JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372
PEMULIHAN ARUS GANGGUAN PADA SKTM 20 KV
DENGAN MENGGUNAKAN FASILITAS GROUND
FAULT DETECTOR (GFD) 3G
Jecklin Praspa Dewi & Syamsir Abduh
Jurusan Teknik Elektro Fakultas Teknologi Industri Universitas Trisakti
Jalan Kiai Tapa No. 1 Jakarta Barat 11440
E-mail: syamsir@trisakti.ac.id
ABSTRACT
One of the main tasks of the electricity industry is to provide reliable electricity to
customers. Supply interruptions are less and less accepted by customers and society mainly
because their socioeconomic effects are increasingly severe. Reliability of supply and its
value are key factors for the decision making process underlying expansion plans not only of
electricity generation systems but also of transmission and distribution networks. To meet
these demands, the PLN use reliable distribution technology, i. e. 3G Ground Fault Detector
(GFD). This paper aims to analyze the use of 3G GFD. The secondary data were obtained
from the substation Setiabudi Jakarta. The results showed that use of 3G GFD can speed
maneuverability and long outages of 143.06 minutes to 34.25 minutes and reduce the
number of unsold kWh amounting to 76.06%.
Keywords: ground fault detector, GFD, 3G
ABSTRAK
Salah satu tugas utama perusahaan listrik adalah menghasilkan tenaga listrik yang dapat
diandalkan oleh pelanggan. Gangguan pasokan listrik semakin tidak dapat ditolerir oleh
pelanggan karena dampak sosial dan ekonomi yang sangat berat. Keandalan pasokan
merupakan salah satu faktor kunci dalam pengambilan keputusan untuk pengembangan
sistem pembangkit, transmisi dan distribusi tenaga listrik. Untuk memenuhi tuntutan tersebut
PLN menggunakan teknologi distribusi yang bisa diandalkan kualitasnya, yaitu Ground
Fault Detector (GFD) 3G. Pada tulisan ini dikemukakan analisis penggunaan GFD 3G
dengan menggunakan data sekunder dari Gardu Induk Setiabudi Jakarta. Dari hasil analisis
diketahui bahwa penggunaan GFD 3G dapat mempercepat waktu manufer gangguan dan
lama padam dari 143,06 menit menjadi 34,25 menit serta mengurangi jumlah kWh tak
terjual sebesar 76,06%.
Kata kunci: gangguan, ground fault detector, 3G
JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372
38
1. PENDAHULUAN
Sistem ketenagalistrikan di Indonesia dikelola oleh PT PLN (Persero) untuk
melayani kebutuhan listrik diseluruh pelosok Indonesia. PT PLN (Persero) Distribusi
Jakarta Raya dan Tangerang adalah salah satu unit PLN yang bertanggung jawab
dalam distribusi tenaga listrik tegangan menengah 20 kV hingga tegangan rendah
220 V di wilayah Jakarta Raya dan Tangerang [1]. Dalam mengelola jaringan
distribusi, Area Pengatur Distribusi (APD) merupakan unit yang bertanggung jawab
dalam pengoperasian dan pengaturan Gardu Induk 20 kV dan jaringan distribusi 20
kV [2], baik yang dilakukan secara manual maupun Remote melalui SCADA
(Supervisory Control Data Acquisition) [3].
2. LANDASAN TEORI
2.1. Operasi Sistem Distribusi Tanpa SCADA
Pengoperasian dan manuver jaringan distribusi tanpa SCADA menggunakan
GFD (Ground Fault Detector) sebagai tools untuk pengusutan gangguan yang
dipasang di Gardu Distribusi tipe Beton. GFD berfungsi untuk mendeteksi adanya
arus lebih atau gangguan hubung singkat antara fasa ke tanah pada saluran kabel
tegangan menengah atau SKTM 20 kV [1]. Prinsip kerja Ground Fault Detector
dijelaskan pada Gambar 1.
Gambar 1. Ground fault detector
Jecklin Praspa Dewi dkk. “Pemulihan Arus Gangguan Pada SKTM 20 KV Dengan .........”
39
2.2. Operasi Sistem Distribusi Dengan Komunikasi 3G
Aplikasi operasi sistem distribusi dengan SCADA dapat melakukan fungsi-
fungsi secara umum sebagai berikut [1]:
1. Tele Metering (TM)
Pemantauan pengukuran tegangan dalam kV, arus dalam A dan frekuensi (f).
2. Tele Signalling (TS)
Pemantauan indikasi dari semua alarm, seperti Supply Fault (SF) dan Homopolar
Fault Detector (HFD) serta status terbuka (open) atau tertutupnya (close) Circuit
Breaker (CB) / Load Breaking Switch (LBS).
3. Remote Control (RC)
Pengendalian buka/tutup perangkat pemutus daya dan pemisah yang dilakukan
secara otomatis untuk manuver jaringan.
2.3. Ground Fault Detector (GFD) dengan Komunikasi 3G
Ground Fault Detector (GFD) 3G berfungsi untuk mendeteksi adanya arus
lebih atau gangguan hubung singkat antara fasa ke tanah pada saluran kabel tegangan
menengah atau SKTM 20 kV melalui sistem komunikasi data 3G [1]. Gambar 2
menunjukkan prinsip kerja Ground Fault Detector 3G.
Gambar 2. Ground fault detector 3G
JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372
40
2.4. Kegagalan Kerja GFD 3G
Hal-hal yang dapat menyebabkan terjadinya kegagalan kerja pada Ground
Fault Detector 3G dapat berasal dari GFD, 3G atau dari sisi operator.
2.5. Pengiriman Data
Pengiriman data pada Ground Fault Detector 3G agar sampai ke DCC
diperlihatkan pada Gambar 3.
Gambar 3. Pengiriman data pada ground fault detector 3G
Jecklin Praspa Dewi dkk. “Pemulihan Arus Gangguan Pada SKTM 20 KV Dengan .........”
41
3. METODE OPERASI JARINGAN SISTEM SPINDLE
Pada sistem Spindle telah disediakan fasilitas Remote Control (RC) yang
dipasang di setiap Gardu Induk (GI), Gardu Hubung (GH) dan Gardu Tengah (Midle
Point) untuk penyulang yang terdapat gardu-gardu distribusinya [4]. Gambar 4
menunjukkan sistem jaringan spindle dalam keadaan normal di GI Setiabudi.
Gambar 4. Jaringan dalam keadaan normal
4. ANALISIS DATA
4.1. Analisis Manfaat
Manfaat yang diperoleh dapat dirumuskan dari data manuver gangguan
jaringan tegangan menengah (JTM) selama 1 tahun untuk sampel 10 feeder dapat
dilihat pada Tabel 1. Data ini selanjutnya dianalisis baik secara non-finansial
(efisiensi waktu) maupun finansial.
JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372
42
Tabel 1. Data manuver gangguan JTM
Gardu Induk Feeder
Jumlah
Gardu
Jumlah
Gangguan
Rata-rata
Lama
Padam *)
Rata-rata
Lama
Manuver 1 *)
Rata-rata RC
dari Manuver
1 *)
Rata-rata
kWh Tak
Terjual
Jumlah kWh
Tak Terjual
Gambir Lama Tonil 8 7 96,14 34,00 5,00 2.801,04 19.607,28
Setia Budi Pancing 8 7 125,86 26,00 4,90 4.345,54 30.418,77
Kebon Jeruk Benalu 12 8 151,25 11,00 3,00 6.383,72 51.077,72
Kebon Jeruk Mede 21 9 191,00 50,00 5,00 7.357,86 67.840,70
Kemang Belibis 11 4 70,00 21,00 3,00 1.975,87 7.903,46
Kemang Genek 19 10 137,30 29,50 5,50 4.391,79 43,917,87
Ketapang Baseball 15 4 167,75 29,38 4,84 2.789,19 11.156,74
Ketapang Egrang 11 6 185,83 48,50 12,00 9.839,40 59.036,96
Miniatur Subuh 14 5 174,40 35,00 3,50 7.271,93 36.359,66
Senayan Lidi 12 5 106,20 15,50 5,00 2.511,79 12.558,96
131 65 143,08 29,38 4,87 4.984,92 339.878,12
*) satuan dalam menit
4.2. Manfaat Non-finansial
Dari Tabel 1 dapat dilakukan perbandingan antara 2 skema manuver,
yaitu:
1. Bila manuver gangguan JTM dilakukan dengan SCADA dan GFD manual, maka
dibutuhkan waktu rata-rata 143,08 menit. Hal tersebut disebabkan karena
dibutuhkan waktu extra untuk kedatangan petugas PLN mengecek satu per satu
indikasi lampu GFD di Gardu Ditribusi.
2. Bila manuver gangguan JTM dilakukan dengan SCADA dan GFD 3G, maka
dibutuhkan waktu rata-rata 34,25 menit.
Nilai efisiensi manuver gangguan JTM =
, ,
,
100%
= 76,06%
4.3. Manfaat Finansial
Manfaat finansial dari implementasi inovasi ini adalah:
1. Mengurangi kWh tak terjual sebesar 76,06%.
Untuk sampel data 10 feeder dengan jumlah gangguan 65 kali / tahun:
Nilai efisiensi kWh tak terjual = 76,06% × 339.878,12 kWh × Rp.787/kWh
Jecklin Praspa Dewi dkk. “Pemulihan Arus Gangguan Pada SKTM 20 KV Dengan .........”
43
= Rp.203.448.391,58
Bila jumlah gangguan total tahun 2010 sebesar 5466 kali, maka:
Nilai efisiensi kWh tak terjual total = ( ) × Rp.203.44.391,58
= Rp.17,1 Milyar
2. Biaya investasi mendapat Break Even Point (BEP) dalam waktu ± 6 tahun yang
diperoleh dari:
Σ Gardu Distribusi (dari 10 feeder) = 131
Σ Middle Point (dari 10 feeder) = 10
Σ GFD = 131 – 10
= 121
Biaya Investasi / Gardu Distribusi = Rp. 10 juta
Biaya Investasi Total = 121 x 10 juta
= Rp. 1,21 Milyar
Waktu BEP =
. ,
. /
= 5,94 tahun
5. KESIMPULAN
Berdasarkan analisis yang dilakukan maka dapat disimpulkan:
1. Penggunaan GFD 3G dapat mempercepat waktu manuver gangguan dan lama
padam dari 143,08 menit menjadi 34,25 menit.
2. Penggunaan GFD 3G dapat mengurangi jumlah kWh tak terjual sebesar 76,06%.
JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372
44
DAFTAR PUSTAKA
[1] Aulia Mahdi dkk. Modifikasi GFD Existing menggunakan teknologi GPRS untuk
mempercepat manuver. PT PLN (Persero). Jakarta, 2011.
[2] Standar Konstruksi Jaringan Distribusi PT PLN Persero Distribusi Jakarta Raya
dan Tangerang, Buku I. Jakarta, 1994.
[3] Pedoman PT PLN Persero Area Jakarta dan Tanggerang. Jakarta, 2010.
[4] Syamsir Abduh dan Lita Widia. “Analisis Penggunaan Ground Fault Detector
GPRS Akibat Gangguan Hubung Singkat Pada SKTM 20 KV”, Prosiding
Seminar Nasional Teknologi Industri, 2014.
Filename: 25.23 (hal 37-44) Pemulihan arus. syamsir_11153AE
Directory: C:UsersFTI-USAKTIAppDataLocalTemp
Template: C:UsersFTI-
USAKTIAppDataRoamingMicrosoftTemplatesNormal.dotm
Title:
Subject:
Author: KOMP-10
Keywords:
Comments:
Creation Date: 28/10/2015 21:47:00
Change Number: 16
Last Saved On: 24/11/2015 18:43:00
Last Saved By: 062 FTI-USAKTI
Total Editing Time: 643 Minutes
Last Printed On: 01/02/2016 13:02:00
As of Last Complete Printing
Number of Pages: 8
Number of Words: 1.248 (approx.)
Number of Characters: 7.131 (approx.)

More Related Content

Similar to PEMULIHAN ARUS GANGGUAN PADA SKTM 20 KV DENGAN MENGGUNAKAN FASILITAS GROUND FAULT DETECTOR (GFD) 3G

Laporan Dasar Sistem Kontrol (Pengatur Integrator)
Laporan Dasar Sistem Kontrol (Pengatur Integrator)Laporan Dasar Sistem Kontrol (Pengatur Integrator)
Laporan Dasar Sistem Kontrol (Pengatur Integrator)
Lyla Susanti
 
Makalah Pengukuran Keserempakan PMT 150 KV
Makalah Pengukuran Keserempakan PMT 150 KVMakalah Pengukuran Keserempakan PMT 150 KV
Makalah Pengukuran Keserempakan PMT 150 KV
Janedi Jhaned
 
current monitoring tools with current sensor chip ACS712-20
current monitoring tools with current sensor chip ACS712-20current monitoring tools with current sensor chip ACS712-20
current monitoring tools with current sensor chip ACS712-20
Kiki Amelia
 
Comm 004- eny sukani rahayu-perancangan antena mikrostrip untuk
Comm 004- eny sukani rahayu-perancangan antena mikrostrip untukComm 004- eny sukani rahayu-perancangan antena mikrostrip untuk
Comm 004- eny sukani rahayu-perancangan antena mikrostrip untuk
Lalu Arioki Setiadi
 

Similar to PEMULIHAN ARUS GANGGUAN PADA SKTM 20 KV DENGAN MENGGUNAKAN FASILITAS GROUND FAULT DETECTOR (GFD) 3G (20)

Putri Maharani Pricilia_1501620063_Laporan PKL.pptx
Putri Maharani Pricilia_1501620063_Laporan PKL.pptxPutri Maharani Pricilia_1501620063_Laporan PKL.pptx
Putri Maharani Pricilia_1501620063_Laporan PKL.pptx
 
CyPIRAL_2040221038_M Akbar Hidayatullah_Laporan Instrumentasi Industri.docx
CyPIRAL_2040221038_M Akbar Hidayatullah_Laporan Instrumentasi Industri.docxCyPIRAL_2040221038_M Akbar Hidayatullah_Laporan Instrumentasi Industri.docx
CyPIRAL_2040221038_M Akbar Hidayatullah_Laporan Instrumentasi Industri.docx
 
B200 2 a2_rahmatnurfaizal
B200 2 a2_rahmatnurfaizalB200 2 a2_rahmatnurfaizal
B200 2 a2_rahmatnurfaizal
 
Perencanaan pembangkit listrik tenaga surya.pptx
Perencanaan pembangkit listrik tenaga surya.pptxPerencanaan pembangkit listrik tenaga surya.pptx
Perencanaan pembangkit listrik tenaga surya.pptx
 
TUGAS PPT SMART DISTRIBUTION KELOMPOK 3 .pptx
TUGAS PPT SMART DISTRIBUTION KELOMPOK 3 .pptxTUGAS PPT SMART DISTRIBUTION KELOMPOK 3 .pptx
TUGAS PPT SMART DISTRIBUTION KELOMPOK 3 .pptx
 
Laporan Dasar Sistem Kontrol (Pengatur Integrator)
Laporan Dasar Sistem Kontrol (Pengatur Integrator)Laporan Dasar Sistem Kontrol (Pengatur Integrator)
Laporan Dasar Sistem Kontrol (Pengatur Integrator)
 
SEMHAS.pptx
SEMHAS.pptxSEMHAS.pptx
SEMHAS.pptx
 
10 naskah publikasi ersan budi kusuma
10 naskah publikasi ersan budi kusuma10 naskah publikasi ersan budi kusuma
10 naskah publikasi ersan budi kusuma
 
g
gg
g
 
Makalah Pengukuran Keserempakan PMT 150 KV
Makalah Pengukuran Keserempakan PMT 150 KVMakalah Pengukuran Keserempakan PMT 150 KV
Makalah Pengukuran Keserempakan PMT 150 KV
 
current monitoring tools with current sensor chip ACS712-20
current monitoring tools with current sensor chip ACS712-20current monitoring tools with current sensor chip ACS712-20
current monitoring tools with current sensor chip ACS712-20
 
Alat monitoring Arus
Alat monitoring Arus Alat monitoring Arus
Alat monitoring Arus
 
Alat Monitoring Arus
Alat Monitoring Arus Alat Monitoring Arus
Alat Monitoring Arus
 
Alat Monitoring Arus
Alat Monitoring ArusAlat Monitoring Arus
Alat Monitoring Arus
 
Curent Sensor with Arduino Uno
Curent Sensor with Arduino UnoCurent Sensor with Arduino Uno
Curent Sensor with Arduino Uno
 
Comm 004- eny sukani rahayu-perancangan antena mikrostrip untuk
Comm 004- eny sukani rahayu-perancangan antena mikrostrip untukComm 004- eny sukani rahayu-perancangan antena mikrostrip untuk
Comm 004- eny sukani rahayu-perancangan antena mikrostrip untuk
 
PRESENTASI Indonesia investment week
PRESENTASI Indonesia investment weekPRESENTASI Indonesia investment week
PRESENTASI Indonesia investment week
 
3 BAB III
3 BAB III3 BAB III
3 BAB III
 
Sistem Kendali Water Level dengan Metode PID
Sistem Kendali Water Level dengan Metode PIDSistem Kendali Water Level dengan Metode PID
Sistem Kendali Water Level dengan Metode PID
 
daya saing industri manufaktur indonesia sektor oil and gas.pdf
daya saing industri manufaktur indonesia sektor oil and gas.pdfdaya saing industri manufaktur indonesia sektor oil and gas.pdf
daya saing industri manufaktur indonesia sektor oil and gas.pdf
 

More from SyamsirAbduh2

Article-IJBMM Volume 8 Issue 4- July-August 2023.pdf
Article-IJBMM Volume 8 Issue 4- July-August 2023.pdfArticle-IJBMM Volume 8 Issue 4- July-August 2023.pdf
Article-IJBMM Volume 8 Issue 4- July-August 2023.pdf
SyamsirAbduh2
 
Analisis Kuat Hantar Arus-Sekararum & S.Abduh.pdf
Analisis Kuat Hantar Arus-Sekararum & S.Abduh.pdfAnalisis Kuat Hantar Arus-Sekararum & S.Abduh.pdf
Analisis Kuat Hantar Arus-Sekararum & S.Abduh.pdf
SyamsirAbduh2
 
BIS Complete Floating PV-Dianing & S.Abduh.pdf
BIS Complete Floating PV-Dianing & S.Abduh.pdfBIS Complete Floating PV-Dianing & S.Abduh.pdf
BIS Complete Floating PV-Dianing & S.Abduh.pdf
SyamsirAbduh2
 
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaHosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
SyamsirAbduh2
 
Design of Street Light Revitalitation using Dialux EVO
Design of Street Light Revitalitation using Dialux EVODesign of Street Light Revitalitation using Dialux EVO
Design of Street Light Revitalitation using Dialux EVO
SyamsirAbduh2
 
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-EDevelopment Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
SyamsirAbduh2
 
ICHVEPS23-OS1-B6_449-Jujun & S.Abduh.pdf
ICHVEPS23-OS1-B6_449-Jujun & S.Abduh.pdfICHVEPS23-OS1-B6_449-Jujun & S.Abduh.pdf
ICHVEPS23-OS1-B6_449-Jujun & S.Abduh.pdf
SyamsirAbduh2
 
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-EDevelopment Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
SyamsirAbduh2
 
Daftar Anggota Senat-Institut Teknologi PLN.pdf
Daftar Anggota Senat-Institut Teknologi PLN.pdfDaftar Anggota Senat-Institut Teknologi PLN.pdf
Daftar Anggota Senat-Institut Teknologi PLN.pdf
SyamsirAbduh2
 

More from SyamsirAbduh2 (20)

Certificate of Engineer Registration (STRI-PII
Certificate of Engineer Registration (STRI-PIICertificate of Engineer Registration (STRI-PII
Certificate of Engineer Registration (STRI-PII
 
Article-IJBMM Volume 8 Issue 4- July-August 2023.pdf
Article-IJBMM Volume 8 Issue 4- July-August 2023.pdfArticle-IJBMM Volume 8 Issue 4- July-August 2023.pdf
Article-IJBMM Volume 8 Issue 4- July-August 2023.pdf
 
ANALISIS LAJU PENUAAN ISOLASI KERTAS MENGGUNAKAN ESTER BASED OIL PADA TRANSFO...
ANALISIS LAJU PENUAAN ISOLASI KERTAS MENGGUNAKAN ESTER BASED OIL PADA TRANSFO...ANALISIS LAJU PENUAAN ISOLASI KERTAS MENGGUNAKAN ESTER BASED OIL PADA TRANSFO...
ANALISIS LAJU PENUAAN ISOLASI KERTAS MENGGUNAKAN ESTER BASED OIL PADA TRANSFO...
 
Analisis Kuat Hantar Arus-Sekararum & S.Abduh.pdf
Analisis Kuat Hantar Arus-Sekararum & S.Abduh.pdfAnalisis Kuat Hantar Arus-Sekararum & S.Abduh.pdf
Analisis Kuat Hantar Arus-Sekararum & S.Abduh.pdf
 
BIS Complete Floating PV-Dianing & S.Abduh.pdf
BIS Complete Floating PV-Dianing & S.Abduh.pdfBIS Complete Floating PV-Dianing & S.Abduh.pdf
BIS Complete Floating PV-Dianing & S.Abduh.pdf
 
Photovoltaic and Diesel Power Plant Optimization for Isolated Island
Photovoltaic and Diesel Power Plant Optimization for Isolated IslandPhotovoltaic and Diesel Power Plant Optimization for Isolated Island
Photovoltaic and Diesel Power Plant Optimization for Isolated Island
 
Techno Economic Modeling for Replacement of Diesel Power Plant
Techno Economic Modeling for Replacement of Diesel Power PlantTechno Economic Modeling for Replacement of Diesel Power Plant
Techno Economic Modeling for Replacement of Diesel Power Plant
 
Analysis of Modelling and Engineering Building Power Integration System Based...
Analysis of Modelling and Engineering Building Power Integration System Based...Analysis of Modelling and Engineering Building Power Integration System Based...
Analysis of Modelling and Engineering Building Power Integration System Based...
 
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaHosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
 
Design of Street Light Revitalitation using Dialux EVO
Design of Street Light Revitalitation using Dialux EVODesign of Street Light Revitalitation using Dialux EVO
Design of Street Light Revitalitation using Dialux EVO
 
Military Microgrid in Indonesia
Military Microgrid in IndonesiaMilitary Microgrid in Indonesia
Military Microgrid in Indonesia
 
ICVEPS23-OS3-C6_4830-Riqi & S.Abduh.pdf
ICVEPS23-OS3-C6_4830-Riqi & S.Abduh.pdfICVEPS23-OS3-C6_4830-Riqi & S.Abduh.pdf
ICVEPS23-OS3-C6_4830-Riqi & S.Abduh.pdf
 
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-EDevelopment Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
 
ICHVEPS23-OS1-B6_449-Jujun & S.Abduh.pdf
ICHVEPS23-OS1-B6_449-Jujun & S.Abduh.pdfICHVEPS23-OS1-B6_449-Jujun & S.Abduh.pdf
ICHVEPS23-OS1-B6_449-Jujun & S.Abduh.pdf
 
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-EDevelopment Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
Development Design of Lightning Protection System in Rig PDSI #38.2/D1000-E
 
Collaborative Research- ITPLN_UNITEN.pdf
Collaborative Research- ITPLN_UNITEN.pdfCollaborative Research- ITPLN_UNITEN.pdf
Collaborative Research- ITPLN_UNITEN.pdf
 
Daftar Anggota Senat-Institut Teknologi PLN.pdf
Daftar Anggota Senat-Institut Teknologi PLN.pdfDaftar Anggota Senat-Institut Teknologi PLN.pdf
Daftar Anggota Senat-Institut Teknologi PLN.pdf
 
SK DOSEN TETAP INSTITUT TEKNOLOGI PLN - Syamsir Abduh.pdf
SK DOSEN TETAP INSTITUT TEKNOLOGI  PLN - Syamsir Abduh.pdfSK DOSEN TETAP INSTITUT TEKNOLOGI  PLN - Syamsir Abduh.pdf
SK DOSEN TETAP INSTITUT TEKNOLOGI PLN - Syamsir Abduh.pdf
 
2023-CV-Syamsir-Abduh (English Version).pdf
2023-CV-Syamsir-Abduh (English Version).pdf2023-CV-Syamsir-Abduh (English Version).pdf
2023-CV-Syamsir-Abduh (English Version).pdf
 
Sertifikat_EC00202314077-HKI-26012023.pdf
Sertifikat_EC00202314077-HKI-26012023.pdfSertifikat_EC00202314077-HKI-26012023.pdf
Sertifikat_EC00202314077-HKI-26012023.pdf
 

Recently uploaded

Obat Aborsi jakarta WA 082223109953 Jual Obat Aborsi Cytotec Asli Di jakarta
Obat Aborsi jakarta WA 082223109953  Jual Obat Aborsi Cytotec Asli Di jakartaObat Aborsi jakarta WA 082223109953  Jual Obat Aborsi Cytotec Asli Di jakarta
Obat Aborsi jakarta WA 082223109953 Jual Obat Aborsi Cytotec Asli Di jakarta
Obat Aborsi jakarta WA 082223109953 Cytotec Asli Di jakarta
 
Jual Obat Aborsi Denpasar Bali ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik...
Jual Obat Aborsi Denpasar Bali ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik...Jual Obat Aborsi Denpasar Bali ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik...
Jual Obat Aborsi Denpasar Bali ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik...
Jual Obat Aborsi Denpasar ( Asli Ampuh No.1 ) 082223109953
 
Klinik Obat Aborsi Di Depok Wa 082223109953 Klinik Aborsi Di Depok
Klinik Obat Aborsi Di Depok Wa 082223109953 Klinik Aborsi Di DepokKlinik Obat Aborsi Di Depok Wa 082223109953 Klinik Aborsi Di Depok
Klinik Obat Aborsi Di Depok Wa 082223109953 Klinik Aborsi Di Depok
Klinik Obat Aborsi Di Depok Wa 082223109953
 
703618627-PPT-INVESTIGASI-KECELAKAAN-KERJA.pptx
703618627-PPT-INVESTIGASI-KECELAKAAN-KERJA.pptx703618627-PPT-INVESTIGASI-KECELAKAAN-KERJA.pptx
703618627-PPT-INVESTIGASI-KECELAKAAN-KERJA.pptx
arisvanrush
 
TUGAS PPT APRIZAL GEDUNG44yddafhhhhhhhhhhhhhhhh.ppt
TUGAS PPT APRIZAL GEDUNG44yddafhhhhhhhhhhhhhhhh.pptTUGAS PPT APRIZAL GEDUNG44yddafhhhhhhhhhhhhhhhh.ppt
TUGAS PPT APRIZAL GEDUNG44yddafhhhhhhhhhhhhhhhh.ppt
Oloy2
 
tugas pelaksana lapangan pekerjaan saluran irigasi
tugas pelaksana lapangan pekerjaan saluran irigasitugas pelaksana lapangan pekerjaan saluran irigasi
tugas pelaksana lapangan pekerjaan saluran irigasi
frenkytanzil5
 
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
obat aborsi Pangkal pinang 082223109953 Jual obat aborsi
 
Jual Obat Aborsi Samarinda ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jua...
Jual Obat Aborsi Samarinda ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jua...Jual Obat Aborsi Samarinda ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jua...
Jual Obat Aborsi Samarinda ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jua...
Obat Aborsi Samarinda ( Asli Ampuh No.1 ) Samarinda
 
Metode_Sampling bahan galian mineral.pptx
Metode_Sampling bahan galian mineral.pptxMetode_Sampling bahan galian mineral.pptx
Metode_Sampling bahan galian mineral.pptx
HeriGeologist
 
Petunjuk teknis Pengisian Usulan Alat Kesehatan SOPHI.pptx
Petunjuk teknis Pengisian Usulan Alat Kesehatan SOPHI.pptxPetunjuk teknis Pengisian Usulan Alat Kesehatan SOPHI.pptx
Petunjuk teknis Pengisian Usulan Alat Kesehatan SOPHI.pptx
pkmcipakudrive
 
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953
 
Jual Obat Aborsi Jakarta Selatan 0822 2310 9953 Klinik Jual Obat Cytotec Asli...
Jual Obat Aborsi Jakarta Selatan 0822 2310 9953 Klinik Jual Obat Cytotec Asli...Jual Obat Aborsi Jakarta Selatan 0822 2310 9953 Klinik Jual Obat Cytotec Asli...
Jual Obat Aborsi Jakarta Selatan 0822 2310 9953 Klinik Jual Obat Cytotec Asli...
Obat Aborsi Jakarta ( Ampuh _ No. 1 ) Kandungan Jakarta
 
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai PenuhObat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli
 

Recently uploaded (18)

Obat Aborsi jakarta WA 082223109953 Jual Obat Aborsi Cytotec Asli Di jakarta
Obat Aborsi jakarta WA 082223109953  Jual Obat Aborsi Cytotec Asli Di jakartaObat Aborsi jakarta WA 082223109953  Jual Obat Aborsi Cytotec Asli Di jakarta
Obat Aborsi jakarta WA 082223109953 Jual Obat Aborsi Cytotec Asli Di jakarta
 
metode pengukuran waktu secaratidak langsung
metode pengukuran waktu secaratidak langsungmetode pengukuran waktu secaratidak langsung
metode pengukuran waktu secaratidak langsung
 
Jual Obat Aborsi Denpasar Bali ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik...
Jual Obat Aborsi Denpasar Bali ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik...Jual Obat Aborsi Denpasar Bali ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik...
Jual Obat Aborsi Denpasar Bali ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik...
 
Klinik Obat Aborsi Di Depok Wa 082223109953 Klinik Aborsi Di Depok
Klinik Obat Aborsi Di Depok Wa 082223109953 Klinik Aborsi Di DepokKlinik Obat Aborsi Di Depok Wa 082223109953 Klinik Aborsi Di Depok
Klinik Obat Aborsi Di Depok Wa 082223109953 Klinik Aborsi Di Depok
 
Perencanaan Pelabuhan perikanan id.pptx
Perencanaan Pelabuhan perikanan  id.pptxPerencanaan Pelabuhan perikanan  id.pptx
Perencanaan Pelabuhan perikanan id.pptx
 
703618627-PPT-INVESTIGASI-KECELAKAAN-KERJA.pptx
703618627-PPT-INVESTIGASI-KECELAKAAN-KERJA.pptx703618627-PPT-INVESTIGASI-KECELAKAAN-KERJA.pptx
703618627-PPT-INVESTIGASI-KECELAKAAN-KERJA.pptx
 
TUGAS PPT APRIZAL GEDUNG44yddafhhhhhhhhhhhhhhhh.ppt
TUGAS PPT APRIZAL GEDUNG44yddafhhhhhhhhhhhhhhhh.pptTUGAS PPT APRIZAL GEDUNG44yddafhhhhhhhhhhhhhhhh.ppt
TUGAS PPT APRIZAL GEDUNG44yddafhhhhhhhhhhhhhhhh.ppt
 
tugas pelaksana lapangan pekerjaan saluran irigasi
tugas pelaksana lapangan pekerjaan saluran irigasitugas pelaksana lapangan pekerjaan saluran irigasi
tugas pelaksana lapangan pekerjaan saluran irigasi
 
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
obat aborsi Pangkal pinang Wa 082223109953 Jual obat aborsi Cytotec asli Di P...
 
PROSEDUR DALAM MELAKUKAN PERHITUNGAN PEKERJAAN PINTU.pptx
PROSEDUR DALAM MELAKUKAN PERHITUNGAN PEKERJAAN PINTU.pptxPROSEDUR DALAM MELAKUKAN PERHITUNGAN PEKERJAAN PINTU.pptx
PROSEDUR DALAM MELAKUKAN PERHITUNGAN PEKERJAAN PINTU.pptx
 
Jual Obat Aborsi Samarinda ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jua...
Jual Obat Aborsi Samarinda ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jua...Jual Obat Aborsi Samarinda ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jua...
Jual Obat Aborsi Samarinda ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jua...
 
Metode_Sampling bahan galian mineral.pptx
Metode_Sampling bahan galian mineral.pptxMetode_Sampling bahan galian mineral.pptx
Metode_Sampling bahan galian mineral.pptx
 
Petunjuk teknis Pengisian Usulan Alat Kesehatan SOPHI.pptx
Petunjuk teknis Pengisian Usulan Alat Kesehatan SOPHI.pptxPetunjuk teknis Pengisian Usulan Alat Kesehatan SOPHI.pptx
Petunjuk teknis Pengisian Usulan Alat Kesehatan SOPHI.pptx
 
Pengukuran Topografi menggunakan GPS Geodetik
Pengukuran Topografi menggunakan GPS GeodetikPengukuran Topografi menggunakan GPS Geodetik
Pengukuran Topografi menggunakan GPS Geodetik
 
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
Jual Obat Aborsi Batam ( Asli Ampuh No.1 ) 082223109953 Tempat Klinik Jual Ob...
 
Jual Obat Aborsi Jakarta Selatan 0822 2310 9953 Klinik Jual Obat Cytotec Asli...
Jual Obat Aborsi Jakarta Selatan 0822 2310 9953 Klinik Jual Obat Cytotec Asli...Jual Obat Aborsi Jakarta Selatan 0822 2310 9953 Klinik Jual Obat Cytotec Asli...
Jual Obat Aborsi Jakarta Selatan 0822 2310 9953 Klinik Jual Obat Cytotec Asli...
 
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai PenuhObat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
Obat Aborsi Sungai Penuh 082223109953 Jual Cytotec Asli Di Sungai Penuh
 
UJI KOMPETENSI-Presentasi Bidang Jalan.pptx
UJI KOMPETENSI-Presentasi Bidang Jalan.pptxUJI KOMPETENSI-Presentasi Bidang Jalan.pptx
UJI KOMPETENSI-Presentasi Bidang Jalan.pptx
 

PEMULIHAN ARUS GANGGUAN PADA SKTM 20 KV DENGAN MENGGUNAKAN FASILITAS GROUND FAULT DETECTOR (GFD) 3G

  • 1. JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372 PEMULIHAN ARUS GANGGUAN PADA SKTM 20 KV DENGAN MENGGUNAKAN FASILITAS GROUND FAULT DETECTOR (GFD) 3G Jecklin Praspa Dewi & Syamsir Abduh Jurusan Teknik Elektro Fakultas Teknologi Industri Universitas Trisakti Jalan Kiai Tapa No. 1 Jakarta Barat 11440 E-mail: syamsir@trisakti.ac.id ABSTRACT One of the main tasks of the electricity industry is to provide reliable electricity to customers. Supply interruptions are less and less accepted by customers and society mainly because their socioeconomic effects are increasingly severe. Reliability of supply and its value are key factors for the decision making process underlying expansion plans not only of electricity generation systems but also of transmission and distribution networks. To meet these demands, the PLN use reliable distribution technology, i. e. 3G Ground Fault Detector (GFD). This paper aims to analyze the use of 3G GFD. The secondary data were obtained from the substation Setiabudi Jakarta. The results showed that use of 3G GFD can speed maneuverability and long outages of 143.06 minutes to 34.25 minutes and reduce the number of unsold kWh amounting to 76.06%. Keywords: ground fault detector, GFD, 3G ABSTRAK Salah satu tugas utama perusahaan listrik adalah menghasilkan tenaga listrik yang dapat diandalkan oleh pelanggan. Gangguan pasokan listrik semakin tidak dapat ditolerir oleh pelanggan karena dampak sosial dan ekonomi yang sangat berat. Keandalan pasokan merupakan salah satu faktor kunci dalam pengambilan keputusan untuk pengembangan sistem pembangkit, transmisi dan distribusi tenaga listrik. Untuk memenuhi tuntutan tersebut PLN menggunakan teknologi distribusi yang bisa diandalkan kualitasnya, yaitu Ground Fault Detector (GFD) 3G. Pada tulisan ini dikemukakan analisis penggunaan GFD 3G dengan menggunakan data sekunder dari Gardu Induk Setiabudi Jakarta. Dari hasil analisis diketahui bahwa penggunaan GFD 3G dapat mempercepat waktu manufer gangguan dan lama padam dari 143,06 menit menjadi 34,25 menit serta mengurangi jumlah kWh tak terjual sebesar 76,06%. Kata kunci: gangguan, ground fault detector, 3G
  • 2. JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372 38 1. PENDAHULUAN Sistem ketenagalistrikan di Indonesia dikelola oleh PT PLN (Persero) untuk melayani kebutuhan listrik diseluruh pelosok Indonesia. PT PLN (Persero) Distribusi Jakarta Raya dan Tangerang adalah salah satu unit PLN yang bertanggung jawab dalam distribusi tenaga listrik tegangan menengah 20 kV hingga tegangan rendah 220 V di wilayah Jakarta Raya dan Tangerang [1]. Dalam mengelola jaringan distribusi, Area Pengatur Distribusi (APD) merupakan unit yang bertanggung jawab dalam pengoperasian dan pengaturan Gardu Induk 20 kV dan jaringan distribusi 20 kV [2], baik yang dilakukan secara manual maupun Remote melalui SCADA (Supervisory Control Data Acquisition) [3]. 2. LANDASAN TEORI 2.1. Operasi Sistem Distribusi Tanpa SCADA Pengoperasian dan manuver jaringan distribusi tanpa SCADA menggunakan GFD (Ground Fault Detector) sebagai tools untuk pengusutan gangguan yang dipasang di Gardu Distribusi tipe Beton. GFD berfungsi untuk mendeteksi adanya arus lebih atau gangguan hubung singkat antara fasa ke tanah pada saluran kabel tegangan menengah atau SKTM 20 kV [1]. Prinsip kerja Ground Fault Detector dijelaskan pada Gambar 1. Gambar 1. Ground fault detector
  • 3. Jecklin Praspa Dewi dkk. “Pemulihan Arus Gangguan Pada SKTM 20 KV Dengan .........” 39 2.2. Operasi Sistem Distribusi Dengan Komunikasi 3G Aplikasi operasi sistem distribusi dengan SCADA dapat melakukan fungsi- fungsi secara umum sebagai berikut [1]: 1. Tele Metering (TM) Pemantauan pengukuran tegangan dalam kV, arus dalam A dan frekuensi (f). 2. Tele Signalling (TS) Pemantauan indikasi dari semua alarm, seperti Supply Fault (SF) dan Homopolar Fault Detector (HFD) serta status terbuka (open) atau tertutupnya (close) Circuit Breaker (CB) / Load Breaking Switch (LBS). 3. Remote Control (RC) Pengendalian buka/tutup perangkat pemutus daya dan pemisah yang dilakukan secara otomatis untuk manuver jaringan. 2.3. Ground Fault Detector (GFD) dengan Komunikasi 3G Ground Fault Detector (GFD) 3G berfungsi untuk mendeteksi adanya arus lebih atau gangguan hubung singkat antara fasa ke tanah pada saluran kabel tegangan menengah atau SKTM 20 kV melalui sistem komunikasi data 3G [1]. Gambar 2 menunjukkan prinsip kerja Ground Fault Detector 3G. Gambar 2. Ground fault detector 3G
  • 4. JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372 40 2.4. Kegagalan Kerja GFD 3G Hal-hal yang dapat menyebabkan terjadinya kegagalan kerja pada Ground Fault Detector 3G dapat berasal dari GFD, 3G atau dari sisi operator. 2.5. Pengiriman Data Pengiriman data pada Ground Fault Detector 3G agar sampai ke DCC diperlihatkan pada Gambar 3. Gambar 3. Pengiriman data pada ground fault detector 3G
  • 5. Jecklin Praspa Dewi dkk. “Pemulihan Arus Gangguan Pada SKTM 20 KV Dengan .........” 41 3. METODE OPERASI JARINGAN SISTEM SPINDLE Pada sistem Spindle telah disediakan fasilitas Remote Control (RC) yang dipasang di setiap Gardu Induk (GI), Gardu Hubung (GH) dan Gardu Tengah (Midle Point) untuk penyulang yang terdapat gardu-gardu distribusinya [4]. Gambar 4 menunjukkan sistem jaringan spindle dalam keadaan normal di GI Setiabudi. Gambar 4. Jaringan dalam keadaan normal 4. ANALISIS DATA 4.1. Analisis Manfaat Manfaat yang diperoleh dapat dirumuskan dari data manuver gangguan jaringan tegangan menengah (JTM) selama 1 tahun untuk sampel 10 feeder dapat dilihat pada Tabel 1. Data ini selanjutnya dianalisis baik secara non-finansial (efisiensi waktu) maupun finansial.
  • 6. JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372 42 Tabel 1. Data manuver gangguan JTM Gardu Induk Feeder Jumlah Gardu Jumlah Gangguan Rata-rata Lama Padam *) Rata-rata Lama Manuver 1 *) Rata-rata RC dari Manuver 1 *) Rata-rata kWh Tak Terjual Jumlah kWh Tak Terjual Gambir Lama Tonil 8 7 96,14 34,00 5,00 2.801,04 19.607,28 Setia Budi Pancing 8 7 125,86 26,00 4,90 4.345,54 30.418,77 Kebon Jeruk Benalu 12 8 151,25 11,00 3,00 6.383,72 51.077,72 Kebon Jeruk Mede 21 9 191,00 50,00 5,00 7.357,86 67.840,70 Kemang Belibis 11 4 70,00 21,00 3,00 1.975,87 7.903,46 Kemang Genek 19 10 137,30 29,50 5,50 4.391,79 43,917,87 Ketapang Baseball 15 4 167,75 29,38 4,84 2.789,19 11.156,74 Ketapang Egrang 11 6 185,83 48,50 12,00 9.839,40 59.036,96 Miniatur Subuh 14 5 174,40 35,00 3,50 7.271,93 36.359,66 Senayan Lidi 12 5 106,20 15,50 5,00 2.511,79 12.558,96 131 65 143,08 29,38 4,87 4.984,92 339.878,12 *) satuan dalam menit 4.2. Manfaat Non-finansial Dari Tabel 1 dapat dilakukan perbandingan antara 2 skema manuver, yaitu: 1. Bila manuver gangguan JTM dilakukan dengan SCADA dan GFD manual, maka dibutuhkan waktu rata-rata 143,08 menit. Hal tersebut disebabkan karena dibutuhkan waktu extra untuk kedatangan petugas PLN mengecek satu per satu indikasi lampu GFD di Gardu Ditribusi. 2. Bila manuver gangguan JTM dilakukan dengan SCADA dan GFD 3G, maka dibutuhkan waktu rata-rata 34,25 menit. Nilai efisiensi manuver gangguan JTM = , , , 100% = 76,06% 4.3. Manfaat Finansial Manfaat finansial dari implementasi inovasi ini adalah: 1. Mengurangi kWh tak terjual sebesar 76,06%. Untuk sampel data 10 feeder dengan jumlah gangguan 65 kali / tahun: Nilai efisiensi kWh tak terjual = 76,06% × 339.878,12 kWh × Rp.787/kWh
  • 7. Jecklin Praspa Dewi dkk. “Pemulihan Arus Gangguan Pada SKTM 20 KV Dengan .........” 43 = Rp.203.448.391,58 Bila jumlah gangguan total tahun 2010 sebesar 5466 kali, maka: Nilai efisiensi kWh tak terjual total = ( ) × Rp.203.44.391,58 = Rp.17,1 Milyar 2. Biaya investasi mendapat Break Even Point (BEP) dalam waktu ± 6 tahun yang diperoleh dari: Σ Gardu Distribusi (dari 10 feeder) = 131 Σ Middle Point (dari 10 feeder) = 10 Σ GFD = 131 – 10 = 121 Biaya Investasi / Gardu Distribusi = Rp. 10 juta Biaya Investasi Total = 121 x 10 juta = Rp. 1,21 Milyar Waktu BEP = . , . / = 5,94 tahun 5. KESIMPULAN Berdasarkan analisis yang dilakukan maka dapat disimpulkan: 1. Penggunaan GFD 3G dapat mempercepat waktu manuver gangguan dan lama padam dari 143,08 menit menjadi 34,25 menit. 2. Penggunaan GFD 3G dapat mengurangi jumlah kWh tak terjual sebesar 76,06%.
  • 8. JETri, Volume 13, Nomor 1, Agustus 2015, Halaman 37 - 44, ISSN 1412-0372 44 DAFTAR PUSTAKA [1] Aulia Mahdi dkk. Modifikasi GFD Existing menggunakan teknologi GPRS untuk mempercepat manuver. PT PLN (Persero). Jakarta, 2011. [2] Standar Konstruksi Jaringan Distribusi PT PLN Persero Distribusi Jakarta Raya dan Tangerang, Buku I. Jakarta, 1994. [3] Pedoman PT PLN Persero Area Jakarta dan Tanggerang. Jakarta, 2010. [4] Syamsir Abduh dan Lita Widia. “Analisis Penggunaan Ground Fault Detector GPRS Akibat Gangguan Hubung Singkat Pada SKTM 20 KV”, Prosiding Seminar Nasional Teknologi Industri, 2014.
  • 9. Filename: 25.23 (hal 37-44) Pemulihan arus. syamsir_11153AE Directory: C:UsersFTI-USAKTIAppDataLocalTemp Template: C:UsersFTI- USAKTIAppDataRoamingMicrosoftTemplatesNormal.dotm Title: Subject: Author: KOMP-10 Keywords: Comments: Creation Date: 28/10/2015 21:47:00 Change Number: 16 Last Saved On: 24/11/2015 18:43:00 Last Saved By: 062 FTI-USAKTI Total Editing Time: 643 Minutes Last Printed On: 01/02/2016 13:02:00 As of Last Complete Printing Number of Pages: 8 Number of Words: 1.248 (approx.) Number of Characters: 7.131 (approx.)