International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4989
COST, SCHEDULE AND SUSTAINABILITY COMPARISON BETWEEN A
TRADITIONAL AND GFRG BASED BUILDING
Jeevan Jacob1, Alifna Muhammed2, Arya J3, Amal Singh4, Sam Sebastian P J5
1 Assitant Professor, Mar Athanasius College of Engineering, Kothamangalam, India
, 2,3,4,5 Under Graduate Students, Mar Athanasius College of Engineering, Kothamangalam, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Glass fiber reinforced gypsum (GFRG) walls are
prefabricated large gypsum panels with hollow cores. The
underlying focus of this paper is to analyse the two different
methods of construction technique theabovementionedGFRG
panel based construction method and the traditional method
of construction (using concrete). An observable difference in
the method of GFRG construction practiced in Kerala andthat
in Tamil Nadu (1st building IIT Chennai) was clearlyvisible .By
taking this knowledge into consideration estimates and work
packages are calculatedforbothGFRG andtraditional method
of construction of a building. A comparison of the various
building parameters such as cost, time and carbon emissions
show interesting results which can be useful.
Key Words: GFRG Panels, cost estimation, schedule,
embodied carbon emissions.
1. INTRODUCTION
GFRG panels has its origins in Australia where it was
introduced in the year 1990, this form of construction was
introduced in India by IIT Madras in 2015 when its guest
house was constructed using this building material. In India
these panels are manufactured under the name Rapidwall
panels. These panels are 12 meters long, 3 meters high and
124mm thick. Each panel has 48 cavities of sizes 230mm x
94mm.[1]
Fig-1: Dimensions of cavities in GFRG panels
The properties of GFRG panel are given below[2]:-
Property Value
Unit Weight 44g/m2
Uniaxial compressive
strength
7500N/mm2
Modulus of elasticity 160kN/m
Ultimate shear strength 21.6KN/m
Table 1:- Properties of GFRG Panels
2. OBJECTIVE
1. To explore GFRG based constructionandequivalent
traditional building construction in the field and
from the literature and choose parameters to study
for comparison.
2. Prepare WBS/estimate and construction
procedures to tabulate cost, schedule and
sustainability parameters during the stages of
construction for both type of buildings.
3. SCOPE
1. Only single storied buildings of approximately
2000 sq ft are considered for evaluation.
2. Features of buildings commonly found in Kerala
are considered for evaluation.
3. Estimation of cost and schedule is done on the
basis of construction procedures commonly used
by engineers in Kerala.
4. CASE STUDIES
4.1 Case study 1
Location:- Chalakudy
The foundation of this building was constructed similar to a
conventional building with random rubble masonry. The
panels were placed over a plinth beam constructed overthis
foundation with starter bars for reinforcements for GFRG
panels. All cavities in the panels were filled with M-20
concrete.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4990
The roof was also made of GFRG panels and had embedded
beams with triangular reinforcements.The beamsintheroof
were placed after cutting one in every three cavities. After
placing of reinforcements a 50mm thick layer of screed was
placed on the roof with a weld mesh embedded inside it.
The construction of the building was completed in 8 months
despite delays due to transportation and rainfall.
The cost of the first finish of the project was 1100 Rs. Per
square feet.
Fig 2:- Building at Chalakudy, Kerala
4.2 Case Study 2:-
Location: - Mulanthuruthy, Kerala
The construction of the building is similar to that of the
building in Chalakudy as its foundation is similar to that of a
conventional random rubble foundation with a plinth beam
casted on top of it. But however in this building the
sunshades and staircase were also made with GFRG panels.
The panels too were erected similar to that of the former
case study with all cavities filled with concrete and one out
of three cavities in the roof having embedded beams in it.
A coat of WDT 30 was applied on the walls for
waterproofing.
The construction of the building was completed within 6
months and cost of construction was 1750 Rs. Per square
feet.
Fig 3:- Building at Mulanthuruthy, Kerala
4.3 Case Study 3:-
Location:- Chelad
The foundation was similar tothatofa conventional building
but however the depth of the foundation was 1.5 meters on
average due to the nature of the soil in that region.
The GFRG panels of the entire building was erected in a day
with a lifting crane and lifting jaws and a work force of 7
people. This was done to reduce the cost incurred on hiring
the crane.
Unlike the former examples the roof of this building was not
made of GFRG panels, instead it was made of concrete like a
traditional buildingtwocolumns wereerectedbeforecasting
of the roofs.
Total plinth area of the house is 2500 square feet and the
total cost of construction is estimated to be aboutRs.50lakh
Fig 4:- Building at Chelad, Kerala
4.4 Case Study 4:-
Location:- Aluva, Kerala
Just like the other examples on the list the foundation of this
house is also done using randomrubblemasonryandaplinth
beam with starter bars was casted on it.
Erection of GFRG panels was completed in a day and with a
workforce of 7 people, and the roofwasmadeofconcretejust
like the building at chelad mentioned above.
Unlike the other examples given above this building is a two
storeyed house and efforts were madeby the designingteam
to make the house more aesthetically pleasing.
Fig 5:- CAD drawing of the Building in Aluva, Kerala
4.5 Case study 5:-
Location:- Taramani guest house, IIT Madras, Chennai,
Tamil Nadu
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4991
This was the first GFRG building constructed in India. It is a
two storeyed house with walls, roofs and staircases made of
GFRG panels.
The total built up area of the house was 1981 sq ft. and the
total cost of construction was 23 lakh Rs. and time of the
construction of the sub structure was 30 days.
Fig 6: Taramani guest house at IIT Madras
5. COST ESTIMATION OF SIMILAR GFRG AND
TRADITIONAL BUILDING
For cost estimation the plan of building at chelad was
considered but however the roof of the building was
assumed to be made of GFRG unlike the roof actual structure
which was made of concrete andsteel,thesunshadesand the
slabs above sitout were assumed to be made of concretejust
like the actual structure.
Based on this information a similar plan of a house was
made except that the walls of the structure was made of
brick and roof was made of concrete (i.e. Traditional
Building). The plan of the similar building was made
assuming both the buildings had the same center line, hence
the carpet area of both houses are different. In this case the
carpet area of the GFRG building is 221.75m2 whereas the
carpet area of the considered traditional building is
200.16m2.
The foundations of both plans were assumed to be the same
that is (footing of 1:4:8 concrete, RR Masonryof60cmx60cm
and basement of 45cmx60cm). Similarly the cost and time
for activities such as plumbing, electrical works, casting of
columns, beams, sunshades and lintels were assumed to be
almost same in both cases. Hence major difference in terms
of cost and time of construction of GFRG and Traditional
Building lies in roofing, erection of panels and Staircases.
For GFRG Building one out of three panels were assumed to
be filled with concrete with minimum reinforcements and
other panels were filled with quarry dust mixed with 5% of
cement. Also the cost and time of plumbing and electrical
activities were directly entered withoutanalysisonthe basis
of the information provided by the engineer.
Cost estimation of traditional was done using DARVol.1and
DAR Vol. 2 Whereas cost estimation of GFRG Building was
done Using DAR Vol1, DAR Vol. 2[5] and “Schedule of Items
and Rate analysis for GFRG Construction” by BMTPC, New
Delhi.[6]
Fig 7:- Plan of the GFRG Building at Chelad
Fig 8:- Plan of assumed traditional building
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4992
Cost estimation of a traditional building:-
WORK COST(Rs.)
EARTH WORK 15,417.79
CONCRETE WORK 6,50,943.94
FORM WORK 2,38,291.83
STEEL WORK 2,62,193.17
RR MASONRY 1,95,591.39
DOORS AND WINDOWS 1,98,397.57
FLOORING 2,45,236.99
FINISHING 2,62,696.20
WALL FINISHING 86,307.12
PLUMBING 5,73,500.00
ELECTRICAL WORKS 4,50,000.00
BRICK & STONE WORK 5,03,826.83
TOTAL 36,82,402.83
Table 2: Cost estimation of a traditional building
Cost estimation of a GFRG building:-
WORK COST(Rs.)
EARTH WORK 15,417.79
CONCRETE WORK 6,42,529.47
FORM WORK 1,51,666.07
STEEL WORK 3,21,152.95
RR MASONRY 1,95,591.39
DOORS AND WINDOWS 1,98,397.57
FLOORING 2,71,081.65
FINISHING 1,74,472.41
WALL FINISHING 86,307.12
GFRG PANEL WORKS 11,43,914.37
WATER PROOFING 53,134.33
PLUMBING 5,73,500.00
ELECTRICAL WORKS 4,50,000.00
TOTAL 42,77,165.12
Table 3: Cost estimation of a GFRG building
When comparing the plinth area, the cost per sq ft, of GFRG
building is around 1533 Rs per sq ft. whereas the cost for the
traditional building is 1311 Rs. per sq ft. But since the carpet
area of both houses are differentwiththecarpetareaofGFRG
buildings being slightly greater than the other, the difference
in cost per sq ft. of carpet area of both buildings becomesless
intense. The cost per sq ft. of carpet area of GFRG building is
1792 Rs per sq ft. whereas that of the traditional building is
1709 Rs. per sq ft.
The cost estimation of both buildings was done by Candy
software.
6. ESTIMATION OF TIME FOR A SIMILAR
TRADITIONAL AND GFRG BUILDING
The schedule of two similar buildings were prepared to
calculate the overall timerequiredforcompletionoftheboth
projects. The total time of completion was calculated
assuming 6 workers work on the project at a time.
Fig 9:-Schedule of a traditional building prepared using
Candy software
Fig 10:- Schedule of a GFRG building prepared using Candy
software
From the schedule prepared we can infer that a GFRG
Building was completed in 230 days whereas a traditional
building was completed in 291 days. Hence a GFRG Building
was completed in 80 % of the timerequiredforcompletionof
a Traditional building.
Hence we can infer that GFRG Structures are constructed
faster than a typical traditional building due to reduction in
formwork, erection of brick work, casting of roof and
staircase etc.
7. COMPARISION OF SUSTAINABILITY OF GFRG
AND TRADITIONAL BUILDING
To measure sustainability we measuretheembodiedcarbon
emission due to the construction of the structure. This is
done by multiplying the quantities with the embodied
carbon emission coefficient. For this project the embodied
carbon emission coefficient isobtainedfromtheInventoryof
carbon and energy or ICE[4].
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4993
The carbon emission coefficient is multiplied with the
quantities of various resources specified during cost
estimationusingCandysoftware.Embodiedcarbonemission
in terms of KgCO2/Kg for GFRG and Traditional Building is
given below:-
WORK KgCO2
CONCRETE WORK 26,973.00
FORM WORK 41
STEEL WORK 7,740.00
RR MASONRY 4,098.00
DOORS AND WINDOWS 423
FLOORING 3,702.00
FINISHING 8,989.00
WALL FINISHING 3,702.00
BRICK & STONE WORK 33,698.00
TOTAL 89,366.00
Table 4:-Embodied carbon emissions of a traditional
building
WORK KgCO2
CONCRETE WORK 27,540.82
FORM WORK 37.99
STEEL WORK 7,644.40
RR MASONRY 4,098.26
DOORS AND WINDOWS 420.53
FLOORING 4,091.88
FINISHING 5,456.11
WALL FINISHING 405.07
GFRG PANEL WORKS 914.05
WATER PROOFING 202.5
TOTAL 50,811.61
Table 5:-Embodied carbon emissions of a GFRG building
The total embodied carbon emission for a traditional
building was 89366Kg of CO2 whereas that for a GFRG
building was 50812 Kg of CO2
From this we can infer that Embodied carbon emissions for
GFRG structures are much lesser (about 45% lesser) than
that of a similar traditional building. This is because GFRG
panels are made from waste products and does not contain
large amounts of embodied carbon unlike materialsusedfor
the construction of conventional buildings like bricks.
8. CONCLUSIONS
From the analysis of the case studies conducted by the team
it was found that the cost of construction of GFRG structures
was 42.8 lacs whereas in case of traditional building it was
36.8 lacs hence based on present mode of construction in
Kerala a GFRG Structure is slightly more costlier than a
similar traditional structure.
Based on the schedule of rates we can infer that a
construction of GFRG structure is quicker than a Traditional
structure as there is a difference of about 60 days in
construction of both similar structures.
Based on Sustainability we can infer that GFRG Structures
contain about 45% lesser embodied carbon emission when
compared to similar Traditional Building.
Hence we can infer that GFRG Structures have an edge over
Traditional structures in terms of the time of construction
and sustainability but however using the construction
processes preferred in Kerala the cost of GFRG structures
increases above a similar Traditional Building.
REFERENCES
[1] Shinto Paul and Phillip Cherian, Use of glass fibre
reinforced gypsum panels with reinforced concrete
infills for construction of walls and slabs,The Indian
Concrete Journal December 016,Volume90issue12,pg.
19-32
[2] Devdas Menon, Rapid affordable mass housing using
glass fiber reinforced gypsum(GFRG), International
Journal of scientific and EngineeringResearch,volume5
issue 7, ISSN 2229-5518.
[3] Jeffy George and Jeevan Jacob, Assessment and
Reduction of Embodied Carbon in buildings,
International Research Journal of Engineering and
Technology, e-ISSN: 2395-0056, Volume 5 Issue 4
[4] Prof. Geoff Hammond and Craig Jones, Inventory of
Carbon and energy version 1.6a, University of Bath
[5] Delhi Analysis Rates Vol 1 & Vol 2
[6] Schedule of Item and rate analysis for GFRG
Construction, BMTPC, New Delhi
[7] GFRG/Rapidwall construction manual, BMTPC, New
Delhi

More Related Content

What's hot

Glass Fiber Reinforced Gypsum (GFRG) Panel
Glass Fiber Reinforced Gypsum (GFRG) Panel Glass Fiber Reinforced Gypsum (GFRG) Panel
Glass Fiber Reinforced Gypsum (GFRG) Panel M.SAAD ATTARWALA
 
Glass fibre reinforced gypsum panels
Glass fibre reinforced gypsum panelsGlass fibre reinforced gypsum panels
Glass fibre reinforced gypsum panelsRavi Shankar
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDINGsathish sak
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication systemArun Arun
 
Prefabrication in a concrete building construction
Prefabrication in a concrete building constructionPrefabrication in a concrete building construction
Prefabrication in a concrete building constructionVinusha Thakkelapati
 
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...Shabaz Khan
 
Prefabricated Structure and its installation process
Prefabricated Structure and its installation processPrefabricated Structure and its installation process
Prefabricated Structure and its installation processUdayram Patil
 
Modular construction for_low_cost_housing_in_india
Modular construction for_low_cost_housing_in_indiaModular construction for_low_cost_housing_in_india
Modular construction for_low_cost_housing_in_indiaNikhil Gadkar
 
IRJET- Structural Performance on Partial Replacement of Cement by Coconut She...
IRJET- Structural Performance on Partial Replacement of Cement by Coconut She...IRJET- Structural Performance on Partial Replacement of Cement by Coconut She...
IRJET- Structural Performance on Partial Replacement of Cement by Coconut She...IRJET Journal
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in constructionShailja km
 
IRJET- Performance of Coconut Shell as Coarse Aggregate in Cement Concrete
IRJET-  	  Performance of Coconut Shell as Coarse Aggregate in Cement ConcreteIRJET-  	  Performance of Coconut Shell as Coarse Aggregate in Cement Concrete
IRJET- Performance of Coconut Shell as Coarse Aggregate in Cement ConcreteIRJET Journal
 
IRJET- A Literature Study on GFRG Building and Lean Construction
IRJET- A Literature Study on GFRG Building and Lean ConstructionIRJET- A Literature Study on GFRG Building and Lean Construction
IRJET- A Literature Study on GFRG Building and Lean ConstructionIRJET Journal
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshulAnshul Shakya
 
Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)Hammam El Meseiry
 
over view of coconut shell as coarse aggreagate
over view of coconut shell as coarse aggreagateover view of coconut shell as coarse aggreagate
over view of coconut shell as coarse aggreagateMUKUNDA BUSI
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 

What's hot (20)

Glass Fiber Reinforced Gypsum (GFRG) Panel
Glass Fiber Reinforced Gypsum (GFRG) Panel Glass Fiber Reinforced Gypsum (GFRG) Panel
Glass Fiber Reinforced Gypsum (GFRG) Panel
 
Glass fibre reinforced gypsum panels
Glass fibre reinforced gypsum panelsGlass fibre reinforced gypsum panels
Glass fibre reinforced gypsum panels
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
 
FIBRE REINFORCED GYPSUM PANELS!
FIBRE REINFORCED GYPSUM PANELS!FIBRE REINFORCED GYPSUM PANELS!
FIBRE REINFORCED GYPSUM PANELS!
 
Prefabrication in a concrete building construction
Prefabrication in a concrete building constructionPrefabrication in a concrete building construction
Prefabrication in a concrete building construction
 
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...
A COMPARATIVE STUDY ON PRECAST CONSTRUCTION AND CONVENTIONAL CONSTRUCTION FOR...
 
Rapidwall
RapidwallRapidwall
Rapidwall
 
Prefabricated Structure and its installation process
Prefabricated Structure and its installation processPrefabricated Structure and its installation process
Prefabricated Structure and its installation process
 
Modular construction for_low_cost_housing_in_india
Modular construction for_low_cost_housing_in_indiaModular construction for_low_cost_housing_in_india
Modular construction for_low_cost_housing_in_india
 
IRJET- Structural Performance on Partial Replacement of Cement by Coconut She...
IRJET- Structural Performance on Partial Replacement of Cement by Coconut She...IRJET- Structural Performance on Partial Replacement of Cement by Coconut She...
IRJET- Structural Performance on Partial Replacement of Cement by Coconut She...
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
IRJET- Performance of Coconut Shell as Coarse Aggregate in Cement Concrete
IRJET-  	  Performance of Coconut Shell as Coarse Aggregate in Cement ConcreteIRJET-  	  Performance of Coconut Shell as Coarse Aggregate in Cement Concrete
IRJET- Performance of Coconut Shell as Coarse Aggregate in Cement Concrete
 
IRJET- A Literature Study on GFRG Building and Lean Construction
IRJET- A Literature Study on GFRG Building and Lean ConstructionIRJET- A Literature Study on GFRG Building and Lean Construction
IRJET- A Literature Study on GFRG Building and Lean Construction
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshul
 
Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
over view of coconut shell as coarse aggreagate
over view of coconut shell as coarse aggreagateover view of coconut shell as coarse aggreagate
over view of coconut shell as coarse aggreagate
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Summer training report
Summer training reportSummer training report
Summer training report
 

Similar to IRJET- Cost, Schedule and Sustainability Comparison between a Traditional and GFRG based Building

FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSISFORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSISIRJET Journal
 
An Attempt of Green Building Construction Using GFRG Panels
An Attempt of Green Building Construction Using GFRG PanelsAn Attempt of Green Building Construction Using GFRG Panels
An Attempt of Green Building Construction Using GFRG PanelsIRJET Journal
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...IRJET Journal
 
IRJET- Affordable Rehabilitation using GFRG Panels
IRJET- Affordable Rehabilitation using GFRG PanelsIRJET- Affordable Rehabilitation using GFRG Panels
IRJET- Affordable Rehabilitation using GFRG PanelsIRJET Journal
 
EVALUATION OF PRECAST TECHNOLOGY ON PROJECT PROFITABILITY
   EVALUATION OF PRECAST TECHNOLOGY ON PROJECT PROFITABILITY   EVALUATION OF PRECAST TECHNOLOGY ON PROJECT PROFITABILITY
EVALUATION OF PRECAST TECHNOLOGY ON PROJECT PROFITABILITYIAEME Publication
 
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”IRJET Journal
 
Irjet v5 i6276
Irjet v5 i6276Irjet v5 i6276
Irjet v5 i6276KumaGTola
 
IRJET-Pre-Engineered Building Design of an Industrial Warehouse
IRJET-Pre-Engineered Building Design of an Industrial WarehouseIRJET-Pre-Engineered Building Design of an Industrial Warehouse
IRJET-Pre-Engineered Building Design of an Industrial WarehouseIRJET Journal
 
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONIRJET Journal
 
Energy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingsEnergy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingschirag aggarwal
 
PPT replacement of m25 grade.pdf
PPT replacement of m25 grade.pdfPPT replacement of m25 grade.pdf
PPT replacement of m25 grade.pdfvarukoluanil
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...IRJET Journal
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsIRJET Journal
 
IRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET Journal
 
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPCOMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPIRJET Journal
 
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...IRJET Journal
 
Cost Optimization of R.C Multistory Building
Cost Optimization of R.C Multistory BuildingCost Optimization of R.C Multistory Building
Cost Optimization of R.C Multistory BuildingIRJET Journal
 
IRJET-A Review on Precast Concrete
IRJET-A Review on Precast ConcreteIRJET-A Review on Precast Concrete
IRJET-A Review on Precast ConcreteIRJET Journal
 
Cost and Quality Management in Buildings
Cost and Quality Management in BuildingsCost and Quality Management in Buildings
Cost and Quality Management in BuildingsIRJET Journal
 
IRJET- Comparative Study of Rc Structure with Different Infill Materials
IRJET-  	  Comparative Study of Rc Structure with Different Infill MaterialsIRJET-  	  Comparative Study of Rc Structure with Different Infill Materials
IRJET- Comparative Study of Rc Structure with Different Infill MaterialsIRJET Journal
 

Similar to IRJET- Cost, Schedule and Sustainability Comparison between a Traditional and GFRG based Building (20)

FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSISFORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
FORMWORK TECHNOLOGY IN HIGH-RISE BUILDING ITS COST AND QUALITY ANALYSIS
 
An Attempt of Green Building Construction Using GFRG Panels
An Attempt of Green Building Construction Using GFRG PanelsAn Attempt of Green Building Construction Using GFRG Panels
An Attempt of Green Building Construction Using GFRG Panels
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...
 
IRJET- Affordable Rehabilitation using GFRG Panels
IRJET- Affordable Rehabilitation using GFRG PanelsIRJET- Affordable Rehabilitation using GFRG Panels
IRJET- Affordable Rehabilitation using GFRG Panels
 
EVALUATION OF PRECAST TECHNOLOGY ON PROJECT PROFITABILITY
   EVALUATION OF PRECAST TECHNOLOGY ON PROJECT PROFITABILITY   EVALUATION OF PRECAST TECHNOLOGY ON PROJECT PROFITABILITY
EVALUATION OF PRECAST TECHNOLOGY ON PROJECT PROFITABILITY
 
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
 
Irjet v5 i6276
Irjet v5 i6276Irjet v5 i6276
Irjet v5 i6276
 
IRJET-Pre-Engineered Building Design of an Industrial Warehouse
IRJET-Pre-Engineered Building Design of an Industrial WarehouseIRJET-Pre-Engineered Building Design of an Industrial Warehouse
IRJET-Pre-Engineered Building Design of an Industrial Warehouse
 
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
 
Energy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildingsEnergy simulation & analysis of two residential buildings
Energy simulation & analysis of two residential buildings
 
PPT replacement of m25 grade.pdf
PPT replacement of m25 grade.pdfPPT replacement of m25 grade.pdf
PPT replacement of m25 grade.pdf
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
 
Time, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast BuildingsTime, Cost , Productivity and Quality Analysis of Precast Buildings
Time, Cost , Productivity and Quality Analysis of Precast Buildings
 
IRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional Construction
 
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPCOMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
 
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
Irjet v4 i73Cost and Time estimation for Conventional, Aluminium &Tunnel Form...
 
Cost Optimization of R.C Multistory Building
Cost Optimization of R.C Multistory BuildingCost Optimization of R.C Multistory Building
Cost Optimization of R.C Multistory Building
 
IRJET-A Review on Precast Concrete
IRJET-A Review on Precast ConcreteIRJET-A Review on Precast Concrete
IRJET-A Review on Precast Concrete
 
Cost and Quality Management in Buildings
Cost and Quality Management in BuildingsCost and Quality Management in Buildings
Cost and Quality Management in Buildings
 
IRJET- Comparative Study of Rc Structure with Different Infill Materials
IRJET-  	  Comparative Study of Rc Structure with Different Infill MaterialsIRJET-  	  Comparative Study of Rc Structure with Different Infill Materials
IRJET- Comparative Study of Rc Structure with Different Infill Materials
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

IRJET- Cost, Schedule and Sustainability Comparison between a Traditional and GFRG based Building

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4989 COST, SCHEDULE AND SUSTAINABILITY COMPARISON BETWEEN A TRADITIONAL AND GFRG BASED BUILDING Jeevan Jacob1, Alifna Muhammed2, Arya J3, Amal Singh4, Sam Sebastian P J5 1 Assitant Professor, Mar Athanasius College of Engineering, Kothamangalam, India , 2,3,4,5 Under Graduate Students, Mar Athanasius College of Engineering, Kothamangalam, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Glass fiber reinforced gypsum (GFRG) walls are prefabricated large gypsum panels with hollow cores. The underlying focus of this paper is to analyse the two different methods of construction technique theabovementionedGFRG panel based construction method and the traditional method of construction (using concrete). An observable difference in the method of GFRG construction practiced in Kerala andthat in Tamil Nadu (1st building IIT Chennai) was clearlyvisible .By taking this knowledge into consideration estimates and work packages are calculatedforbothGFRG andtraditional method of construction of a building. A comparison of the various building parameters such as cost, time and carbon emissions show interesting results which can be useful. Key Words: GFRG Panels, cost estimation, schedule, embodied carbon emissions. 1. INTRODUCTION GFRG panels has its origins in Australia where it was introduced in the year 1990, this form of construction was introduced in India by IIT Madras in 2015 when its guest house was constructed using this building material. In India these panels are manufactured under the name Rapidwall panels. These panels are 12 meters long, 3 meters high and 124mm thick. Each panel has 48 cavities of sizes 230mm x 94mm.[1] Fig-1: Dimensions of cavities in GFRG panels The properties of GFRG panel are given below[2]:- Property Value Unit Weight 44g/m2 Uniaxial compressive strength 7500N/mm2 Modulus of elasticity 160kN/m Ultimate shear strength 21.6KN/m Table 1:- Properties of GFRG Panels 2. OBJECTIVE 1. To explore GFRG based constructionandequivalent traditional building construction in the field and from the literature and choose parameters to study for comparison. 2. Prepare WBS/estimate and construction procedures to tabulate cost, schedule and sustainability parameters during the stages of construction for both type of buildings. 3. SCOPE 1. Only single storied buildings of approximately 2000 sq ft are considered for evaluation. 2. Features of buildings commonly found in Kerala are considered for evaluation. 3. Estimation of cost and schedule is done on the basis of construction procedures commonly used by engineers in Kerala. 4. CASE STUDIES 4.1 Case study 1 Location:- Chalakudy The foundation of this building was constructed similar to a conventional building with random rubble masonry. The panels were placed over a plinth beam constructed overthis foundation with starter bars for reinforcements for GFRG panels. All cavities in the panels were filled with M-20 concrete.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4990 The roof was also made of GFRG panels and had embedded beams with triangular reinforcements.The beamsintheroof were placed after cutting one in every three cavities. After placing of reinforcements a 50mm thick layer of screed was placed on the roof with a weld mesh embedded inside it. The construction of the building was completed in 8 months despite delays due to transportation and rainfall. The cost of the first finish of the project was 1100 Rs. Per square feet. Fig 2:- Building at Chalakudy, Kerala 4.2 Case Study 2:- Location: - Mulanthuruthy, Kerala The construction of the building is similar to that of the building in Chalakudy as its foundation is similar to that of a conventional random rubble foundation with a plinth beam casted on top of it. But however in this building the sunshades and staircase were also made with GFRG panels. The panels too were erected similar to that of the former case study with all cavities filled with concrete and one out of three cavities in the roof having embedded beams in it. A coat of WDT 30 was applied on the walls for waterproofing. The construction of the building was completed within 6 months and cost of construction was 1750 Rs. Per square feet. Fig 3:- Building at Mulanthuruthy, Kerala 4.3 Case Study 3:- Location:- Chelad The foundation was similar tothatofa conventional building but however the depth of the foundation was 1.5 meters on average due to the nature of the soil in that region. The GFRG panels of the entire building was erected in a day with a lifting crane and lifting jaws and a work force of 7 people. This was done to reduce the cost incurred on hiring the crane. Unlike the former examples the roof of this building was not made of GFRG panels, instead it was made of concrete like a traditional buildingtwocolumns wereerectedbeforecasting of the roofs. Total plinth area of the house is 2500 square feet and the total cost of construction is estimated to be aboutRs.50lakh Fig 4:- Building at Chelad, Kerala 4.4 Case Study 4:- Location:- Aluva, Kerala Just like the other examples on the list the foundation of this house is also done using randomrubblemasonryandaplinth beam with starter bars was casted on it. Erection of GFRG panels was completed in a day and with a workforce of 7 people, and the roofwasmadeofconcretejust like the building at chelad mentioned above. Unlike the other examples given above this building is a two storeyed house and efforts were madeby the designingteam to make the house more aesthetically pleasing. Fig 5:- CAD drawing of the Building in Aluva, Kerala 4.5 Case study 5:- Location:- Taramani guest house, IIT Madras, Chennai, Tamil Nadu
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4991 This was the first GFRG building constructed in India. It is a two storeyed house with walls, roofs and staircases made of GFRG panels. The total built up area of the house was 1981 sq ft. and the total cost of construction was 23 lakh Rs. and time of the construction of the sub structure was 30 days. Fig 6: Taramani guest house at IIT Madras 5. COST ESTIMATION OF SIMILAR GFRG AND TRADITIONAL BUILDING For cost estimation the plan of building at chelad was considered but however the roof of the building was assumed to be made of GFRG unlike the roof actual structure which was made of concrete andsteel,thesunshadesand the slabs above sitout were assumed to be made of concretejust like the actual structure. Based on this information a similar plan of a house was made except that the walls of the structure was made of brick and roof was made of concrete (i.e. Traditional Building). The plan of the similar building was made assuming both the buildings had the same center line, hence the carpet area of both houses are different. In this case the carpet area of the GFRG building is 221.75m2 whereas the carpet area of the considered traditional building is 200.16m2. The foundations of both plans were assumed to be the same that is (footing of 1:4:8 concrete, RR Masonryof60cmx60cm and basement of 45cmx60cm). Similarly the cost and time for activities such as plumbing, electrical works, casting of columns, beams, sunshades and lintels were assumed to be almost same in both cases. Hence major difference in terms of cost and time of construction of GFRG and Traditional Building lies in roofing, erection of panels and Staircases. For GFRG Building one out of three panels were assumed to be filled with concrete with minimum reinforcements and other panels were filled with quarry dust mixed with 5% of cement. Also the cost and time of plumbing and electrical activities were directly entered withoutanalysisonthe basis of the information provided by the engineer. Cost estimation of traditional was done using DARVol.1and DAR Vol. 2 Whereas cost estimation of GFRG Building was done Using DAR Vol1, DAR Vol. 2[5] and “Schedule of Items and Rate analysis for GFRG Construction” by BMTPC, New Delhi.[6] Fig 7:- Plan of the GFRG Building at Chelad Fig 8:- Plan of assumed traditional building
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4992 Cost estimation of a traditional building:- WORK COST(Rs.) EARTH WORK 15,417.79 CONCRETE WORK 6,50,943.94 FORM WORK 2,38,291.83 STEEL WORK 2,62,193.17 RR MASONRY 1,95,591.39 DOORS AND WINDOWS 1,98,397.57 FLOORING 2,45,236.99 FINISHING 2,62,696.20 WALL FINISHING 86,307.12 PLUMBING 5,73,500.00 ELECTRICAL WORKS 4,50,000.00 BRICK & STONE WORK 5,03,826.83 TOTAL 36,82,402.83 Table 2: Cost estimation of a traditional building Cost estimation of a GFRG building:- WORK COST(Rs.) EARTH WORK 15,417.79 CONCRETE WORK 6,42,529.47 FORM WORK 1,51,666.07 STEEL WORK 3,21,152.95 RR MASONRY 1,95,591.39 DOORS AND WINDOWS 1,98,397.57 FLOORING 2,71,081.65 FINISHING 1,74,472.41 WALL FINISHING 86,307.12 GFRG PANEL WORKS 11,43,914.37 WATER PROOFING 53,134.33 PLUMBING 5,73,500.00 ELECTRICAL WORKS 4,50,000.00 TOTAL 42,77,165.12 Table 3: Cost estimation of a GFRG building When comparing the plinth area, the cost per sq ft, of GFRG building is around 1533 Rs per sq ft. whereas the cost for the traditional building is 1311 Rs. per sq ft. But since the carpet area of both houses are differentwiththecarpetareaofGFRG buildings being slightly greater than the other, the difference in cost per sq ft. of carpet area of both buildings becomesless intense. The cost per sq ft. of carpet area of GFRG building is 1792 Rs per sq ft. whereas that of the traditional building is 1709 Rs. per sq ft. The cost estimation of both buildings was done by Candy software. 6. ESTIMATION OF TIME FOR A SIMILAR TRADITIONAL AND GFRG BUILDING The schedule of two similar buildings were prepared to calculate the overall timerequiredforcompletionoftheboth projects. The total time of completion was calculated assuming 6 workers work on the project at a time. Fig 9:-Schedule of a traditional building prepared using Candy software Fig 10:- Schedule of a GFRG building prepared using Candy software From the schedule prepared we can infer that a GFRG Building was completed in 230 days whereas a traditional building was completed in 291 days. Hence a GFRG Building was completed in 80 % of the timerequiredforcompletionof a Traditional building. Hence we can infer that GFRG Structures are constructed faster than a typical traditional building due to reduction in formwork, erection of brick work, casting of roof and staircase etc. 7. COMPARISION OF SUSTAINABILITY OF GFRG AND TRADITIONAL BUILDING To measure sustainability we measuretheembodiedcarbon emission due to the construction of the structure. This is done by multiplying the quantities with the embodied carbon emission coefficient. For this project the embodied carbon emission coefficient isobtainedfromtheInventoryof carbon and energy or ICE[4].
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4993 The carbon emission coefficient is multiplied with the quantities of various resources specified during cost estimationusingCandysoftware.Embodiedcarbonemission in terms of KgCO2/Kg for GFRG and Traditional Building is given below:- WORK KgCO2 CONCRETE WORK 26,973.00 FORM WORK 41 STEEL WORK 7,740.00 RR MASONRY 4,098.00 DOORS AND WINDOWS 423 FLOORING 3,702.00 FINISHING 8,989.00 WALL FINISHING 3,702.00 BRICK & STONE WORK 33,698.00 TOTAL 89,366.00 Table 4:-Embodied carbon emissions of a traditional building WORK KgCO2 CONCRETE WORK 27,540.82 FORM WORK 37.99 STEEL WORK 7,644.40 RR MASONRY 4,098.26 DOORS AND WINDOWS 420.53 FLOORING 4,091.88 FINISHING 5,456.11 WALL FINISHING 405.07 GFRG PANEL WORKS 914.05 WATER PROOFING 202.5 TOTAL 50,811.61 Table 5:-Embodied carbon emissions of a GFRG building The total embodied carbon emission for a traditional building was 89366Kg of CO2 whereas that for a GFRG building was 50812 Kg of CO2 From this we can infer that Embodied carbon emissions for GFRG structures are much lesser (about 45% lesser) than that of a similar traditional building. This is because GFRG panels are made from waste products and does not contain large amounts of embodied carbon unlike materialsusedfor the construction of conventional buildings like bricks. 8. CONCLUSIONS From the analysis of the case studies conducted by the team it was found that the cost of construction of GFRG structures was 42.8 lacs whereas in case of traditional building it was 36.8 lacs hence based on present mode of construction in Kerala a GFRG Structure is slightly more costlier than a similar traditional structure. Based on the schedule of rates we can infer that a construction of GFRG structure is quicker than a Traditional structure as there is a difference of about 60 days in construction of both similar structures. Based on Sustainability we can infer that GFRG Structures contain about 45% lesser embodied carbon emission when compared to similar Traditional Building. Hence we can infer that GFRG Structures have an edge over Traditional structures in terms of the time of construction and sustainability but however using the construction processes preferred in Kerala the cost of GFRG structures increases above a similar Traditional Building. REFERENCES [1] Shinto Paul and Phillip Cherian, Use of glass fibre reinforced gypsum panels with reinforced concrete infills for construction of walls and slabs,The Indian Concrete Journal December 016,Volume90issue12,pg. 19-32 [2] Devdas Menon, Rapid affordable mass housing using glass fiber reinforced gypsum(GFRG), International Journal of scientific and EngineeringResearch,volume5 issue 7, ISSN 2229-5518. [3] Jeffy George and Jeevan Jacob, Assessment and Reduction of Embodied Carbon in buildings, International Research Journal of Engineering and Technology, e-ISSN: 2395-0056, Volume 5 Issue 4 [4] Prof. Geoff Hammond and Craig Jones, Inventory of Carbon and energy version 1.6a, University of Bath [5] Delhi Analysis Rates Vol 1 & Vol 2 [6] Schedule of Item and rate analysis for GFRG Construction, BMTPC, New Delhi [7] GFRG/Rapidwall construction manual, BMTPC, New Delhi