Critical Aspects of Condensate Polishers, Its Impact on Feed Water
Quality & Potential Damage Mechanisms: Review
Nitin P. Karmarkar PhD
Senior Chemist, MSPGCL,Koradi Thermal Power Station Koradi, Nagpur-441111, India
---------------------------------------------------------------***-------------------------------------------------------------
ABSTRACT
The condensate polishers is used in the power plants to
remove the contaminants from the boiler feed water
system after condensate extraction pump. Typically, silica
in the form of oxides, sodium, iron oxides, crud and other
scaling substances that are removed due to high feed
velocity are the potential corrosion agents dissolved in the
feed/steam water cycle. The Scaling & corrosion causes
due to these components initiates the damage mechanism
in water walls, superheaters, drum and various heat
exchanging auxiliaries or increases the maintenance
frequency.
The efficient operation of condensate polishers improves
the quality of feed water and thus helps to maintain the
healthiness of the boiler system. For ultrasuper critical
and supercritical there is stringent requirements of high
quality feed water. Required steam purity can be achieved
by the proper operation of condensate polishers.
In present paper, the chemical parameters over which the
exhaustion of condensate polishers to be decided, its
potential impacts due to overrun of polishers on feed
water quality, damages due to scaling and corrosion, and
reduction in efficiency of polishers is reviewed and
expressed.
Keywords: - Exhaustion of polishers overrun, air
scoring, conductivity after cation exchange, orifice
choking, tube failures.
1 INTRODUCTION
As many high pressure boilers applications rely on the
condensate for the bulk of their boiler water system,
condensate polishing system is an essential integral and
effective components in the supply of high quality feed
water. Water quality in power plant critically plays an
important role for maintenance and efficient operation
in lieu of limiting downtime due to boiler tube failures
and preventive maintenance. High purity feed water is
required to ensure proper operation of turbines and
steam generator system. The lower level of impurities
also helps to reduce the chances of corrosion and scale
build up rates in the boiler and various heat exchanging
areas. To promote the optimum performance
downstream filtration or conditioning of feed water
system is of great importance. To encounter all possible
damage mechanisms due to deposition of crud and ionic
contamination of feed water, the condensate polishing
units becomes the necessities of power plant.
Condensate polishing units principally works on the ion
exchange mechanism. A power plant employs the
condensate polishers to remove an ionic impurities and
suspended crud particles from condensate return [1]. It
removes micro colloidal, suspended particle which are
by-products of corrosion scaling process. These particles
are mostly is of all oxides of iron and silicates and other
abrasive material.
As condensate polisher resin is a combination of cationic
and anionic resin, it is desired to monitor the exhaustion
parameters of both the resins. Proper and timely
chemical analysis of polisher outlets water helps to
maintain the proper steam water cycle chemistry. It is
recommended to monitor pH, specific conductivity,
cation conductivity, silica, iron and crud at condensate
polisher outlet.
When both the resins are in the fresh condition, the pH of
outlet of polishers is acidic with low specific and cation
conductivity. The condenser polishers outlet water
quality resembles to DM water parameters. In normal
practice, the cation column conductivity and silica
measurements are considered as exhaustion parameters
of condensate polishers. Since the polisher resin is the
combination of both cation and anion exchange resins,
both the ionic resins exhaust at their different total ion
exchange capacities. It is always desirable to consider the
exhaustion of both these resins to avoid the ingress or
any slippage of ionic and suspended impurities.
The use of mixed resin in a deep-bed condensate
polisher serves to filter insoluble iron oxides and protect
the downstream steam generation equipment in the
event of condenser inleakage. Minimization of insoluble
iron and dissolved contaminant ions in the feedwater is
critical to protect the steam generator tubes from a
variety of corrosion related mechanisms. These
mechanisms are tied to such problems as tube denting
and pitting, inter-granular attack (IGA) and inter-
granular stress corrosion cracking GSCC)[2].
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 641
2 Exhaustion Criteria for Condensate Polishers
2.1 Exhaustion of cation part of resin
While depending on the increase in the cation column
conductivity, pH excursion normally starts due to
exhaustion of cationic part of resin. High pH indicates
the start of ammonium ion cycle after end of hydronium
ion cycle. This indicates the start of exhaustion of
cationic resin. Impurity removal efficiency of condensate
polisher plant (CPP) in ammonium cycle is poor [3]. As
Na+ and K+ cations has a lower activity and lower atomic
size as compared to NH4+ ions. Hence, there is reduction
in ion exchange capacity at ammonium ion cycle. During
the start of ammonium ion cycle, the cations especially
Na+ and K+ may starts sliping through ion exchange sites
of the resin particle and start ingressing in the feed
water cycle. The concentration of Sodium and potassium
may go beyond 500 ppb and 200 ppb respectively. This
may lead to the caustic gauging of the superheaters and
initiates the corrosion scaling mechanism. The damage
mechanisms are more prominent in the case of boilers
which are operating on once through feed cycle.
Therefore, it is always desirable to check and monitor the
exhaustion of cationic resin of condensate polishing unit.
2.2 Exhaustion of anionic part of resin
The excursion of cation column conductivity along with
the specific conductivity indicates the exhaustion stage
of anion part of resin. During this stage, it is desired to
check the silica and chloride along with Conductivity
after cation exchange. When conductivity after cation
exchange shows even a small increasing trend, pH of the
system must be monitor. By deciding the judgement
criteria of pH and cation column conductivity the
exhaustion of condensate polishing unit is to be decided.
It is not desirable to achieve increased value of
conductivity after cation exchange as pH may already
crosses its safeguard limits of exchange of ions and
sodium and potassium. In short, whenever conductivity
after cation exchange start showing increasing trend, its
pH must be monitored and polishers may be withdrawn
from service on account of high pH to maintain the
healthiness of feed system water system.
3 Effect of putting the exhausted CPU in service
after washing
Apart from polishers having the high ion exchange
capacity for soluble impurities, the condensate resin bed
also acts as a fine filter for mechanical or suspended
impurities under high pressure conditions. Its filtering
capability is limited. Large quantities of total suspended
solids can cause plugging and high pressure drop issues
indeep-bed condensate polishers. Filtered particles may
also cause fouling of the resin, particularly the anion
resin beads, and loss of polisher efficiency. [4]
Due the force accelerated corrosions and mechanical
thermal shocks, abrasive fine metal particles, or metal
oxides particles which got removed from the passivated
layer of water wall tubes of boiler and having a
migratory nature starts ingress in the feed system. All
such mechanical impurities contributed to crud. The
crud may be the corrosion scaling product of the boiler
system. The crud when transverse through the vessel of
condensate polisher, it get trapped within the bed of
resin. These micro suspended particles may adhere over
the resin surface cohesively or may trapped within the
cracks of resins. Due to this, the set level of differential
pressure (Δp) along the resin bed is achieved.
Condensate polishers minimises the accumulation of
crud deposits and other ionic contaminants in boiler
system [5]. The bed of crud is formed over the surface of
resin layer of CPU vessel.
In some power plants, after exhaustion of polishers, in
order to achieve the highest OBR of condensate
polishers, the resin bed is subjected to the high pressure
stroke of air through blower followed rinsing through
condensate water. Normal operating pressure of these
blowers may be around 8-9 kg/cm2 which is provided for
removal of tiny small resin particles from nozzles during
transfer of resin for regenertion. The CPU after air score
and rinse at this pressure, the crud particles which are
attached to the resin surface cohesively easily got
removed and washed off subsequently during the rinsing
step. At this stage, the turbidity at the vessel outlet may
found to be practically nil or < 1 NTU and pH around 5.5-
5.7. However, the whole amount of turbidity may not be
removed during this step. When polisher resin bed is
again subjected to another stroke of air, the turbidity at
vessel outlet in rinsing step may observed above 150
NTU.
This implies that thought the surface colloidal particles
which are adhered to the surface got removed from the
surface easily. But the particles which may be entrapped
in the bulk or crevices of the resin or which are attached
to the resin beads with strong Vander Vaal’s forces are
very difficult to be removed off easily. Hence when such
polishers are put in service directly after the first wash,
micro particles of crud may get ingressed in the feed
water under CEP high pressure. i.e. [around 29 kg/cm2].
The micro turbidity may get deposited where turbulence
and restrictions are maximum.e.g. the boiler tubes &
heat exchange auxiliaries turn outs . This initiates the
damage mechanisms and may lead to tube failures due to
starvation or overheating.
The case is more prominent for a super critical once
through boiler feed water system where the feed flow is
around 2150 T.hr-1 and systems without blowdown and
force accelerated corrosion is of greater concern.
Moreover, the frequent and unnecessary air scoring at
high pressure may damage the resin bead structure
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 642
ultimately leading premature attrition of resin bead and
impacts ion exchange capacities severely leading to loss
of resin. To prevent the above consequences, the overrun
of exhausted condensate polishers through air scoring at
high pressure and rinsing must be avoided. The polishers
do not make the system immune to the chemistry issues,
but they do lesser impact on chemistry problems and
often allow a plant to continue operating with minimum
condenser tube failure that may require the immediate
outage. In addition condensate polishers are suitable for
operating with high performance chemistry programs
such as oxygenated treatments [6]. It accelerates the
start-up activities by minimising the chemistry hold. It
allows a more orderly plant shut down in case of
significant water contaminations.
4 Condenser polisher system outages
As discussed earlier, due to high pressure air scoring
there is premature attrition of resin particle occur. This
attrition may include development of cracks in resin
bead and even breaking of resin particles. This may
damage the cross-linking of the resin beads which also
provides the micro sieves for crud entrapment. Mostly
Cation exchange resins has styrene-divinylbenzene
(DVB) copolymers with 6-10% cross-linking. This
provides better potential for enhanced crud removal [7].
Air scoring at high pressure affect the ion exchange
capacities and cross linkings of resin particle seriously.
Due to attrition of resin particles following consequences
may occur which may lead to forced outages of polisher
system.
4.1 Reduction In Availability of Stand By Polishers
Due to breaking of resin particles, finess of resin bed
increases which increases the bed compactness. The
differential pressure across the polisher vessel may
increase. Hence, polishers are not able to handle the total
quantum of feed flow. Feed flow is diverted through auto
bypass system. To cope up with such situations
additional stand by polishers which are meant to be
placed in service in case of exhaustion of running
polishers vessels are required to be put in service. This
reduces the availability of standby polishers and
ultimately reduces the polisher system efficiency. This
affects the requirement of feed water quality.
4.2 Polishers Forced Outages
The fine particles of resin may get trapped in the resin
strainer which increases the differential pressure across
the resin trap. Hence, flow cannot be passed through
polisher vessel. Due to high differential pressure, the
forward feed flow diverted through auto bypass system.
In such cases resin traps are to be cleaned by removing
the polishers from operation. Further the excess
pressure on resin traps may lead to bursting of resin trap
sieves or gaskets from where resin fine particles may
ingress in the feed water system. Removal of resin traps
for cleaning increases the system downtime and reduces
the polishers system availability. Polishers system need
to be operated on bypass system consequently affecting
the feed water quality.
5 Potential Cause for boiler tube failures.
Ingress of turbidity due to crud may get deposited at
orifice from where the water is being circulated to water
wall. The orifices are designed to provide the equal flow
distributions across the water wall.
Crud can deposit on orifice over a time and slowly
reduces the flow to the circuit tube. Fig 1. This may lead
to improper flow distribution across water walls. The
heavy accumulation of crud at the orifice opening may
lead to starvation of water walls and may prone to
overheating. Subsequently, leading to boiler tube failures.
Since the primary site for the accumulation is at
economiser, the frequent failures are occur in this zone
may be of short term over heating type. Further, the
deposition may occur in the form of layer on the water
wall surfaces which cause inefficient transfer of heat to
water through metal. That may also leads to boiler tube
failures. In both the cases the type of failures can be
identified. In first case, the melting or flow like pattern
over the tube material can be observed. In second case
fish mouth vide opening is observed due to overheating
as shown in the Fig 2.
Fig1. Orifice Choking due to Crud accumulation
Fig:2 Short Term Overheating of Boiler waterwall
Tube due to overheating.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 643
Condensor inleakages
Condenser in-leakage can also be a problem because the
quality of the condensate recycled to the boiler or steam
generator is affected by the contamination [8].
Condenser in leakage causes high chloride, sulphates in
the steam generators. High TDS conditions existed in the
hotwell during re-start preparations due to ingress of
cooling water from the coolant side of the condenser.
Although the condensate polishers provided ion
exchange capacity to remove the majority of the
contaminant ions, the steam generators were showing
unacceptably high chloride levels.
As discussed earlier, overrun of polishers, rise in
differential pressure across the polisher vessel, choking
of resin traps and subsequent unavailability of standby
polishers are the potential threats during the condenser
ingress. In all the cases polishers are either unavailable
or running on auto bypass systems. The boilers
operating on once through cycle systems are at the risk
in chemistry point of view in all the above mentioned
cases. Even ingress of 10 % of high TDS content due to
condenser in leakages may affect the boiler metallurgy
seriously. The effect may be catastrophic and may lead to
frequent tube failures.
The boiler operating on oxygenated treatments are at
more potential risk as the conductivity after the cation
exchanges may increase gradually if polishers are failed
to exchange the high TDS ingress in the feed cycle. The
chemistry may not have a fair control on oxygen dosing
regimen. In such cases, it necessitates shifting of cycle
chemistry from oxygenated treatment to AVT (O).
CONCLUSION
The chemical analysis of condensate polisher has been
carried out considering an output between regeneration
as a length of study. It is clear that as the pH of the
condensate polishers start increasing, indicates that the
cationic part of resin is exhausting and operation of
polishers on ammonium ion cycle started. During this
the corrosion scaling prone cations such as
Na/k/ca2+/Mg2+ and Fe2+ starts ingressing in the feed
water cycle thereby perturbing the required quality of
feed water system and affecting healthiness of the
system. pH of polisher may be the criteria of exhaustion
of polishers. Considering pH, cation column conductivity
may be considered in congruence with one another and
polishers should be removed from service after
exhaustion. Overrun of the polisher through air scoring
at high pressure must be avoided especially for the
boilers operating at critical pressures.
The variation of effluent parameters of polishers after air
score and rinse at high pressure may be the problem of
concern and initiate the damage mechanisms. Crud
particles which are adhered to the surface of the resin
particles are prominently get removed along with some
ionic load. When condensate polishers are subjected to
another stroke of air scoring and rinsing till clearance of
turbidity, the some part of ionic impurities which are not
exchanged efficiently again washed off from resin surface
along with high turbidity may be around 150 NTU. Under
such operating conditions, if polisher were put in the
service, high volume turbidity which is coming out as a
effluent in second stroke of washing & starts ingressing
and affecting the feed water quality. This leads to
deterioration of resin quality and loss of resin due to
attrition. The cross linkings of polymers across the resin
bead may damage. This crosslinking of polymers is acts
as a micro sieves for micro crud. Further, reduction in
availability of polishers and may lead to system outages.
The deposition of crud on water wall, water wall
economiser turned outs and orifices may lead to boiler
tube failures either due to overheating or starvation.
Rise in differential pressure across the polisher vessel,
choking of resin traps and subsequent unavailability of
standby polishers are the potential threats during the
condenser ingress. In all the cases polishers are either
unavailable or running on opening of auto bypass
systems. The boilers operating on once through cycle
systems are at the risk in chemistry point of view in all
the above mentioned cases. Even ingress of 10 % of high
TDS content due to condenser in leakages may affect the
boiler metallurgy seriously. The effect may be
catastrophic and may lead to frequent tube failures.
Tolerance period during condenser inleakages of feed
cycle reduces leading to immediate forced outage of
boilers.
The boiler operating on oxygenated treatments are at
more potential risk due to high cation column
conductivity if polishers are failed to exchange the high
TDS ingress in the feed cycle. The chemistry may not
have a fair control on oxygen dosing regimen. In such
cases, it necessitates shifting of cycle chemistry from
oxygenated treatment to AVT (O).
Boiler system becomes vulnerable towards chlorides and
sulphate contaminants handling may withdrawn from
running conditions if feed cycle operating with
unavailability of condensate polishers or polishers
operating with auto bypass systems in service.
Thus, the practise of overrun of condensate polishers
over pH and air score rinse after first exhaustion must be
avoided to maintain the healthiness of the system with
minimum chemistry hold and to reduce the failure,
maintenance frequency.
REFERENCES
[1] Electric power research Institute, 2006, Prod.
Abstract, Product ID 1010181,192.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 644
[2] Sstephen W., New ion exchange resin designs and
regeneration procedures yield improved performance
for various condensate polishing applications., The Dow
Chemical Company, Midland, MI., FR 0301238.
[3] Kumbhar A. Padmakumari, T., Narasimhan, S., Mathur,
P., Operating power plant experience with condensate
polishing units in morpholine/ammonia-OH cycle,
Proceedings of the symposium on current trends in
water chemistry of nuclear and thermal power plants
and other related units1995 IAEA, ref no-26071792,Vol-
26,issue 22
[4] Stephen N., New Ion Exchange resin design and
regeneration produces yield improved performance for
various condensate polishing applications, Dow
Chemical Company. Midland,MI.
[5] S.Mitra, Vstps. R. Kumar, vstps, Pinaki Ghosh, vstps,
Enhancing throughput of condensate polishing
unit instage-iv of ntpc vindhyachal: a case study.
[6] ] Izumi, T., et al, "Crud Removal Characteristics of
Newly Developed Ion Exchange Resins", International
Water Conference, 1989.
[7]Collen M. Layman, Lisa L. Beneette,Condensate
polishers adding operating reliability and flexibility,
Bachtel Power Corp.
[8] EPRI Condensor Inleakage Guidelines,Nuclear,
Technical Reportp 282,2000.
AUTHOR
Dr. Nitin P. Karmarkar (Ph.D. Chemistry, Nagpur
University, Maharashtra state, India) is currently working
in Maharashtra State Power Generation Company
Limited, Koradi Super Critical Thermal Power Plant,
India. He is having 14 years experience of operation,
maintenance of water treatment plant, Operation of
super critical plant, chemistry aspect, and environment
management.
CONTACT
Dr Nitin P Karmarkar, PhD
Plot No:-20, Flat No-101,
Ratneshwar apartment,
Dhanwantari Nagar
Nagpur-440024
e-mail: nitinpkarmarkar26@gmail.com
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072

More Related Content

Similar to Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & Potential Damage Mechanisms: Review

presentation1kalisindhjhalawar-140821080222-phpapp02.pdf
presentation1kalisindhjhalawar-140821080222-phpapp02.pdfpresentation1kalisindhjhalawar-140821080222-phpapp02.pdf
presentation1kalisindhjhalawar-140821080222-phpapp02.pdfJasaRChoudhary
 
Presentation1 kalisindh jhalawar
Presentation1 kalisindh jhalawarPresentation1 kalisindh jhalawar
Presentation1 kalisindh jhalawarMAHENDRA MEENA
 
SiC Membranes Pre-RO Treatment of Scrubber Effluent: Case Study
SiC Membranes Pre-RO Treatment of Scrubber Effluent: Case StudySiC Membranes Pre-RO Treatment of Scrubber Effluent: Case Study
SiC Membranes Pre-RO Treatment of Scrubber Effluent: Case StudyH2OSystems
 
Water Treatment Plant.pptx
Water Treatment Plant.pptxWater Treatment Plant.pptx
Water Treatment Plant.pptxSAURAVSALIL1
 
Photocatalytic Converter
Photocatalytic ConverterPhotocatalytic Converter
Photocatalytic Convertertheijes
 
POWER PLANT CHEMISTRY
POWER PLANT CHEMISTRYPOWER PLANT CHEMISTRY
POWER PLANT CHEMISTRYDilip Kumar
 
Treatment of wastewater from chrome plating industry by ion exchange method
Treatment of wastewater from chrome plating industry by ion exchange methodTreatment of wastewater from chrome plating industry by ion exchange method
Treatment of wastewater from chrome plating industry by ion exchange methodeSAT Journals
 
Power Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTPower Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTDilip Kumar
 
IRJET- Hardness Removal of Groundwater by using Optimum Lime-Soda Process
IRJET-  	  Hardness Removal of Groundwater by using Optimum Lime-Soda ProcessIRJET-  	  Hardness Removal of Groundwater by using Optimum Lime-Soda Process
IRJET- Hardness Removal of Groundwater by using Optimum Lime-Soda ProcessIRJET Journal
 
Current Passivation Methodologies By Daryl Roll Of Astro Pak
Current Passivation Methodologies By Daryl Roll Of Astro PakCurrent Passivation Methodologies By Daryl Roll Of Astro Pak
Current Passivation Methodologies By Daryl Roll Of Astro PakVanessa Valdez
 
Application for ceramic filter and reverse osmosis membrane for produced wate...
Application for ceramic filter and reverse osmosis membrane for produced wate...Application for ceramic filter and reverse osmosis membrane for produced wate...
Application for ceramic filter and reverse osmosis membrane for produced wate...sunilkumarvss395
 
Water Analysis.pdf
Water Analysis.pdfWater Analysis.pdf
Water Analysis.pdfDr.Timy Jose
 
Treatment of Hospital Wastewater by Electro-Coagulation Technique
Treatment of Hospital Wastewater by Electro-Coagulation TechniqueTreatment of Hospital Wastewater by Electro-Coagulation Technique
Treatment of Hospital Wastewater by Electro-Coagulation TechniqueIRJET Journal
 

Similar to Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & Potential Damage Mechanisms: Review (20)

45. baljit singh
45. baljit singh45. baljit singh
45. baljit singh
 
wtp_ppt_ub.ppt
wtp_ppt_ub.pptwtp_ppt_ub.ppt
wtp_ppt_ub.ppt
 
presentation1kalisindhjhalawar-140821080222-phpapp02.pdf
presentation1kalisindhjhalawar-140821080222-phpapp02.pdfpresentation1kalisindhjhalawar-140821080222-phpapp02.pdf
presentation1kalisindhjhalawar-140821080222-phpapp02.pdf
 
Presentation1 kalisindh jhalawar
Presentation1 kalisindh jhalawarPresentation1 kalisindh jhalawar
Presentation1 kalisindh jhalawar
 
SiC Membranes Pre-RO Treatment of Scrubber Effluent: Case Study
SiC Membranes Pre-RO Treatment of Scrubber Effluent: Case StudySiC Membranes Pre-RO Treatment of Scrubber Effluent: Case Study
SiC Membranes Pre-RO Treatment of Scrubber Effluent: Case Study
 
Water Treatment Plant.pptx
Water Treatment Plant.pptxWater Treatment Plant.pptx
Water Treatment Plant.pptx
 
Photocatalytic Converter
Photocatalytic ConverterPhotocatalytic Converter
Photocatalytic Converter
 
Reverse osmosis module
Reverse osmosis moduleReverse osmosis module
Reverse osmosis module
 
POWER PLANT CHEMISTRY
POWER PLANT CHEMISTRYPOWER PLANT CHEMISTRY
POWER PLANT CHEMISTRY
 
Treatment of wastewater from chrome plating industry by ion exchange method
Treatment of wastewater from chrome plating industry by ion exchange methodTreatment of wastewater from chrome plating industry by ion exchange method
Treatment of wastewater from chrome plating industry by ion exchange method
 
Power Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENTPower Plant Chemistry FEED WATER TREATMENT
Power Plant Chemistry FEED WATER TREATMENT
 
IRJET- Hardness Removal of Groundwater by using Optimum Lime-Soda Process
IRJET-  	  Hardness Removal of Groundwater by using Optimum Lime-Soda ProcessIRJET-  	  Hardness Removal of Groundwater by using Optimum Lime-Soda Process
IRJET- Hardness Removal of Groundwater by using Optimum Lime-Soda Process
 
Current Passivation Methodologies By Daryl Roll Of Astro Pak
Current Passivation Methodologies By Daryl Roll Of Astro PakCurrent Passivation Methodologies By Daryl Roll Of Astro Pak
Current Passivation Methodologies By Daryl Roll Of Astro Pak
 
Boiler
Boiler Boiler
Boiler
 
Waste management system
Waste management systemWaste management system
Waste management system
 
Feed water treatment
Feed water treatmentFeed water treatment
Feed water treatment
 
Application for ceramic filter and reverse osmosis membrane for produced wate...
Application for ceramic filter and reverse osmosis membrane for produced wate...Application for ceramic filter and reverse osmosis membrane for produced wate...
Application for ceramic filter and reverse osmosis membrane for produced wate...
 
Cooper
CooperCooper
Cooper
 
Water Analysis.pdf
Water Analysis.pdfWater Analysis.pdf
Water Analysis.pdf
 
Treatment of Hospital Wastewater by Electro-Coagulation Technique
Treatment of Hospital Wastewater by Electro-Coagulation TechniqueTreatment of Hospital Wastewater by Electro-Coagulation Technique
Treatment of Hospital Wastewater by Electro-Coagulation Technique
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & Potential Damage Mechanisms: Review

  • 1. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 640 Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & Potential Damage Mechanisms: Review Nitin P. Karmarkar PhD Senior Chemist, MSPGCL,Koradi Thermal Power Station Koradi, Nagpur-441111, India ---------------------------------------------------------------***------------------------------------------------------------- ABSTRACT The condensate polishers is used in the power plants to remove the contaminants from the boiler feed water system after condensate extraction pump. Typically, silica in the form of oxides, sodium, iron oxides, crud and other scaling substances that are removed due to high feed velocity are the potential corrosion agents dissolved in the feed/steam water cycle. The Scaling & corrosion causes due to these components initiates the damage mechanism in water walls, superheaters, drum and various heat exchanging auxiliaries or increases the maintenance frequency. The efficient operation of condensate polishers improves the quality of feed water and thus helps to maintain the healthiness of the boiler system. For ultrasuper critical and supercritical there is stringent requirements of high quality feed water. Required steam purity can be achieved by the proper operation of condensate polishers. In present paper, the chemical parameters over which the exhaustion of condensate polishers to be decided, its potential impacts due to overrun of polishers on feed water quality, damages due to scaling and corrosion, and reduction in efficiency of polishers is reviewed and expressed. Keywords: - Exhaustion of polishers overrun, air scoring, conductivity after cation exchange, orifice choking, tube failures. 1 INTRODUCTION As many high pressure boilers applications rely on the condensate for the bulk of their boiler water system, condensate polishing system is an essential integral and effective components in the supply of high quality feed water. Water quality in power plant critically plays an important role for maintenance and efficient operation in lieu of limiting downtime due to boiler tube failures and preventive maintenance. High purity feed water is required to ensure proper operation of turbines and steam generator system. The lower level of impurities also helps to reduce the chances of corrosion and scale build up rates in the boiler and various heat exchanging areas. To promote the optimum performance downstream filtration or conditioning of feed water system is of great importance. To encounter all possible damage mechanisms due to deposition of crud and ionic contamination of feed water, the condensate polishing units becomes the necessities of power plant. Condensate polishing units principally works on the ion exchange mechanism. A power plant employs the condensate polishers to remove an ionic impurities and suspended crud particles from condensate return [1]. It removes micro colloidal, suspended particle which are by-products of corrosion scaling process. These particles are mostly is of all oxides of iron and silicates and other abrasive material. As condensate polisher resin is a combination of cationic and anionic resin, it is desired to monitor the exhaustion parameters of both the resins. Proper and timely chemical analysis of polisher outlets water helps to maintain the proper steam water cycle chemistry. It is recommended to monitor pH, specific conductivity, cation conductivity, silica, iron and crud at condensate polisher outlet. When both the resins are in the fresh condition, the pH of outlet of polishers is acidic with low specific and cation conductivity. The condenser polishers outlet water quality resembles to DM water parameters. In normal practice, the cation column conductivity and silica measurements are considered as exhaustion parameters of condensate polishers. Since the polisher resin is the combination of both cation and anion exchange resins, both the ionic resins exhaust at their different total ion exchange capacities. It is always desirable to consider the exhaustion of both these resins to avoid the ingress or any slippage of ionic and suspended impurities. The use of mixed resin in a deep-bed condensate polisher serves to filter insoluble iron oxides and protect the downstream steam generation equipment in the event of condenser inleakage. Minimization of insoluble iron and dissolved contaminant ions in the feedwater is critical to protect the steam generator tubes from a variety of corrosion related mechanisms. These mechanisms are tied to such problems as tube denting and pitting, inter-granular attack (IGA) and inter- granular stress corrosion cracking GSCC)[2]. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
  • 2. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 641 2 Exhaustion Criteria for Condensate Polishers 2.1 Exhaustion of cation part of resin While depending on the increase in the cation column conductivity, pH excursion normally starts due to exhaustion of cationic part of resin. High pH indicates the start of ammonium ion cycle after end of hydronium ion cycle. This indicates the start of exhaustion of cationic resin. Impurity removal efficiency of condensate polisher plant (CPP) in ammonium cycle is poor [3]. As Na+ and K+ cations has a lower activity and lower atomic size as compared to NH4+ ions. Hence, there is reduction in ion exchange capacity at ammonium ion cycle. During the start of ammonium ion cycle, the cations especially Na+ and K+ may starts sliping through ion exchange sites of the resin particle and start ingressing in the feed water cycle. The concentration of Sodium and potassium may go beyond 500 ppb and 200 ppb respectively. This may lead to the caustic gauging of the superheaters and initiates the corrosion scaling mechanism. The damage mechanisms are more prominent in the case of boilers which are operating on once through feed cycle. Therefore, it is always desirable to check and monitor the exhaustion of cationic resin of condensate polishing unit. 2.2 Exhaustion of anionic part of resin The excursion of cation column conductivity along with the specific conductivity indicates the exhaustion stage of anion part of resin. During this stage, it is desired to check the silica and chloride along with Conductivity after cation exchange. When conductivity after cation exchange shows even a small increasing trend, pH of the system must be monitor. By deciding the judgement criteria of pH and cation column conductivity the exhaustion of condensate polishing unit is to be decided. It is not desirable to achieve increased value of conductivity after cation exchange as pH may already crosses its safeguard limits of exchange of ions and sodium and potassium. In short, whenever conductivity after cation exchange start showing increasing trend, its pH must be monitored and polishers may be withdrawn from service on account of high pH to maintain the healthiness of feed system water system. 3 Effect of putting the exhausted CPU in service after washing Apart from polishers having the high ion exchange capacity for soluble impurities, the condensate resin bed also acts as a fine filter for mechanical or suspended impurities under high pressure conditions. Its filtering capability is limited. Large quantities of total suspended solids can cause plugging and high pressure drop issues indeep-bed condensate polishers. Filtered particles may also cause fouling of the resin, particularly the anion resin beads, and loss of polisher efficiency. [4] Due the force accelerated corrosions and mechanical thermal shocks, abrasive fine metal particles, or metal oxides particles which got removed from the passivated layer of water wall tubes of boiler and having a migratory nature starts ingress in the feed system. All such mechanical impurities contributed to crud. The crud may be the corrosion scaling product of the boiler system. The crud when transverse through the vessel of condensate polisher, it get trapped within the bed of resin. These micro suspended particles may adhere over the resin surface cohesively or may trapped within the cracks of resins. Due to this, the set level of differential pressure (Δp) along the resin bed is achieved. Condensate polishers minimises the accumulation of crud deposits and other ionic contaminants in boiler system [5]. The bed of crud is formed over the surface of resin layer of CPU vessel. In some power plants, after exhaustion of polishers, in order to achieve the highest OBR of condensate polishers, the resin bed is subjected to the high pressure stroke of air through blower followed rinsing through condensate water. Normal operating pressure of these blowers may be around 8-9 kg/cm2 which is provided for removal of tiny small resin particles from nozzles during transfer of resin for regenertion. The CPU after air score and rinse at this pressure, the crud particles which are attached to the resin surface cohesively easily got removed and washed off subsequently during the rinsing step. At this stage, the turbidity at the vessel outlet may found to be practically nil or < 1 NTU and pH around 5.5- 5.7. However, the whole amount of turbidity may not be removed during this step. When polisher resin bed is again subjected to another stroke of air, the turbidity at vessel outlet in rinsing step may observed above 150 NTU. This implies that thought the surface colloidal particles which are adhered to the surface got removed from the surface easily. But the particles which may be entrapped in the bulk or crevices of the resin or which are attached to the resin beads with strong Vander Vaal’s forces are very difficult to be removed off easily. Hence when such polishers are put in service directly after the first wash, micro particles of crud may get ingressed in the feed water under CEP high pressure. i.e. [around 29 kg/cm2]. The micro turbidity may get deposited where turbulence and restrictions are maximum.e.g. the boiler tubes & heat exchange auxiliaries turn outs . This initiates the damage mechanisms and may lead to tube failures due to starvation or overheating. The case is more prominent for a super critical once through boiler feed water system where the feed flow is around 2150 T.hr-1 and systems without blowdown and force accelerated corrosion is of greater concern. Moreover, the frequent and unnecessary air scoring at high pressure may damage the resin bead structure International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
  • 3. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 642 ultimately leading premature attrition of resin bead and impacts ion exchange capacities severely leading to loss of resin. To prevent the above consequences, the overrun of exhausted condensate polishers through air scoring at high pressure and rinsing must be avoided. The polishers do not make the system immune to the chemistry issues, but they do lesser impact on chemistry problems and often allow a plant to continue operating with minimum condenser tube failure that may require the immediate outage. In addition condensate polishers are suitable for operating with high performance chemistry programs such as oxygenated treatments [6]. It accelerates the start-up activities by minimising the chemistry hold. It allows a more orderly plant shut down in case of significant water contaminations. 4 Condenser polisher system outages As discussed earlier, due to high pressure air scoring there is premature attrition of resin particle occur. This attrition may include development of cracks in resin bead and even breaking of resin particles. This may damage the cross-linking of the resin beads which also provides the micro sieves for crud entrapment. Mostly Cation exchange resins has styrene-divinylbenzene (DVB) copolymers with 6-10% cross-linking. This provides better potential for enhanced crud removal [7]. Air scoring at high pressure affect the ion exchange capacities and cross linkings of resin particle seriously. Due to attrition of resin particles following consequences may occur which may lead to forced outages of polisher system. 4.1 Reduction In Availability of Stand By Polishers Due to breaking of resin particles, finess of resin bed increases which increases the bed compactness. The differential pressure across the polisher vessel may increase. Hence, polishers are not able to handle the total quantum of feed flow. Feed flow is diverted through auto bypass system. To cope up with such situations additional stand by polishers which are meant to be placed in service in case of exhaustion of running polishers vessels are required to be put in service. This reduces the availability of standby polishers and ultimately reduces the polisher system efficiency. This affects the requirement of feed water quality. 4.2 Polishers Forced Outages The fine particles of resin may get trapped in the resin strainer which increases the differential pressure across the resin trap. Hence, flow cannot be passed through polisher vessel. Due to high differential pressure, the forward feed flow diverted through auto bypass system. In such cases resin traps are to be cleaned by removing the polishers from operation. Further the excess pressure on resin traps may lead to bursting of resin trap sieves or gaskets from where resin fine particles may ingress in the feed water system. Removal of resin traps for cleaning increases the system downtime and reduces the polishers system availability. Polishers system need to be operated on bypass system consequently affecting the feed water quality. 5 Potential Cause for boiler tube failures. Ingress of turbidity due to crud may get deposited at orifice from where the water is being circulated to water wall. The orifices are designed to provide the equal flow distributions across the water wall. Crud can deposit on orifice over a time and slowly reduces the flow to the circuit tube. Fig 1. This may lead to improper flow distribution across water walls. The heavy accumulation of crud at the orifice opening may lead to starvation of water walls and may prone to overheating. Subsequently, leading to boiler tube failures. Since the primary site for the accumulation is at economiser, the frequent failures are occur in this zone may be of short term over heating type. Further, the deposition may occur in the form of layer on the water wall surfaces which cause inefficient transfer of heat to water through metal. That may also leads to boiler tube failures. In both the cases the type of failures can be identified. In first case, the melting or flow like pattern over the tube material can be observed. In second case fish mouth vide opening is observed due to overheating as shown in the Fig 2. Fig1. Orifice Choking due to Crud accumulation Fig:2 Short Term Overheating of Boiler waterwall Tube due to overheating. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
  • 4. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 643 Condensor inleakages Condenser in-leakage can also be a problem because the quality of the condensate recycled to the boiler or steam generator is affected by the contamination [8]. Condenser in leakage causes high chloride, sulphates in the steam generators. High TDS conditions existed in the hotwell during re-start preparations due to ingress of cooling water from the coolant side of the condenser. Although the condensate polishers provided ion exchange capacity to remove the majority of the contaminant ions, the steam generators were showing unacceptably high chloride levels. As discussed earlier, overrun of polishers, rise in differential pressure across the polisher vessel, choking of resin traps and subsequent unavailability of standby polishers are the potential threats during the condenser ingress. In all the cases polishers are either unavailable or running on auto bypass systems. The boilers operating on once through cycle systems are at the risk in chemistry point of view in all the above mentioned cases. Even ingress of 10 % of high TDS content due to condenser in leakages may affect the boiler metallurgy seriously. The effect may be catastrophic and may lead to frequent tube failures. The boiler operating on oxygenated treatments are at more potential risk as the conductivity after the cation exchanges may increase gradually if polishers are failed to exchange the high TDS ingress in the feed cycle. The chemistry may not have a fair control on oxygen dosing regimen. In such cases, it necessitates shifting of cycle chemistry from oxygenated treatment to AVT (O). CONCLUSION The chemical analysis of condensate polisher has been carried out considering an output between regeneration as a length of study. It is clear that as the pH of the condensate polishers start increasing, indicates that the cationic part of resin is exhausting and operation of polishers on ammonium ion cycle started. During this the corrosion scaling prone cations such as Na/k/ca2+/Mg2+ and Fe2+ starts ingressing in the feed water cycle thereby perturbing the required quality of feed water system and affecting healthiness of the system. pH of polisher may be the criteria of exhaustion of polishers. Considering pH, cation column conductivity may be considered in congruence with one another and polishers should be removed from service after exhaustion. Overrun of the polisher through air scoring at high pressure must be avoided especially for the boilers operating at critical pressures. The variation of effluent parameters of polishers after air score and rinse at high pressure may be the problem of concern and initiate the damage mechanisms. Crud particles which are adhered to the surface of the resin particles are prominently get removed along with some ionic load. When condensate polishers are subjected to another stroke of air scoring and rinsing till clearance of turbidity, the some part of ionic impurities which are not exchanged efficiently again washed off from resin surface along with high turbidity may be around 150 NTU. Under such operating conditions, if polisher were put in the service, high volume turbidity which is coming out as a effluent in second stroke of washing & starts ingressing and affecting the feed water quality. This leads to deterioration of resin quality and loss of resin due to attrition. The cross linkings of polymers across the resin bead may damage. This crosslinking of polymers is acts as a micro sieves for micro crud. Further, reduction in availability of polishers and may lead to system outages. The deposition of crud on water wall, water wall economiser turned outs and orifices may lead to boiler tube failures either due to overheating or starvation. Rise in differential pressure across the polisher vessel, choking of resin traps and subsequent unavailability of standby polishers are the potential threats during the condenser ingress. In all the cases polishers are either unavailable or running on opening of auto bypass systems. The boilers operating on once through cycle systems are at the risk in chemistry point of view in all the above mentioned cases. Even ingress of 10 % of high TDS content due to condenser in leakages may affect the boiler metallurgy seriously. The effect may be catastrophic and may lead to frequent tube failures. Tolerance period during condenser inleakages of feed cycle reduces leading to immediate forced outage of boilers. The boiler operating on oxygenated treatments are at more potential risk due to high cation column conductivity if polishers are failed to exchange the high TDS ingress in the feed cycle. The chemistry may not have a fair control on oxygen dosing regimen. In such cases, it necessitates shifting of cycle chemistry from oxygenated treatment to AVT (O). Boiler system becomes vulnerable towards chlorides and sulphate contaminants handling may withdrawn from running conditions if feed cycle operating with unavailability of condensate polishers or polishers operating with auto bypass systems in service. Thus, the practise of overrun of condensate polishers over pH and air score rinse after first exhaustion must be avoided to maintain the healthiness of the system with minimum chemistry hold and to reduce the failure, maintenance frequency. REFERENCES [1] Electric power research Institute, 2006, Prod. Abstract, Product ID 1010181,192. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
  • 5. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 644 [2] Sstephen W., New ion exchange resin designs and regeneration procedures yield improved performance for various condensate polishing applications., The Dow Chemical Company, Midland, MI., FR 0301238. [3] Kumbhar A. Padmakumari, T., Narasimhan, S., Mathur, P., Operating power plant experience with condensate polishing units in morpholine/ammonia-OH cycle, Proceedings of the symposium on current trends in water chemistry of nuclear and thermal power plants and other related units1995 IAEA, ref no-26071792,Vol- 26,issue 22 [4] Stephen N., New Ion Exchange resin design and regeneration produces yield improved performance for various condensate polishing applications, Dow Chemical Company. Midland,MI. [5] S.Mitra, Vstps. R. Kumar, vstps, Pinaki Ghosh, vstps, Enhancing throughput of condensate polishing unit instage-iv of ntpc vindhyachal: a case study. [6] ] Izumi, T., et al, "Crud Removal Characteristics of Newly Developed Ion Exchange Resins", International Water Conference, 1989. [7]Collen M. Layman, Lisa L. Beneette,Condensate polishers adding operating reliability and flexibility, Bachtel Power Corp. [8] EPRI Condensor Inleakage Guidelines,Nuclear, Technical Reportp 282,2000. AUTHOR Dr. Nitin P. Karmarkar (Ph.D. Chemistry, Nagpur University, Maharashtra state, India) is currently working in Maharashtra State Power Generation Company Limited, Koradi Super Critical Thermal Power Plant, India. He is having 14 years experience of operation, maintenance of water treatment plant, Operation of super critical plant, chemistry aspect, and environment management. CONTACT Dr Nitin P Karmarkar, PhD Plot No:-20, Flat No-101, Ratneshwar apartment, Dhanwantari Nagar Nagpur-440024 e-mail: nitinpkarmarkar26@gmail.com International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072