ISSUE 2006
POWER PLANT PRESENTATION 2016
SUMMARY OF MAJOR INTERVENTIONS ON
DESIGN AND SUPERVISION OF POWER PLANTS
It has been followed by interventions of different complexity, at Unimar TPP in
Ambarli (TR); Bandirma Natural Gas Combined Cycle Power Plant, 936.5 MW (TR);
Aliağa Thermal Power Plant, 350 MW (TR); Mesaieed (Qatar) ; Bekirli Coal-fired
Thermal Power Plant - 2x600 MW (TR); Al-Khalij Thermal Power Plant, 4x350 MW
(Libya); El Ain El Sokhna Supercritical Thermal PP - 2x650 MW (Egypt); Samsun
Combined Cycle Power Plant, 870 MW (TR); Atlas Iskenderun Coal-fired Thermal Power
Plant - 2x600 MW
Apart earlier interventions on the design of marine pipelines and intake structures, a
“full immersion” in the power plant sealine design and supervision started with the
Sugözü - 2x605 MW Power Plant in Turkey
The presentation does not include all other sealine
projects, ie. outfalls, pipelines for desalination plants
and collateral activities, which are covered by a more
general presentation of Avanzini Middle East.
POWER PLANT PRESENTATION 2016
SUGÖZÜ POWER PLANT
- İSKEN İSKENDERUN ENERJI ÜRETIM VE
TICARET A.Ş. - 2 X 605 MW TURKEY, 2000
Sealine data:
 Intake: GRP, 4 x ND2800, length 415m with 4 separate concrete intake structures
 Discharge: GRP, 4 x ND2400, length 1280m , 4 diffusers with 3 ports each
CONTRACTING: SIEMENS – GAMA - TEKFEN
POWER PLANT PRESENTATION 2016
Main tasks have been:
 assessment/revision of the base
design prepared by Siemens of
the intake and discharge sealines
 evaluation, design and
specifications for GRP (FW
continuous mandrel type) -
assistance in the qualification of
the supplier and control and
testing of the pipe production
 Executive design and
specifications for the sealines
and coastal scour protection
 Design of the intake structures
and of the flexible connection to
the pipelines
 part time supervision in
assistance to the main
contractor's
team in the pipeline
installation phase
[SÜGÖZU 2]
POWER PLANT PRESENTATION 2016
Phase 1 – at producer’s factory
 Consultant for pipe qualification
 Supervision of production
 Witnessing of production tests
 Supervision of the production
of fittings
 Supervision of shipments
Main Contractor : GAMA (TR)
Pipe Supplier : SUBOR (TR)
Onshore cooling water circuit,
GRP ND 2500, length ≈6000m
AL-KHALIJ THERMAL POWER PLANT
GECOL - GENERAL ELECTRICAL COMPANY
OF LIBYA
4x350 MW – LIBYA (2000-2001)
POWER PLANT PRESENTATION 2016
Phase 2 – in the field
 Supervision of pipe laminations and curing
 Assistance in verification of installation drawings
 Supervision of installation and backfilling
 Assistance to hydraulic testing
[AL KHALIJ 2]
POWER PLANT PRESENTATION 2016
Main Contractor : GAMA (TR)
Pipe Supplier : AMITECH SPAIN (ES)
Marine Contractor Geocean FR
AL-KHALIJ THERMAL POWER PLANT
SEALINES
Observation of installation during the presence on site
POWER PLANT PRESENTATION 2016
AMBARLI, UNIMAR THERMAL P0WER PLANT
(2005)
Construction of new tapered diffuser, removal
of the existing one and connection of the new
one to the main line.
Contractor: STFA (TR)
The need of the substitution of the original
diffuser with a new one to be connected to the
main GRP pipeline ND2500 was originated by
updated thermal discharge requirements
While the construction of the new diffuser on
piling did not present in itself particular
problems, the removal of the old from the main
line and the connetion of the new was “space and
time limited”
POWER PLANT PRESENTATION 2016
It was requested to perform the connection respecting the
existing alignment and executing the intervention in less
than 12 hours to ovoid the interruption of the production.
The SOW was the study, together with the client’s and
contractors engineering team, of the necessary connection
tolerances and of the pipe spools and accessories to
compensate such tri-dimensional tolerances
A combination of GRP short
spools and of tailor-made
steel bolted Compression
Couplings, designed with
±200 mm longitudinal insertion
tolerance and ± 3° allowable angular deflection has been
used to compensate the installation misalignment.
The arrangement permitted the realization of the tie-in
in ≈8 hrs, practically without disturbance
to the TPP operation.
[UNIMAR 2]
POWER PLANT PRESENTATION 2016
MESAIEED A (QATAR) 2009
LAND SECTION OF INTAKE LINE GRP ND 1800
ND 1800, 6 km long intake line on land under water
table level
The request of expertise had two main aspects.
The first was the peer-review of the main calculation
aspects, i.e. hydraulics, deflection, ovalization
etc. and the analysis of the possible tolerances.
The second aspect was the analysis of the leaks
which appeared after backfill and of their repair
with internal lamination using a technique and
materials proposed by the pipe supplier.
With a few exceptions,
all measured data of
gap, deflection and
ovalization were well
within the design
limits.
In a dewatered pipe, the system is acceptable
and has proven leakproof.
BANDIRMA NATURAL GAS CCTP
ENERJISA ENERJI ÜRETIM A.Ş
1 x 936.5 MW – TR (2010)
Cooling water GRP pipelines – 2 x 2200 intake lines 200m long
to -23 m depth and 1 x 2400 outfall 350m long with diffuser
at -29m depth.
CONTRACTING: ATEC (AUSTRIA)
SOW
Analysis of the contractor’s design of a
twin intake pipelines and related offshore
intake structures, and of the discharge line
and diffuser
Peer-Review of the executive design
executed by the marine contractor
POWER PLANT PRESENTATION 2016
 Analysis and control of the diffuser installation
in soft bottom area
POWER PLANT PRESENTATION 2016
After start-up: evaluation of the reasons of the
displacement and disconnection of the discharge pipe on the
slope, study of the stabilization and assistance in the
repairs of pipeline.
[BANDIRMA 2]
POWER PLANT PRESENTATION 2016
BEKİRLİ COAL-FIRED THERMAL POWER PLANT –
İÇDAŞ ELEKTRİK ENERJİSİ ÜRETİM ve YATIRIM A.Ş.
2 X 600 MW – TR (2010)
GRP ND 3500, 450 mm long intake line with a 90m
semi-buried diffuser at -35m
The SOW included several stages
• The coordination and assistance in the field to the
surveyor and assistance in the reporting
• Hydraulic and diffuser calculations and outline
design
• Preparation of the documents for the Ministerial
approval
• Analysis of the seismic profiles to
define the safest route and choice of
the centre line
POWER PLANT PRESENTATION 2016
After the choice, it was studied
a safe stabilization system along the 27% slope.
The risk was not only the sliding downwards of the
pipe, but also the eventual settlement.
The solution was found by
using 6 lateral marine lugs
and pipes with anti-sliding
ribs.
The upper bend was
connected with a steel
compression coupling
permitting a ±3° angular
deflection and the lower one
was anchored by a thrust
block.
[BEKIRLI 2]
POWER PLANT PRESENTATION 2016
GRP 3 x ND 3000, 2 x 1280 + 1 x 1350 mm long
EL AIN EL SOKHNA SUPERCRITICAL THERMAL PP
EAST DELTA ELECTRICITY PRODUCTION Co - 2X650 MW – EGYPT
Phase 1 – at FPI Factory in
Cairo
 Consultant for pipe
qualification
 Supervision of production
 Witnessing of production
tests
 Supervision of the
production of fittings,
chlorination pipes and of the
double chamber manholes
Main Contractor : ORASCOM-BESIX
Pipe Supplier : FUTURE PIPE INDUSTRY Egypt
Supervision requested by PGESCo -Egypt
 Control of shipments
POWER PLANT PRESENTATION 2016[SOKHNA 2]
The second part of the SOW has been the peer
review of the design “for construction”, the
evaluation and assessment of the installation
method, a part time installation control and the
verification of the pipe joints .
POWER PLANT PRESENTATION 2016[SOKHNA 3]
The pipes were connected across the joint with marine
lugs. Part of them were kept tight and part released after
installation.
A 16mm gap inside and a maximum 0.5° was specified at
each joint by the client. However, the couplings tightness
had been tested in the factory
with a 63mm gap and 1.2°
at 9 bar without leaks.
The measure of gaps in different stages of installation brought to
an animated discussion and to the definition of limits agreed
between client, pipe producer and contractor and accepted by us.
The study about the tolerances was the most interesting part of
the supervision.
The values of gaps in
4 points at each coupling
have been recorded immediately after each pipe’s
installation and after the completion of 100-120m
sections before the backfill.
Only minor changes due to local settlements have
been found and eventually corrected,
POWER PLANT PRESENTATION 2016
After the examination of the geometric parameters with the pipe supplier, it
was presented to the client a revision of the acceptable values (after backfill)
proposing 90 mm gap and 0,9°as “safe”. In theory, larger gaps could be
exceptionally accepted, provided that the position of the gasket from the
coupling edge was at least 25mm (defined as “gasket not visible”)
[SOKHNA 4]
It must be noted however that the value of
tolerances depend from the diameter, the
geometry of pipe spigot and of the double
bell coupling.
The comparison of the values
“before and after” demonstrated
that with the enhanced safe value
of the tolerances only 3% of the
joints needed a repair, mostly due
to the displacement of the gasket.
ALIAĞA THERMAL POWER PLANT
IZDEMIR ENERJI ELEKTRIK URETIM A.S. -
350 MW – TR (2013)
SOW
Assistance during the
environmental studies and preliminary route choice
 assistance during the third-party executive design and
peer-review of the issue for construction
 Part-time inspection of workmanship and supervision
during installation
POWER PLANT PRESENTATION 2016
Construction of the
900m long HDPE ND
1200 intake line with
GRP intake structure
and of the 700m long
discharge ND 900 with
90m diffuser
POWER PLANT PRESENTATION 2016
SAMSUN COMBINED CYCLE POWER PLANT
OMV GAS & POWER - 870 MW – TR (2011)
Main Contractor: METKA – Power Project – Costantinidis (GR
Pipe Producer : SUBOR (TR)
Intake Structures Producer : ARMAPLAST (TR)
GRP Pipelines
 3 x ND 2400 x 860m intake lines with GRP intake
structures with OD 14m
 2 x ND 3200 x 600m discharge lines with diffusers
SOW
 Peer review of the basic design and
hydraulic calculations
 Executive design and specifications
 Outline design of Intake Structure
 Installation tender specs
POWER PLANT PRESENTATION 2016[SAMSUN 2]
 Design of the connection to the pump chamber and
discharge pit with the use of steel compression
couplings
 Supervision to the pipe production
and testing
POWER PLANT PRESENTATION 2016[SAMSUN 3]
The 3 GRP intake structures have been stabilized
after installation with grout poured inside the body
POWER PLANT PRESENTATION 2016
ISKENDERUN COAL-FIRED THERMAL
POWER PLANT
ATLAS POWER GENERATION INC.
2 X 600 MW -TR (2014)
Pipe Producer : SUPERLIT (TR)
GRP, ND 4000, length 700 m discharge
line with 4 parallel diffuser branches,
each with 7 ports
Pipe supplied with Double Bell Couplings with full-face
embedded gasket and rotating marine lugs
POWER PLANT PRESENTATION 2016
Discharge line 1 x ND 4000 with complex diffuser
with 6 parallel ND 2300 branches, each with 7 ports
POWER PLANT PRESENTATION 2016
Peer-review of the outline design, executive hydraulic and diffuser calculations,
outline design, executive design for construction
KARABIGA COAL-FIRED THERMAL POWER PLANT
CENAL ELECTRIC POWER GENERATION INC.
2 X 660 MW -TR (2014)
Pipe Producer : SUBOR (TR)
 GRP 3 x ND4000 Intake lines (lengths
630, 615, 600 m) each with a Ø18m
intake structure
 1 x ND3800 intake 485m long with
Ø14,2 intake structure
 3 x ND3800 discharge lines with
multiport diffuser (length 920, 965,
1015 m)
AVANZINI MIDDLE EAST FZE
Marine pipeline design and consulting
Saif Zone POBox 121256 Sharjah
Mob. +971.50.9391572 (UAE)
E-mail avanzini@mideastfze.com
Independent Professional Engineer
Cemil Topuzlu Cad. Bal Apt. 26-1
34726 Ciftehavuzlar, Istanbul, Turkey
Tel 0090.216.3692011 / Mob.
0090.542.3580445
E-mail carlo.avanzini@sealinecons.com
CV SUMMARY
Name Carlo Avanzini, Dr. Engr.
Born Trieste ( Italy ) 31.10.1939
Nationality Italian
Degree Naval Architecture,& Naval and Mechanical
Engineering, University of Genova,1963
Languages Italian ( mother tongue), English (excellent,
written and spoken), German (fluent), French
(fair), Spanish (fair), Turkish (elements)
Registrations Chamber of Engineers, Genova, Nr. 8679A
Personal specializations
• Consulting, preliminary design, studies and investigations, Hydraulic studies on
pipelines intake structures, design of land and marine pipelines (oil & gas,
aqueducts, sewerage lines), outfalls and intake/discharge lines for cooling water
systems and desalination plants
• Preparation of installation manuals; qualification and testing of tubular materials; engineering assistance in
development and application of products for marine installation, qualification of marine Contractors
• Preparation of specifications and contracts, project coordination and planning, project management, Executive
engineering and design for construction, Construction , testing and commissioning supervision

More Related Content

What's hot

Trenchless technologies comparing thrust boring with horizontal directional ...
Trenchless technologies  comparing thrust boring with horizontal directional ...Trenchless technologies  comparing thrust boring with horizontal directional ...
Trenchless technologies comparing thrust boring with horizontal directional ...Tobiloba Omitola
 
Armtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsArmtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsCommunications Branding
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentCommunications Branding
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report KRISHNA MURARI
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDeltares
 
Kostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectKostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectVladimir Popovic
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Communications Branding
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline ProtectionSikko Krol
 
Building services
Building services Building services
Building services Nur Azreen
 
OTC Asia 2014 Petronas
OTC Asia 2014 PetronasOTC Asia 2014 Petronas
OTC Asia 2014 PetronasSteven Kennedy
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser DesignKon Aguek
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 
HydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax Inc. Limited
 

What's hot (20)

Trenchless technologies comparing thrust boring with horizontal directional ...
Trenchless technologies  comparing thrust boring with horizontal directional ...Trenchless technologies  comparing thrust boring with horizontal directional ...
Trenchless technologies comparing thrust boring with horizontal directional ...
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
Armtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsArmtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End Treatments
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
Mining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering ProcessesMining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering Processes
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
 
Kostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectKostajnica City - WS/WW Project
Kostajnica City - WS/WW Project
 
Site Report
Site ReportSite Report
Site Report
 
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGYTRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
 
Building services
Building services Building services
Building services
 
OTC Asia 2014 Petronas
OTC Asia 2014 PetronasOTC Asia 2014 Petronas
OTC Asia 2014 Petronas
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser Design
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
HydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof Drainage
 

Viewers also liked

Everything! about Twitter in Korea
Everything! about Twitter in KoreaEverything! about Twitter in Korea
Everything! about Twitter in KoreaDaumsoft Inc.
 
Un maniac sexuel déballe toute son intimité
Un maniac sexuel déballe toute son intimitéUn maniac sexuel déballe toute son intimité
Un maniac sexuel déballe toute son intimitéusedstudent1973
 
Aapex 2013: Meet Made in Korea' this November!
Aapex 2013: Meet Made in Korea' this November!Aapex 2013: Meet Made in Korea' this November!
Aapex 2013: Meet Made in Korea' this November!Cindy Moon
 
Coal Fire Power Plant - Presentation
Coal Fire Power Plant - PresentationCoal Fire Power Plant - Presentation
Coal Fire Power Plant - PresentationHarichandran Raja
 
Bangalore list of companies
Bangalore list of companiesBangalore list of companies
Bangalore list of companiesPrince Patni
 
Packaging & labeling in food industries
Packaging & labeling in food industriesPackaging & labeling in food industries
Packaging & labeling in food industriesnaveenaugust
 

Viewers also liked (7)

Everything! about Twitter in Korea
Everything! about Twitter in KoreaEverything! about Twitter in Korea
Everything! about Twitter in Korea
 
1. _
1.          _   1.          _
1. _
 
Un maniac sexuel déballe toute son intimité
Un maniac sexuel déballe toute son intimitéUn maniac sexuel déballe toute son intimité
Un maniac sexuel déballe toute son intimité
 
Aapex 2013: Meet Made in Korea' this November!
Aapex 2013: Meet Made in Korea' this November!Aapex 2013: Meet Made in Korea' this November!
Aapex 2013: Meet Made in Korea' this November!
 
Coal Fire Power Plant - Presentation
Coal Fire Power Plant - PresentationCoal Fire Power Plant - Presentation
Coal Fire Power Plant - Presentation
 
Bangalore list of companies
Bangalore list of companiesBangalore list of companies
Bangalore list of companies
 
Packaging & labeling in food industries
Packaging & labeling in food industriesPackaging & labeling in food industries
Packaging & labeling in food industries
 

Similar to AME POWER PLANT REFERENCES

Cathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookCathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookSimone Tremolada
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Engineers Australia
 
ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014Xavier MICHEL
 
Thiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boThiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boRobinking Boley
 
Material Characterization of Buried GFRP Pipeline Failed during Hydrostatic T...
Material Characterization of Buried GFRP Pipeline Failed during Hydrostatic T...Material Characterization of Buried GFRP Pipeline Failed during Hydrostatic T...
Material Characterization of Buried GFRP Pipeline Failed during Hydrostatic T...IRJET Journal
 
Thiết kế đường ống trên bờ
Thiết kế đường ống trên bờThiết kế đường ống trên bờ
Thiết kế đường ống trên bờVcoi Vit
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Mohammed wahab
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
G&W High Voltage Cable Accessories - Joints & Terminations
G&W High Voltage Cable Accessories - Joints & TerminationsG&W High Voltage Cable Accessories - Joints & Terminations
G&W High Voltage Cable Accessories - Joints & TerminationsThorne & Derrick International
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirris
 
company Profile_June 2016
company Profile_June 2016company Profile_June 2016
company Profile_June 2016Tony Martini
 

Similar to AME POWER PLANT REFERENCES (20)

Cathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookCathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlook
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
 
ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014
 
Oil pipiline stress monitoring
Oil pipiline  stress monitoringOil pipiline  stress monitoring
Oil pipiline stress monitoring
 
Thiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boThiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_bo
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
Material Characterization of Buried GFRP Pipeline Failed during Hydrostatic T...
Material Characterization of Buried GFRP Pipeline Failed during Hydrostatic T...Material Characterization of Buried GFRP Pipeline Failed during Hydrostatic T...
Material Characterization of Buried GFRP Pipeline Failed during Hydrostatic T...
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
Thiết kế đường ống trên bờ
Thiết kế đường ống trên bờThiết kế đường ống trên bờ
Thiết kế đường ống trên bờ
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
G&W High Voltage Cable Accessories - Joints & Terminations
G&W High Voltage Cable Accessories - Joints & TerminationsG&W High Voltage Cable Accessories - Joints & Terminations
G&W High Voltage Cable Accessories - Joints & Terminations
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-Power
 
company Profile_June 2016
company Profile_June 2016company Profile_June 2016
company Profile_June 2016
 
Paper
PaperPaper
Paper
 

AME POWER PLANT REFERENCES

  • 2. POWER PLANT PRESENTATION 2016 SUMMARY OF MAJOR INTERVENTIONS ON DESIGN AND SUPERVISION OF POWER PLANTS It has been followed by interventions of different complexity, at Unimar TPP in Ambarli (TR); Bandirma Natural Gas Combined Cycle Power Plant, 936.5 MW (TR); Aliağa Thermal Power Plant, 350 MW (TR); Mesaieed (Qatar) ; Bekirli Coal-fired Thermal Power Plant - 2x600 MW (TR); Al-Khalij Thermal Power Plant, 4x350 MW (Libya); El Ain El Sokhna Supercritical Thermal PP - 2x650 MW (Egypt); Samsun Combined Cycle Power Plant, 870 MW (TR); Atlas Iskenderun Coal-fired Thermal Power Plant - 2x600 MW Apart earlier interventions on the design of marine pipelines and intake structures, a “full immersion” in the power plant sealine design and supervision started with the Sugözü - 2x605 MW Power Plant in Turkey The presentation does not include all other sealine projects, ie. outfalls, pipelines for desalination plants and collateral activities, which are covered by a more general presentation of Avanzini Middle East.
  • 3. POWER PLANT PRESENTATION 2016 SUGÖZÜ POWER PLANT - İSKEN İSKENDERUN ENERJI ÜRETIM VE TICARET A.Ş. - 2 X 605 MW TURKEY, 2000 Sealine data:  Intake: GRP, 4 x ND2800, length 415m with 4 separate concrete intake structures  Discharge: GRP, 4 x ND2400, length 1280m , 4 diffusers with 3 ports each CONTRACTING: SIEMENS – GAMA - TEKFEN
  • 4. POWER PLANT PRESENTATION 2016 Main tasks have been:  assessment/revision of the base design prepared by Siemens of the intake and discharge sealines  evaluation, design and specifications for GRP (FW continuous mandrel type) - assistance in the qualification of the supplier and control and testing of the pipe production  Executive design and specifications for the sealines and coastal scour protection  Design of the intake structures and of the flexible connection to the pipelines  part time supervision in assistance to the main contractor's team in the pipeline installation phase [SÜGÖZU 2]
  • 5. POWER PLANT PRESENTATION 2016 Phase 1 – at producer’s factory  Consultant for pipe qualification  Supervision of production  Witnessing of production tests  Supervision of the production of fittings  Supervision of shipments Main Contractor : GAMA (TR) Pipe Supplier : SUBOR (TR) Onshore cooling water circuit, GRP ND 2500, length ≈6000m AL-KHALIJ THERMAL POWER PLANT GECOL - GENERAL ELECTRICAL COMPANY OF LIBYA 4x350 MW – LIBYA (2000-2001)
  • 6. POWER PLANT PRESENTATION 2016 Phase 2 – in the field  Supervision of pipe laminations and curing  Assistance in verification of installation drawings  Supervision of installation and backfilling  Assistance to hydraulic testing [AL KHALIJ 2]
  • 7. POWER PLANT PRESENTATION 2016 Main Contractor : GAMA (TR) Pipe Supplier : AMITECH SPAIN (ES) Marine Contractor Geocean FR AL-KHALIJ THERMAL POWER PLANT SEALINES Observation of installation during the presence on site
  • 8. POWER PLANT PRESENTATION 2016 AMBARLI, UNIMAR THERMAL P0WER PLANT (2005) Construction of new tapered diffuser, removal of the existing one and connection of the new one to the main line. Contractor: STFA (TR) The need of the substitution of the original diffuser with a new one to be connected to the main GRP pipeline ND2500 was originated by updated thermal discharge requirements While the construction of the new diffuser on piling did not present in itself particular problems, the removal of the old from the main line and the connetion of the new was “space and time limited”
  • 9. POWER PLANT PRESENTATION 2016 It was requested to perform the connection respecting the existing alignment and executing the intervention in less than 12 hours to ovoid the interruption of the production. The SOW was the study, together with the client’s and contractors engineering team, of the necessary connection tolerances and of the pipe spools and accessories to compensate such tri-dimensional tolerances A combination of GRP short spools and of tailor-made steel bolted Compression Couplings, designed with ±200 mm longitudinal insertion tolerance and ± 3° allowable angular deflection has been used to compensate the installation misalignment. The arrangement permitted the realization of the tie-in in ≈8 hrs, practically without disturbance to the TPP operation. [UNIMAR 2]
  • 10. POWER PLANT PRESENTATION 2016 MESAIEED A (QATAR) 2009 LAND SECTION OF INTAKE LINE GRP ND 1800 ND 1800, 6 km long intake line on land under water table level The request of expertise had two main aspects. The first was the peer-review of the main calculation aspects, i.e. hydraulics, deflection, ovalization etc. and the analysis of the possible tolerances. The second aspect was the analysis of the leaks which appeared after backfill and of their repair with internal lamination using a technique and materials proposed by the pipe supplier. With a few exceptions, all measured data of gap, deflection and ovalization were well within the design limits. In a dewatered pipe, the system is acceptable and has proven leakproof.
  • 11. BANDIRMA NATURAL GAS CCTP ENERJISA ENERJI ÜRETIM A.Ş 1 x 936.5 MW – TR (2010) Cooling water GRP pipelines – 2 x 2200 intake lines 200m long to -23 m depth and 1 x 2400 outfall 350m long with diffuser at -29m depth. CONTRACTING: ATEC (AUSTRIA) SOW Analysis of the contractor’s design of a twin intake pipelines and related offshore intake structures, and of the discharge line and diffuser Peer-Review of the executive design executed by the marine contractor POWER PLANT PRESENTATION 2016  Analysis and control of the diffuser installation in soft bottom area
  • 12. POWER PLANT PRESENTATION 2016 After start-up: evaluation of the reasons of the displacement and disconnection of the discharge pipe on the slope, study of the stabilization and assistance in the repairs of pipeline. [BANDIRMA 2]
  • 13. POWER PLANT PRESENTATION 2016 BEKİRLİ COAL-FIRED THERMAL POWER PLANT – İÇDAŞ ELEKTRİK ENERJİSİ ÜRETİM ve YATIRIM A.Ş. 2 X 600 MW – TR (2010) GRP ND 3500, 450 mm long intake line with a 90m semi-buried diffuser at -35m The SOW included several stages • The coordination and assistance in the field to the surveyor and assistance in the reporting • Hydraulic and diffuser calculations and outline design • Preparation of the documents for the Ministerial approval • Analysis of the seismic profiles to define the safest route and choice of the centre line
  • 14. POWER PLANT PRESENTATION 2016 After the choice, it was studied a safe stabilization system along the 27% slope. The risk was not only the sliding downwards of the pipe, but also the eventual settlement. The solution was found by using 6 lateral marine lugs and pipes with anti-sliding ribs. The upper bend was connected with a steel compression coupling permitting a ±3° angular deflection and the lower one was anchored by a thrust block. [BEKIRLI 2]
  • 15. POWER PLANT PRESENTATION 2016 GRP 3 x ND 3000, 2 x 1280 + 1 x 1350 mm long EL AIN EL SOKHNA SUPERCRITICAL THERMAL PP EAST DELTA ELECTRICITY PRODUCTION Co - 2X650 MW – EGYPT Phase 1 – at FPI Factory in Cairo  Consultant for pipe qualification  Supervision of production  Witnessing of production tests  Supervision of the production of fittings, chlorination pipes and of the double chamber manholes Main Contractor : ORASCOM-BESIX Pipe Supplier : FUTURE PIPE INDUSTRY Egypt Supervision requested by PGESCo -Egypt  Control of shipments
  • 16. POWER PLANT PRESENTATION 2016[SOKHNA 2] The second part of the SOW has been the peer review of the design “for construction”, the evaluation and assessment of the installation method, a part time installation control and the verification of the pipe joints .
  • 17. POWER PLANT PRESENTATION 2016[SOKHNA 3] The pipes were connected across the joint with marine lugs. Part of them were kept tight and part released after installation. A 16mm gap inside and a maximum 0.5° was specified at each joint by the client. However, the couplings tightness had been tested in the factory with a 63mm gap and 1.2° at 9 bar without leaks. The measure of gaps in different stages of installation brought to an animated discussion and to the definition of limits agreed between client, pipe producer and contractor and accepted by us. The study about the tolerances was the most interesting part of the supervision. The values of gaps in 4 points at each coupling have been recorded immediately after each pipe’s installation and after the completion of 100-120m sections before the backfill. Only minor changes due to local settlements have been found and eventually corrected,
  • 18. POWER PLANT PRESENTATION 2016 After the examination of the geometric parameters with the pipe supplier, it was presented to the client a revision of the acceptable values (after backfill) proposing 90 mm gap and 0,9°as “safe”. In theory, larger gaps could be exceptionally accepted, provided that the position of the gasket from the coupling edge was at least 25mm (defined as “gasket not visible”) [SOKHNA 4] It must be noted however that the value of tolerances depend from the diameter, the geometry of pipe spigot and of the double bell coupling. The comparison of the values “before and after” demonstrated that with the enhanced safe value of the tolerances only 3% of the joints needed a repair, mostly due to the displacement of the gasket.
  • 19. ALIAĞA THERMAL POWER PLANT IZDEMIR ENERJI ELEKTRIK URETIM A.S. - 350 MW – TR (2013) SOW Assistance during the environmental studies and preliminary route choice  assistance during the third-party executive design and peer-review of the issue for construction  Part-time inspection of workmanship and supervision during installation POWER PLANT PRESENTATION 2016 Construction of the 900m long HDPE ND 1200 intake line with GRP intake structure and of the 700m long discharge ND 900 with 90m diffuser
  • 20. POWER PLANT PRESENTATION 2016 SAMSUN COMBINED CYCLE POWER PLANT OMV GAS & POWER - 870 MW – TR (2011) Main Contractor: METKA – Power Project – Costantinidis (GR Pipe Producer : SUBOR (TR) Intake Structures Producer : ARMAPLAST (TR) GRP Pipelines  3 x ND 2400 x 860m intake lines with GRP intake structures with OD 14m  2 x ND 3200 x 600m discharge lines with diffusers SOW  Peer review of the basic design and hydraulic calculations  Executive design and specifications  Outline design of Intake Structure  Installation tender specs
  • 21. POWER PLANT PRESENTATION 2016[SAMSUN 2]  Design of the connection to the pump chamber and discharge pit with the use of steel compression couplings  Supervision to the pipe production and testing
  • 22. POWER PLANT PRESENTATION 2016[SAMSUN 3] The 3 GRP intake structures have been stabilized after installation with grout poured inside the body
  • 23. POWER PLANT PRESENTATION 2016 ISKENDERUN COAL-FIRED THERMAL POWER PLANT ATLAS POWER GENERATION INC. 2 X 600 MW -TR (2014) Pipe Producer : SUPERLIT (TR) GRP, ND 4000, length 700 m discharge line with 4 parallel diffuser branches, each with 7 ports Pipe supplied with Double Bell Couplings with full-face embedded gasket and rotating marine lugs
  • 24. POWER PLANT PRESENTATION 2016 Discharge line 1 x ND 4000 with complex diffuser with 6 parallel ND 2300 branches, each with 7 ports
  • 25. POWER PLANT PRESENTATION 2016 Peer-review of the outline design, executive hydraulic and diffuser calculations, outline design, executive design for construction KARABIGA COAL-FIRED THERMAL POWER PLANT CENAL ELECTRIC POWER GENERATION INC. 2 X 660 MW -TR (2014) Pipe Producer : SUBOR (TR)  GRP 3 x ND4000 Intake lines (lengths 630, 615, 600 m) each with a Ø18m intake structure  1 x ND3800 intake 485m long with Ø14,2 intake structure  3 x ND3800 discharge lines with multiport diffuser (length 920, 965, 1015 m)
  • 26. AVANZINI MIDDLE EAST FZE Marine pipeline design and consulting Saif Zone POBox 121256 Sharjah Mob. +971.50.9391572 (UAE) E-mail avanzini@mideastfze.com Independent Professional Engineer Cemil Topuzlu Cad. Bal Apt. 26-1 34726 Ciftehavuzlar, Istanbul, Turkey Tel 0090.216.3692011 / Mob. 0090.542.3580445 E-mail carlo.avanzini@sealinecons.com CV SUMMARY Name Carlo Avanzini, Dr. Engr. Born Trieste ( Italy ) 31.10.1939 Nationality Italian Degree Naval Architecture,& Naval and Mechanical Engineering, University of Genova,1963 Languages Italian ( mother tongue), English (excellent, written and spoken), German (fluent), French (fair), Spanish (fair), Turkish (elements) Registrations Chamber of Engineers, Genova, Nr. 8679A Personal specializations • Consulting, preliminary design, studies and investigations, Hydraulic studies on pipelines intake structures, design of land and marine pipelines (oil & gas, aqueducts, sewerage lines), outfalls and intake/discharge lines for cooling water systems and desalination plants • Preparation of installation manuals; qualification and testing of tubular materials; engineering assistance in development and application of products for marine installation, qualification of marine Contractors • Preparation of specifications and contracts, project coordination and planning, project management, Executive engineering and design for construction, Construction , testing and commissioning supervision