INTRODUCTION
• Holding Company: Gujarat Uraja Vikas Nigam Limited (GUVNL)
• Generation Company: Gujarat State Electricity Corporation Limited (GSECL)
• Transmission Company: Gujarat Energy Transmission Corporation Limited
(GETCO)
• Distribution Companies:
1. Dakshin Gujarat Vij Company Limited (DGVCL)
2. Uttar Gujarat Vij Company Limited (UGVCL)
3. Madhya Gujarat Vij Company Limited (MGVCL)
4. Paschim Gujarat Vij Company Limited (PGVCL)
Ukai Thermal Power Station of the GSECL, is a power station with an installed capacity of 1110 MW.
It is one of Gujarat's major coal-fired power plants, located on the bank of the Tapi river because of
water resources, along with hydroelectric power plant with the same name. It is coal based thermal
power plant so water is essential thing for power generation. There are multiple plants with multiple
capacity of generation.
UKAI THERMAL POWER STATION
Stage Number of unit Installed capacity(MW) Status
Stage I 1 120 Retired from service
Stage II 2 120 Retired from service
Stage III 3 200 Running
Stage IV 4 200 Running
Stage V 5 210 Running
Stage VI 6 500 Running
• The coal extracted from
the mines is brought to
the UTPS through train.
The coal is in imported
from Bihar, Jharkhand
(corba) and Maharashtra
by train. In one train there
is 55 to 60 wagon are
there.
COAL HANDLING PLANT
• Tippler is motor driven assembly which
unload the train wagon by rotating 180º The
motor used in tippler is of 6.6 kv operated by
operator when tipper hold the wagon.
• After the coal is unloaded form wagon it falls
on Apron feeder. Apron feeder is a
mechanism moving on the shafts and return
Roller. It ca manage flow of stones , powder
like coal.
 TRIPPLER
 FLOW CHART OF COAL PLANT
Conveyer belt
Bunker
Stacker cum reclaimer
Coal Crusher
Coal storage
Ordinary coal
Washed coal
• As the name indicates boiler is use to boil water and turns into steam. There are various types of
boilers based on fuel used in boiler. There is coal fire boiler, oil fire boiler, gas fire boiler etc.
• Boilers are classified in two types:
1. Water tube boiler
2. Fire tube boiler
• Boiler system:
 Economizer
 Super Heater
 Air Pre-Heater
 Condenser
BOILER
• There are three parts of turbine.
 High Pressure Turbine
 Intermediate Pressure Turbine
 Low Pressure Turbine
TURBINE
A steam turbine is mechanical device that extract thermal energy from pressurize steam and
transforms it into mechanical energy, as the steam turbine generaterotary motion they are suited
for driving electrical generators. The turbine shaft is connected to the generator shaft.
• Steam inlet temperature is 540℃ and pressure is
130kg/cm^2.
 HIGH PRESSURE TURBINE
• Steam inlet temperature is 540℃ and pressure is
25kg/cm^2.
 INTERMIDATE PRESSURE TURBINE
• The steam in LP come from IP turbine with
reduces pressure and temperature and goes to
condenser.
 LOW PRESSURE TURBINE
GENERATOR
• Turbine shaft is connected with generator shaft hence it rotates the generator. Here in thermal
power station ukai AC synchronous generator(turbo generator) is used which is Water and
hydrogen cooled.
• Here generator is with capacity of 235300KVA in unit 3 & 4. Same as in unit 6 generator
capacity is 588000KVA.
• Speed of both different capacity generator is 3000 RPM with a frequency of 50 Hz. Both are
star-star connected generators.
 For unit 3&4
• PF: 0.85
• Voltage: 15750 V
• Stator current: 8625 A
• Stator winding connection: 3 phase start-star
• Hydrogen pressure: 3.0kG/cm2
Turbo Genrator
 For unit 6
• PF: 0.85
• Voltage: 21000 V
• Stator current: 16200 A
• CONNECTION: star-star
• COOLANT: Water and hydrogen
Turbo Genrator (Unit 6)
MAIN OUTPUT SYSTEM
• After generation of electricity it is very important export or transmit it to the grid by
switchyard. There for the transformers generating transformers are being used to step up the
voltage.
• There are different types of transformers on basis of ratings and function. Also for stepping up
and stepping down transformer are being used to take power from the switch yard.
• Generator Transformer :
GSECL, UTPS has 6 GTs of different MVA capacity.
Unit produce 15.75kV the generator transformer
steps up from 15.75kv to 220kV. In unit six generator
output is 21kv so generator transformer steps up
voltage from 21kv to 400kv.
• Station Transformer :
 UTPS has 4 ST of different capacity. The function
of station transformer is in emergency case or
when station has to start the unit station
transformer feed power to the auxiliaries from
switchyard. Station transformer step down
220kV/7kV and makes two bus 6.6KvA and UAT
is generally step 6.6kvB.
 HT motors operates on 6.6Kv.
• Unit Auxiliary Transformer :
 Step- down transformer. Which step down the
voltage of ST from 6.6Kv to 415V.
 LT motors operates on 415V.
220KV SWITCHYARD
• Switchyard is a switching station which is the main link between the generating plant and the
transmission system. It can be considered as the heart of the power plant, the generated power
will only be worthy if it can be transmitted and received by the consumers.
• Components of switchyard
Bus bar
Bus coupler
Lightning arrester
Circuit breaker
Isolator
Current transformer
Potential transformer
Wave trap Or Power line
communication Carrier(PLCC)
Bus bar
Lightning arrester
Ckt breaker
Isolator
Current Transformer Wave trap
ASH HANDLING PLANT
• Ash plant is very important section in station, Where two types of air collected.
Fly Ash
Bottom Ash
• There are two sides of ash control, fly ash control and bottom ash control. For bottom ash as
well as fly ash SILO system is installed. There is ESP (Electrostatic precipitator). There are
total 3 Nos of SILO, where 2 Nos are for fly ash and 1 Nos for bottom ash.
• The fly Ash is send to the cement and block producers by the truck.
• Bottom Ash is added with water to make the slurry form of Ash. Generally the ratio of water
and bottom Ash is 3:1.
• Bottom Ash is stored in Ash pond which is located near the plant.
Electrical Grid
Thank you!

More Related Content

Similar to Internship PPT ukai thermal power station .pptx

Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANTCyber4Tech
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARVIMAL VAIBHAV
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power stationNaveen Kumar
 
Parichha thermal power point PPT
Parichha thermal power point PPTParichha thermal power point PPT
Parichha thermal power point PPTankit shrivastava
 
Ppt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionPpt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionSuvamSahu2
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxssuser4c2635
 
Lakvijaya_Presentation1.pptx
Lakvijaya_Presentation1.pptxLakvijaya_Presentation1.pptx
Lakvijaya_Presentation1.pptxBhathiyaRanawaka
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant pptAshish Singh
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportDeepak Solanki
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON pptRanjan kumar
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal powerShishupal03012015
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptxParulChandna6
 
Ppt of ajeet on suratgarh super thermal power station
Ppt of ajeet on suratgarh super thermal power stationPpt of ajeet on suratgarh super thermal power station
Ppt of ajeet on suratgarh super thermal power stationajeet singh choudhary
 

Similar to Internship PPT ukai thermal power station .pptx (20)

Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANT
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
 
Parichha thermal power point PPT
Parichha thermal power point PPTParichha thermal power point PPT
Parichha thermal power point PPT
 
V.T ppt
V.T pptV.T ppt
V.T ppt
 
Ppt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distributionPpt on power generation(thermal), transmission & distribution
Ppt on power generation(thermal), transmission & distribution
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
Lakvijaya_Presentation1.pptx
Lakvijaya_Presentation1.pptxLakvijaya_Presentation1.pptx
Lakvijaya_Presentation1.pptx
 
Training presentation
Training presentationTraining presentation
Training presentation
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant ppt
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training report
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Ppt of ajeet on suratgarh super thermal power station
Ppt of ajeet on suratgarh super thermal power stationPpt of ajeet on suratgarh super thermal power station
Ppt of ajeet on suratgarh super thermal power station
 

Recently uploaded

Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor banktawat puangthong
 
Lesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsxLesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsxmichaelprrior
 
EMPLOYEE MANAGEMENT SYSTEM FINAL presentation
EMPLOYEE MANAGEMENT SYSTEM FINAL presentationEMPLOYEE MANAGEMENT SYSTEM FINAL presentation
EMPLOYEE MANAGEMENT SYSTEM FINAL presentationAmayJaiswal4
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdfKamal Acharya
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdfKamal Acharya
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
Introduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoIntroduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoAbhimanyu Sangale
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...ShivamTiwari995432
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New HorizonMorshed Ahmed Rahath
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)NareenAsad
 
ChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfqasastareekh
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.MdManikurRahman
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..MaherOthman7
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Lovely Professional University
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsSheetal Jain
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5T.D. Shashikala
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 

Recently uploaded (20)

Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
Lesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsxLesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsx
 
EMPLOYEE MANAGEMENT SYSTEM FINAL presentation
EMPLOYEE MANAGEMENT SYSTEM FINAL presentationEMPLOYEE MANAGEMENT SYSTEM FINAL presentation
EMPLOYEE MANAGEMENT SYSTEM FINAL presentation
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Introduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoIntroduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of Arduino
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
ChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdf
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent Acts
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 

Internship PPT ukai thermal power station .pptx

  • 1. Summer Internship at Ukai Thermal Power Station Submitted By Sr No. Name Enrollment No. 1 Patel Abhay M. 200280109059 2 Kumbhar Sagar N. 200280109106 3 Mali Dashrath B. 200280109065 Submitted to. Mitul G. Patel
  • 2. L.D. College of Engineering Two weeks internship at Ukai Thermal Power Station(UTPS) (A unit under G.S.E.C.L.)
  • 3. INTRODUCTION • Holding Company: Gujarat Uraja Vikas Nigam Limited (GUVNL) • Generation Company: Gujarat State Electricity Corporation Limited (GSECL) • Transmission Company: Gujarat Energy Transmission Corporation Limited (GETCO) • Distribution Companies: 1. Dakshin Gujarat Vij Company Limited (DGVCL) 2. Uttar Gujarat Vij Company Limited (UGVCL) 3. Madhya Gujarat Vij Company Limited (MGVCL) 4. Paschim Gujarat Vij Company Limited (PGVCL)
  • 4. Ukai Thermal Power Station of the GSECL, is a power station with an installed capacity of 1110 MW. It is one of Gujarat's major coal-fired power plants, located on the bank of the Tapi river because of water resources, along with hydroelectric power plant with the same name. It is coal based thermal power plant so water is essential thing for power generation. There are multiple plants with multiple capacity of generation. UKAI THERMAL POWER STATION Stage Number of unit Installed capacity(MW) Status Stage I 1 120 Retired from service Stage II 2 120 Retired from service Stage III 3 200 Running Stage IV 4 200 Running Stage V 5 210 Running Stage VI 6 500 Running
  • 5. • The coal extracted from the mines is brought to the UTPS through train. The coal is in imported from Bihar, Jharkhand (corba) and Maharashtra by train. In one train there is 55 to 60 wagon are there. COAL HANDLING PLANT
  • 6. • Tippler is motor driven assembly which unload the train wagon by rotating 180º The motor used in tippler is of 6.6 kv operated by operator when tipper hold the wagon. • After the coal is unloaded form wagon it falls on Apron feeder. Apron feeder is a mechanism moving on the shafts and return Roller. It ca manage flow of stones , powder like coal.  TRIPPLER
  • 7.  FLOW CHART OF COAL PLANT Conveyer belt Bunker Stacker cum reclaimer Coal Crusher Coal storage Ordinary coal Washed coal
  • 8. • As the name indicates boiler is use to boil water and turns into steam. There are various types of boilers based on fuel used in boiler. There is coal fire boiler, oil fire boiler, gas fire boiler etc. • Boilers are classified in two types: 1. Water tube boiler 2. Fire tube boiler • Boiler system:  Economizer  Super Heater  Air Pre-Heater  Condenser BOILER
  • 9. • There are three parts of turbine.  High Pressure Turbine  Intermediate Pressure Turbine  Low Pressure Turbine TURBINE A steam turbine is mechanical device that extract thermal energy from pressurize steam and transforms it into mechanical energy, as the steam turbine generaterotary motion they are suited for driving electrical generators. The turbine shaft is connected to the generator shaft.
  • 10. • Steam inlet temperature is 540℃ and pressure is 130kg/cm^2.  HIGH PRESSURE TURBINE • Steam inlet temperature is 540℃ and pressure is 25kg/cm^2.  INTERMIDATE PRESSURE TURBINE • The steam in LP come from IP turbine with reduces pressure and temperature and goes to condenser.  LOW PRESSURE TURBINE
  • 11. GENERATOR • Turbine shaft is connected with generator shaft hence it rotates the generator. Here in thermal power station ukai AC synchronous generator(turbo generator) is used which is Water and hydrogen cooled. • Here generator is with capacity of 235300KVA in unit 3 & 4. Same as in unit 6 generator capacity is 588000KVA. • Speed of both different capacity generator is 3000 RPM with a frequency of 50 Hz. Both are star-star connected generators.
  • 12.  For unit 3&4 • PF: 0.85 • Voltage: 15750 V • Stator current: 8625 A • Stator winding connection: 3 phase start-star • Hydrogen pressure: 3.0kG/cm2 Turbo Genrator
  • 13.  For unit 6 • PF: 0.85 • Voltage: 21000 V • Stator current: 16200 A • CONNECTION: star-star • COOLANT: Water and hydrogen Turbo Genrator (Unit 6)
  • 14. MAIN OUTPUT SYSTEM • After generation of electricity it is very important export or transmit it to the grid by switchyard. There for the transformers generating transformers are being used to step up the voltage. • There are different types of transformers on basis of ratings and function. Also for stepping up and stepping down transformer are being used to take power from the switch yard. • Generator Transformer : GSECL, UTPS has 6 GTs of different MVA capacity. Unit produce 15.75kV the generator transformer steps up from 15.75kv to 220kV. In unit six generator output is 21kv so generator transformer steps up voltage from 21kv to 400kv.
  • 15. • Station Transformer :  UTPS has 4 ST of different capacity. The function of station transformer is in emergency case or when station has to start the unit station transformer feed power to the auxiliaries from switchyard. Station transformer step down 220kV/7kV and makes two bus 6.6KvA and UAT is generally step 6.6kvB.  HT motors operates on 6.6Kv. • Unit Auxiliary Transformer :  Step- down transformer. Which step down the voltage of ST from 6.6Kv to 415V.  LT motors operates on 415V.
  • 16. 220KV SWITCHYARD • Switchyard is a switching station which is the main link between the generating plant and the transmission system. It can be considered as the heart of the power plant, the generated power will only be worthy if it can be transmitted and received by the consumers.
  • 17. • Components of switchyard Bus bar Bus coupler Lightning arrester Circuit breaker Isolator Current transformer Potential transformer Wave trap Or Power line communication Carrier(PLCC) Bus bar Lightning arrester Ckt breaker Isolator
  • 19. ASH HANDLING PLANT • Ash plant is very important section in station, Where two types of air collected. Fly Ash Bottom Ash • There are two sides of ash control, fly ash control and bottom ash control. For bottom ash as well as fly ash SILO system is installed. There is ESP (Electrostatic precipitator). There are total 3 Nos of SILO, where 2 Nos are for fly ash and 1 Nos for bottom ash. • The fly Ash is send to the cement and block producers by the truck. • Bottom Ash is added with water to make the slurry form of Ash. Generally the ratio of water and bottom Ash is 3:1. • Bottom Ash is stored in Ash pond which is located near the plant.