International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 922
Production Plan & Control
Rahul Acharekar1, Pranjal Banawalikar2
1,2Student, Dept. of Mechanical Engineering, Bharati Vidyapeeth College of Engineering, Navi Mumbai
-----------------------------------------------------------------------------------------------------------------------------------------------
Abstract:- Production Planning & Control includes various
manufacturing phases, comp, functioning and relationship of
production planning and control with other departments.
Apart from this it includes various manufacturing methods of
production processes and management policies for meeting
demands of customers, work distribution among workers and
centralization. In this paper we have included various phases
of production. An overview of productionplanningandcontrol
about systems and management has been introduced.
Key Words: Manufacturing Phases, Management Phases &
Strategy.
1. INTRODUCTION
Manufacturing, a branch of industry, is the application of
tools and processes for the transformation of raw materials
into finished products. The manufacturing sector is closely
connected with engineering and industrial design. Some
industries, such as semiconductor and steel manufactures
use the term fabrication instead. Manufacturing includes all
intermediate processes required for the production and
integration of a product’s components.
The term manufacturing system refers to a collection or
arrangement of operations and processes used to make a
desired product or component. It includes the actual
equipments for composing the processes and the
arrangement of those processes. In a manufacturingsystem,
if there is a change or disturbance in the system, the system
should accommodate or adjust itself and continue to
function efficiently. Normally the effect of disturbance must
be counteracted by controllable inputs or the system itself.
2. STAGES OF PRODUCTION PLANNING & CONTROL
The stages of Production planning and control has three
phases:
1. Planning Phase
2. Action Phase
3. Control Phase
2.1 PLANNING PHASE
Planning is an exercise of intelligent anticipation in
order to establish how an objective can be achieved or a
need fulfilled in circumstances, which are invariably
restrictive. Production planning determines the optimal
schedule and sequence of operations economic batch
quantity, machine assignment and dispatching priorities for
sequencing. It has two categories of planning:
A. Prior planning
B. Active planning
A) PRIOR PLANNING
Prior planning means pre-productionplanning.Thisincludes
all the planning efforts, which are taking place prior to the
active planning.
A.1 Product development and Design
The process of developing a new product with all the
features, which are essential for effective use in the field, and
designing it accordingly. At the design stage, one has to take
several aspects of design like, design for selling, design for
manufacturing and design for usage.
A.2 Forecasting
It is an estimate of demand, which will happen in future.
Since, it is onlyan estimatebased on thepastdemand,proper
care must be taken while estimating it. Given the sales
forecast, the factory capacity, the aggregate inventory levels
and size of the work force, the manager must decide at what
rate of production to operate the plant over an intermediate
planning horizon.
A.3 Aggregate planning
The aim is to find out a product wise planning over the
intermediate planning.
A.4 Material requirement and Planning
It is a technique for determining the quantity and timing for
the acquisition of dependent items needed to satisfy the
master production schedule.
B) ACTIVE PLANNING
B.1 Process planning & Routing
It is a complete determination of the specific technological
process steps and their sequence to produce products at the
desired quality, quantity and cost. It determines the method
of manufacturing a productselectsthetoolsandequipments,
analyses how the manufacturing of the product will fit into
the facilities. Routing in particular prescribes the flow of
work in the plant and it is related to the considerations of
layout, temporary locations for raw materials and
components and materials handling systems.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 923
B.2 Material Planning
A material planning is a process which determines the
requirements of various raw materials/subassemblies by
considering thetrade-offbetweenvariouscostcomponents
like, carrying cost, ordering cost, shortage cost, and so
forth.
B.3 Tool’s Planning
It determines the requirements of various tools by taking
process specification (surfacefinish,lengthofthejob,overall
depth of cut etc.), material specifications (type of material
used, hardness of the material, shapeandsizeofthematerial
etc.) and equipment specifications (speed range, feed range,
depth of cut range etc.).
B.4 Loading
Loading is a process of assigning jobs to several machines
such that there is a load balance among the machines.Thisis
relatively a complex task, which can be managed with the
help of efficient heuristic procedure.
B.5 Scheduling
Scheduling is the timephase ofloadinganddetermineswhen
and in what sequence the work will be carried out. Thisfixes
the starting as well as the finishing time for each job.
2.2 ACTION PHASE
2.2.1 Dispatching
Action phase has the major step of dispatching. Dispatching
is the transition from planning phase to action phase. In this
phase, the worker is ordered to start manufacturing the
product. The tasks which are included in dispatching arejob
order, store issue order, tool order, time ticket, inspection
order, move order etc.
2.2.2 Job Order
The job order number is the key item which is to be
mentioned in all other reports/orders.
2.2.2 Store Issue Order
It gives instruction to stores to issue materials for
manufacturing the product as per product specifications. As
per tooling requirements for manufacturing the product,
the tool Order instruct the tool room to issue necessary
tools.
2.2.3 Time Ticket
It is nothing but a card which is designed to note down the
actual time taken at various processes. This information is
used for deciding the costs for future jobs of similar nature
and also for performing variance analysis, which helps to
exercise control.
Job order is the official authorization to the shop floor to
start manufacturing the product. Generally, the process
sequence will contain some testing and inspection. So, these
are to be instructed to inspection wing in the form of
inspection order for timely testing and inspectionsothatthe
amount of rework is minimized. Themanufactureofproduct
involves moving raw materials/subassemblies to the main
line. This is done by a well-designed materials handling
system. So, proper instruction is given to the materials
handling facilities for major movements of
materials/subassemblies in the form of a move order.
Movements which involve less distance and fewer loads are
managed at the shop floor level based on requests from
operators.
2.3 CONTROL PHASE
2.3.1 Progress Reporting
In progress reporting, the data regarding what is happening
with the job is collected. Also, it helps to make comparison
with the present level of performance. The various data
pertaining to materials rejection, process variations,
equipment failures, operator efficiency, operator
absenteeism, tool life, etc., are collected and analyzedforthe
purpose of progress reporting. These data are used for
performing variance analysis, which would help us to
identify critical areas that deserve immediate attention for
corrective actions.
2.3.2 Corrective Action
The tasks under corrective actionprimarilymakeprovisions
for an unexpected event. Some examples of corrective
actions are creating schedule flexibility, schedule
modifications,capacitymodifications,makeor buydecisions,
expediting the work, pre-planning, and so on. Due to
unforeseen reasons such as, machine breakdown, labor
absenteeism, too much rejectionduetopoormaterial quality
etc., it may not be possible to realize the schedule as per the
plan. Under such condition, it is better to reschedule the
whole product mix so that we get a clear picture of the
situation to progress further. Under such situation, itisto be
re-examined for selecting appropriate course of action.
Expediting means taking action if the progress reporting
indicates deviations from the originally set targets. Pre-
planning of the whole affair becomes essential in case the
expediting fails to bring the deviated plan to its right path.
4. CONCLUSION
As we have seen, that during production planning & control
various phases need to considered and planned well in
advance before design of product & accordingly make a
product which will be the best one in market. Planning isthe
main objective before any production which must be
considered. Productionphasesgivesa clearidea about which
machineries should be used during production, cost
optimization & labor required.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 924
REFERENCES
[1] A.Z. Keller “Just in Time”, 2013.
[2] Stanley B Gershwin “Introduction to Manufacturing
Systems”
[3] Taylor and Francis “Production Plan & Control”

More Related Content

What's hot

Functions of production planning and control 2
Functions of production planning and control 2Functions of production planning and control 2
Functions of production planning and control 2Vignesh Jayakumar
 
production planning and control
production planning and controlproduction planning and control
production planning and controlReshma Babu
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & controlBrijesh Kandu
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic conceptsgokulfea
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planningVenu Yadav
 
Production control presentation
Production control presentationProduction control presentation
Production control presentationkieran122
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGjntuhcej
 
Production scheduling
Production schedulingProduction scheduling
Production schedulingMohanKirthik
 
Production of Planning & control
Production of Planning & controlProduction of Planning & control
Production of Planning & controlVishal Kanthali
 
Pharmaceutical Production Planning and control
Pharmaceutical Production Planning and controlPharmaceutical Production Planning and control
Pharmaceutical Production Planning and controlRaviTeja Netha
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlNikitaGidde
 

What's hot (20)

Functions of production planning and control 2
Functions of production planning and control 2Functions of production planning and control 2
Functions of production planning and control 2
 
Unit 3 Manufacturing system design
Unit   3 Manufacturing system designUnit   3 Manufacturing system design
Unit 3 Manufacturing system design
 
Unit 2 manufacturing system design
Unit   2 manufacturing system designUnit   2 manufacturing system design
Unit 2 manufacturing system design
 
Ppc New
Ppc NewPpc New
Ppc New
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic concepts
 
Work study
Work studyWork study
Work study
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
Production control presentation
Production control presentationProduction control presentation
Production control presentation
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 
Production scheduling
Production schedulingProduction scheduling
Production scheduling
 
Production of Planning & control
Production of Planning & controlProduction of Planning & control
Production of Planning & control
 
production scheduling
production schedulingproduction scheduling
production scheduling
 
Pharmaceutical Production Planning and control
Pharmaceutical Production Planning and controlPharmaceutical Production Planning and control
Pharmaceutical Production Planning and control
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Unit 2
Unit 2Unit 2
Unit 2
 

Similar to IRJET- Production Plan and Control

Automobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringAutomobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringlovely467637
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...IRJET Journal
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.pptSrinuKN
 
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...IRJET Journal
 
New text document
New text documentNew text document
New text documentsalunkhev15
 
PRODUCTION PLANNING AND CONTROL.pdf
 PRODUCTION PLANNING AND CONTROL.pdf PRODUCTION PLANNING AND CONTROL.pdf
PRODUCTION PLANNING AND CONTROL.pdfvijay511413
 
Production mgt lecture_4
Production mgt lecture_4Production mgt lecture_4
Production mgt lecture_4Jyoti Yadav
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Manu Alias
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET Journal
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxssusera85eeb1
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...IRJET Journal
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIRJET Journal
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET Journal
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPratikDalvi17
 

Similar to IRJET- Production Plan and Control (20)

Chapter4EN.PDF.pdf
Chapter4EN.PDF.pdfChapter4EN.PDF.pdf
Chapter4EN.PDF.pdf
 
Automobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringAutomobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineering
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.ppt
 
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
IRJET- Role of Artificial Intelligence in Flexible Manufacturing Process - A ...
 
New text document
New text documentNew text document
New text document
 
PRODUCTION PLANNING AND CONTROL.pdf
 PRODUCTION PLANNING AND CONTROL.pdf PRODUCTION PLANNING AND CONTROL.pdf
PRODUCTION PLANNING AND CONTROL.pdf
 
Production mgt lecture_4
Production mgt lecture_4Production mgt lecture_4
Production mgt lecture_4
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docx
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
 
Unit 2 cim
Unit 2 cimUnit 2 cim
Unit 2 cim
 
Article final ivan f
Article final ivan fArticle final ivan f
Article final ivan f
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

IRJET- Production Plan and Control

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 922 Production Plan & Control Rahul Acharekar1, Pranjal Banawalikar2 1,2Student, Dept. of Mechanical Engineering, Bharati Vidyapeeth College of Engineering, Navi Mumbai ----------------------------------------------------------------------------------------------------------------------------------------------- Abstract:- Production Planning & Control includes various manufacturing phases, comp, functioning and relationship of production planning and control with other departments. Apart from this it includes various manufacturing methods of production processes and management policies for meeting demands of customers, work distribution among workers and centralization. In this paper we have included various phases of production. An overview of productionplanningandcontrol about systems and management has been introduced. Key Words: Manufacturing Phases, Management Phases & Strategy. 1. INTRODUCTION Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing sector is closely connected with engineering and industrial design. Some industries, such as semiconductor and steel manufactures use the term fabrication instead. Manufacturing includes all intermediate processes required for the production and integration of a product’s components. The term manufacturing system refers to a collection or arrangement of operations and processes used to make a desired product or component. It includes the actual equipments for composing the processes and the arrangement of those processes. In a manufacturingsystem, if there is a change or disturbance in the system, the system should accommodate or adjust itself and continue to function efficiently. Normally the effect of disturbance must be counteracted by controllable inputs or the system itself. 2. STAGES OF PRODUCTION PLANNING & CONTROL The stages of Production planning and control has three phases: 1. Planning Phase 2. Action Phase 3. Control Phase 2.1 PLANNING PHASE Planning is an exercise of intelligent anticipation in order to establish how an objective can be achieved or a need fulfilled in circumstances, which are invariably restrictive. Production planning determines the optimal schedule and sequence of operations economic batch quantity, machine assignment and dispatching priorities for sequencing. It has two categories of planning: A. Prior planning B. Active planning A) PRIOR PLANNING Prior planning means pre-productionplanning.Thisincludes all the planning efforts, which are taking place prior to the active planning. A.1 Product development and Design The process of developing a new product with all the features, which are essential for effective use in the field, and designing it accordingly. At the design stage, one has to take several aspects of design like, design for selling, design for manufacturing and design for usage. A.2 Forecasting It is an estimate of demand, which will happen in future. Since, it is onlyan estimatebased on thepastdemand,proper care must be taken while estimating it. Given the sales forecast, the factory capacity, the aggregate inventory levels and size of the work force, the manager must decide at what rate of production to operate the plant over an intermediate planning horizon. A.3 Aggregate planning The aim is to find out a product wise planning over the intermediate planning. A.4 Material requirement and Planning It is a technique for determining the quantity and timing for the acquisition of dependent items needed to satisfy the master production schedule. B) ACTIVE PLANNING B.1 Process planning & Routing It is a complete determination of the specific technological process steps and their sequence to produce products at the desired quality, quantity and cost. It determines the method of manufacturing a productselectsthetoolsandequipments, analyses how the manufacturing of the product will fit into the facilities. Routing in particular prescribes the flow of work in the plant and it is related to the considerations of layout, temporary locations for raw materials and components and materials handling systems.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 923 B.2 Material Planning A material planning is a process which determines the requirements of various raw materials/subassemblies by considering thetrade-offbetweenvariouscostcomponents like, carrying cost, ordering cost, shortage cost, and so forth. B.3 Tool’s Planning It determines the requirements of various tools by taking process specification (surfacefinish,lengthofthejob,overall depth of cut etc.), material specifications (type of material used, hardness of the material, shapeandsizeofthematerial etc.) and equipment specifications (speed range, feed range, depth of cut range etc.). B.4 Loading Loading is a process of assigning jobs to several machines such that there is a load balance among the machines.Thisis relatively a complex task, which can be managed with the help of efficient heuristic procedure. B.5 Scheduling Scheduling is the timephase ofloadinganddetermineswhen and in what sequence the work will be carried out. Thisfixes the starting as well as the finishing time for each job. 2.2 ACTION PHASE 2.2.1 Dispatching Action phase has the major step of dispatching. Dispatching is the transition from planning phase to action phase. In this phase, the worker is ordered to start manufacturing the product. The tasks which are included in dispatching arejob order, store issue order, tool order, time ticket, inspection order, move order etc. 2.2.2 Job Order The job order number is the key item which is to be mentioned in all other reports/orders. 2.2.2 Store Issue Order It gives instruction to stores to issue materials for manufacturing the product as per product specifications. As per tooling requirements for manufacturing the product, the tool Order instruct the tool room to issue necessary tools. 2.2.3 Time Ticket It is nothing but a card which is designed to note down the actual time taken at various processes. This information is used for deciding the costs for future jobs of similar nature and also for performing variance analysis, which helps to exercise control. Job order is the official authorization to the shop floor to start manufacturing the product. Generally, the process sequence will contain some testing and inspection. So, these are to be instructed to inspection wing in the form of inspection order for timely testing and inspectionsothatthe amount of rework is minimized. Themanufactureofproduct involves moving raw materials/subassemblies to the main line. This is done by a well-designed materials handling system. So, proper instruction is given to the materials handling facilities for major movements of materials/subassemblies in the form of a move order. Movements which involve less distance and fewer loads are managed at the shop floor level based on requests from operators. 2.3 CONTROL PHASE 2.3.1 Progress Reporting In progress reporting, the data regarding what is happening with the job is collected. Also, it helps to make comparison with the present level of performance. The various data pertaining to materials rejection, process variations, equipment failures, operator efficiency, operator absenteeism, tool life, etc., are collected and analyzedforthe purpose of progress reporting. These data are used for performing variance analysis, which would help us to identify critical areas that deserve immediate attention for corrective actions. 2.3.2 Corrective Action The tasks under corrective actionprimarilymakeprovisions for an unexpected event. Some examples of corrective actions are creating schedule flexibility, schedule modifications,capacitymodifications,makeor buydecisions, expediting the work, pre-planning, and so on. Due to unforeseen reasons such as, machine breakdown, labor absenteeism, too much rejectionduetopoormaterial quality etc., it may not be possible to realize the schedule as per the plan. Under such condition, it is better to reschedule the whole product mix so that we get a clear picture of the situation to progress further. Under such situation, itisto be re-examined for selecting appropriate course of action. Expediting means taking action if the progress reporting indicates deviations from the originally set targets. Pre- planning of the whole affair becomes essential in case the expediting fails to bring the deviated plan to its right path. 4. CONCLUSION As we have seen, that during production planning & control various phases need to considered and planned well in advance before design of product & accordingly make a product which will be the best one in market. Planning isthe main objective before any production which must be considered. Productionphasesgivesa clearidea about which machineries should be used during production, cost optimization & labor required.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 924 REFERENCES [1] A.Z. Keller “Just in Time”, 2013. [2] Stanley B Gershwin “Introduction to Manufacturing Systems” [3] Taylor and Francis “Production Plan & Control”