SUBJECT: ASSESSMENT REPORT TO <Name of project and Location>
1. INTRODUCTION:
This report contains results from the site Assessment carried out to <Project Name>, conducted by
<Name of person carried out assessment> <Position> of MEHRD Asset Management Division on
the <Date>.
2. PURPOSE:
The purpose of this Assessment is to: (1) inspect and verify the <Asbestos content in the building
or what…..>
(2) .To prepare costing for removal of Asbestos content material if present in the building.
3. LOCATION OF BUILDING OR PROJECT:
<Building OR Project name>School Name><District Ward>, <Province> Solomon Islands
4. DESCRIPTION:
<Describe the project or building see sample below- delete this>
(The building was built around 1980s and is situated on a levelled cut and fill area, previously a slope hill side. A
concrete retaining wall is constructed at lower side of slope to hold in position ground fill material from cut area at
highest point of slope within the land boundary. The said building is constructed of reinforced concrete columns and
hardwood timber frames as main structure of building. Walls are constructed of timber frame with Fibre cement sheets
interior wall and ceiling lining and timber exterior cladding. The roof framing is timber with roofing Iron sheets
covering)
5. FINDINGS:
Description Contains/Works/Location status Remarks/Comments
1. Staff office
Building-Room 5
(e.g.)
Wall lining-FC board Old
Dusty
-Suspected asbestos content
-Remove and replace with
different material.
-Risky for staff member
using the room.
1. Staff office
Building-Room 5
2. (e.g.)
Ceiling lining-Fibre
cement sheets/Board
Old,
signs of
cracking
visible
Suspected asbestos content
-Remove and replace with
different material.
-Risky for staff member
using the room
3. Classroom 4
(e.g.)
Walls-150mm block walls Collapsed -Not safe for students
-Remove block wall and
replace with timber
4. RC Column
(First and Second
Floor Columns)
25Mpa Concrete, D16
Steel rod, R10 plain steel
rod, Galvanized Tie wire,
Form work/ Casing
Part of
building
completed
27% Completed
(Included in erected part of
building )
5. Block walls
(Ground Floor
and First Floor
walls)
200mm Hollow Concrete
blocks, D12 steel rod ,
Galvanized Tie wire and
17Mpa Concrete core fill
to HCB cells
Part of
Building
27% completed
(Included in erected part of
building )
6. Timber walls
(Second Floor
Walls)
100x50 Hardwood Timber
frames and 150x25
cladding dressed timber
Not reached
construction
stage that
involve
working with
timbers
0% complete
Assessment Report 3
7.
8.
9.
10. Roof Framing
Rough Timber 50% Already supplied
11. Roof Covering Corrugated roofing iron
steel, Double sided
sisalation paper, Bird wire
netting
Construction
work not
reach stage
for roof
covering work
Current Construction stage
sill on fist floor walls
12. Windows 144x44 timber frames,
Amplimesh, Louver blades,
Louver frames, Insect
screen netting
Some windows
installed
27% completed
13. Doors 144x44 timber frames,
Standard hard core doors,
locks, knobs and hinges
Some doors
installed
24% completed
14. Plumbing Work Plumbing items Underground
pipe laid and
water
connected up
Some
materials for
plumbing
work are
onsite
Condition of
material on
site: Still in
good
condition
16% completed
15. Electrical Work Electrical items Temporary
electricity
supply
connected up,
Preparation
for wiring
progressing
25% complete temporary
power supply connected
16. Tiling Ceramic & Vinyl tiles Not installed Not yet supplied
17. Drainage Gutterings Construction
work not
reach stage
for guttering
work
Materials for guttering not
supplied on site
18. Reinforcement Reinforcement steel rod
D12, D16, R6, R10, D20,
& mesh wires
Some steel rod
and mesh wire
used in the
completed
retaining
walls, and
part of
building
footing,
columns and
beams.
32% completed/used up
Some steel rod supplied
onsite and are in good
condition
19. Temporary Timbers Onsite Yet to supply
Assessment Report 4
support works
20. Blockworks 200mm blocks Some block
work installed
in part of
building that
completed
27% Complete
21. External
claddings
Timber Yet to supply
22. Internal
Claddings
Fibro & Masonites Yet to supply
23. Paintings Concrete Sealer paint-
semi and full gloss paints,
Pink Primer- semi and full
gloss paints, Top coat
paints-semi and full gloss.
Yet to supply 0% supplied
24. Glazing Louvre frames & glasses Some installed 23% completed, 77%
remaining window work
material are yet to supply
on site.
25. Hardware Doors, locks nettings, nails Some doors
installed.
24% supplied onsite.
6. OVERAL COMPLETION or assessment type STATUS OF THE BUILDING
(See sample below)
From the result of assessment of building carried out, it shows that the building has
Asbestos materials. For safety purpose, it is a rule that buildings built in 1994 and
backs wards shall be assumed as asbestos content, if fibre cement sheets/board or
any other asbestos content material are used in the building.
7. Photos
Assessment Report 5
8. RECOMMENDATION(
(Sample only)
It is recommended, that all existing fibre cement board lining, in the buildings assessed are
to be removed, by a qualified asbestos removal specialist and properly dispose at
recommended location away from buildings, drinking water sources buried in the ground.
The Fibre cement sheets shall not be reused by anyone.
Date…………….
Sign…………….
Officer’s Name:
Position:

More Related Content

What's hot

Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and Process
Wilden How
 
Top 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samplesTop 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samples
gedihutes
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-
Adel Alqontar
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02
Minh Bui Si
 
CV - Drilling Logistics Coordinator with 8 years Experience
CV - Drilling  Logistics Coordinator with 8 years ExperienceCV - Drilling  Logistics Coordinator with 8 years Experience
CV - Drilling Logistics Coordinator with 8 years Experience
Prince David K
 
CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10
Jackie Ha
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolition
Manthan Vaghasiya
 
Bq preamble
Bq preambleBq preamble
Bq preamble
aizat76
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
stooty s
 
Jasvir cv scaffolding Inspector
Jasvir cv scaffolding InspectorJasvir cv scaffolding Inspector
Jasvir cv scaffolding Inspector
Jasvir Kumar
 

What's hot (20)

Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and Process
 
Top 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samplesTop 8 instrumentation engineer resume samples
Top 8 instrumentation engineer resume samples
 
ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)
 
Method statement for civil works
Method statement for civil worksMethod statement for civil works
Method statement for civil works
 
Pr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedurePr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedure
 
Plant shutdown
Plant shutdownPlant shutdown
Plant shutdown
 
Tankfarm terminal operator
Tankfarm  terminal operatorTankfarm  terminal operator
Tankfarm terminal operator
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02
 
SCAFFOLDING
SCAFFOLDINGSCAFFOLDING
SCAFFOLDING
 
Scope of work
Scope of workScope of work
Scope of work
 
CV - Drilling Logistics Coordinator with 8 years Experience
CV - Drilling  Logistics Coordinator with 8 years ExperienceCV - Drilling  Logistics Coordinator with 8 years Experience
CV - Drilling Logistics Coordinator with 8 years Experience
 
CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolition
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairing
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
Bq preamble
Bq preambleBq preamble
Bq preamble
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Jasvir cv scaffolding Inspector
Jasvir cv scaffolding InspectorJasvir cv scaffolding Inspector
Jasvir cv scaffolding Inspector
 

Similar to Assessment report template

Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxStructural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
cpatriciarpatricia
 
Kitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic PouringKitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic Pouring
AshleyLiKITSEN
 
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Sustainable Performance Institute
 
EMBASSY GARDENS FOH CONSTRUCTION PROGRAMME REV E
EMBASSY GARDENS FOH CONSTRUCTION PROGRAMME REV E EMBASSY GARDENS FOH CONSTRUCTION PROGRAMME REV E
EMBASSY GARDENS FOH CONSTRUCTION PROGRAMME REV E
Dele Bankole
 

Similar to Assessment report template (20)

5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
Hot Melt Roofing Solution to Hiscox's new headquarters by Make Architects #Pe...
Hot Melt Roofing Solution to Hiscox's new headquarters by Make Architects #Pe...Hot Melt Roofing Solution to Hiscox's new headquarters by Make Architects #Pe...
Hot Melt Roofing Solution to Hiscox's new headquarters by Make Architects #Pe...
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
 
Reconstruction of a 4 storey commercial building to a 5 story building
Reconstruction of a 4 storey commercial building to a 5 story buildingReconstruction of a 4 storey commercial building to a 5 story building
Reconstruction of a 4 storey commercial building to a 5 story building
 
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxStructural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
kuku.pptx
kuku.pptxkuku.pptx
kuku.pptx
 
B tech project 2
B tech project 2B tech project 2
B tech project 2
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
Special concrete and advanced construction materials
Special concrete and advanced construction materialsSpecial concrete and advanced construction materials
Special concrete and advanced construction materials
 
Kitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic PouringKitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic Pouring
 
mohamadalmasri cv,.
mohamadalmasri cv,.mohamadalmasri cv,.
mohamadalmasri cv,.
 
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
 
AIA course metal roofing
AIA course metal roofingAIA course metal roofing
AIA course metal roofing
 
Site Report
Site Report Site Report
Site Report
 
2nd batch.pptx
2nd batch.pptx2nd batch.pptx
2nd batch.pptx
 
Site report
Site reportSite report
Site report
 
EMBASSY GARDENS FOH CONSTRUCTION PROGRAMME REV E
EMBASSY GARDENS FOH CONSTRUCTION PROGRAMME REV E EMBASSY GARDENS FOH CONSTRUCTION PROGRAMME REV E
EMBASSY GARDENS FOH CONSTRUCTION PROGRAMME REV E
 
IAED 251 Construction and Materials i-Report
IAED 251 Construction and Materials i-ReportIAED 251 Construction and Materials i-Report
IAED 251 Construction and Materials i-Report
 

Recently uploaded

01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
AshwaniAnuragi1
 

Recently uploaded (20)

Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptx
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptx
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 

Assessment report template

  • 1. ACE CONSULTANCY NAME OF PROJECT: ASSESSMENT REPORT DATE: Prepare by: Name: Name of AMD officer Mobile: Email: Project Name: eg. Girls Dorm School Name: Eg Pawa PSS Building Location: Eg, Attention: NAME
  • 2. Assessment Report 2 SUBJECT: ASSESSMENT REPORT TO <Name of project and Location> 1. INTRODUCTION: This report contains results from the site Assessment carried out to <Project Name>, conducted by <Name of person carried out assessment> <Position> of MEHRD Asset Management Division on the <Date>. 2. PURPOSE: The purpose of this Assessment is to: (1) inspect and verify the <Asbestos content in the building or what…..> (2) .To prepare costing for removal of Asbestos content material if present in the building. 3. LOCATION OF BUILDING OR PROJECT: <Building OR Project name>School Name><District Ward>, <Province> Solomon Islands 4. DESCRIPTION: <Describe the project or building see sample below- delete this> (The building was built around 1980s and is situated on a levelled cut and fill area, previously a slope hill side. A concrete retaining wall is constructed at lower side of slope to hold in position ground fill material from cut area at highest point of slope within the land boundary. The said building is constructed of reinforced concrete columns and hardwood timber frames as main structure of building. Walls are constructed of timber frame with Fibre cement sheets interior wall and ceiling lining and timber exterior cladding. The roof framing is timber with roofing Iron sheets covering) 5. FINDINGS: Description Contains/Works/Location status Remarks/Comments 1. Staff office Building-Room 5 (e.g.) Wall lining-FC board Old Dusty -Suspected asbestos content -Remove and replace with different material. -Risky for staff member using the room. 1. Staff office Building-Room 5 2. (e.g.) Ceiling lining-Fibre cement sheets/Board Old, signs of cracking visible Suspected asbestos content -Remove and replace with different material. -Risky for staff member using the room 3. Classroom 4 (e.g.) Walls-150mm block walls Collapsed -Not safe for students -Remove block wall and replace with timber 4. RC Column (First and Second Floor Columns) 25Mpa Concrete, D16 Steel rod, R10 plain steel rod, Galvanized Tie wire, Form work/ Casing Part of building completed 27% Completed (Included in erected part of building ) 5. Block walls (Ground Floor and First Floor walls) 200mm Hollow Concrete blocks, D12 steel rod , Galvanized Tie wire and 17Mpa Concrete core fill to HCB cells Part of Building 27% completed (Included in erected part of building ) 6. Timber walls (Second Floor Walls) 100x50 Hardwood Timber frames and 150x25 cladding dressed timber Not reached construction stage that involve working with timbers 0% complete
  • 3. Assessment Report 3 7. 8. 9. 10. Roof Framing Rough Timber 50% Already supplied 11. Roof Covering Corrugated roofing iron steel, Double sided sisalation paper, Bird wire netting Construction work not reach stage for roof covering work Current Construction stage sill on fist floor walls 12. Windows 144x44 timber frames, Amplimesh, Louver blades, Louver frames, Insect screen netting Some windows installed 27% completed 13. Doors 144x44 timber frames, Standard hard core doors, locks, knobs and hinges Some doors installed 24% completed 14. Plumbing Work Plumbing items Underground pipe laid and water connected up Some materials for plumbing work are onsite Condition of material on site: Still in good condition 16% completed 15. Electrical Work Electrical items Temporary electricity supply connected up, Preparation for wiring progressing 25% complete temporary power supply connected 16. Tiling Ceramic & Vinyl tiles Not installed Not yet supplied 17. Drainage Gutterings Construction work not reach stage for guttering work Materials for guttering not supplied on site 18. Reinforcement Reinforcement steel rod D12, D16, R6, R10, D20, & mesh wires Some steel rod and mesh wire used in the completed retaining walls, and part of building footing, columns and beams. 32% completed/used up Some steel rod supplied onsite and are in good condition 19. Temporary Timbers Onsite Yet to supply
  • 4. Assessment Report 4 support works 20. Blockworks 200mm blocks Some block work installed in part of building that completed 27% Complete 21. External claddings Timber Yet to supply 22. Internal Claddings Fibro & Masonites Yet to supply 23. Paintings Concrete Sealer paint- semi and full gloss paints, Pink Primer- semi and full gloss paints, Top coat paints-semi and full gloss. Yet to supply 0% supplied 24. Glazing Louvre frames & glasses Some installed 23% completed, 77% remaining window work material are yet to supply on site. 25. Hardware Doors, locks nettings, nails Some doors installed. 24% supplied onsite. 6. OVERAL COMPLETION or assessment type STATUS OF THE BUILDING (See sample below) From the result of assessment of building carried out, it shows that the building has Asbestos materials. For safety purpose, it is a rule that buildings built in 1994 and backs wards shall be assumed as asbestos content, if fibre cement sheets/board or any other asbestos content material are used in the building. 7. Photos
  • 5. Assessment Report 5 8. RECOMMENDATION( (Sample only) It is recommended, that all existing fibre cement board lining, in the buildings assessed are to be removed, by a qualified asbestos removal specialist and properly dispose at recommended location away from buildings, drinking water sources buried in the ground. The Fibre cement sheets shall not be reused by anyone. Date……………. Sign……………. Officer’s Name: Position: