2. 1) COMPANY INTRODUCTION
2) OUR SERVICE WORK
3) STRUCTURE ORGANIZATION
4) VALUE PROPOSITION
5) EQUIPMENT AND TOOLS LIST
6) COMPANY EXPERIENCE & CLIENT
REFERENCE
3.
4. 2. OUR SERVICE WORK
Engineering Services (EPC, EPCm)
Process
Civil & Steel Structure
Piping
Mechanical Equipment
Electrical & Instrument
Project EPC, EPCm, Plant
Modification
Petrochemical & Refinery
Power Plant
Waste Water Treatment Plant
Steel Mill
General Factory
Project Management
Maintenance Service
(Shutdown, Turnaround)
Material Management and
Supply
6. PEG Organization
PEG INTERTECH ORGANIZATION CHART
Document Control Safety
Miss. Piyaluck R.
Tel. : 091-2501963
Tel. : 088-5109739
Mr.Chaowalit K.
Mr Tawatchai P.
Miss. Yuriya T.
Lead Piping Engineer Lead Instrument Engineer
Mr. Anurak T.
Construction Manager
Document Control Safety
Miss. Kanya S.
Tel. : 080-2897782
Tel.081-3631379
Finance & Admin Manager
Ms. Nuanwan Ano
Tel..081-575 6562
nuanwan@peg.in.th
QA&QC Manager
FIELD ENGINEER
Tel. : 083-785 9302
somkid@peg.in.th
Tel. : 080-644 7840
kimmy@peg.in.th
Civil Manager
Mr.Chalermphol K.
Lead Instrument Engineer
Mr. Satit S.
Mr. Somkid H.
anurak@peg.in.th
Tel. 089-606-7627
Mr. Yutthana M.
Safety Supervisor
Electrical Manager
Mr. Satit S.Mr. Jeerasak K.
Tel. : 080-0599636
thanisorn@peg.in.th
Mr. Porramate D.
Mr. Sorayuth K. Mr. Chatchawan S.
Tel. : 089-4064424
Chatchawan@peg.in.th
manu@peg.in.th
Tel.086-378-3945
Engineer
Tel. :092-6577003
satit@peg.in.th
Engineer
Sompoch@peg.in.th
Mr. Mana K.
Account
Tel. : 081-4367950
Miss. Rossukol T.
Electrical Engineer
Tel. : 083-4226162
Mr. Thanisorn W.
Tel.086-378-3945
Mr. Sorayuth K.
Civil Manager
Tel. : 089-6382538
Supervisor
Tel. : 092-8405815
Supervisor
Senior Supervisor
Senior Supervisor
Mr. Chotechanith S.
Engineering Manager
Tel. : 087-5332633
Supervisor
Tel. :092-6577003
satit@peg.in.th
Electrical Manager
Mr. Jeerasak K.
Tel. : 080-0599636
DOCUMENT CONTROL
MS.Suchada Janhom
Tel : 081-652-4504
suchada@peg.in.th
Tel. : 087-9538637 Mr.Phonkit D.
Mr. Sompoch HL.
Tel. : 089-1788022
manoch@peg.in.th
Safety Supervisor
jeerasak@peg.in.th
Tel. : 085-6589450
sitthikorn@peg.in.th
Mr. Rungsiwut J.
Purchase
Miss. Kan B.
QA/QC Officer
Purchase
Miss. Orrathai P.
Tel. : 085-6204386
QA&QC Engineer
Tel. : 085-2556941
Miss. Natrnapa P.
Tel. :082-4788446
Sorayuth@peg.in.th
Tel. 087-6472585
Account
Tel. : 087-7844776
Mr. Maneth G.
Tel. : 085-7560265
Tel. : 085-2760375
Mr. Wallop K.
Mr. Somsong N.
Tel. : 081-4777546
Survey Supervisor
Tel. : 084-5635504
Mr. Weerachai S.
Mr. Nuttawut M.
Tel. : 085-6971319
HR Officer
Mr. Apai R.
Mr. Boonmee T.
Tel. : 089-24970503 Tel. : 085-4306896
Miss. Sunantha S.
Tel. : 086-2244454
Finance
Miss. Lamai J.
Tel. : 081-1547546
MANAGING DIRECTOR
Mr. Chaivichit Ano
Tel. : 081-3026985
chaivichit@peg.in.th
Deputy Managing Director
Mr. Kitja Makulkarn
Tel. : 089-938 5400
Kitja@peg.in.th
สามัญวิศวกร สก.2310
Mr.Teerawut P.
INSPECTOR
Tel. :085-7156256
Tel. 085-147 5994
Tel. : 080-0157159
Mr. Manoch W.
Mr. Sitthikorn K.
Tel. 086-885-3884
Sorayuth@peg.in.th
Safety Supervisor
PROJECT ADVISOR
Mr. Chotechanith S.
สามัญวิศวกร สก.2310
Tel. 085-147 5994
MR.Manu Thongrat
Project Manager HSE Manager
MR.Kimmy Boonlad
Tel. : 081-866-9975
CIVIL SECTION Human ResourseELECTRICALSECTION Finance & Account PURCHASEMechanical & Piping Section
ConstructionSectionEngineering Section
INSTRUMENTSECTION
SAFETYSECTION QA & QC SECTION
7. 4. Value Proposition
4.1 Safety
Without any LTI accident
Safety Behavior
4.2 Quality Control
Conformity requirement
4.3 Schedule & Planning
Comply & meet to Master schedule,
All Resource Planning
4.4 Cost and Budgetary
Saving
Meet to Budgetary
10. No. Description Q’ty Unit
3 Loading / Unloading
3.1 Gantry Crane 10 Tons 2 Sets
3.2 Mobile Crane 25 Tons 1 Car
3.3 Forklift 3 Tons 1 Car
4 Bending Machine
4.1 Pipe Bending 8 Sets
4.2 Plate Bending 1 Set
5 Drilling Machine
5.1 Hydraulic Punching 1 Set
5.2 Magnetic Drilling 3 Sets
5.3 Electric Hand drill 5 Sets
5.4 Radiant Drilling 2 Sets
5.5 Jet Broach 8 Sets
11. No. Description Q’ty Unit
6 Electrode Oven
6.1 100 kgs 1 Set
6.2 50 kgs 1 Set
7 Grinding Machine
7.1 4” Grinding M/C 55 Ea
7.2 5” Grinding M/C 4 Ea
7.3 7” Grinding M/C 35 Ea
8 Milling Machine 1 Set
9 Lathe Machine 1 Set
10 Electrode Dryer 60 Ea
12. No. Description Q’ty Unit
11 Truck Crane
11.1 5 tons 2 Car
12 Wheel Truck
12.1 Ten wheel 10 Car
12.2 Six Wheel 3 Car
13 Road Roller
13.1 4 tons 1 Car
13.2 10 tons 1 Car
14 Backhoe 3 Car
15 JCB 1 Car
14. 6.1 PETROCHEMICAL INDUSTRIAL
6.2 WATER TREATMENT INDUSTRIAL
6.3 POWER PLANT
6.4 STEEL MAKING PLANT
6.5 GENERAL FACTORY
6. COMPANY EXPERIENCE & CLIENT
REFERENCE
15. No. Owner Project Name Scope of work Year Contract
(THB)
1 TY STEEL Steel Marking
Plant Expansion
Civil and Building
work
2014 94,000,000
2 UBE Chemicals
(Asia) Public
Company Limited
New Sulfur
Furnace &
Converter
Improvement
Civil, Structure ,
Piping and
mechanical work
2014 48,500,000
3 TY STEEL Steel Marking
Plant Expansion
Civil and Building
work
2013 190,000,000
4 IRPC Public
Company Limited
Waste Water
Treatment
Upgrading
(PWTU)
Detail Eng.,
Procurement and
Construction
2012-
2013
109,000,000
6. COMPANY EXPERIENCE
16. No. Owner Project Name Scope of work Year Contract
(THB)
5 IRPC Public
Company
Limited
Improve Evaporation
System (HDU-II)
Engineering,
Procurement and
construction
2012-
2013
209,000,000
6 TPSC Amata B. Grimm
Power
Construction work
for Piping, Electrical
and Instrument
2012-
2013
101,000,000
7 HMC Polymer Improvement Project
(Pilot Plant unit)
Engineering,
Procurement and
construction
2012 19,500,000
8 MTP HPPO
(SCG-DOW
Group)
HDPE Piping and
Install Bio Cooling
Piping work 2012 9,000,000
9 Global Power
Synergy
__(GPSC)
22 KV Power
Distribution and pipe
line system from
CUP#1 to VCX
Basic & Detail
engineering,
Procurement and
construction
2014-
2015
48,500,000
6. COMPANY EXPERIENCE