The document outlines a training program for drilling engineering that includes several modules over multiple months. It lists 27 individual courses covering topics like petroleum exploration, reservoir engineering, drilling, well design, cementing, and completions. The courses range from 1-2 weeks in length and cover basic introductions to more advanced topics. They include both classroom instruction and practical training components. The program takes place in Nigeria and is designed to provide participants with a comprehensive overview of drilling engineering.
New Holland W110C Tier 4 Wheel Loader Service Repair Manual.pdf
Oil and Gas Training Schedule with Course Codes
1. Reference Description Location Weeks Instructors Dates Comments QLMS Code
PRE-1 Pre-Evaluation and Assessment Lagos 1.0
2013
M1-S2 Petroleum Exploration and Production ELC 1.0 Alain Brie May 6th to 9th 2013 MD-TC0-NXT01531
M1-S5 Reservoir Engineering ELC 1.0 Can Bakiler May 13th to 17th 2013 RE-TC1-NXT10040
M1-S4 Introduction to Geophysics ELC 1.0 Ed Palmer May 20th to 24th 2013 GP-TC0-NXT08520
M1-S1 HSE (including Radiation/Explosive/Pressure/Driving) ELC 1.0 Tony Cashman May 27th to 31st 2013 MD-TC1-NXT17630
M1-S6 Introduction to Production Engineering ELC 1.0 Bill Whitehead June 3rd to 7th 2013 PE-TC0-NXT07500
M1-S3 Introduction to Geology ELC 1.0 Mike McMurtry June 10th to 14th 2013 GL-TC0-NXT08760
M1-S7 Introduction to Drilling ELC 1.0 Michel Le Naour June 17th to 21st 2013 DR-TC0-NXT08900
M1-S8 Rig Awareness and Familiarization ELC 1.0 Marc Garriga June 24th to 28th 2013 DR-TC1-NXT07330
M1-S9 Drilling Engineering ELC 1.0 Michel Le Naour July 1st to 5th 2013 DR-TC1-NXT08680
M1-S10 Well Design & Construction Engineering ELC 1.0 Sam Osisanya July 8th to 12th 2013 DR-TC2-HWU02340
M1-S11 Casing Design ELC 1.0 Richard Lau July 15th to 19th 2013 DR-TC2-NXT02380
M1-S12 Drill String Design & Bits ELC 1.0 David Humphrey July 22nd to 26th 2013 DR-TC2-NXT02370
M1-S13 Drilling Fluids ELC 1.0 Marc Migazzi July 29th to August 2nd 2013 DR-TC2-OTH00690
M1-S14 Cementing Operations ELC 1.0 Benoit Vidick August 5th to 9th 2013 DR-TC1-NXT05410
M1-S15 Mud Logging ELC 1.0 Jean-Claude Dereuder August 12th to 16th 2013 DR-TC1-SLB16461
M1-S16 Well Heads & BOPs ELC 1.0 Tony Cashman August 19th to 22nd 2013 MD-TC1-NXT09570
2 Weeks Break
Module 2 - Wellsite Equipment Exposure 2013
M2-R1 Prime Movers/Power generation Warri 1.0 From sub contractor 16th-20th September MD-TC1-NXT09570
M2-R2 Rotating & Circuating System Warri 1.0 From sub contractor 23rd-27th September MD-TC1-NXT09570
M2-R3 Pressure Control/High Pressure Manifold Warri 1.0 From sub contractor 30th September-4th October MD-TC1-NXT09570
M2-R4 Rig Floor and Rig Floor Instrumentation Warri 1.0 From sub contractor 7th October-11th October MD-TC1-NXT09570
M2-R5 Rig Foor Handling/Drill String Warri 1.0 From sub contractor 14th October-18th October MD-TC1-NXT09570
M2-R6 Drill Bits and BHA Components Warri 1.0 From sub contractor 21st October-25th October MD-TC1-NXT09570
M2-R7 Survey Packages, Casing Design Warri 1.0 From sub contractor 28th October-1st November MD-TC1-NXT09570
M2-R8 Casing Accessories/Cementing Warri 1.0 From sub contractor 4th November-8th November MD-TC1-NXT09570
M2-R9 Making up BHA and Drilling Ahead Warri 1.0 From sub contractor 11th November-15th November MD-TC1-NXT09570
M2-R10 Drilling Mechanics/ Daily Drilling Report Warri 1.0 From sub contractor 18th November-22 November MD-TC1-NXT09570
M2-R11 Well Logging/Casing and Cementing Warri 1.0 From sub contractor 25th November-29th November MD-TC1-NXT09570
Module 3 - Intermidiate Level Training 2013
M3-S1 Directional Drilling and Surveying ELC 1.0 Kevin Gray 2nd December-6th December DR-TC1-NXT00640
M3-S2 Petroleum Geomechanics and Pore Pressure ELC 1.0 Walid Ben Ismail 9th December-13th December GM-TC1-SLB1550
M3-S3 Well Control ELC 1.0 Mahmood Amani 16th December-20th December DR-TC1-NXT02320
Christmas and New Year Break_2 Weeks Break 2014
M3-S4 Cementing Program Workshop Using CemCADE ELC 1.0 Benoit Vidick 6th January-10th January 2014 DR-TC2-NXT05410
M3-S7 LWD and Wireline Logging ELC 1.0 Mohammed Watfa 13th January-17th January 2014 DR-TC2-NXT07890
M3-S6 Drilling Optimization ELC 1.0 David Conroy 20th January-24th January 2014 DR-TC2-NXT08810
M3-S5 Stuck Pipe, Fishing Operations and Hole Cleaning ELC 1.0 David Humphrey 27th January-31st January 2014 DR-TC2-NXT05650
M3-S8 Workovers and Completions ELC 1.0 Gonzalo Rivero 3rd February-7th February 2014 PE-TC1-OTH09920
M3-S9 Well Intervention ELC 1.0 Raul Olivera 10th February-14th February 2014 PE-TC0-NXT19870
Module 4 - PRACTICALS
M4-P1 Project Introduction & Introduction to DMT ELC 1.0 Alaistar Oag/Kevin Gray MD-TC1-NXT09570
M4-SI1P2 Drilling Simulation & Project Assignment in Groups ELC 1.0 Alaistar Oag/Kevin Gray MD-TC1-NXT09570
M4-SI1P2 Drilling Simulation & Project Assignment in Groups ELC 1.0 Alaistar Oag/Kevin Gray MD-TC1-NXT09570
M4-P2 Petrel Fundamentals and Petrel Well Design ELC 1.0 MD-TC1-NXT09570
POST-1 Post-Evaluation and Assessment ELC 1.0 Alaistar Oag/Kevin Gray MD-TC1-NXT09570
NExT SCHLUMBERGER DRILLING ENGINEERING PG-DIP TRANSCRIPT
Done in 2012
Module 1 - Foundation Training
17th February-14th March 2014