SlideShare a Scribd company logo
1 of 6
Mohamed Ahmed Salah
Between two bridges – Abu Dhabi - UAE
Mobile: +971559486914
E-mail: ala799@hotmail.com
ala799@gmail.com
Ahmed.salahmohamed@dargroup.com
Career Objective
Seeking an intellectually challenging position within an international environment, whereby I can
build upon my education, experience and interpersonal skills that would allow for further career
development.
Educational Background
• Bachelor in civil engineering- 2006
The High Technological Institute at 10th of Ramadan city, A.R.E.
Career History
Company: Dar Al- Handasah(Shair and partners) (Abu Dhabi ) january 2012 – Present
Tittle : Site Civil Engineer
First project:
2 basement levels below ground level of 20,414 m2 enclosing car parking and technical areas and
three entrance lobbies leading to the upper floors.
A two story podium at ground and first floor enclosing reduced number of car parking, amenity
functions for the building ( Swimming pool, Gymnasium, Children play room, and relevant services)
and complete finished apartments, with private gardens on ground floor for each apartment facing
the main road and the canal side. Three pedestrian accesses and one vehicular access will serve the
building from the main road through the public buffer zone.
5 story residential building divided in three adjoining blocks enclosing different sizes of residential
units of two and three bedroom units, with private terraces/gardens for apartments on top of podium
level facing the canal side.
The area above ground level is around 42,577 m2, the total built-up Area is around 62,990 m2.
Responsibilities
• Ensure that the selected material (Block, Steel, concrete, membrane, cement, paint , … etc.) are
in accordance with the agreed specification, standards and as per the basic and engineering
design stipulated in the Contract document.
• Checking & reviewing the concrete sample testing results and to grant that the results are within
the design acceptable limits.
• Carrying out numerous checks for the reinforcement steel bars size and type, in order to grant
that the site construction material is implemented based on the agreed design calculations,
engineering basis & standards.
• Preparing snagging list form.
• Carrying out the inspection of all finishing activities(Block work , plaster, false ceiling , water
proofing, tiles works, paint ,aluminum works, wooden doors, metal doors , marble works, … etc.)
including with the snag and de snag lists.
• Ensure that the engineering specifications, standards and procedures are compliance /
implemented on all Phases of Projects.
second project:
2 basement levels below ground level of 11992 m2 enclosing retail kiosks at promenade level, car
parking areas, technical areas and two entrance lobbies leading to the upper floors.
A two storey podium at ground and first floor, enclosing Gymnasium, MEP rooms, Service rooms,
auxiliary amenities, and complete finished apartments with private terrace on ground floor for each
apartment facing the main road and the canal side. Two pedestrian accesses and one vehicular
access
will serve the building from the main road through the public buffer zone.
6 storey residential building with typical floors composed of two adjoining similar blocks enclosing
three types of residential units of one, two and three bedroom units, with dedicated private balconies
and terraces with different shapes at each floor.
The setback areas will comprise landscape hard and soft finishes for private gardens of apartments,
for common areas (barbecue area and pocket garden) and for technical areas as well.
The built up area above ground level is around 28,874 m2, and the building total built-up Area is
around 40,866 m2.
Responsibilities
• Ensure that the selected material (Block, Steel, concrete, membrane, cement, paint , … etc.) are
in accordance with the agreed specification, standards and as per the basic and engineering
design stipulated in the Contract document.
• Checking & reviewing the concrete sample testing results and to grant that the results are within
the design acceptable limits.
• Carrying out numerous checks for the reinforcement steel bars size and type, in order to grant
that the site construction material is implemented based on the agreed design calculations,
engineering basis & standards.
• Preparing snagging list form.
• Carrying out the inspection of all finishing activities(Block work , plaster, false ceiling , water
proofing, tiles works, paint ,aluminum works, wooden doors, metal doors , marble works, … etc.)
including with the snag and de snag lists.
• Ensure that the engineering specifications, standards and procedures are compliance /
implemented on all Phases of Projects.
• Reviewing the structural as built drawing.
PRECAST experience
ADNOC precast temporary guest houses (RUWAIS)
Temporary worked in this project for approximately two months supervising the casting and other
finishing works of the precast panels in abu dhabi and dubai precast factory yards by checking
strict compliance to the stringent dimensional tolerance of the precast panels by ensuring
structural steel works and the finishing work are done as per the approved drawing.
Consultant Group International Company (UAE)- March 2007 till January 2012.
Tittle : Site Structural Engineer
Responsibilities
• Preparation of daily, weekly progress reports, attending the meetings with the contractors and
follow up the actual site progress.
• Ensure that the selected material (Cement, reinforcement concrete, bituminous, plywood,
gravels, sand… etc.) are in accordance with the agreed specification, standards and as per the
basic and engineering design stipulated in the Contract document.
• Follow up the project phase’s progress and updating the actual progress vs. planned schedule.
• Preparation the Bill of Quantity and Cost Estimate related to the projects.
• Checking & reviewing the concrete sample testing results which being received from Laboratory
and to grant that the results are within the design acceptable limits.
• Carrying out numerous checks for the reinforcement steel bars size and type, in order to grant
that the site construction material is implemented based on the agreed design calculations,
engineering basis & standards.
• Ensure that the engineering specifications, standards and procedures are compliance /
implemented on all Phases of Projects.
• Reviewing the project scope of work, drawings, specifications, material submittals and other
technical documents related to the projects.
• Carrying out the required in-house civil design and detailed engineering works, including the
structural analysis / modeling, reinforced concrete design, preparation of drawings, provision of
technical / standard details, etc.
• Supervising the project site construction phases to be sure that the project construction is being
implemented as per the planned schedule and agreed scope of work.
• Reviewing any design changes may be requested by the owner, preparation the design change
request and preparation, brief scope of work, detailed engineering, etc.
• Reviewing the prepared punch list. Following up the pre-commissioning & commissioning
completion stages with all concerned parties.
• Piling Site Works (related to the implemented project as indicated in the attached project list).
 Reviewing the piling access and check the steel bars size & type.
 Attend the site piling installation to ensure that the excavation piles reach to the acceptable
design depth.
 Checking the piling concrete samples to grant that the results are within the acceptable limits.
 Attend, check & supervise the required piling static load and integrity tests.
Company: Specialized Engineering contracting co.
Tittle : Site Engineer
Responsibilities:
• Ensure that the defective insulated areas (based on site inspection) were repaired and accepted.
• Preparation of daily, weekly, monthly progress reports.
• Attend regular meeting with the contractors and prepare the MOM, checking the contractor’s
manpower histogram.
• Follow-up and checking the insulation material availability, inspection certificates, etc.
Practical training as part of the educational syllabus program
The following training programs were established and organized by the high technological institute as
a part of the educational syllabus program for students for a period of three (3) months (during
summer time) for every separate training course.
1- Company name : Al Tawfikia Construction Company.
Project : Construction of Sally Mall Building.
Duration: 3 months.
Location : Makram Ebeed St., Nasr City, Cairo.
Training scope: Training on the site Construction of the reinforcement concert of slabs, Beams,
columns ... etc. In addition to (marble installation leveling, finishing … etc.) of walls, floors and
stairs.
2- Company Name: The Arab Constructors Company.
Project: Maintenance and repair of the old Islamic Buildings.
Duration: 3 months.
Location: Al Gamalia area at Al-Azhar zone, Cairo.
Training scope: follow up the execution of Maintenance and Refurbishment of the old Islamic
building by Injection using specific Materials, removal of bad conditions of stairs, wall,... etc. and
assembly of the new replacement Material.
3- Company name: Petro jet.
Project: Construction of Administration Building.
Duration: 3 months.
Location: The 5th district location.
Training scope: follow up the Raft foundation construction site execution, columns… etc.
(approximate reinforcement concrete volume was 2000 mt3).
4- Company Name: Moharm Bakhom Consultant office.
Project & Training scope:
Project: Design Projects Calculations.
Duration: 3 months.
Location: Cairo.
Training Scope:
 Design calculation of additional administrative building in Cairo airport area.
 Follow the design of (Sharm El Sheikh Museum), which previously designed by Nadia & Gehan El-
Masri Office.
Personal Skills
- High learning ability & organized thinking.
- Self-motivated, organized and detail oriented; attention to details and quality of work.
- Ability to work under pressure and tight deadlines.
- Flexible team player.
Computer Skills
- Excellent command of Windows, Word, Excel & Power Point.
- AutoCAD (2D).
- Proficient user of Internet facilities.
- Primavera project planner (p3).
Language Skills
- Arabic : Native
- English : Very good (Written & Spoken)
Personal Data
- Date of Birth : january 1, 1981
- Born : Arab Republic of Egypt
- Nationality : Egyptian
- Marital Status : Married
- Military Status : Exempted
The following table shown the projects which finalized / are being constructed in Abu Dhabi.
NO OWNER PROJECT DETAIL STATUS
1
ABDULL ABD ALL AL
HAMIDAN VILLAS
This project consisted of Three (3) Villas each,
one have two floors and one roof.
finish all
2
ABU DHABI NATIONALITIES
AND RESIDENCE
DEPARTMENT
project was consisted of the following:-
a]printing and services building (two levels).
b] New additional level to the existing club.
c] Changing the existing internal design to new
design for the visa building.
D]new commercial building consists of two
levels
finish all
3 HAMZA AL GOHY VILLA
This project consisted of one villa, ground floor,
1st level and roof.
finish all
4
INDUSTRIAL SHABRA
BUILDING (Owner
This building consisted of two floors each, one
divided to specific offices.
finish all
5
MAJOR /SAEED OBAID AL
MAZROU VILLA
This project consists of one villa, and site /
external meeting hall & external kitchen. Such
villa consisted of ground floor 1st floor & roof.
finish all
6 RASHID AL ZAABI VILLAS
Four (4) villas, each one consists of ground
floor, 1st floor and roof .
finish all
7
INDUSTRIAL SHABRA
PROJECT (Owner: Mr. Mattar
Al Rumaithy)
This building consists of two floors each, one
divided to specific offices.
finish all
8
MR. AHMED OBAID AL
MAZROOE VILLA
This villa consists of ground floor and 1st floor
levels.
finish all
9
MRS. MYTHAA & MARIAM
VILLAS
This project consisted of two villas, one for Mrs.
Mythaa and the other for Mrs. Mariam. Each
villa consisted of ground, 1st and roof level.
finish all
10
MR. SULTAN AL ZAABI
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
11
MR. HAMEED AL ZAABI
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
12
MR. OMAR AL ZAABI
COMPOUND
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
13
MR. ABDULA AL ZAHERY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
14
MR. SLAYAM EL KESARY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
15
MR. BEKHET EL KESERY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
16
MRS.HAMDA ABD EL
RAHMAN EL ZAABI
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
17
MRS.SHKHA ABD EL
RAHMAN EL ZAABI
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
18 MRS.ALIAA EL SOWEDY
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
19
MR. AHMED OBAID AL
MAZROOE 8 VILLA
This project consisted of eight villas, Each villa
consists of ground, 1st and roof level.
finish all
20 MR.KHALIFA EL KINDI
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
21 MRS.SHAMSA MOHAMED
This project consisted of one villas, Each villa
consists of ground, 1st and roof level.
finish all
22
MR. AHMED OBAID AL
MAZROOE BUILDING
This project consisted of one building of seven
typical floors and roof
finish all
23 Mr.abu salem
This project consisted of extension for the
main villa + service block
finish all
24 Mr.Mohamed ateq
This project consisted of four villas, Each villa
consists of ground, 1st and roof level.+four
service block
finish all
25 Mr.obaid ateq
This project consisted of four villas, Each villa
consists of ground, 1st and roof level.+four
service block
finish all
26
EXECUTION PLAN FOR THE
DRAINAGE AND WATER
SUPPLY NET FOR ALL THE
ABOVE PROJECT
Preparation of the detailed drawings, basic
design required for all above projects,
indicating B.O.Q., cost estimate, routine of the
drainage & water supply net / system
completed with all tanks, pumps and valves for
every above separate project.
References are Furnished Upon Request.
10
MR. SULTAN AL ZAABI
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
11
MR. HAMEED AL ZAABI
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
12
MR. OMAR AL ZAABI
COMPOUND
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
13
MR. ABDULA AL ZAHERY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
14
MR. SLAYAM EL KESARY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
15
MR. BEKHET EL KESERY
COMPOUND
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
16
MRS.HAMDA ABD EL
RAHMAN EL ZAABI
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
17
MRS.SHKHA ABD EL
RAHMAN EL ZAABI
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
18 MRS.ALIAA EL SOWEDY
This project consisted of five villas, Each villa
consists of ground, 1st and roof level.
finish all
19
MR. AHMED OBAID AL
MAZROOE 8 VILLA
This project consisted of eight villas, Each villa
consists of ground, 1st and roof level.
finish all
20 MR.KHALIFA EL KINDI
This project consisted of six villas, Each villa
consists of ground, 1st and roof level.
finish all
21 MRS.SHAMSA MOHAMED
This project consisted of one villas, Each villa
consists of ground, 1st and roof level.
finish all
22
MR. AHMED OBAID AL
MAZROOE BUILDING
This project consisted of one building of seven
typical floors and roof
finish all
23 Mr.abu salem
This project consisted of extension for the
main villa + service block
finish all
24 Mr.Mohamed ateq
This project consisted of four villas, Each villa
consists of ground, 1st and roof level.+four
service block
finish all
25 Mr.obaid ateq
This project consisted of four villas, Each villa
consists of ground, 1st and roof level.+four
service block
finish all
26
EXECUTION PLAN FOR THE
DRAINAGE AND WATER
SUPPLY NET FOR ALL THE
ABOVE PROJECT
Preparation of the detailed drawings, basic
design required for all above projects,
indicating B.O.Q., cost estimate, routine of the
drainage & water supply net / system
completed with all tanks, pumps and valves for
every above separate project.
References are Furnished Upon Request.

More Related Content

What's hot

Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...
Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...
Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...CSR Consultant and Associates
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparationNoshad Ahmed Wahocho
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016Pedro Rosario
 
Building Structural repair consultant and Project Management Consultancy serv...
Building Structural repair consultant and Project Management Consultancy serv...Building Structural repair consultant and Project Management Consultancy serv...
Building Structural repair consultant and Project Management Consultancy serv...CSR Consultant and Associates
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Naveed Gohar
 
CURRICULUM VITAE - Zoran Erdeljanac - English
CURRICULUM VITAE - Zoran Erdeljanac - EnglishCURRICULUM VITAE - Zoran Erdeljanac - English
CURRICULUM VITAE - Zoran Erdeljanac - Englishzoran erdeljanac
 

What's hot (19)

Shiraz nawaz cv.
Shiraz nawaz cv.Shiraz nawaz cv.
Shiraz nawaz cv.
 
Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...
Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...
Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...
 
MARTIN Daniel CV
MARTIN Daniel CVMARTIN Daniel CV
MARTIN Daniel CV
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
Site architect cv ammar alsweidan
Site architect cv ammar alsweidan Site architect cv ammar alsweidan
Site architect cv ammar alsweidan
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
Building Structural repair consultant and Project Management Consultancy serv...
Building Structural repair consultant and Project Management Consultancy serv...Building Structural repair consultant and Project Management Consultancy serv...
Building Structural repair consultant and Project Management Consultancy serv...
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
Civil Diploma Industrial Training Report
Civil Diploma Industrial Training ReportCivil Diploma Industrial Training Report
Civil Diploma Industrial Training Report
 
CURRICULUM VITAE - Zoran Erdeljanac - English
CURRICULUM VITAE - Zoran Erdeljanac - EnglishCURRICULUM VITAE - Zoran Erdeljanac - English
CURRICULUM VITAE - Zoran Erdeljanac - English
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
Naim CV
Naim CVNaim CV
Naim CV
 
24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA
24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA
24 DAY INDUSTRIAL TRAINING- CIVIL DIPLOMA
 

Similar to M.Salah cv1

Similar to M.Salah cv1 (20)

Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
C.V,,,,,,
C.V,,,,,,C.V,,,,,,
C.V,,,,,,
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
hazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mohamed cv - Copy
hazem mohamed cv - Copy
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Ahmed_c.v
Ahmed_c.vAhmed_c.v
Ahmed_c.v
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 
CV
CVCV
CV
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
Abdullah khan_original
Abdullah khan_originalAbdullah khan_original
Abdullah khan_original
 
Pathak resume
Pathak resumePathak resume
Pathak resume
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
 
Cv copy. khedr-c
Cv   copy. khedr-cCv   copy. khedr-c
Cv copy. khedr-c
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.update
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.update
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 

M.Salah cv1

  • 1. Mohamed Ahmed Salah Between two bridges – Abu Dhabi - UAE Mobile: +971559486914 E-mail: ala799@hotmail.com ala799@gmail.com Ahmed.salahmohamed@dargroup.com Career Objective Seeking an intellectually challenging position within an international environment, whereby I can build upon my education, experience and interpersonal skills that would allow for further career development. Educational Background • Bachelor in civil engineering- 2006 The High Technological Institute at 10th of Ramadan city, A.R.E. Career History Company: Dar Al- Handasah(Shair and partners) (Abu Dhabi ) january 2012 – Present Tittle : Site Civil Engineer First project: 2 basement levels below ground level of 20,414 m2 enclosing car parking and technical areas and three entrance lobbies leading to the upper floors. A two story podium at ground and first floor enclosing reduced number of car parking, amenity functions for the building ( Swimming pool, Gymnasium, Children play room, and relevant services) and complete finished apartments, with private gardens on ground floor for each apartment facing the main road and the canal side. Three pedestrian accesses and one vehicular access will serve the building from the main road through the public buffer zone. 5 story residential building divided in three adjoining blocks enclosing different sizes of residential units of two and three bedroom units, with private terraces/gardens for apartments on top of podium level facing the canal side. The area above ground level is around 42,577 m2, the total built-up Area is around 62,990 m2. Responsibilities • Ensure that the selected material (Block, Steel, concrete, membrane, cement, paint , … etc.) are in accordance with the agreed specification, standards and as per the basic and engineering design stipulated in the Contract document. • Checking & reviewing the concrete sample testing results and to grant that the results are within the design acceptable limits. • Carrying out numerous checks for the reinforcement steel bars size and type, in order to grant that the site construction material is implemented based on the agreed design calculations, engineering basis & standards. • Preparing snagging list form. • Carrying out the inspection of all finishing activities(Block work , plaster, false ceiling , water proofing, tiles works, paint ,aluminum works, wooden doors, metal doors , marble works, … etc.) including with the snag and de snag lists. • Ensure that the engineering specifications, standards and procedures are compliance / implemented on all Phases of Projects. second project: 2 basement levels below ground level of 11992 m2 enclosing retail kiosks at promenade level, car parking areas, technical areas and two entrance lobbies leading to the upper floors. A two storey podium at ground and first floor, enclosing Gymnasium, MEP rooms, Service rooms, auxiliary amenities, and complete finished apartments with private terrace on ground floor for each apartment facing the main road and the canal side. Two pedestrian accesses and one vehicular access
  • 2. will serve the building from the main road through the public buffer zone. 6 storey residential building with typical floors composed of two adjoining similar blocks enclosing three types of residential units of one, two and three bedroom units, with dedicated private balconies and terraces with different shapes at each floor. The setback areas will comprise landscape hard and soft finishes for private gardens of apartments, for common areas (barbecue area and pocket garden) and for technical areas as well. The built up area above ground level is around 28,874 m2, and the building total built-up Area is around 40,866 m2. Responsibilities • Ensure that the selected material (Block, Steel, concrete, membrane, cement, paint , … etc.) are in accordance with the agreed specification, standards and as per the basic and engineering design stipulated in the Contract document. • Checking & reviewing the concrete sample testing results and to grant that the results are within the design acceptable limits. • Carrying out numerous checks for the reinforcement steel bars size and type, in order to grant that the site construction material is implemented based on the agreed design calculations, engineering basis & standards. • Preparing snagging list form. • Carrying out the inspection of all finishing activities(Block work , plaster, false ceiling , water proofing, tiles works, paint ,aluminum works, wooden doors, metal doors , marble works, … etc.) including with the snag and de snag lists. • Ensure that the engineering specifications, standards and procedures are compliance / implemented on all Phases of Projects. • Reviewing the structural as built drawing. PRECAST experience ADNOC precast temporary guest houses (RUWAIS) Temporary worked in this project for approximately two months supervising the casting and other finishing works of the precast panels in abu dhabi and dubai precast factory yards by checking strict compliance to the stringent dimensional tolerance of the precast panels by ensuring structural steel works and the finishing work are done as per the approved drawing. Consultant Group International Company (UAE)- March 2007 till January 2012. Tittle : Site Structural Engineer Responsibilities • Preparation of daily, weekly progress reports, attending the meetings with the contractors and follow up the actual site progress. • Ensure that the selected material (Cement, reinforcement concrete, bituminous, plywood, gravels, sand… etc.) are in accordance with the agreed specification, standards and as per the basic and engineering design stipulated in the Contract document. • Follow up the project phase’s progress and updating the actual progress vs. planned schedule. • Preparation the Bill of Quantity and Cost Estimate related to the projects. • Checking & reviewing the concrete sample testing results which being received from Laboratory and to grant that the results are within the design acceptable limits. • Carrying out numerous checks for the reinforcement steel bars size and type, in order to grant that the site construction material is implemented based on the agreed design calculations, engineering basis & standards. • Ensure that the engineering specifications, standards and procedures are compliance / implemented on all Phases of Projects. • Reviewing the project scope of work, drawings, specifications, material submittals and other technical documents related to the projects. • Carrying out the required in-house civil design and detailed engineering works, including the structural analysis / modeling, reinforced concrete design, preparation of drawings, provision of technical / standard details, etc. • Supervising the project site construction phases to be sure that the project construction is being implemented as per the planned schedule and agreed scope of work. • Reviewing any design changes may be requested by the owner, preparation the design change request and preparation, brief scope of work, detailed engineering, etc.
  • 3. • Reviewing the prepared punch list. Following up the pre-commissioning & commissioning completion stages with all concerned parties. • Piling Site Works (related to the implemented project as indicated in the attached project list).  Reviewing the piling access and check the steel bars size & type.  Attend the site piling installation to ensure that the excavation piles reach to the acceptable design depth.  Checking the piling concrete samples to grant that the results are within the acceptable limits.  Attend, check & supervise the required piling static load and integrity tests. Company: Specialized Engineering contracting co. Tittle : Site Engineer Responsibilities: • Ensure that the defective insulated areas (based on site inspection) were repaired and accepted. • Preparation of daily, weekly, monthly progress reports. • Attend regular meeting with the contractors and prepare the MOM, checking the contractor’s manpower histogram. • Follow-up and checking the insulation material availability, inspection certificates, etc. Practical training as part of the educational syllabus program The following training programs were established and organized by the high technological institute as a part of the educational syllabus program for students for a period of three (3) months (during summer time) for every separate training course. 1- Company name : Al Tawfikia Construction Company. Project : Construction of Sally Mall Building. Duration: 3 months. Location : Makram Ebeed St., Nasr City, Cairo. Training scope: Training on the site Construction of the reinforcement concert of slabs, Beams, columns ... etc. In addition to (marble installation leveling, finishing … etc.) of walls, floors and stairs. 2- Company Name: The Arab Constructors Company. Project: Maintenance and repair of the old Islamic Buildings. Duration: 3 months. Location: Al Gamalia area at Al-Azhar zone, Cairo. Training scope: follow up the execution of Maintenance and Refurbishment of the old Islamic building by Injection using specific Materials, removal of bad conditions of stairs, wall,... etc. and assembly of the new replacement Material. 3- Company name: Petro jet. Project: Construction of Administration Building. Duration: 3 months. Location: The 5th district location. Training scope: follow up the Raft foundation construction site execution, columns… etc. (approximate reinforcement concrete volume was 2000 mt3). 4- Company Name: Moharm Bakhom Consultant office. Project & Training scope: Project: Design Projects Calculations. Duration: 3 months. Location: Cairo. Training Scope:  Design calculation of additional administrative building in Cairo airport area.  Follow the design of (Sharm El Sheikh Museum), which previously designed by Nadia & Gehan El- Masri Office.
  • 4. Personal Skills - High learning ability & organized thinking. - Self-motivated, organized and detail oriented; attention to details and quality of work. - Ability to work under pressure and tight deadlines. - Flexible team player. Computer Skills - Excellent command of Windows, Word, Excel & Power Point. - AutoCAD (2D). - Proficient user of Internet facilities. - Primavera project planner (p3). Language Skills - Arabic : Native - English : Very good (Written & Spoken) Personal Data - Date of Birth : january 1, 1981 - Born : Arab Republic of Egypt - Nationality : Egyptian - Marital Status : Married - Military Status : Exempted The following table shown the projects which finalized / are being constructed in Abu Dhabi. NO OWNER PROJECT DETAIL STATUS 1 ABDULL ABD ALL AL HAMIDAN VILLAS This project consisted of Three (3) Villas each, one have two floors and one roof. finish all 2 ABU DHABI NATIONALITIES AND RESIDENCE DEPARTMENT project was consisted of the following:- a]printing and services building (two levels). b] New additional level to the existing club. c] Changing the existing internal design to new design for the visa building. D]new commercial building consists of two levels finish all 3 HAMZA AL GOHY VILLA This project consisted of one villa, ground floor, 1st level and roof. finish all 4 INDUSTRIAL SHABRA BUILDING (Owner This building consisted of two floors each, one divided to specific offices. finish all 5 MAJOR /SAEED OBAID AL MAZROU VILLA This project consists of one villa, and site / external meeting hall & external kitchen. Such villa consisted of ground floor 1st floor & roof. finish all 6 RASHID AL ZAABI VILLAS Four (4) villas, each one consists of ground floor, 1st floor and roof . finish all 7 INDUSTRIAL SHABRA PROJECT (Owner: Mr. Mattar Al Rumaithy) This building consists of two floors each, one divided to specific offices. finish all 8 MR. AHMED OBAID AL MAZROOE VILLA This villa consists of ground floor and 1st floor levels. finish all 9 MRS. MYTHAA & MARIAM VILLAS This project consisted of two villas, one for Mrs. Mythaa and the other for Mrs. Mariam. Each villa consisted of ground, 1st and roof level. finish all
  • 5. 10 MR. SULTAN AL ZAABI COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 11 MR. HAMEED AL ZAABI COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 12 MR. OMAR AL ZAABI COMPOUND This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 13 MR. ABDULA AL ZAHERY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 14 MR. SLAYAM EL KESARY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 15 MR. BEKHET EL KESERY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 16 MRS.HAMDA ABD EL RAHMAN EL ZAABI This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 17 MRS.SHKHA ABD EL RAHMAN EL ZAABI This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 18 MRS.ALIAA EL SOWEDY This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 19 MR. AHMED OBAID AL MAZROOE 8 VILLA This project consisted of eight villas, Each villa consists of ground, 1st and roof level. finish all 20 MR.KHALIFA EL KINDI This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 21 MRS.SHAMSA MOHAMED This project consisted of one villas, Each villa consists of ground, 1st and roof level. finish all 22 MR. AHMED OBAID AL MAZROOE BUILDING This project consisted of one building of seven typical floors and roof finish all 23 Mr.abu salem This project consisted of extension for the main villa + service block finish all 24 Mr.Mohamed ateq This project consisted of four villas, Each villa consists of ground, 1st and roof level.+four service block finish all 25 Mr.obaid ateq This project consisted of four villas, Each villa consists of ground, 1st and roof level.+four service block finish all 26 EXECUTION PLAN FOR THE DRAINAGE AND WATER SUPPLY NET FOR ALL THE ABOVE PROJECT Preparation of the detailed drawings, basic design required for all above projects, indicating B.O.Q., cost estimate, routine of the drainage & water supply net / system completed with all tanks, pumps and valves for every above separate project. References are Furnished Upon Request.
  • 6. 10 MR. SULTAN AL ZAABI COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 11 MR. HAMEED AL ZAABI COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 12 MR. OMAR AL ZAABI COMPOUND This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 13 MR. ABDULA AL ZAHERY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 14 MR. SLAYAM EL KESARY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 15 MR. BEKHET EL KESERY COMPOUND This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 16 MRS.HAMDA ABD EL RAHMAN EL ZAABI This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 17 MRS.SHKHA ABD EL RAHMAN EL ZAABI This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 18 MRS.ALIAA EL SOWEDY This project consisted of five villas, Each villa consists of ground, 1st and roof level. finish all 19 MR. AHMED OBAID AL MAZROOE 8 VILLA This project consisted of eight villas, Each villa consists of ground, 1st and roof level. finish all 20 MR.KHALIFA EL KINDI This project consisted of six villas, Each villa consists of ground, 1st and roof level. finish all 21 MRS.SHAMSA MOHAMED This project consisted of one villas, Each villa consists of ground, 1st and roof level. finish all 22 MR. AHMED OBAID AL MAZROOE BUILDING This project consisted of one building of seven typical floors and roof finish all 23 Mr.abu salem This project consisted of extension for the main villa + service block finish all 24 Mr.Mohamed ateq This project consisted of four villas, Each villa consists of ground, 1st and roof level.+four service block finish all 25 Mr.obaid ateq This project consisted of four villas, Each villa consists of ground, 1st and roof level.+four service block finish all 26 EXECUTION PLAN FOR THE DRAINAGE AND WATER SUPPLY NET FOR ALL THE ABOVE PROJECT Preparation of the detailed drawings, basic design required for all above projects, indicating B.O.Q., cost estimate, routine of the drainage & water supply net / system completed with all tanks, pumps and valves for every above separate project. References are Furnished Upon Request.