15
D= lane distribution factor=1
N=no of standard axels for one lane in both directions.
= 21.5 msa.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 278
2.2. COMPACTION TEST
Using a typical proctor compaction test, establish the
optimum moisture content and maximum dry density of a
soil.
2.1 Collection of soil sample:
Along 1 km road soil samples at starting, center and the end
point are taken.
For finding out CBR value of soil sample firstly required
Optimum Moisture content ofsoil.Thisiswhywecarried out
Standard compaction test (Heavy compaction test) on soil
samples.
2.3. WATER CONTENT DETERMINATION BY OVEN
DRYING METHOD:
Trial No 1 2 3 4
Empty weight of
tin(W1)
26 24 24 27
Initial weight of tin
+ weight of sample
(W2)
40 39 51 48
Weight of tin + dry
sample (W3)
38 36.5 46 44
Water content (%) 16.67% 20% 22.72% 23.52%
Table no.1.CBR standard load
Graph no.1.Water Content v/s Dry Density
RESULT:
OMC obtained from oven drying method = 20%
3. CBR TEST:
To carry out a load penetration test in the lab and estimate
the California bearing ratio. The thickness values of a
pavement employed in the IRC technique are read from the
CBR values of the sub grade since it is based on a
mechanistic empirical approach. From CBR value and
Cumulative standard axle load the total pavement thickness
could be read. Design procedure of pavement based on IRC:
37-2012.
3.1. CALIFORNIA BEARING RATIO TEST:
1. Calculation for sample no.1
Table no.2
Graph no.2
Graph no.2
Penetration
CBR Value
Sample No. 1
At 250mm
=
(Cal Load/ 1370)
2.38
At 500mm
=
(Cal Load/ 2055)
2.52
1.6
1.65
1.7
1.75
1.8
1.85
1.9
0 10 20 30
Watercontent
Dry
density
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 279
Table no.3
Graph no.3
3. calculation for sample no.3
Table no.4
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0 5 10
Penetration
load
Graph no.4
RESULT
Table no.5
The average CBR value obtained is 3%.
4. CALCULATION OF ROAD COST
Given:
CBR value: 3%
Traffic volume: 21.5msa
Solution:
By using IRC 37 -2012, the thickness of every layer is
calculated.
4.1. Thickness
Table no.6
Penetration
CBR Value
Sample No 2
At 250mm
=
(Cal Load/ 1370)
0.74
At 500mm
=
(Cal Load/ 2055)
1.33
Penetration
CBR Value
Sample No. 3
At 250mm
=
(Cal Load/ 1370)
2.21
At 500mm
=
(Cal Load/ 2055)
2.26
SAMPLE NO CBR VALUE %
1 2.52
2 1.33
3 2.26
Layers of road Thickness
BC layer 40
DBM layer 123
Granular Base 250
Granular Sub-base 380
0
0.1
0.2
0.3
0.4
0.5
0.6
0 5 10
Penetration
Load
2. Calculation for sample no.2
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 280
4.2. Width of single lane Road:
Width for BC layer: 3.75m
Width for DBM layer:
= 3.75 + (2×0.04)
= 3.83m
Width for granular base layer:
=3.83 + (2×0.123)
=4.076m
Width for Granular sub-base:
= 4.076 + (2×0.250)
= 4.576m
4.3. Compacted volume per KM:
BC layer:
Volume= L×B×D
=1000×3.75×0.04
V =150cumec
DBM:
Volume=L×B×D
=1000×3.83×0.123
V =471.09cumec.
Granular base layer:
Volume =L×B×D
=1000×4.08×0.25
V =1019cumec
Granular sub base layer:
Volume =L×B×D
=1000×4.58×0.38
V =1738.8 8cumec.
4.4. Material cost & construction cost:
The material costs are obtained from DSR rates and MORTH
specification. The construction cost are obtained from
multiplication of compacted volume, construction cost
obtained from standard data sheet and DSR rates.
CONCLUSION
The cheapest road crust type forthepresenttraffic volumeis
cemented base and cemented sub base with SAMI layer and
highest cost of road crust type is granular base and granular
sub base layer.
Moreover, by changing the kind of flexible road crust at any
time during construction, this research may be utilized to
determine the impact on direct construction costs. This
analysis can also be used in future when traffic volume
increases to 30 to 50 msa.
This analysis can also be used in future when traffic volume
increases to 30 to 50 msa.
REFERENCES
1) Harshavardhan N. Shinde (july2018),“Cost
Deviation Approach to Obtain Direct Construction
Cost Escalation or Savings for Different Flexible
Pavements at Traffic Volume 50-150msa and
Various CBR Conditions”, International Research
Journal of Engineering and Technology (IRJET),
Volume: 05, Issue: 07.
2) Harshavardhan N. Shinde (June 2018),”Minimal
Cost Approach for Selecting the flexible pavement
type to Minimize the Construction Cost of Road”,
International Journal of Latest Technology in
Engineering, Management & Applied Science,
Volume VII, Issue VI.
3) Harshavardhan N. Shinde (Feb 2019),” Material &
Construction Cost Deviation In Road Construction
for Different Flexible Pavement Crust Types at
Various Traffic&SubgradeCBRConditions”,Journal
of Emerging Technologies andInnovativeResearch,
Volume 6, Issue 2.
4) Badake Sanju Kumar, Malothu Narasimha (Nov
2017), “Design and estimation of flexible pavement
on 2/4 lane carriageway with paved shoulder using
mix road software”, Anveshana’s International
Journal Of Research in Engineering And Applied
Sciences, volume-2, issue 11.
5) Bent Flyvbjerg, Mette K.Skamris Holm and Søren L.
Buhl (Jan 2014), “What Causes Cost Overrun in
Transport Infrastructure Projects?” Transport
Reviews, volume-24, no.1, pp. 3-18.
6) Chantal C. Cantarelli , Bert van Wee, Eric J. E. Molin,
and Bent Flyvbjerg (April 2012), “Different Cost
Performance: Different Determinants? The Case of
Cost Overruns in Dutch Transportation
Infrastructure Projects”, Transport Policy, volume-
22, 88–95.
7) Ghulam Abbas Niazi, Noel Painting (2017),
“Significant Factors Causing Cost Overruns in the
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 281
ConstructionIndustryinAfghanistan”,International
Journal of Scientific and Research Publications,
Procedia Engineering 182, 510 – 517.
8) Ibrahim Mohamed (June-2013), “Effectsofproject’s
physical characteristics on cost deviation in road
construction”, Journal of King Saud University-
Engineering Science 25, 81-88.
9) Mr. Peter Morris and Mr.William F. Willson (2006),
“Measuring and Managing Cost Escalation”, AACE
International Transactions, CSC.06.
10) Rodrigo F. Herrera, OmarSanchez,KarenCastaneda
and Hernan Porras (August 2020), “Cost Overrun
Causative Factors in Road InfrastructureProjects:A
Frequency and Importance Analysis”,Appl.Science,
vol.10, 5506.
11) Salim S. Mulla, Ashish P. Waghmare(October2015),
“Influencing Factors caused for Time & Cost
Overruns in Construction Projects in Pune-India &
their Remedies”, IJISET-International Journal of
Innovative Science, Engineering & Technology,
Volume-2, Issue 10.
12) Guidelines for the design of flexible pavements: IRC
37, July 2012.
13) Government of Maharashtra Public Works
Department State e-DSR for year 2019-2020, w.e.f.
14/06/2019.
14) MORTH - Specifications for Road & Bridge Works
(5th Revision) 1, 2013.

More Related Content

Similar to Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type For Reducing Direct Construction Cost Of Road Project

Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET Journal
 
Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800PRIYANSHU KUMAR
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterIRJET Journal
 
Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...IAEME Publication
 
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...IAEME Publication
 
Using genetic algorithms to optimize material and construction variables for ...
Using genetic algorithms to optimize material and construction variables for ...Using genetic algorithms to optimize material and construction variables for ...
Using genetic algorithms to optimize material and construction variables for ...IRJET Journal
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALIRJET Journal
 
Design of flexible pavement using experimental and software approach
Design of flexible pavement using experimental and software approachDesign of flexible pavement using experimental and software approach
Design of flexible pavement using experimental and software approachIRJET Journal
 
76s201901
76s20190176s201901
76s201901IJRAT
 
Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...eSAT Journals
 
Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...eSAT Journals
 
Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...eSAT Journals
 
Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...eSAT Journals
 
Analysis of rc bridge decks for selected national and internationalstandard l...
Analysis of rc bridge decks for selected national and internationalstandard l...Analysis of rc bridge decks for selected national and internationalstandard l...
Analysis of rc bridge decks for selected national and internationalstandard l...eSAT Publishing House
 

Similar to Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type For Reducing Direct Construction Cost Of Road Project (20)

Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
 
Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800
 
Roads & bridges
Roads & bridgesRoads & bridges
Roads & bridges
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
 
Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...
 
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
 
Vgguj.pptx
Vgguj.pptxVgguj.pptx
Vgguj.pptx
 
Fk2410001003
Fk2410001003Fk2410001003
Fk2410001003
 
Design of expressway
Design of expresswayDesign of expressway
Design of expressway
 
Using genetic algorithms to optimize material and construction variables for ...
Using genetic algorithms to optimize material and construction variables for ...Using genetic algorithms to optimize material and construction variables for ...
Using genetic algorithms to optimize material and construction variables for ...
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
 
Design of flexible pavement using experimental and software approach
Design of flexible pavement using experimental and software approachDesign of flexible pavement using experimental and software approach
Design of flexible pavement using experimental and software approach
 
76s201901
76s20190176s201901
76s201901
 
Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...
 
Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...
 
Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...
 
Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...Analysis of rc bridge decks for selected national a nd internationalstandard ...
Analysis of rc bridge decks for selected national a nd internationalstandard ...
 
Analysis of rc bridge decks for selected national and internationalstandard l...
Analysis of rc bridge decks for selected national and internationalstandard l...Analysis of rc bridge decks for selected national and internationalstandard l...
Analysis of rc bridge decks for selected national and internationalstandard l...
 
TRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdfTRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdf
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 

Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type For Reducing Direct Construction Cost Of Road Project

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 276 Optimum Cost Analysis For Selecting Best Suited Flexible Pavement Road Type For Reducing Direct Construction Cost Of Road Project Omkar S.Patil1 Bachelor of Engineering, Dept. of civil Engineering, TKIET, Warananagar, Maharashtra, India. --------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - The goal of this study is to determine which of the five flexible road types listedin IRC37-2012 willresult in the lowest construction costs for a range of CBRs from 2% to 15% and a range of traffic volumecircumstancesin msa. Based on the district schedule rates the roads specifications, standards and the proportions of the cost of the materials, equipment and direct construction (MORTH Specifications). In order to choose the least expensive road crust type at a specific location of a particular CBR, a correlation between the cost, road forms, CBRs, and traffic volumes is computed. Key Words: Direct Construction Cost, Road Types, Traffic, CBRs, and Proportions of Construction Cost. 1. INTRODUCTION For development of any specific region, wemustunravel one thing or we should know about primary communication conveniences of that region. Besidesisitingoodconditionor not? How can we communicate existing amenitieswiththeir proper suitability? Else someone can insinuate also. This is integral part of development of any region that’s why road construction plays first rated role. There are a lots of road projects who has been facing various setbacks throughout their entire project life but yet it posses 3.64% of total GDP of India. In fact one main challenge is to realize cost difference which is frequently in increased manner due to time taking process of planning and during construction phase. Road construction costs vary on average by 16.73%, according to observations. Several studies have found that9 out of 10 construction projects ran over budget by an average of 28%. When opposed to road construction with larger construction time and budget, smaller road projects with shorter constructionperiodshavehighercostvariation. For different combinations of flexible pavement crusts at different CBRs and different traffic volumes, the least direct construction cost technique can be employedtocutdown on the direct construction cost. It is crucial to gather information on cost overruns at the key construction sites since changes in the kinds of road crust during ongoing development have a significant influence on planning for construction costs. 1.2. DISCUSSION AND OBSERVATION As per mentioned in IRC-37 (flexible pavement) there are 5 types of flexible pavements. Their suitability depends upon ground conditions and available construction equipments for that particular region. It is obligatory that it should low budgetary with their appropriate functioning hence we should choose low budget road crust type of flexible pavement regarding with region on which we have to construct flexible pavement road. IRC-37 specifies five distinct types of flexible pavement road crusts. This study evaluates the effect on direct construction costs owing to changes in the resultant flexible road crust type of construction techniques or scope adjustments for any combination of subgrade CBRs ranging from 3 to 15% and traffic from 50 to 150 msa. A cost baselinecan be established or altered based on the cost variation percentagesdescribed in this article. 1.3. OBJECTIVE  To study of literature review.  To calculate direct construction cost of five flexible road crust types given in IRC 37 for various traffic volumes and CBRs by using DSR for sample traffic and CBR of location.  To obtain low costing best suited road among five road crust types given at IRC 37 for sample traffic and CBR of location by using optimum cost analysis method.  To calculate the construction cost proportions of equipment cost, material cost with reference to direct construction cost so as to make baseline for budget.  In case of change in road type due to changeinscope, finding out cost escalation by calculating cost variance percentage for all five types of flexible pavements. 1.4. METHODOLOGY The following methodology will be adopted -  Collection of preliminary information through a literature survey.  Manifesting of problem statement, objectives, IRC- 37(2012) and analyzing types of flexible pavements.  Study of MORTH specification and standards then collecting appropriate require data for our project
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 277 as well as study of general conditions given in standard data book published by NHAI.  Calculation of material cost and direct construction cost for various flexible pavements given in IRC-37 such as, 1. Granular Base and Granular Sub-base (GB and GSB). 2. Cementitious Base and Cementitious Sub-base of aggregate interlayer for crack relief (CB and CSB). 3. Cementitious base and sub-base with SAMI at the interface of base and the bituminous layer (CB and CSB with SAMI). 4. Foamed bitumen/bitumen emulsion treatedRAP or fresh aggregates over 250 mm Cementitious sub-base (RAP). 5. Cementitious base and granular sub-base with crack relief layer of aggregate layer above the cementitious base (CB and GSB with crack relief layer).  Finding out parameters for cost reduction and cost escalation by optimum cost analysismethodandcost variance method.  Suggesting the best recommendations for formation of baseline for low budgeting direct cost of road construction, material and equipments. 2. TRAFFIC DATA STUDY AND ANALYSIS The process of designing a highway takes into account the purpose of the road, the kind and amount of traffic, possible traffic hazards and safety, capital expenses, maintenance costs, vehicle operating costs, environmental implications, aesthetics, and the convenience of the road users. Road categorization, the horizontal alignment, vertical alignment, and the road cross-section are the key geometric elements for achieving these goals. The effectiveness of the pavement is crucial since it directly affects the economic returns. This chapter discusses the design process used for the new roadway's flexible and rigid pavement, as well as the reinforcement and restoration of the current carriageway. This chapter also discusses the project corridor's current state, the pavement option analysis, andtheideal alternative design. This chapter discusses the design process used for the new roadway's flexible andrigidpavement,aswell asthe reinforcement and restoration of the current carriageway. This chapter also discusses the project corridor's current state, the pavement option analysis, andtheideal alternative design. 2.1. COMPUTATION OF DESIGN TRAFFICC Given equation must be used to calculate thetotal number of standard axles to be transported during the course of the road's design life: Where N = number of standard axles in terms of msa. A = Initial traffic measured in commercial vehiclesperday in the year at the end of construction (CVPD). D = Lane distribution factor. F = Vehicle Damage Factor (VDF). n = years of design life. The following formula is used to estimate traffic in the year of completion. Where, p= Last counted number of commercial vehicles. n= Years between the most recent count and the construction's completion year. Kodoli - Borpadale road r=annual growth rate=7.5% F=vehicle damage factor (VDF) = 3.5 A=645 CVPD n= Design period in years=15 D= lane distribution factor=1 N=no of standard axels for one lane in both directions. = 21.5 msa.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 278 2.2. COMPACTION TEST Using a typical proctor compaction test, establish the optimum moisture content and maximum dry density of a soil. 2.1 Collection of soil sample: Along 1 km road soil samples at starting, center and the end point are taken. For finding out CBR value of soil sample firstly required Optimum Moisture content ofsoil.Thisiswhywecarried out Standard compaction test (Heavy compaction test) on soil samples. 2.3. WATER CONTENT DETERMINATION BY OVEN DRYING METHOD: Trial No 1 2 3 4 Empty weight of tin(W1) 26 24 24 27 Initial weight of tin + weight of sample (W2) 40 39 51 48 Weight of tin + dry sample (W3) 38 36.5 46 44 Water content (%) 16.67% 20% 22.72% 23.52% Table no.1.CBR standard load Graph no.1.Water Content v/s Dry Density RESULT: OMC obtained from oven drying method = 20% 3. CBR TEST: To carry out a load penetration test in the lab and estimate the California bearing ratio. The thickness values of a pavement employed in the IRC technique are read from the CBR values of the sub grade since it is based on a mechanistic empirical approach. From CBR value and Cumulative standard axle load the total pavement thickness could be read. Design procedure of pavement based on IRC: 37-2012. 3.1. CALIFORNIA BEARING RATIO TEST: 1. Calculation for sample no.1 Table no.2 Graph no.2 Graph no.2 Penetration CBR Value Sample No. 1 At 250mm = (Cal Load/ 1370) 2.38 At 500mm = (Cal Load/ 2055) 2.52 1.6 1.65 1.7 1.75 1.8 1.85 1.9 0 10 20 30 Watercontent Dry density
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 279 Table no.3 Graph no.3 3. calculation for sample no.3 Table no.4 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0 5 10 Penetration load Graph no.4 RESULT Table no.5 The average CBR value obtained is 3%. 4. CALCULATION OF ROAD COST Given: CBR value: 3% Traffic volume: 21.5msa Solution: By using IRC 37 -2012, the thickness of every layer is calculated. 4.1. Thickness Table no.6 Penetration CBR Value Sample No 2 At 250mm = (Cal Load/ 1370) 0.74 At 500mm = (Cal Load/ 2055) 1.33 Penetration CBR Value Sample No. 3 At 250mm = (Cal Load/ 1370) 2.21 At 500mm = (Cal Load/ 2055) 2.26 SAMPLE NO CBR VALUE % 1 2.52 2 1.33 3 2.26 Layers of road Thickness BC layer 40 DBM layer 123 Granular Base 250 Granular Sub-base 380 0 0.1 0.2 0.3 0.4 0.5 0.6 0 5 10 Penetration Load 2. Calculation for sample no.2
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 280 4.2. Width of single lane Road: Width for BC layer: 3.75m Width for DBM layer: = 3.75 + (2×0.04) = 3.83m Width for granular base layer: =3.83 + (2×0.123) =4.076m Width for Granular sub-base: = 4.076 + (2×0.250) = 4.576m 4.3. Compacted volume per KM: BC layer: Volume= L×B×D =1000×3.75×0.04 V =150cumec DBM: Volume=L×B×D =1000×3.83×0.123 V =471.09cumec. Granular base layer: Volume =L×B×D =1000×4.08×0.25 V =1019cumec Granular sub base layer: Volume =L×B×D =1000×4.58×0.38 V =1738.8 8cumec. 4.4. Material cost & construction cost: The material costs are obtained from DSR rates and MORTH specification. The construction cost are obtained from multiplication of compacted volume, construction cost obtained from standard data sheet and DSR rates. CONCLUSION The cheapest road crust type forthepresenttraffic volumeis cemented base and cemented sub base with SAMI layer and highest cost of road crust type is granular base and granular sub base layer. Moreover, by changing the kind of flexible road crust at any time during construction, this research may be utilized to determine the impact on direct construction costs. This analysis can also be used in future when traffic volume increases to 30 to 50 msa. This analysis can also be used in future when traffic volume increases to 30 to 50 msa. REFERENCES 1) Harshavardhan N. Shinde (july2018),“Cost Deviation Approach to Obtain Direct Construction Cost Escalation or Savings for Different Flexible Pavements at Traffic Volume 50-150msa and Various CBR Conditions”, International Research Journal of Engineering and Technology (IRJET), Volume: 05, Issue: 07. 2) Harshavardhan N. Shinde (June 2018),”Minimal Cost Approach for Selecting the flexible pavement type to Minimize the Construction Cost of Road”, International Journal of Latest Technology in Engineering, Management & Applied Science, Volume VII, Issue VI. 3) Harshavardhan N. Shinde (Feb 2019),” Material & Construction Cost Deviation In Road Construction for Different Flexible Pavement Crust Types at Various Traffic&SubgradeCBRConditions”,Journal of Emerging Technologies andInnovativeResearch, Volume 6, Issue 2. 4) Badake Sanju Kumar, Malothu Narasimha (Nov 2017), “Design and estimation of flexible pavement on 2/4 lane carriageway with paved shoulder using mix road software”, Anveshana’s International Journal Of Research in Engineering And Applied Sciences, volume-2, issue 11. 5) Bent Flyvbjerg, Mette K.Skamris Holm and Søren L. Buhl (Jan 2014), “What Causes Cost Overrun in Transport Infrastructure Projects?” Transport Reviews, volume-24, no.1, pp. 3-18. 6) Chantal C. Cantarelli , Bert van Wee, Eric J. E. Molin, and Bent Flyvbjerg (April 2012), “Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transportation Infrastructure Projects”, Transport Policy, volume- 22, 88–95. 7) Ghulam Abbas Niazi, Noel Painting (2017), “Significant Factors Causing Cost Overruns in the
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 06 | Jun 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 281 ConstructionIndustryinAfghanistan”,International Journal of Scientific and Research Publications, Procedia Engineering 182, 510 – 517. 8) Ibrahim Mohamed (June-2013), “Effectsofproject’s physical characteristics on cost deviation in road construction”, Journal of King Saud University- Engineering Science 25, 81-88. 9) Mr. Peter Morris and Mr.William F. Willson (2006), “Measuring and Managing Cost Escalation”, AACE International Transactions, CSC.06. 10) Rodrigo F. Herrera, OmarSanchez,KarenCastaneda and Hernan Porras (August 2020), “Cost Overrun Causative Factors in Road InfrastructureProjects:A Frequency and Importance Analysis”,Appl.Science, vol.10, 5506. 11) Salim S. Mulla, Ashish P. Waghmare(October2015), “Influencing Factors caused for Time & Cost Overruns in Construction Projects in Pune-India & their Remedies”, IJISET-International Journal of Innovative Science, Engineering & Technology, Volume-2, Issue 10. 12) Guidelines for the design of flexible pavements: IRC 37, July 2012. 13) Government of Maharashtra Public Works Department State e-DSR for year 2019-2020, w.e.f. 14/06/2019. 14) MORTH - Specifications for Road & Bridge Works (5th Revision) 1, 2013.