Discussion of Regulatory issues in closing a chemical manufacturing facility. Presented the Alliance for Chemical Safety July 9, 2014 by Willard Vaughan, PE CIH
Plant shutdowns can happen for a variety of reasons from
planned and unplanned to strategic and unexpected. No matter
the reason, it’s critical to have a sound plant shutdown
management plan in place.
The term Prestartup Safety Review (PSSR) first received prominence in the process industries with the introduction of the Process Safety Management (PSM) regulations.
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputGaurav Singh Rajput
Hazard and operability study | hazop | method of conduction | steps involved by gauravsinghrajput | gauravkrsrajput I Gaurav Singh Rajput I gauravsinghrajput I gauravkrsrajput
This short summary lists the requirements for relief system related PSI and how other PSM elements tie into relief systems documentation. This short paper is meant to provide insight into how Smith & Burgess LLC approach relief systems documentation work. We satisfy the listed regulatory requirements; while leaving a system, which can be maintained by a knowledgeable process engineer.
Plant shutdowns can happen for a variety of reasons from
planned and unplanned to strategic and unexpected. No matter
the reason, it’s critical to have a sound plant shutdown
management plan in place.
The term Prestartup Safety Review (PSSR) first received prominence in the process industries with the introduction of the Process Safety Management (PSM) regulations.
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputGaurav Singh Rajput
Hazard and operability study | hazop | method of conduction | steps involved by gauravsinghrajput | gauravkrsrajput I Gaurav Singh Rajput I gauravsinghrajput I gauravkrsrajput
This short summary lists the requirements for relief system related PSI and how other PSM elements tie into relief systems documentation. This short paper is meant to provide insight into how Smith & Burgess LLC approach relief systems documentation work. We satisfy the listed regulatory requirements; while leaving a system, which can be maintained by a knowledgeable process engineer.
This is about HAZOP (Hazard and Operability Study), a risk assessment technique used in various industries.For a detailed training course and certification in HAZOP please visit http://www.abhisam.com/hazop-training-course.html
Conceptual Approach for Trouble Shooting of Chemical Process Industry. Proper design and trained operating manpower ensures trouble free plant operation.
Pressure Relief Systems
BACKGROUND TO RELIEF SYSTEM DESIGN Vol.1 of 6
The Guide has been written to advise those involved in the design and engineering of pressure relief systems. It takes the user from the initial identification of potential causes of overpressure or under pressure through the process design of relief systems to the detailed mechanical design. "Hazard Studies" and quantitative hazards analysis are not described; these are seen as complementary activities. Typical users of the Guide will use some Parts in detail and others in overview.
Onerous new regulations for the Pennsylvania Marcellus Shale industry proposed by the state Dept. of Environmental Protection. The new regs will, according to the DEP, help PA reduce so-called fugitive methane emissions and some types of air pollution (VOCs). This is liberal Gov. Tom Wolf's way of addressing mythical man-made global warming.
This is about HAZOP (Hazard and Operability Study), a risk assessment technique used in various industries.For a detailed training course and certification in HAZOP please visit http://www.abhisam.com/hazop-training-course.html
Conceptual Approach for Trouble Shooting of Chemical Process Industry. Proper design and trained operating manpower ensures trouble free plant operation.
Pressure Relief Systems
BACKGROUND TO RELIEF SYSTEM DESIGN Vol.1 of 6
The Guide has been written to advise those involved in the design and engineering of pressure relief systems. It takes the user from the initial identification of potential causes of overpressure or under pressure through the process design of relief systems to the detailed mechanical design. "Hazard Studies" and quantitative hazards analysis are not described; these are seen as complementary activities. Typical users of the Guide will use some Parts in detail and others in overview.
Onerous new regulations for the Pennsylvania Marcellus Shale industry proposed by the state Dept. of Environmental Protection. The new regs will, according to the DEP, help PA reduce so-called fugitive methane emissions and some types of air pollution (VOCs). This is liberal Gov. Tom Wolf's way of addressing mythical man-made global warming.
BlueScape Learn Air Permits & Compliance Training 7-28-15BlueScape
This training by James A. Westbrook, President of BlueScape Environmental covers what facility operators need to know learn about air quality regulations and permits. The topics include types of air regulations, a discussion on what requirements are found in air permits, development of an Air Quality Management System, and working with agencies.
James can be reached at 877-486-9257 for questions, customized training, and air quality permitting and compliance support.
Hazardous Materials Assessments for Renovation/Demolition ProjectsGuy Sylvester
Neglecting a thorough HAZMAT inspection can have devastating financial, legal, health and environmental impacts. Determining what is a hazardous waste is paramount, because only those wastes that have specific attributes are subject to regulation. Learn about potential sources of Asbestos, Lead Paint, PCBs, Mercury and Mold on the job site.
A Deep Dive into the RCRA Regulations: Are You Aware of These Lesser Known Re...Triumvirate Environmental
We are all familiar with the standard requirements found within the hazardous waste regulations such as labeling, closure requirements, secondary containment, training, and other basic rules and requirements. But are you aware that there are more? Taking a deeper look into RCRA regulations reveals much more, including:
Daily Tank Inspections and Recording Requirements
Subpart AA- Organic Emission Standards
Subpart BB- Air Emission Standards
And more…
We will review each of the lesser known RCRA requirements to provide you with a complete understanding of the regulation and help ensure compliance.
NSPS Subpart OOOO: Applicability and Compliance BasicsAll4 Inc.
Roy Rakiewicz of ALL4 Inc, presents "General Applicability of NSPS Subpart OOOO: Applicability and Compliance Basics". The presentation provides detailed information on: affected facilities, rule structure, storage vessel affected facilities, and gas well affected facilities.
In the fall of 2016, the EPA updated Section 608 of the Clean Air Act (CAA) by extending ozone depleting refrigerants to include substitutes like hydrofluorocarbons (HFCs). These changes strengthen the existing program, effectively reducing climate-damaging emissions from air conditioning and refrigeration equipment.
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape
This webinar by James Westbrook at BlueScape describes the air permitting process for energy projects, from early planning and technical feasibility review to application submittal and permit negotiation. The webinar presents tips to avoid delays and move quickly, save money, and address issues and hurdles that can impact the project. Issues such as emission limits and BACT emission controls, offsets, Title V permitting, and modeling impacts are discussed. The presenter provides tips on how to conduct the permitting process to be successful, and maximize operational flexibility. Mr. Westbrook can be reached at 858-774-2009 for more information. For a video presentation go to youtube.com/watch?v=AB84GQORp2w. Also see www.bluescapeinc.com.
Presented to:
Pueblo Chemical Depot (PCD) Citizens’ Advisory Commission (CAC)
Presented by:
Mr. Steven Bird
PCAPP EDS Project Lead
Joint Project Manager-Elimination (Provisional) (JPM-E (P))
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
8. PMC Air Permit
• When:
– Production stops
– Materials are removed from site
– All cleaning of the permitted equipment and
storage equipment is completed,
– Equipment is inactivated
9. PMC Air Permit
• Then
– PMC will/can no longer discharge regulated VOCs.
– Go into eBiz and notify Ohio EPA that the is
decommissioned and no longer in service.
10.
11. SARA
• Once all materials are off site submit a revised
Tier II report, AND
• Notify LEPA, Fire Department that materials
are off site and processes have been
shutdown
12.
13. SARA Form R
• Don’t forget to gather your data while you can
for next year’s Form R.
14. Waste Water
• MSD has its own 7 step procedure for Process
Closure / Transfer
21. RCRA
• There is a whole section in the regulations
dealing with Cessation of Regulated Activities.
Ohio Administrative Code 3745 – 66
22.
23. 3745-66-10 Closure and post-closure: applicability.
Except as rule 3745-65-01 of the Administrative Code provides otherwise:
(A) Rules 3745-66-11 to 3745-66-15 of the Administrative Code, which concern
closure, apply to the owners and operators of all hazardous waste management
facilities; and
(B) Rules 3745-66-16 to 3745-66-20 of the Administrative Code, which concern post-
closure care, apply to the owners and operators of:
(1) All hazardous waste disposal facilities;
(2) Waste piles and surface impoundments for which the owner or operator
intends to remove the wastes at closure to the extent that these rules are made
applicable to such facilities in rule 3745-67-28 or 3745-67-58 of the Administrative
Code;
(3) Tank systems that are required under rule 3745-66-97 of the
Administrative Code to meet requirements for landfills; and
24. 3745-66 -11
Closure Performance Standard
The owner or operator must close his facility in a manner
that:
(A) Minimizes the need for further maintenance; and
(B) Controls, minimizes, or eliminates, to the extent necessary to
protect human health and the environment, post-closure escape of
hazardous waste, hazardous constituents, leachate, contaminated
run-off, or hazardous waste decomposition products to the ground
water, or surface waters, or to the atmosphere; and
(C) Complies with the closure requirements of rules 3745-66-10 to
3745-66-21, including, but not limited to, the requirements of rules
3745-66-97, 3745-67-28, 3745-67-58, 3745-67-80, 3745-68-10, 3745-
68-51, 3745-68-81, 3745-69-04, and 3745-205-1023745-256-102 of
the Administrative Code.
25. 3745-66 Closure performance
standard
• 3745-66-97 deals with hazardous waste tanks
• 3745-67-28 deals with surface impoundments
• 3745-67-58 deals with waste piles
• 3745-67-80 deals with land treatment
• 3745-68-10 deals with landfills
29. Permanent/Temporary CRO and Contact Person Form (30/45 Day Form)
epa0327.pdf
Regulated Substance & Equipment Removal Form (90 Day-Final Form)
epa0329.pdf
Holder of the First Mortgage/Fiduciary/Indentured Trustee/Receiver Form
(15/60 Day Form)
epa0330.pdf
Government Forms
30.
31.
32.
33. Closure Plan
• 3745-66-12 Closure plan; amendment of plan.
(A) Written plan. On April 15, 1981, the owner or
operator of a hazardous waste management facility
must have a written closure plan. Until final closure is
completed and certified in accordance with rule 3745-
66-15 of the Administrative Code, a copy of the most
current closure plan must be furnished to the director
upon request, including request by mail. In addition, for
facilities without approved plans, it must also be
provided during site inspections, on the day of
inspection, to any officer, employee, or representative of
Ohio EPA who is duly designated by the director.
34. Other things to think of
• Freon
• Asbestos/Lead
• Florescent Bulbs – Universal Waste
• Oils and Glycols
• Mercury Switches
• Lab Waste
35. Issues
• What are you going to do with documents like
RCRA records?
• Who is going to do annual reports?
40. Problems
• Half way through the process, the other
facility can’t make the product and you have
to start back up.
• If your plant has been in operation for more
than 20 years, you have things in the closet
that you never knew was there.
Good afternoon and welcome to my presentation on the Trails an Tribulations of Shutting Dow a Chemical Plant.
Well everything comes to an end at some time and there are times we just got to give it and move on – or take a nap.
PMC purchased the facility in Feb 2013 and announced in July 2013 that they would consolidate the operations of Cincinnati and Carrolton, KY together in Carrolton, KY. In September, 2013 Cincinnati personnel were informed of their state and some were offered positions in Carrolton and some where not. I was not.
BUT this being said, while everyone stated looking for work, there is a dedicated professional staff that has continued working to make sure all goes correctly without getting anyone hurt or spills/leaking of materials.
This is a Google map shot of the plant. PMC owns the property including the ball fields out front. However the ball fields are rented for something like a dollar for 10 years but in reality is a buffer for the plant to the residential south of the plant.
The plant was begun right after World War II and has been a manufacturing facility every since but as the title shows, it has gone through a number ownership changes. With each change, the products and process did remain somewhat constant and the real changes came from the management culture of each corporate purchase.
We are a chemical plant with a variety of materials
railcars of Chlorine and methyl Chloride
Tanks of various organics
Tin in both solid and liquid states
We have the normal Large Quantity Hazardous Waste permits, We submit Sara Tier II and Form R reports, We have an air permit, discharge industrial waste to MSD under a permit. Further more the plant under went a RCRA 3013 inspection before me and had just finished up remediation of the site but had never gotten Federal EPA in Chicago to close out the account.
So while we are not complicated, there are a number of issues that will need to be addressed.
Also, we are shutting down because we want to not under orders from anyone.
But moving large objects does get complicated and a lot of people will have to be involved otherwise things can go really wrong quickly.
However even very large objects can be moved with the right equipment, personal and planning.
This is Cape Hatteras lighthouse on the outer banks of North Carolina.
For the full story and more photos go to http://www.nps.gov/caha/historyculture/movingthelighthouse.htm
But it can be done so where to begin?
So what do we mean by the term shutdown?
Easiest answer, the date the last person walks out the gates and turns off the lights.
Stop bringing materials on site
To most this means end of production - but this is misleading in that stopping production does not mean you have shutdown
There are a number of regulations and laws that apply to each site depending on what you do. Each of these agencies above have a different issue and determine shutdown a bit differently.
Air Emissions
Waste Water Discharges
Hazardous and Solid Waste
SARA reporting
TSCA regulated materials (asbestos and lead)
Lets start with the easiest – Air emissions.
The end of production is simple enough
Production stops, you are not making anything, nothing goes in and nothing comes out.
Materials are removed from site – raw materials are off site and can not be used, leak or spill
All cleaning of the permitted equipment and storage equipment is completed – opening a tank or container to wash it out can release more air toxics, VOCs or other regulated substances which need to be measured or estimated for reporting.
Equipment is inactivated – Air gaped, disconnecting equipment with piping or removal of equipment from site.
Once all the above occurs, then you
This is a screen shot of PMC’s Emission Unit (EU) for a major process – all I have to do is edit this profile and at the bottom of the screen is a button that I click to say shut it down.
There are a number of clicks you have to make for each of the sections.
Each time, the software will warn you that once the equipment is removed, it can not be re-actived without a full permit application.
So if all the sudden they want to put the system back on line for just one more day, you have to get a new permit.
And once all the equipment is removed, all that is left is a final quarterly report and I will go ahead and do an annual report for submittal.
This is the easy process. Now we go to the next step.
This is just page one of three pages – could not find a link on MSD’s web page but they will be very happy to get you a copy if you request it.
Nothing really surprising – required notification dates, need for contact person after transfer or closure and such and a closure plan.
This is the big one since
And if in doubt,
http://codes.ohio.gov/oac/3745-66
This is the big one since
And if in doubt that it applies to you – the question to ask is, does anyone know about your operations? If yes then this applies.
http://www.epa.ohio.gov/dmwm/Home/Cro.aspx
http://epa.ohio.gov/portals/32/pdf/epa0327.pdf
http://epa.ohio.gov/portals/32/pdf/epa0329.pdf
http://epa.ohio.gov/portals/32/pdf/epa0330.pdf
So What’s Next?
For the facility we will continue working down the road in clearing out all the products and materials, removing and shipping all equipment and tanks other PMC facilities want, and cleaning the place up so that it will be safe for the salvage / demolition crews to come in and do their work.
For me personally,
Well its time for this super hero to take a short nap – I am looking around for a position but since I have some time before everything ends, I am taking my time
But if you know of somewhere south within 100 miles of the Chattanooga, TN area feel free to let me know!!
if you want a copy of this power point with the links to all the documents and information I hope to have this up on my linked in page – just look me up at Willard Vaughan.
Thanks for you time and are there any further questions?