SUMITTED TO
Mr. VIKAS BHALLA By:-ASHWINI KR.ACHARYA
S.K. BAWEJA 15ECTEE202
4th year 15ectee202
COLLEGE OF ENGINEERING &TECHNOLOGY BIKANER
RAJASTHAN TECHNICAL UNIVERSITY, KOTA
Presentation on training in north westren
railway workashop
bikaner
CONTENT
• HISTORY OF WORKSHOP
• PERIOD-OVERHAULING
• PROCEDURE OF OVERHAULING
• ELECTRIC SHOP
• MAJOR EQUIPMENT OF ELECTRIC SHOP
• GENERATOR
• BATTERY& CHARGING UNIT
• ALTERNATOR
• RECTIFIRE CUM REGULATOR IMAGE
• FLUORESCENT TUBE LIGHT
• FAN
• EMERGENCY FEED TERMINALS
HISTORY OF WORKSHOP
• Foundation : Maharaja Ganga Singh on 18th
March,1925
• Location: Outskirt of Bikaner town known as Lalgarh
• Plant started: 1st March,1927
• Total area: 141226 meter sq.
• Machinery in plant:232
• Track inside plant:2.6 km
PERIODIC-OVERHAULING
Periodic-overhauling(POH): It is a process of
18 days during which checking &
repairing/replacement of train’s parts take
place.
Time Period Of POH:
Mail/Express train: POH after 12 months
Passenger Train : POH after 18 months
Procedures of POH
1 day : Disassembly of electrical components
2 day : Lift/Lowering & stripping
3 day : Body repair
4 day : Carpenter work
5 day : Painting
1 day : Electrical component fitting
1 day : Adjustment of all parts
1 day : Vaccum testing
Electrical shop
Power supply to work shop & Electric parts are repairs
in electric shop
• Supply taken from the 33kv gss and supply the work shop
through 11 kv .
• 3 Φ/440volt supply given to the all shops in work shop
• Incase of any fault in supply through the 11 kv supply
system generator is used to supply shops
• And reparing of batterys ,charging of batterys ,reparing of
fans ,alternators etc.
MAJOR EQUIPMENT OF ELECTRIC SHOP
• majorEquipment of electric shop
• 11 kv supply from substation
• Generator
• Battery& charging system
• Alternator
• Rectifire cum regulator
• Fluorescent Tube Light
• Fans
• Emergency Feed Terminals etc.
•
Generator
• Max speed of generatoe 1500rpm
• Generating capacity 40kw
• Oil Tank capacity 100 gallon
• Supplying 3 phase
Battery& charging unit
• 24volt battery are used in meter gauge
trains and 110 volt battery are used brode
gauge trains
• Thyrister rectifire charger are used for
charging battery.
• Max charging time for
Charging is 48 hrs
Alternator
• It is used for charging battery during train running
period.max speed of alternator is1850rpm.but for
charging it need max speed of 22kmph.it is
coupled between the two wheels.
• Induction type Alternators used in non AC coaches
are 4.5KW/37.5A/120V DC.18KW 2 unit in parallel
with RRU ,battery, brush less alternators are used on
AC coaches.
• The brushless alternator with the help of static
rectifier cum regulator unit is capable of developing
voltage from minimum speed to maximum speed.
ALTERNATOR IMAGE
RECTIFIRE CUM REGULATOR
• Battery and Battery Charging Terminals
• The output of the RRU is given to battery box to
charge the battery .
• In a non AC coaches a battery box consist of 18 cells(6V/120Ah
each) ,In AC coaches 2 battery box 56 cells(2V/1100Ah each)
used.
• BCT is provided for external charging of the batteries at stations
or maintenance lines.
• Used Battery in train is VRLA (Valve Regulated Lead Acid) types
advantages -
• Topping up with water is not required.
• Periodical checking of specific gravity is not required.
• Regular maintenance to avoid sulphation of terminals and
connections not required
Rectifire cum regulator image
FLUORESCENT TUBE LIGHT
• It is a 2 feet long,18 Watt fluorescent tube
light provided in the coach for the sitting
gallery light and 11watt for toilet light.
• It works at 110V DC supply.
• It gives good light with 30% and 70% power
supply.
•
Fans
• INDIAN RAILWAY USED 400MM AND 300 MM BRUSH LESS DIRECT
CURRENT MOTER (BLDC) FANS OPERATED BY 110V DC IN THE
COACHES.
• SPECIFICATION :32W, BWARING USED 6200NO.
• FAN CONSIST OF FNN CAB, SENCER MAGNET, ROTOR MAGNET, PCB,
STARTING WAINDING.
• FAN INSULATION ON RESISTANCE IS NOT LESS THEN 2MOMH .IT
CHEAKED BY MEGGER IN RAINY SEASON RESISTANCE SHOULD BE
1MOMH
EMERGENCY FEED TERMINALS
• It is provided at the both end of the coach to
feed the additional supply to the adjacent
coach in case of emergency.
• Supply from the healthy coach may be
extended to him/dark coach by connecting
wire(1.5x2 meter) for supply to the positive
and negative terminals of the EFT.
•
THANKS

More Related Content

What's hot

GANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIAGANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIA1996kuldeep
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plantAbhinaw kapoor
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIATENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIAAvinash Kumar
 
Presentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperPresentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperJyoti Rawat
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationSaumyadip Moitra
 
MAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTMAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTSuryanshu Jain
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewRidwanul Hoque
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpurkalumutha
 
DPL Transmission And Distribution
DPL Transmission And DistributionDPL Transmission And Distribution
DPL Transmission And DistributionSubhojeet Sinha ☁
 
Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Deo Nath Jha
 

What's hot (20)

GANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIAGANESH KUMAR RAM PPT ON TTPS LALPANIA
GANESH KUMAR RAM PPT ON TTPS LALPANIA
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
TTPS
TTPSTTPS
TTPS
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIATENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
 
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
 
Presentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperPresentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapper
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
 
Ashwani
AshwaniAshwani
Ashwani
 
DPL Project
DPL ProjectDPL Project
DPL Project
 
MAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTMAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORT
 
My report vfd
My  report vfdMy  report vfd
My report vfd
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
Rps plant
Rps plantRps plant
Rps plant
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Quadbolter
QuadbolterQuadbolter
Quadbolter
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpur
 
DPL Transmission And Distribution
DPL Transmission And DistributionDPL Transmission And Distribution
DPL Transmission And Distribution
 
Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)
 

Similar to electrical shop ppt north westren railway workshop bikaner

KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptxParulChandna6
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training ReportUtsav Yagnik
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING Om Prakash
 
110kv mangad SUBSTATION.pptx
110kv mangad SUBSTATION.pptx110kv mangad SUBSTATION.pptx
110kv mangad SUBSTATION.pptxSooryajithT
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationLekhraJ Meena
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladeshImran Hossain
 
Internship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationInternship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationmalikavita731
 
Internship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxInternship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxmalikavita731
 
Internship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationInternship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationmalikavita731
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator TrainingVedant Sumaria
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 
Railway coaches
Railway coachesRailway coaches
Railway coachesnoor patel
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineeringYogesh Jadoun
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpurShrey Dhasmana
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222Ankit Poonia
 

Similar to electrical shop ppt north westren railway workshop bikaner (20)

HOTEL LOAD
HOTEL LOADHOTEL LOAD
HOTEL LOAD
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
110kv mangad SUBSTATION.pptx
110kv mangad SUBSTATION.pptx110kv mangad SUBSTATION.pptx
110kv mangad SUBSTATION.pptx
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladesh
 
Internship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationInternship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power station
 
Internship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxInternship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptx
 
Internship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationInternship PPT final ukai thermal power station
Internship PPT final ukai thermal power station
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222
 

Recently uploaded

Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniR. Sosa
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdfKamal Acharya
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksIJECEIAES
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Stationsiddharthteach18
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Toolssoginsider
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...drjose256
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 

Recently uploaded (20)

Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 

electrical shop ppt north westren railway workshop bikaner

  • 1. ` SUMITTED TO Mr. VIKAS BHALLA By:-ASHWINI KR.ACHARYA S.K. BAWEJA 15ECTEE202 4th year 15ectee202 COLLEGE OF ENGINEERING &TECHNOLOGY BIKANER RAJASTHAN TECHNICAL UNIVERSITY, KOTA Presentation on training in north westren railway workashop bikaner
  • 2. CONTENT • HISTORY OF WORKSHOP • PERIOD-OVERHAULING • PROCEDURE OF OVERHAULING • ELECTRIC SHOP • MAJOR EQUIPMENT OF ELECTRIC SHOP • GENERATOR • BATTERY& CHARGING UNIT • ALTERNATOR • RECTIFIRE CUM REGULATOR IMAGE • FLUORESCENT TUBE LIGHT • FAN • EMERGENCY FEED TERMINALS
  • 3. HISTORY OF WORKSHOP • Foundation : Maharaja Ganga Singh on 18th March,1925 • Location: Outskirt of Bikaner town known as Lalgarh • Plant started: 1st March,1927 • Total area: 141226 meter sq. • Machinery in plant:232 • Track inside plant:2.6 km
  • 4. PERIODIC-OVERHAULING Periodic-overhauling(POH): It is a process of 18 days during which checking & repairing/replacement of train’s parts take place. Time Period Of POH: Mail/Express train: POH after 12 months Passenger Train : POH after 18 months
  • 5. Procedures of POH 1 day : Disassembly of electrical components 2 day : Lift/Lowering & stripping 3 day : Body repair 4 day : Carpenter work 5 day : Painting 1 day : Electrical component fitting 1 day : Adjustment of all parts 1 day : Vaccum testing
  • 6. Electrical shop Power supply to work shop & Electric parts are repairs in electric shop • Supply taken from the 33kv gss and supply the work shop through 11 kv . • 3 Φ/440volt supply given to the all shops in work shop • Incase of any fault in supply through the 11 kv supply system generator is used to supply shops • And reparing of batterys ,charging of batterys ,reparing of fans ,alternators etc.
  • 7. MAJOR EQUIPMENT OF ELECTRIC SHOP • majorEquipment of electric shop • 11 kv supply from substation • Generator • Battery& charging system • Alternator • Rectifire cum regulator • Fluorescent Tube Light • Fans • Emergency Feed Terminals etc. •
  • 8. Generator • Max speed of generatoe 1500rpm • Generating capacity 40kw • Oil Tank capacity 100 gallon • Supplying 3 phase
  • 9. Battery& charging unit • 24volt battery are used in meter gauge trains and 110 volt battery are used brode gauge trains • Thyrister rectifire charger are used for charging battery. • Max charging time for Charging is 48 hrs
  • 10. Alternator • It is used for charging battery during train running period.max speed of alternator is1850rpm.but for charging it need max speed of 22kmph.it is coupled between the two wheels. • Induction type Alternators used in non AC coaches are 4.5KW/37.5A/120V DC.18KW 2 unit in parallel with RRU ,battery, brush less alternators are used on AC coaches. • The brushless alternator with the help of static rectifier cum regulator unit is capable of developing voltage from minimum speed to maximum speed.
  • 12. RECTIFIRE CUM REGULATOR • Battery and Battery Charging Terminals • The output of the RRU is given to battery box to charge the battery . • In a non AC coaches a battery box consist of 18 cells(6V/120Ah each) ,In AC coaches 2 battery box 56 cells(2V/1100Ah each) used. • BCT is provided for external charging of the batteries at stations or maintenance lines. • Used Battery in train is VRLA (Valve Regulated Lead Acid) types advantages - • Topping up with water is not required. • Periodical checking of specific gravity is not required. • Regular maintenance to avoid sulphation of terminals and connections not required
  • 14. FLUORESCENT TUBE LIGHT • It is a 2 feet long,18 Watt fluorescent tube light provided in the coach for the sitting gallery light and 11watt for toilet light. • It works at 110V DC supply. • It gives good light with 30% and 70% power supply. •
  • 15. Fans • INDIAN RAILWAY USED 400MM AND 300 MM BRUSH LESS DIRECT CURRENT MOTER (BLDC) FANS OPERATED BY 110V DC IN THE COACHES. • SPECIFICATION :32W, BWARING USED 6200NO. • FAN CONSIST OF FNN CAB, SENCER MAGNET, ROTOR MAGNET, PCB, STARTING WAINDING. • FAN INSULATION ON RESISTANCE IS NOT LESS THEN 2MOMH .IT CHEAKED BY MEGGER IN RAINY SEASON RESISTANCE SHOULD BE 1MOMH
  • 16. EMERGENCY FEED TERMINALS • It is provided at the both end of the coach to feed the additional supply to the adjacent coach in case of emergency. • Supply from the healthy coach may be extended to him/dark coach by connecting wire(1.5x2 meter) for supply to the positive and negative terminals of the EFT. •