Esfahan Refinery Upgrading ProjectEsfahan Refinery Upgrading ProjectEsfahan Refinery Upgrading ProjectEsfahan Refinery Upgrading Project 19-May-08 A 09-Jun-10 333 225 121
Package CPackage CPackage CPackage C 19-May-08 A 09-Jun-10 333 225 121
EngineeringEngineeringEngineeringEngineering 19-May-08 A 09-Jun-10 333 225 121
Detail DesignDetail DesignDetail DesignDetail Design 20-Oct-08 A 28-Apr-10 303 195 53
Structure (Concrete/Steel)Structure (Concrete/Steel)Structure (Concrete/Steel)Structure (Concrete/Steel) 30-Jul-09 29-Mar-10 173 173 1
Unit 41Unit 41Unit 41Unit 41 30-Jul-09 29-Mar-10 173 173 1
EED41STVLS0500 STRUCTURE ENGINEERING DOCUMENTS FOR ACC EPC CONTRACTOR (UNIT 41) 30-Jul-09* 29-Mar-10 243 243 1 PPL41MEPO03
Mechanical (Fixed Mechanical EquipmentMechanical (Fixed Mechanical Equipment)Mechanical (Fixed Mechanical Equipment)Mechanical (Fixed Mechanical Equipment) 20-Oct-08 A 28-Apr-10 303 195 7
Unit 41Unit 41Unit 41Unit 41 30-Jul-09 27-Apr-10 194 194 3
EED41MEVLS0520 MECHANICAL ENGINEERING DOCUMENTS FOR CPP EPC CONTRACTOR (UNIT ... Deleted 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41MEVLS0530 MECHANICAL ENGINEERING DOCUMENTS FOR DEOILING EPC CONTRACTOR (... Deleted 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41MEVLS0550 MECHANICAL ENGINEERING DOCUMENTS FOR WTP (DEMIN) EPC CONTRACT... Deleted 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
Unit 42Unit 42Unit 42Unit 42 30-Jul-09 28-Apr-10 195 195 1
EED42MEVLS0510 MECHANICAL ENGINEERING DOCUMENTS FOR WET COOLING EPC CONTRAC... Deleted 30-Jul-09* 28-Apr-10 273 273 1 PPL00GNPO07
Unit 46Unit 46Unit 46Unit 46 30-Jul-09 28-Apr-10 195 195 2
EED46MEVLS0540 MECHANICAL ENGINEERING DOCUMENTS FOR OILY SYSTEM EPC CONTRACT... 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
EED46MEVLS0560 MECHANICAL ENGINEERING DOCUMENTS FOR SANITARY SYSTEM EPC CONT... 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
Unit 50Unit 50Unit 50Unit 50 20-Oct-08 A 01-Mar-10 252 153 1
EED50MEVLS0500 MECHANICAL ENGINEERING DOCUMENTS FOR ATMOSPHERIC TANKS EPC CO... Deleted 20-Oct-08 A 01-Mar-10 353 215 1 EMS00GNGEN0010, PPL50MEPO14
Mechanical (Rotary EquipmentMechanical (Rotary Equipment & Packages)Mechanical (Rotary Equipment & Packages)Mechanical (Rotary Equipment & Packages) 30-Jul-09 28-Apr-10 195 195 7
Unit 41Unit 41Unit 41Unit 41 30-Jul-09 28-Apr-10 195 195 4
EED41MAVLS0500 MACHINARY ENGINEERING DOCUMENTS FOR ACC EPC CONTRACTOR (UNIT 41) 30-Jul-09* 29-Mar-10 243 243 1 PPL41MEPO03
EED41MAVLS0510 MACHINARY ENGINEERING DOCUMENTS FOR CPP EPC CONTRACTOR (UNIT 41) 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41MAVLS0520 MACHINARY ENGINEERING DOCUMENTS FOR DEOILING EPC CONTRACTOR (... 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41MAVLS0560 MACHINARY ENGINEERING DOCUMENTS FOR WTP (DEMIN) EPC CONTRACTO... 30-Jul-09* 28-Apr-10 273 273 1 PPL41MEPO03
Unit 42Unit 42Unit 42Unit 42 30-Jul-09 28-Apr-10 195 195 1
EED42MAVLS0550 MACHINARY ENGINEERING DOCUMENTS FOR WET COOLING EPC CONTRACT... 30-Jul-09* 28-Apr-10 273 273 1 PPL00GNPO07
Unit 46Unit 46Unit 46Unit 46 30-Jul-09 28-Apr-10 195 195 2
EED46MAVLS0530 MACHINARY ENGINEERING DOCUMENTS FOR OILY SYSTEM EPC CONTRACTO... 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
EED46MAVLS0540 MACHINARY ENGINEERING DOCUMENTS FOR SANITARY SYSTEM EPC CONTR... 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
PipingPipingPipingPiping 30-Jul-09 28-Apr-10 195 195 7
Unit 41Unit 41Unit 41Unit 41 30-Jul-09 27-Apr-10 194 194 4
EED41PIVLS0510 PIPING ENGINEERING DOCUMENTS FOR CPP EPC CONTRACTOR (UNIT 41) 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41PIVLS0520 PIPING ENGINEERING DOCUMENTS FOR DEOILING EPC CONTRACTOR (UNIT 41) 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41PIVLS0540 PIPING ENGINEERING DOCUMENTS FOR ACC EPC CONTRACTOR (UNIT 41) 30-Jul-09* 29-Mar-10 243 243 1 PPL00GNPO07
EED41PIVLS0560 PIPING ENGINEERING DOCUMENTS FOR WTP (DEMIN) EPC CONTRACTOR (UN... 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
Unit 42Unit 42Unit 42Unit 42 30-Jul-09 28-Apr-10 195 195 1
EED42PIVLS0550 PIPING ENGINEERING DOCUMENTS FOR WET COOLING EPC CONTRACTOR (U... 30-Jul-09* 28-Apr-10 273 273 1 PPL00GNPO07
Unit 46Unit 46Unit 46Unit 46 30-Jul-09 28-Apr-10 195 195 2
EED46PIVLS0500 PIPING ENGINEERING DOCUMENTS FOR SANITARY SYSTEM EPC CONTRACTO... Deleted 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
EED46PIVLS0530 PIPING ENGINEERING DOCUMENTS FOR OILY SYSTEM EPC CONTRACTOR (U... Deleted 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
ElectricalElectricalElectricalElectrical 20-Oct-08 A 28-Apr-10 281 195 12
Unit 41Unit 41Unit 41Unit 41 30-Jul-09 27-Apr-10 194 194 4
EED41ELVLS0550 ELECTRICAL ENGINEERING DOCUMENTS FOR WTP (DEMIN) EPC CONTRACTO... Deleted 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41ELVLS0560 ELECTRICAL ENGINEERING DOCUMENTS FOR CPP EPC CONTRACTOR (UNIT 41) Deleted 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41ELVLS0580 ELECTRICAL ENGINEERING DOCUMENTS FOR DEOILING EPC CONTRACTOR (... Deleted 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41ELVLS0610 ELECTRICAL ENGINEERING DOCUMENTS FOR ACC EPC CONTRACTOR (UNIT 41) Deleted 30-Jul-09* 29-Mar-10 243 243 1 PPL00GNPO07
Unit 42Unit 42Unit 42Unit 42 30-Jul-09 28-Apr-10 195 195 1
EED42ELVLS0570 ELECTRICAL ENGINEERING DOCUMENTS FOR WET COOLING EPC CONTRACT... Deleted 30-Jul-09* 28-Apr-10 273 273 1 PPL00GNPO07
Unit 46Unit 46Unit 46Unit 46 30-Jul-09 28-Apr-10 195 195 2
EED46ELVLS0590 ELECTRICAL ENGINEERING DOCUMENTS FOR SANITARY SYSTEM EPC CONTR... 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
EED46ELVLS0600 ELECTRICAL ENGINEERING DOCUMENTS FOR OILY SYSTEM EPC CONTRACT... 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
Unit 50Unit 50Unit 50Unit 50 20-Oct-08 A 01-Mar-10 253 152 1
EED50ELVLS0540 ELECTRICAL ENGINEERING DOCUMENTS FOR ATMOSPHERIC TANKS EPC CO... Deleted 20-Oct-08 A 01-Mar-10 353 214 1 EMS00GNGEN0010, PPL50MEPO14
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 01-Aug-09 31-Mar-10 172 172 4
EED00ELVLS0500 ELECTRICAL ENGINEERING DOCUMENTS FOR CATHODIC PROTECTION SYST... Deleted 07-Dec-09* 27-Feb-10 82 82 1 EMS00GNGEN0010, PPL00ELPO30
EED00ELVLS0510 ELECTRICAL ENGINEERING DOCUMENTS FOR SUBSTATION 63/20 KV EPC CO... Deleted 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
EED00ELVLS0520 ELECTRICAL ENGINEERING DOCUMENTS FOR SUBSTATION 71 EPC CONTRAC... Deleted 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
EED00ELVLS0530 ELECTRICAL ENGINEERING DOCUMENTS FOR SUBSTATION 77 EPC CONTRAC... Deleted 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
InstrumentInstrumentInstrumentInstrument 30-Jul-09 28-Apr-10 195 195 9
Unit 41Unit 41Unit 41Unit 41 30-Jul-09 27-Apr-10 194 194 3
EED41INVLS0510 I&C ENGINEERING DOCUMENTS FOR DEOILING EPC CONTRACTOR (UNIT 41) 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41INVLS0520 I&C ENGINEERING DOCUMENTS FOR WTP (DEMIN) EPC CONTRACTOR (UNIT 41) 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41INVLS0530 I&C ENGINEERING DOCUMENTS FOR CPP EPC CONTRACTOR (UNIT 41) 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
Unit 42Unit 42Unit 42Unit 42 30-Jul-09 28-Apr-10 195 195 1
EED42INVLS0580 I&C ENGINEERING DOCUMENTS FOR WET COOLING EPC CONTRACTOR (UNIT ... Deleted 30-Jul-09* 28-Apr-10 273 273 1 PPL00GNPO07
Unit 46Unit 46Unit 46Unit 46 30-Jul-09 28-Apr-10 195 195 2
EED46INVLS0500 I&C ENGINEERING DOCUMENTS FOR OILY SYSTEM EPC CONTRACTOR (UNIT 46) By MAPNA'... 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
EED46INVLS0540 I&C ENGINEERING DOCUMENTS FOR SANITARY SYSTEM EPC CONTRACTOR (... By MAPNA'... 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 01-Aug-09 31-Mar-10 172 172 3
EED00INVLS0550 I&C ENGINEERING DOCUMENTS FOR SUBSTATION 63/20 KV EPC CONTRACTO... 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
ERUP- E Classic WBS Layout 06-Oct-09 18:04
Page 1 of 3 TASK filter: VLS.
© Primavera Systems, Inc.
- 2. Activity ID Activity Name user_text8 user_text9 Start Finish Original
Duration
Remaining
Duration
Activity
Count
Predecessors
EED00INVLS0560 I&C ENGINEERING DOCUMENTS FOR SUBSTATION 71 EPC CONTRACTOR (CO... 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
EED00INVLS0570 I&C ENGINEERING DOCUMENTS FOR SUBSTATION 77 EPC CONTRACTOR (CO... 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
ProcessProcessProcessProcess 30-Jul-09 28-Apr-10 195 195 6
Unit 41Unit 41Unit 41Unit 41 30-Jul-09 27-Apr-10 194 194 3
EED41PRVLS0510 PROCESS ENGINEERING DOCUMENTS FOR CPP EPC CONTRACTOR (UNIT 41) 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41PRVLS0540 PROCESS ENGINEERING DOCUMENTS FOR DEOILING EPC CONTRACTOR (UNI... 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
EED41PRVLS0550 PROCESS ENGINEERING DOCUMENTS FOR WTP (DEMIN) EPC CONTRACTOR (... 30-Jul-09* 27-Apr-10 272 272 1 PPL41MEPO03
Unit 42Unit 42Unit 42Unit 42 30-Jul-09 28-Apr-10 195 195 1
EED42PRVLS0500 PROCESS ENGINEERING DOCUMENTS FOR WET COOLING EPC CONTRACTO... 30-Jul-09* 28-Apr-10 273 273 1 PPL00GNPO07
Unit 46Unit 46Unit 46Unit 46 30-Jul-09 28-Apr-10 195 195 2
EED46PRVLS0520 PROCESS ENGINEERING DOCUMENTS FOR WASTE WATER TREATMENT EPC ... Modified Predecessor... 30-Jul-09* 28-Apr-10 273 273 1 EEB00GNGRP0020, PPL46PMPO12
EED46PRVLS0530 PROCESS ENGINEERING DOCUMENTS FOR SANITARY SYSTEM EPC CONTRA... Deleted 30-Jul-09* 28-Apr-10 273 273 1 PPL46PMPO12
Health Safety Environment(Health Safety Environment(Incl. Fire Fighting)Health Safety Environment(Incl. Fire Fighting)Health Safety Environment(Incl. Fire Fighting) 30-Jul-09 31-Mar-10 174 174 4
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 30-Jul-09 31-Mar-10 174 174 4
EED00HSVLS0500 HSE ENGINEERING DOCUMENTS FOR SUBSTATION 77 EPC CONTRACTOR (CO... 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
EED00HSVLS0510 HSE ENGINEERING DOCUMENTS FOR SUBSTATION 63/20 KV EPC CONTRACT... 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
EED00HSVLS0520 HSE ENGINEERING DOCUMENTS FOR SUBSTATION 71 EPC CONTRACTOR (CO... 01-Aug-09* 31-Mar-10 242 242 1 PPL00ELPO23
EED00HSVLS0530 HSE ENGINEERING DOCUMENTS FOR FIRE FIGHTING SYSTEMS (COMMON) 30-Jul-09* 29-Mar-10 243 243 1 EMS00GNGEN0010
Procurement ServicesProcurement ServicesProcurement ServicesProcurement Services 19-May-08 A 09-Jun-10 333 225 68
Heating, Ventilation, Air ConditioningHeating, Ventilation, Air Conditioning & CoolingHeating, Ventilation, Air Conditioning & CoolingHeating, Ventilation, Air Conditioning & Cooling 05-Nov-09 17-Mar-10 94 94 2
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 05-Nov-09 17-Mar-10 94 94 2
EEP00HVVLS0120 VENDOR SELECTION for KITCHEN EQUIPMENT (P.O. 21) 05-Nov-09* 0 0 1 EEP00HVTBE0120
EEP71HVVLS0020 VENDOR SELECTION for HVAC EQUIPMENT (P.O. 19) 17-Mar-10* 0 0 1 EEP71HVTBE0020
Mechanical (Fixed Mechanical EquipmentMechanical (Fixed Mechanical Equipment)Mechanical (Fixed Mechanical Equipment)Mechanical (Fixed Mechanical Equipment) 10-Jul-08 A 20-Feb-10 255 147 14
Unit 35Unit 35Unit 35Unit 35 02-Aug-09 29-Nov-09 85 85 3
EEP35MEVLS0020 VENDOR SELECTION for FLARE K.O. DRUM (U 35) (P.O. 02) 17-Nov-09* 0 0 1 EEP35METBE0020
EEP35MEVLS0040 VENDOR SELECTION for FLARE STACK (U 35) (P.O. 01) 17-Oct-09* 0 0 1 EEP35METBE0040
EEP35MEVLS0550 VENDOR PRINT CHECK LIST REVIEW FOR FLARE STACK (UNIT 35) 02-Aug-09* 29-Nov-09 120 120 1 EMS00GNGEN0010
Unit 41Unit 41Unit 41Unit 41 22-Sep-09 26-Nov-09 47 47 2
EEP41MEVLS0020 VENDOR SELECTION for AIR COOLED CONDENSER & COOLING WATER PACKA... 26-Nov-09* 0 0 1 EEP41METBE0020
EEP41MEVLS0080 VENDOR SELECTION for STEAM GENERATION ISLAND (HRSG & UTILITY BOILE... 22-Sep-09* 0 0 1 EEP41METBE0080
Unit 42Unit 42Unit 42Unit 42 27-Nov-09 28-Nov-09 0 0 2
EEP42MEVLS0040 VENDOR SELECTION for FIRE FIGHTING SYSTEM (FOR ENTIRE REFINERY) (P.O... 27-Nov-09* 0 0 1 EEP42METBE0040
EEP42MEVLS0070 VENDOR SELECTION for FIRE FIGHTING PUMP HOUSE PACKAGE (P.O. 09) 28-Nov-09* 0 0 1 EEP42METBE0070
Unit 43Unit 43Unit 43Unit 43 30-Nov-09 30-Nov-09 0 0 1
EEP43MEVLS0020 VENDOR SELECTION for FUEL SUPPLY PACKAGE & HP FUEL GAS COMPRESS... 30-Nov-09* 0 0 1 EEP43METBE0020
Unit 50Unit 50Unit 50Unit 50 10-Jul-08 A 10-Oct-09 158 52 4
EEP50MEVLS0020 VENDOR SELECTION for ATMOSPHERIC STORAGE TANKS (P.O. 14) 11-Sep-0... 0 0 1 EEP50METBE0020
EEP50MEVLS0080 VENDOR SELECTION for EPS PRESSURE STORAGE SPHERES (LPG) (P.O. 15) 10-Jul-08 A 0 0 1 EEP50METBE0080
EEP50MEVLS0120 VENDOR SELECTION for LOADING ARMS (P.O. 16) 07-Oct-09* 0 0 1 EEP50METBE0120
EEP50MEVLS0600 VENDOR PRINT CHECK LIST REVIEW FOR SPHERICAL TANKS CONTRACTOR (... 10-Sep-08 A 10-Oct-09 181 73 1 EMS00GNGEN0010
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 20-Feb-10 20-Feb-10 0 0 1
EEP00MEVLS0020 VENDOR SELECTION for CRANES AND MONORAILS (P.O. 34) 20-Feb-10* 0 0 1 EEP00METBE0020
WORKSHOPWORKSHOPWORKSHOPWORKSHOP 02-Nov-09 02-Nov-09 0 0 1
EEPWRMEVLS0020 VENDOR SELECTION for WORKSHOP EQUIPMENT (P.O. 22) 02-Nov-09* 0 0 1 EEPWRMETBE0020
Mechanical (Rotary EquipmentMechanical (Rotary Equipment & Packages)Mechanical (Rotary Equipment & Packages)Mechanical (Rotary Equipment & Packages) 10-Jul-09 A 27-Jan-10 130 130 13
Unit 41Unit 41Unit 41Unit 41 10-Jul-09 A 27-Jan-10 130 130 6
EEP41MAVLS0500 VENDOR PRINT CHECK LIST REVIEW FOR ACC CONTRACTOR (UNIT 41) 27-Aug-09* 26-Jan-10 152 152 1 EMS00GNGEN0010
EEP41MAVLS0520 VENDOR PRINT CHECK LIST REVIEW FOR BOILER & HRSG CONTRACTOR (UNI... 30-Jul-09* 26-Jan-10 181 181 1 EMS00GNGEN0010
EEP41MAVLS0560 VENDOR PRINT CHECK LIST REVIEW FOR GTG CONTRACTOR (UNIT 41) 30-Jul-09* 27-Nov-09 121 121 1 EMS00GNGEN0010
EEP41MAVLS0610 VENDOR PRINT CHECK LIST REVIEW FOR STG CONTRACTOR (UNIT 41) 30-Jul-09* 27-Jan-10 182 182 1 EMS00GNGEN0010
EEP41MEVLS0060 VENDOR SELECTION for GTG PACKAGE (P.O. 04) 10-Jul-09 A 0 0 1 EEP41METBE0060
EEP41MEVLS0100 VENDOR SELECTION for STG PACKAGE (P.O. 06) 27-Oct-09* 0 0 1 EEP41METBE0100
Unit 42Unit 42Unit 42Unit 42 27-Aug-09 26-Jan-10 108 108 2
EEP42MAVLS0540 VENDOR PRINT CHECK LIST REVIEW FOR FIRE FIGHTING SYSTEM CONTRACT... 29-Aug-09* 27-Dec-09 121 121 1 EMS00GNGEN0010
EEP42MAVLS0630 VENDOR PRINT CHECK LIST REVIEW FOR WET COOLING SYSTEM CONTRACT... 27-Aug-09* 26-Jan-10 152 152 1 EMS00GNGEN0010
Unit 44Unit 44Unit 44Unit 44 08-Aug-09 27-Nov-09 79 79 2
EEP44MAVLS0510 VENDOR PRINT CHECK LIST REVIEW FOR AIR COMPRESSOR (UNIT 44) 08-Aug-09* 06-Nov-09 90 90 1 EMS00GNGEN0010
EEP44MEVLS0020 VENDOR SELECTION for INSTRUMENT & PLANT AIR PACKAGE (P.O. 11) 27-Nov-09* 0 0 1 EEP44METBE0020
Unit 46Unit 46Unit 46Unit 46 30-Jul-09 27-Nov-09 87 87 1
EEP46MAVLS0590 VENDOR PRINT CHECK LIST REVIEW FOR OILY SYSTEM CONTRACTOR (UNIT 46) 30-Jul-09* 27-Nov-09 121 121 1 EMS00GNGEN0010
Unit 50Unit 50Unit 50Unit 50 08-Oct-09 08-Oct-09 0 0 1
EEP50MEVLS0040 VENDOR SELECTION for DYE INJECTION & ODORANT (P.O. 17) 08-Oct-09* 0 0 1 EEP50METBE0040
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 02-Nov-09 02-Nov-09 0 0 1
EEP42MEVLS0060 VENDOR SELECTION for WATER SUPPLY PUMPS (U42) CENTRIFUGAL & ROTA... 02-Nov-09* 0 0 1 EEP42METBE0060
PipingPipingPipingPiping 26-Dec-09 09-Jun-10 118 118 7
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 26-Dec-09 09-Jun-10 118 118 7
EEP41PIVLS0080 VENDOR SELECTION (FIRST ORDER) for PIPE,FITTING (U35,U41,U42,U43,U44,U... 08-Mar-10* 0 0 1 EEP41PITBE0080
EEP41PIVLS0120 VENDOR SELECTION (FIRST ORDER) for VALVES,FLANGES,GASKET, ... (U35,U4... 08-Mar-10* 0 0 1 EEP41PITBE0120
EEP50PIVLS0020 VENDOR SELECTION (FINAL ORDER) for PIPE,FITTING (U41,U42,U43,U44,U45,U... 09-Jun-10* 0 0 1 EEP50PITBE0020
EEP50PIVLS0060 VENDOR SELECTION (FINAL ORDER) for VALVES, FLANGES, GASKETS, ... (U41,... 09-Jun-10* 0 0 1 EEP50PITBE0060
ERUP- E Classic WBS Layout 06-Oct-09 18:04
Page 2 of 3 TASK filter: VLS.
© Primavera Systems, Inc.
- 3. Activity ID Activity Name user_text8 user_text9 Start Finish Original
Duration
Remaining
Duration
Activity
Count
Predecessors
EEP50PIVLS0100 VENDOR SELECTION (FIRST ORDER) for for PIPE,FITTING (U45,U50) (P.O. 39) 26-Dec-09* 0 0 1 EEP50PITBE0100
EEP50PIVLS0130 VENDOR SELECTION (FINAL ORDER) for HOSE & HOSE CONNECTION (U35,U41,... 09-Jun-10* 0 0 1 EEP50PITBE0070
EEP50PIVLS0150 VENDOR SELECTION (FINAL ORDER) for INSULATION MATERIAL (U35,U41,U42,... 09-Jun-10* 0 0 1 EEP50PITBE0140
ElectricalElectricalElectricalElectrical 19-May-08 A 23-Apr-10 214 189 16
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 19-May-08 A 23-Apr-10 214 189 15
EEP00ELVLS0020 VENDOR SELECTION for UPS,BATTERIES,CHARGER (P.O. 28) 07-Jan-10* 0 0 1 EEP00ELTBE0020
EEP00ELVLS0040 VENDOR SELECTION for BUS DUCTS (P.O.33) 12-Dec-09* 0 0 1 EEP00ELTBE0040
EEP00ELVLS0050 VENDOR SELECTION for TRAY,CONDUIT,FITTING ,LADDER,...(P.O. 27) 17-Dec-09* 0 0 1 EEP00ELTBE0050
EEP00ELVLS0080 VENDOR SELECTION for TANKS CATHODIC PROTECTION (P.O. 30) 23-Apr-10* 0 0 1 EEP00ELTBE0080
EEP00ELVLS0140 VENDOR SELECTION for PRIMARY EARTHING SYSTEM & EARTHING & LIGHTEN... 22-Nov-09* 0 0 1 EEP00ELTBE0140
EEP00ELVLS0160 VENDOR SELECTION for TRANSFORMERS (P.O. 24) 29-Oct-09* 0 0 1 EEP00ELTBE0160
EEP00ELVLS0180 VENDOR SELECTION for ELECTRICAL HEAT TRACING (P.O. 35) 21-Oct-09* 0 0 1 EEP00ELTBE0180
EEP00ELVLS0200 VENDOR SELECTION for PAGA,PABX,CCTV,LAN,MIS,... (P.O. 29) 06-Nov-09* 0 0 1 EEP00ELTBE0200
EEP00ELVLS0220 VENDOR SELECTION for OUTDOOR LIGHTING (P.O. 3 2) 29-Nov-09* 0 0 1 EEP00ELTBE0220
EEP00ELVLS0240 VENDOR SELECTION for CABLES (LV,MV,…) (P.O. 25) 08-Jan-10* 0 0 1 EEP00ELTBE0240
EEP00ELVLS0270 VENDOR SELECTION for CATHODIC PROTECTION OF PIPING & OTHERS EQU. (... 22-Apr-10* 0 0 1 EEP00ELTBE0270
EEP00ELVLS0360 VENDOR SELECTION for POWER MANAGEMENT SYSTEM (P.O. 26) 17-Nov-09* 0 0 1 EEP00ELTBE0360
EEP00ELVLS0490 VENDOR SELECTION for RELOCATION OF EXISTING OVERHEAD LINE (P.O. 55) 19-May-0... 0 0 1 EEP00ELTBE0490
EEP00ELVLS0500 VENDOR SELECTION for 63 KV TRANSMISSION LINE (P.O. 52) 12-Nov-09* 0 0 1 EEP00ELTBE0500
EEP00ELVLS0620 VENDOR PRINT CHECK LIST REVIEW FOR TRANSFORMER CONTRACTOR (CO... 01-Aug-09* 28-Nov-09 120 120 1 EMS00GNGEN0010
SUBSTATION 71SUBSTATION 71SUBSTATION 71SUBSTATION 71 15-Dec-09 15-Dec-09 0 0 1
EEP71ELVLS0020 VENDOR SELECTION for SS71,SS77,SS63-20,LV & MV SWG.,NGR,CAPACITORS,... 15-Dec-09* 0 0 1 EEP71ELTBE0020
InstrumentInstrumentInstrumentInstrument 30-Jul-09 26-Jan-10 129 129 12
Unit 50Unit 50Unit 50Unit 50 20-Sep-09 20-Sep-09 0 0 1
EEP50INVLS0020 VENDOR SELECTION for TANK GAUGING SYSTEM (P.O. 13) 20-Sep-09* 0 0 1 EEP50INTBE0020
Unit 00 - GeneralUnit 00 - GeneralUnit 00 - GeneralUnit 00 - General 30-Jul-09 26-Jan-10 129 129 11
EEP00INVLS0020 VENDOR SELECTION for ANALYZERS (U50,U35) (P.O. 43) 20-Dec-09* 0 0 1 EEP00INTBE0020
EEP00INVLS0060 VENDOR SELECTION for ESD & PCS (P.O. 37) 23-Sep-09* 0 0 1 EEP00INTBE0060
EEP00INVLS0100 VENDOR SELECTION for F&G (P.O. 36) 12-Nov-09* 0 0 1 EEP00INTBE0100
EEP00INVLS0530 VENDOR PRINT CHECK LIST REVIEW FOR F&G SYSTEM CONTRACTOR (COMM... 14-Aug-09* 11-Nov-09 90 90 1 EMS00GNGEN0010
EEP00INVLS0570 VENDOR PRINT CHECK LIST REVIEW FOR MAIN CONTROL SYSTEM CONTRAC... 30-Jul-09* 26-Jan-10 181 181 1 EMS00GNGEN0010
EEP00INVLS0580 VENDOR PRINT CHECK LIST REVIEW FOR MIS/LAN CONTRACTOR (COMMON) 09-Aug-09* 06-Nov-09 90 90 1 EMS00GNGEN0010
EEP35INVLS0030 VENDOR SELECTION for CONTROL VALVES (U50,U35) (P.O. 44) 13-Jan-10* 0 0 1 EEP35INTBE0030
EEP35INVLS0050 VENDOR SELECTION for TRANSMITTERS (U50,U35) (P.O. 38) 13-Jan-10* 0 0 1 EEP35INTBE0050
EEP35INVLS0070 VENDOR SELECTION for GAUGES (U50,U35) (P.O. 42) 29-Nov-09* 0 0 1 EEP35INTBE0070
EEP35INVLS0130 VENDOR SELECTION for MOTOR OPERATED VALVES (U50,U35) (P.O. 45) 10-Dec-09* 0 0 1 EEP35INTBE0130
EEP50INVLS0120 VENDOR SELECTION for HOOK-UP / INSTRUMENT BULK MATERIAL (U50,U35) (P... 08-Jan-10* 0 0 1 EEP50INTBE0120
ProcessProcessProcessProcess 30-Jul-09 19-Jan-10 123 123 4
Unit 41Unit 41Unit 41Unit 41 30-Jul-09 30-Jul-09 0 0 1
EEP41PRVLS0020 VENDOR SELECTION for COND. DEOILING UNIT;POLISHING UNIT;DEMINERALIZ... 30-Jul-09* 0 0 1 EEP41PRTBE0020
Unit 46Unit 46Unit 46Unit 46 19-Aug-09 19-Aug-09 0 0 1
EEP46PRVLS0020 VENDOR SELECTION for OILY & SANITARY WATER TREATMENT (P.O. 12) 19-Aug-09* 0 0 1 EEP46PRTBE0020
LABRATOARY SOUTH AREALABRATOARY SOUTH AREALABRATOARY SOUTH AREALABRATOARY SOUTH AREA 04-Nov-09 19-Jan-10 54 54 2
EEPLSPRVLS0020 VENDOR SELECTION for LABORATORY EQUIPMENT(P.O. 20) 04-Nov-09* 0 0 1 EEPLSPRTBE0020
EEPLSPRVLS0030 VENDOR SELECTION for LABORATORY FURNITURE (P.O. 54) 19-Jan-10* 0 0 1 EEPLSPRTBE0030