1. D.RAJESH
PIPING DDEESSIIGGNNEERR//DDrraauugghhttssmmaann
++991199117766551188881188
rraajjeesshhddvvmm@@ggmmaaiill..ccoomm
IInndduussttrriieess OOuuttlliinnee:
MMAAEERRSSKK OOIILL OONN BBEEHHAALLFF OOFF OOCCEEAANNEEEERRIINNGG :: JJaann 22001144 ttoo OOcctt 22001144
QQAATTAARR ((OOFFFFSSHHOORREE))
DDUUBBAAII PPEETTRROOLLEEUUMM OONN BBEEHHAALLFF OOFF EEIILL :: SSeepp 22001111 ttoo JJaann 22001144
UUAAEE ((DDUUBBAAII))
GGUULLFF SSPPIICC GGeenneerraall TTrraaddiinngg && CCoonntt.. ccoo.. WW..LL..LL :: SSeepp 22000099 ttoo AAuugg 22001111
KKUUWWAAIITT
SSPPIICC SSMMOO :: FFeebb 22000066 TTOO AAuugg 22000099
CCHHEENNNNAAII
More than 8.5 years Experience as a Piping Designer, Detailed Design and Engineering in Oil & Gas, Refinery
and Petrochemical Industries both in Onshore and Offshore facilities.
EEDDUUCCAATTIIOONNAALL && PPRROOFFEESSSSIIOONNAALL CCRREEDDEENNTTIIAALLSS
· DIPLOMA IN MECHANICAL ENGINEERING (SANDWICH) DEC 2005; Central Polytechnic ,Chennai.
SSooffttwwaarree SSkkiillllssss
· AutoCAD-2002 TO 2013
· CAD Works - 2010.
· Plant Design management system (PDMS).
· MS Office
AArreeaa ooff SSttrreennggtthh// EExxppeerriieennccee
· Preparation of Equipment Layout. Preparation of PFD, P&ID, Plot Plan, GAD, Equipment Layout, Piping Layout,
Isometric, Pipe Supports, Bill of Materials etc.
· Carry out Offshore Site Survey and making approximate Piping Routings.
· Familiarity with Equipment Modeling, Piping and Nozzle Orientation, Pipeline Projects-Crude Oil Export Lines,
Water Lines and Storage Tank Lines.
· Familiarity with Drawing Checking, Quality Control and Planning and Quantity Surveying.
· Aware of Codes and Standards (API, ASME, ANSI, etc.).
· Review vendor drawings for verification and quantity assessment purposes,
· Preparation of as built Drawings as per site survey.
· Aware of Codes and Standards(API,ASME,ANSI,etc.)
· Preparation of Fire Fighting Layout, Drain & Detail drawings.
· Work under the supervision of Site Management Team to review work progress of Subcontractors
· Co-ordination with other departments for all Piping Deliverables.
PPeerrssoonnaall DDeettaaiillss
· Passport No : F 7475567
· Passport Validity : 28.04.2016
· Nationality : INDIAN
· UAE Driving License no : 1963495
· Date of birth : 06.03.1985
2. · Gender : Male
· Marital status : Single
· Languages Known : English, Tamil
VVAALLIIDD OOFFFFSSHHOORREE PPAASSSSEESS
· T-BOSIET – 05-09-2015
· H2S - 28-01-2016
Helicopter Pass No -55601 (Qatar)
CCHHRROONNIICCLLEE OOFF PPRROOFFEESSSSIIOONNAALL EEXXPPEERRIIEENNCCEE
MMAAEERRSSKK OOIILL ((OONN BBEEHHAALLFF OOFF MM//ss OOCCEEAANNEEEERRIINNGG OOIISS,, AABBHHUUDDHHAABBHHII..))
JJAANN 1144--OOCCTT 1144
PPiippiinngg DDrraauugghhttssmmaann ((EEnnggiinneeeerriinngg DDeeppaarrttmmeenntt))
TTiittllee AL-SHAHEEN OIL FEILD QATAR (B,E and D LOCATION OIL PLATFORM)
CClliieenntt MAERSK OIL.
RReessppoonnssiibbiilliittiieess Self carried out site survey to derive the scope of work for Installation contractor.
Line Walking, Pipeline Tracing, Surveying, Piping Layouts & Isometric Drawings and work
completion assessment.
Equipments drawings & Vessel Trim, Update P&ID, Tag Equipments & Pipe Fittings for
identification, Submit daily working progress report to Supervisor.
Attend Tool Meetings and Safety Drills.
DDUUBBAAII PPEETTRROOLLEEUUMM ((OONN BBEEHHAALLFF OOFF EEMMIIRRAATTEESS IINNDDUUSSTTRRIIAALL LLAABBOORRAATTOORRYY DDUUBBAAII))
SSEEPP 1111--JJAANN 1144
PPiippiinngg DDeessiiggnneerr ((EEnnggiinneeeerriinngg DDeeppaarrttmmeenntt))
TTiittllee Risk Based Inspection (RBI)
CClliieenntt DUBAI PETROLEUM.
RReessppoonnssiibbiilliittiieess Assisting Engineers in conducting Risk Based Inspection at offshore for both
Fateh/South west Fateh fields for all Platforms.
Updating the field Markups on existing Mechanical/Piping drawings based on
RBI report.
TTiittllee KK platform Well slot A and B Addition-SOUTH WEST FATEH
CClliieenntt DUBAI PETROLEUM.
RReessppoonnssiibbiilliittiieess Self carried out site survey to derive the scope of work for Installation contractor.
Preparation of P&ID,PFD drawings.
Preparation of Equipment layout/piping layout.
Preparation of Isometric/support drawings.
Existing Manifold modification.
Preparation of Bill of materials.
TTiittllee GL-1 Generator Train A & B cooling water line modification- SOUTH WEST FATEH
3. CClliieenntt DUBAI PETROLEUM.
RReessppoonnssiibbiilliittiieess Preparation of P&ID as per modification.
Preparation of Piping layout
Existing support/isometric modification
Preparation of Bill of materials.
GGUULLFFSSPPIICC GGEENNEERRAALL TTRRAADDIINNGG && CCOONNTTRRAACCTTIINNGG CCOOMMPPAANNYY WW..LL..LL,, KKUUWWAAIITT
SSEEPP 0099--AAUUGG 1111
PPiippiinngg DDrraauugghhttssmmaann ((EEnnggiinneeeerriinngg DDeeppaarrttmmeenntt)
TTiittllee INSTALLATION OF MULTICYCLONE SCRUBBERS AND CONDENSATE FILTER
CClliieenntt KUWAIT OIL COMPANY.
RReessppoonnssiibbiilliittiieess Doing Site survey and incorporate the site details in the GAD drawings.
Preparation of GAD drawings for GC-27,28,and 11 based on site survey, P& ID and client
inputs.
Preparation of Isometric Drawings with BOM based on GAD for the GC-27, 28,and 11.
TTiittllee 36678 - Updating of As-Built Drawings in South Kuwait,East Kuwait, North Kuwait, West
Kuwait, Tank Farms & Export Facilities including Mina Al Ahmadi and the Ex-Ministry
Crude and Fuel Oil Pipelines located anywhere within State of Kuwait and performing all
work which could be reasonably deemed necessary to complete.
CClliieenntt KUWAIT OIL COMPANY.
RReessppoonnssiibbiilliittiieess Site survey and Site verification.
Preparation of Process Flow Diagrams (PFD).
Preparation of Plot Plan.
Preparation of Equipment Layout.
Preparation of General Arrangement Drawing.
Preparation of Isometric drawings.
Preparation of As built Drawings as per site survey.
SSPPIICC SSMMOO,, CCHHEENNNNAAII
FFEEBB 0066--AAUUGG 0099
DDrraauugghhttssmmaann
TTrraaiinniinngg DDrraaffttssmmaann
TTiittllee HP Gas and Drain System..
CClliieenntt Bader Al Mullah-Kuwait (Joint Operation).
RReessppoonnssiibbiilliittiieess Preparation of Isometric drawings.
Editing work for Pipe Supports detail drawings
Editing work for General arrangement drawings.
4. TTiittllee GC-28 Capacity expansions for compression and medium crude
CClliieenntt Tecnicas Reunidas S.A (Kuwait Oil Company. (K.S.C), Kuwait).
RReessppoonnssiibbiilliittiieess Preparation of Isometric drawings.
Editing work for General arrangement drawings.
DDeeccllaarraattiioonn
I hereby declare that the above-mentioned details are true to the best of my knowledge.
Yours Sincerely,
D.RAJESH