What is Productivity ?
 Productivity is a measure of how much input is required to produce a
given output i.e. the ratio output to input is called productivity.
 Productivity can be also be define as human efforts to produce more and
more with less and less inputs of resources as a result of which the benefits
of production are distributed among maximum number of people.
 Productivity means a balance between all factors of production that will
give the maximum output with the smallest efforts.
 Productivity implies development of an attitude of mind and constant urge
to find better, cheaper, easier, quicker and safer means of doing a job,
manufacturing a product and providing services.
What is Productivity ?
Productivity =
π‘‰π‘Žπ‘™π‘’π‘’ π‘œπ‘“ π‘”π‘œπ‘œπ‘‘π‘  π‘Žπ‘›π‘‘ π‘ π‘’π‘Ÿπ‘£π‘–π‘π‘’π‘  π‘π‘Ÿπ‘œπ‘‘π‘’π‘π‘’π‘‘
π‘‰π‘Žπ‘™π‘’π‘’ π‘œπ‘“ π‘Ÿπ‘’π‘ π‘œπ‘’π‘Ÿπ‘π‘’π‘  𝑒𝑑𝑖𝑙𝑖𝑧𝑒𝑑 π‘“π‘œπ‘Ÿ π‘π‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘œπ‘›
Productivity and Production
 The concept of productivity and production are totally different.
Production refers to absolute output while productivity is relative term
wherein output is always expressed in terms of input.
 The production may rise without the corresponding rise in the productivity
and wise versa. If the input remains the same and the production of the
output increases there is a rise in productivity.
Measurement of Productivity
 The basic objectives behind productivity measurement are:
1. To study performance of a system overtime.
2. To study relative comparison of different systems for a given level; and
3. To compare the actual productivity of the system with its planned
productivity.
Productivity Index (Kinds of Productivity Measurement)
π‘€π‘Žπ‘‘π‘’π‘Ÿπ‘–π‘Žπ‘™ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ =
π‘π‘’π‘šπ‘π‘’π‘Ÿ π‘œπ‘“ 𝑒𝑛𝑖𝑑𝑠 π‘π‘Ÿπ‘œπ‘‘π‘’π‘π‘’π‘‘
πΆπ‘œπ‘ π‘‘ π‘œπ‘“ π‘šπ‘Žπ‘‘π‘’π‘Ÿπ‘–π‘Žπ‘™
 Raw material productivity can be increased by:
1. Proper choice of design.
2. Proper training and motivating of workers by way of better handling of
materials and reduction of rejection.
3. Better material planning and control ; use of jigs and fixtures.
4. Waste reduction, scape control.
5. Proper care of materials in storage.
6. Recycling and reuse of materials.
7. Searching alternative cheaper materials etc.
Productivity Index (Kinds of Productivity Measurement)
πΏπ‘Žπ‘π‘œπ‘’π‘Ÿ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ =
π‘‡π‘œπ‘‘π‘Žπ‘™ π‘Ÿπ‘’π‘£π‘’π‘›π‘’π‘’ π‘“π‘Ÿπ‘œπ‘š π‘π‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘œπ‘›
𝐸π‘₯π‘π‘’π‘›π‘‘π‘–π‘‘π‘’π‘Ÿπ‘’ π‘œπ‘› πΏπ‘Žπ‘π‘œπ‘’π‘Ÿ
 Labour productivity can be increased by:
1. Selection of product design and process of manufacture so as to ensure
most economical use of labour.
2. Providing training to use best method of production.
3. Constantly motivating workers by providing financial and non-financial
incentives.
4. Keeping high morale of employees.
5. Improving working condition in plant.
6. By providing opportunities for self development.
Productivity Index (Kinds of Productivity Measurement)
πΆπ‘Žπ‘π‘–π‘‘π‘Žπ‘™ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ =
π‘‡π‘’π‘Ÿπ‘› π‘œπ‘£π‘’π‘Ÿ
πΆπ‘Žπ‘π‘–π‘‘π‘Žπ‘™ πΈπ‘šπ‘π‘™π‘œπ‘¦π‘’π‘‘
 Capital productivity can be increased by:
1. Better utilization of capital resources like land, building, machines.
2. Careful make or buy decision.
3. By using modern techniques of production, maintenance, flexible
manufacturing system, proper plant layout etc.
Productivity Index (Kinds of Productivity Measurement)
π‘€π‘Žπ‘β„Žπ‘–π‘›π‘’ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ =
𝑂𝑒𝑑𝑝𝑒𝑑
π΄π‘π‘‘π‘’π‘Žπ‘™ π‘šπ‘Žπ‘β„Žπ‘–π‘›π‘’ β„Žπ‘œπ‘’π‘Ÿπ‘  𝑒𝑑𝑖𝑙𝑖𝑧𝑒𝑑
 Machine productivity can be increased by:
1. Preventive maintenance.
2. Use of proper speed, feed, depth of cut etc.
3. Using Method study techniques.
4. Use of skilled, properly trained workers.
5. Line balancing etc.
General Measure of Productivity
π΄π‘”π‘”π‘Ÿπ‘’π‘”π‘Žπ‘‘π‘’ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ =
𝑂𝑒𝑑𝑝𝑒𝑑
πΏπ‘Žπ‘›π‘‘ + πΏπ‘Žπ‘π‘œπ‘’π‘Ÿ + π‘€π‘Žπ‘‘π‘’π‘Ÿπ‘–π‘Žπ‘™ + πΆπ‘Žπ‘π‘–π‘‘π‘Žπ‘™ + π‘‚π‘‘β„Žπ‘’π‘Ÿ 𝐼𝑛𝑝𝑒𝑑𝑠
Importance of Productivity
 The aim should be optimum use of resources so as to provide maximum
satisfaction with minimum efforts and expenditure. Productivity analysis
and measures indicate the stages and situations where improvement in the
working inputs is possible to increase the output.
National Productivity Council (NPC)
 Autonomous organization
 Established in 1958 and has 5 regional productivity directorates in the
country.
 47 local councils at various industrial centres in the country.
Means of Increasing Productivity
 Every management tries to improve the productivity. The productivity can
be improved broadly by the following two ways:
1. Increasing the resources and thereby production.
2. Effective utilization of resources.
I. By increasing the output from the same input.
II. By reducing the input for the same output.
III. By a small increase in input, archiving a substantial increase in output.
Means of Increasing Productivity
 Thus, the productivity of the enterprise will be increased when:
1. The quality and quantity of output is increased by better management, by
using best possible method determined by method study.
2. The input is reduced by avoiding waste in all forms.
3. For better utilization of existing resources, a small increase is made in
inputs resulting in a large increase in output.
Role of Government for Productivity improvement
1. By having balanced program of economic development.
2. By taking steps necessary to maintain employment.
3. By trying to make opportunities for employment for those who are
unemployed or under-employed, and for those who have lost their jobs
as a result of productivity improvement in individual plants.
Role of Management (Employer) for Productivity improvement
1. Balancing the use of one resources against another and by coordinating
the efforts of everyone in the organization to achieve the best results.
2. Motivating workers through the introduction of incentives schemes.
3. Maintaining good relations with the workers to seek their cooperation.
4. Keeping equipment and machinery in good working condition and
planning the work to have effective utilization of the available resources.
Improving Productivity by Reducing Work Content
Work content means the amount of work β€œcontained in” a given product or
process measured in man-hour or machine-hour.
Total work content = Basic work content + Excess time.
Basic work content is the irreducible minimum time theoretically required to
produce one unit of time.
The excess time = Time defects in design or specification + time due to
inefficient methods of manufacturing or operation.
Productivity Improvement Procedure
1. Improving the existing method of plant operation.
2. Purpose of operation.
3. Design of part
4. Tolerance and specifications.
5. Effective utilization of materials.
6. Process of manufacture.
7. Setup and tools.
8. Work conditions
9. Material Handling
10. Plant Layout
Lighting
Control of Temperature
Provide adequate ventilation
Control Sound
Promote orderliness, cleanliness, and good Housekeeping
Arrange for disposal of irritating and harmful dusts, fumes, gases etc.
Provide necessary personal protective equipment
β€œSIX LINES OF ATTACK” to Improve the Productivity
1. Improve the basic process by research and development.
2. Provide more and improved physical means to motivate the workers.
3. Simplify and improve the product and reduce the variety i.e. standardize
the product.
4. Improve the methods of operation.
5. Improve organization, production planning and control.
6. Improve manpower efficiency at all levels.
Productivity and Fatigue
Rate of production increases during the first few hours but, thereafter, output
starts falling and then goes on declining steadily till the day lasts, i.e. the
principles of diminishing return applies to human energy also.
Unnecessary fatigue is the decreased capacity for work, induced not only by
the nature of work but also by unfavorable working conditions and methods.
Benefits of Increasing Productivity
 For management
1. To earn good profit because of reduction in costs.
2. To sell more, to earn profit.
3. To have better utilization of resources.
4. To stand better in the market.
5. Provide overall prosperity and reputation of the company.
 For workers
1. Higher wages.
2. Better working conditions, improved morale.
3. Higher standards of living
4. Job security and satisfaction.
Benefits of Increasing Productivity
 For Consumers
1. Better quality goods at reduced prices which helps to raise their standard of living.
2. More satisfaction.
 To Government
1. Higher profits earned by factories will bring more revenue to the government by
taxation.
2. Export trades may develop bringing more foreign exchange to the nation.
3. It helps to increase the welfare of the nation and development of national economy.
4. It helps better utilization of resources of the nation.
5. It increases per capita income.
6. Development of the nation.

More Related Content

What's hot

what is Productivity
what is  Productivitywhat is  Productivity
what is ProductivityVishal Kachhdiya
Β 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
Β 
Line balancing
Line balancingLine balancing
Line balancingHiwa Gaffari
Β 
Work measurement
Work measurementWork measurement
Work measurementAniket Verma
Β 
Productivity improvement techniques
Productivity improvement techniques Productivity improvement techniques
Productivity improvement techniques prathiekraj1
Β 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation ManagementJo Balucanag - Bitonio
Β 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive MaintenanceMahendra K SHUKLA
Β 
Production mgt(productivity ppt)
Production mgt(productivity ppt)Production mgt(productivity ppt)
Production mgt(productivity ppt)Swapnil Mayekar
Β 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivityANSHUL AHUJA
Β 
Capacity planning
Capacity planning Capacity planning
Capacity planning Abdullah Shahid
Β 
Time study
Time studyTime study
Time studyLav Gupta
Β 
Productivity measurement approaches
Productivity measurement approachesProductivity measurement approaches
Productivity measurement approachesAmit Verma
Β 
Unit 1 production and operation management
Unit 1 production and operation managementUnit 1 production and operation management
Unit 1 production and operation managementAbu Bashar
Β 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity Waleed Attalla
Β 
Work sample
Work sampleWork sample
Work sampleManali Ojha
Β 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process PlanningPraveenManickam2
Β 

What's hot (20)

what is Productivity
what is  Productivitywhat is  Productivity
what is Productivity
Β 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
Β 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
Β 
Line balancing
Line balancingLine balancing
Line balancing
Β 
Work measurement
Work measurementWork measurement
Work measurement
Β 
Productivity improvement techniques
Productivity improvement techniques Productivity improvement techniques
Productivity improvement techniques
Β 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation Management
Β 
Method study
Method studyMethod study
Method study
Β 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
Β 
Production mgt(productivity ppt)
Production mgt(productivity ppt)Production mgt(productivity ppt)
Production mgt(productivity ppt)
Β 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivity
Β 
Capacity planning
Capacity planning Capacity planning
Capacity planning
Β 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
Β 
Time study
Time studyTime study
Time study
Β 
Productivity measurement approaches
Productivity measurement approachesProductivity measurement approaches
Productivity measurement approaches
Β 
Industrial Engineering
Industrial EngineeringIndustrial Engineering
Industrial Engineering
Β 
Unit 1 production and operation management
Unit 1 production and operation managementUnit 1 production and operation management
Unit 1 production and operation management
Β 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity
Β 
Work sample
Work sampleWork sample
Work sample
Β 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process Planning
Β 

Similar to Improve Productivity With Less Effort

production planning and control division
production planning and control divisionproduction planning and control division
production planning and control divisionHossam Hassan
Β 
Executive summary of production and productivity
Executive summary of production and productivityExecutive summary of production and productivity
Executive summary of production and productivityPacific Cotton
Β 
Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Dr. Parveen Kaur Nagpal
Β 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Khairul Bashar
Β 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Studyjosy2108
Β 
Productivity and performance in an organization
Productivity and performance in an organizationProductivity and performance in an organization
Productivity and performance in an organizationAswii007
Β 
Contionus improvement case analysis
Contionus improvement case analysisContionus improvement case analysis
Contionus improvement case analysis1shruthika
Β 
Hall MR12CD Wednesday 09h15 - Sello Mosai
Hall MR12CD Wednesday 09h15 - Sello MosaiHall MR12CD Wednesday 09h15 - Sello Mosai
Hall MR12CD Wednesday 09h15 - Sello Mosai7391456
Β 
Managing Operations
Managing Operations Managing Operations
Managing Operations Amna Zafar
Β 
Productivity enhancement using lean
Productivity enhancement using leanProductivity enhancement using lean
Productivity enhancement using leanSherin El-Rashied
Β 
Productivity
ProductivityProductivity
ProductivityJ.T.A.JONES
Β 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)sundar sivam
Β 
Employee productivity and Role of HR
Employee productivity and Role of HREmployee productivity and Role of HR
Employee productivity and Role of HRSelf-employed
Β 
Employee productivity
Employee productivityEmployee productivity
Employee productivitySelf-employed
Β 
APO-Productivity Tools & Techniques (Basic)_Module-4.pdf
APO-Productivity Tools & Techniques (Basic)_Module-4.pdfAPO-Productivity Tools & Techniques (Basic)_Module-4.pdf
APO-Productivity Tools & Techniques (Basic)_Module-4.pdfTariqulBari2
Β 
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdfHow Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdfMr. Business Magazine
Β 
Productivity - Personnel Management
Productivity - Personnel ManagementProductivity - Personnel Management
Productivity - Personnel ManagementMANNU KUMAR
Β 
Production & Productivity.pptx
Production & Productivity.pptxProduction & Productivity.pptx
Production & Productivity.pptxAbdullaIsmail6
Β 

Similar to Improve Productivity With Less Effort (20)

production planning and control division
production planning and control divisionproduction planning and control division
production planning and control division
Β 
Executive summary of production and productivity
Executive summary of production and productivityExecutive summary of production and productivity
Executive summary of production and productivity
Β 
Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3
Β 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
Β 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
Β 
Productivity and performance in an organization
Productivity and performance in an organizationProductivity and performance in an organization
Productivity and performance in an organization
Β 
Contionus improvement case analysis
Contionus improvement case analysisContionus improvement case analysis
Contionus improvement case analysis
Β 
Hall MR12CD Wednesday 09h15 - Sello Mosai
Hall MR12CD Wednesday 09h15 - Sello MosaiHall MR12CD Wednesday 09h15 - Sello Mosai
Hall MR12CD Wednesday 09h15 - Sello Mosai
Β 
Managing Operations
Managing Operations Managing Operations
Managing Operations
Β 
Productivity enhancement using lean
Productivity enhancement using leanProductivity enhancement using lean
Productivity enhancement using lean
Β 
Productivity
ProductivityProductivity
Productivity
Β 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
Β 
Om
OmOm
Om
Β 
Production management ppt
Production management pptProduction management ppt
Production management ppt
Β 
Employee productivity and Role of HR
Employee productivity and Role of HREmployee productivity and Role of HR
Employee productivity and Role of HR
Β 
Employee productivity
Employee productivityEmployee productivity
Employee productivity
Β 
APO-Productivity Tools & Techniques (Basic)_Module-4.pdf
APO-Productivity Tools & Techniques (Basic)_Module-4.pdfAPO-Productivity Tools & Techniques (Basic)_Module-4.pdf
APO-Productivity Tools & Techniques (Basic)_Module-4.pdf
Β 
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdfHow Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
How Lean Manufacturing Helps Streamlining Production for Efficiency.pdf
Β 
Productivity - Personnel Management
Productivity - Personnel ManagementProductivity - Personnel Management
Productivity - Personnel Management
Β 
Production & Productivity.pptx
Production & Productivity.pptxProduction & Productivity.pptx
Production & Productivity.pptx
Β 

More from Ratnadeepsinh Jadeja (20)

Alloys and phase diagrams
Alloys and phase diagramsAlloys and phase diagrams
Alloys and phase diagrams
Β 
Solid solution
Solid solutionSolid solution
Solid solution
Β 
Crystal structures
Crystal structuresCrystal structures
Crystal structures
Β 
Ferrous material
Ferrous materialFerrous material
Ferrous material
Β 
Engineering Materials
Engineering MaterialsEngineering Materials
Engineering Materials
Β 
Measurement of surface finish
Measurement of surface finishMeasurement of surface finish
Measurement of surface finish
Β 
Force, torque and power measurement
Force, torque and power measurementForce, torque and power measurement
Force, torque and power measurement
Β 
Work measurement
Work measurementWork measurement
Work measurement
Β 
Pressure measurement
Pressure measurementPressure measurement
Pressure measurement
Β 
Method study
Method studyMethod study
Method study
Β 
Tempreture measurement
Tempreture measurementTempreture measurement
Tempreture measurement
Β 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Β 
Site selection and plant layout
Site selection and plant layoutSite selection and plant layout
Site selection and plant layout
Β 
Introduction to generalized measurement system
Introduction to generalized measurement systemIntroduction to generalized measurement system
Introduction to generalized measurement system
Β 
Standards of Measurement
Standards of MeasurementStandards of Measurement
Standards of Measurement
Β 
Introduction to metrology
Introduction to metrologyIntroduction to metrology
Introduction to metrology
Β 
Gear boxes
Gear boxesGear boxes
Gear boxes
Β 
Brakes
BrakesBrakes
Brakes
Β 
Corrosion in Metal
Corrosion in MetalCorrosion in Metal
Corrosion in Metal
Β 
Automotive safety
Automotive safetyAutomotive safety
Automotive safety
Β 

Recently uploaded

EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
Β 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
Β 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
Β 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
Β 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
Β 
HỌC TỐT TIαΊΎNG ANH 11 THEO CHΖ―Ζ NG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIαΊΎT - CαΊ’ NΔ‚...
HỌC TỐT TIαΊΎNG ANH 11 THEO CHΖ―Ζ NG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIαΊΎT - CαΊ’ NΔ‚...HỌC TỐT TIαΊΎNG ANH 11 THEO CHΖ―Ζ NG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIαΊΎT - CαΊ’ NΔ‚...
HỌC TỐT TIαΊΎNG ANH 11 THEO CHΖ―Ζ NG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIαΊΎT - CαΊ’ NΔ‚...Nguyen Thanh Tu Collection
Β 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
Β 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
Β 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
Β 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
Β 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
Β 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
Β 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
Β 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
Β 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
Β 

Recently uploaded (20)

EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
Β 
Model Call Girl in Bikash Puri Delhi reach out to us at πŸ”9953056974πŸ”
Model Call Girl in Bikash Puri  Delhi reach out to us at πŸ”9953056974πŸ”Model Call Girl in Bikash Puri  Delhi reach out to us at πŸ”9953056974πŸ”
Model Call Girl in Bikash Puri Delhi reach out to us at πŸ”9953056974πŸ”
Β 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
Β 
Model Call Girl in Tilak Nagar Delhi reach out to us at πŸ”9953056974πŸ”
Model Call Girl in Tilak Nagar Delhi reach out to us at πŸ”9953056974πŸ”Model Call Girl in Tilak Nagar Delhi reach out to us at πŸ”9953056974πŸ”
Model Call Girl in Tilak Nagar Delhi reach out to us at πŸ”9953056974πŸ”
Β 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
Β 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Β 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
Β 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
Β 
HỌC TỐT TIαΊΎNG ANH 11 THEO CHΖ―Ζ NG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIαΊΎT - CαΊ’ NΔ‚...
HỌC TỐT TIαΊΎNG ANH 11 THEO CHΖ―Ζ NG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIαΊΎT - CαΊ’ NΔ‚...HỌC TỐT TIαΊΎNG ANH 11 THEO CHΖ―Ζ NG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIαΊΎT - CαΊ’ NΔ‚...
HỌC TỐT TIαΊΎNG ANH 11 THEO CHΖ―Ζ NG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIαΊΎT - CαΊ’ NΔ‚...
Β 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
Β 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
Β 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
Β 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
Β 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
Β 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
Β 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
Β 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
Β 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
Β 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
Β 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
Β 

Improve Productivity With Less Effort

  • 2. What is Productivity ?  Productivity is a measure of how much input is required to produce a given output i.e. the ratio output to input is called productivity.  Productivity can be also be define as human efforts to produce more and more with less and less inputs of resources as a result of which the benefits of production are distributed among maximum number of people.  Productivity means a balance between all factors of production that will give the maximum output with the smallest efforts.  Productivity implies development of an attitude of mind and constant urge to find better, cheaper, easier, quicker and safer means of doing a job, manufacturing a product and providing services.
  • 3. What is Productivity ? Productivity = π‘‰π‘Žπ‘™π‘’π‘’ π‘œπ‘“ π‘”π‘œπ‘œπ‘‘π‘  π‘Žπ‘›π‘‘ π‘ π‘’π‘Ÿπ‘£π‘–π‘π‘’π‘  π‘π‘Ÿπ‘œπ‘‘π‘’π‘π‘’π‘‘ π‘‰π‘Žπ‘™π‘’π‘’ π‘œπ‘“ π‘Ÿπ‘’π‘ π‘œπ‘’π‘Ÿπ‘π‘’π‘  𝑒𝑑𝑖𝑙𝑖𝑧𝑒𝑑 π‘“π‘œπ‘Ÿ π‘π‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘œπ‘›
  • 4. Productivity and Production  The concept of productivity and production are totally different. Production refers to absolute output while productivity is relative term wherein output is always expressed in terms of input.  The production may rise without the corresponding rise in the productivity and wise versa. If the input remains the same and the production of the output increases there is a rise in productivity.
  • 5. Measurement of Productivity  The basic objectives behind productivity measurement are: 1. To study performance of a system overtime. 2. To study relative comparison of different systems for a given level; and 3. To compare the actual productivity of the system with its planned productivity.
  • 6. Productivity Index (Kinds of Productivity Measurement) π‘€π‘Žπ‘‘π‘’π‘Ÿπ‘–π‘Žπ‘™ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ = π‘π‘’π‘šπ‘π‘’π‘Ÿ π‘œπ‘“ 𝑒𝑛𝑖𝑑𝑠 π‘π‘Ÿπ‘œπ‘‘π‘’π‘π‘’π‘‘ πΆπ‘œπ‘ π‘‘ π‘œπ‘“ π‘šπ‘Žπ‘‘π‘’π‘Ÿπ‘–π‘Žπ‘™  Raw material productivity can be increased by: 1. Proper choice of design. 2. Proper training and motivating of workers by way of better handling of materials and reduction of rejection. 3. Better material planning and control ; use of jigs and fixtures. 4. Waste reduction, scape control. 5. Proper care of materials in storage. 6. Recycling and reuse of materials. 7. Searching alternative cheaper materials etc.
  • 7. Productivity Index (Kinds of Productivity Measurement) πΏπ‘Žπ‘π‘œπ‘’π‘Ÿ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ = π‘‡π‘œπ‘‘π‘Žπ‘™ π‘Ÿπ‘’π‘£π‘’π‘›π‘’π‘’ π‘“π‘Ÿπ‘œπ‘š π‘π‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘œπ‘› 𝐸π‘₯π‘π‘’π‘›π‘‘π‘–π‘‘π‘’π‘Ÿπ‘’ π‘œπ‘› πΏπ‘Žπ‘π‘œπ‘’π‘Ÿ  Labour productivity can be increased by: 1. Selection of product design and process of manufacture so as to ensure most economical use of labour. 2. Providing training to use best method of production. 3. Constantly motivating workers by providing financial and non-financial incentives. 4. Keeping high morale of employees. 5. Improving working condition in plant. 6. By providing opportunities for self development.
  • 8. Productivity Index (Kinds of Productivity Measurement) πΆπ‘Žπ‘π‘–π‘‘π‘Žπ‘™ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ = π‘‡π‘’π‘Ÿπ‘› π‘œπ‘£π‘’π‘Ÿ πΆπ‘Žπ‘π‘–π‘‘π‘Žπ‘™ πΈπ‘šπ‘π‘™π‘œπ‘¦π‘’π‘‘  Capital productivity can be increased by: 1. Better utilization of capital resources like land, building, machines. 2. Careful make or buy decision. 3. By using modern techniques of production, maintenance, flexible manufacturing system, proper plant layout etc.
  • 9. Productivity Index (Kinds of Productivity Measurement) π‘€π‘Žπ‘β„Žπ‘–π‘›π‘’ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ = 𝑂𝑒𝑑𝑝𝑒𝑑 π΄π‘π‘‘π‘’π‘Žπ‘™ π‘šπ‘Žπ‘β„Žπ‘–π‘›π‘’ β„Žπ‘œπ‘’π‘Ÿπ‘  𝑒𝑑𝑖𝑙𝑖𝑧𝑒𝑑  Machine productivity can be increased by: 1. Preventive maintenance. 2. Use of proper speed, feed, depth of cut etc. 3. Using Method study techniques. 4. Use of skilled, properly trained workers. 5. Line balancing etc.
  • 10. General Measure of Productivity π΄π‘”π‘”π‘Ÿπ‘’π‘”π‘Žπ‘‘π‘’ π‘ƒπ‘Ÿπ‘œπ‘‘π‘’π‘π‘‘π‘–π‘£π‘–π‘‘π‘¦ = 𝑂𝑒𝑑𝑝𝑒𝑑 πΏπ‘Žπ‘›π‘‘ + πΏπ‘Žπ‘π‘œπ‘’π‘Ÿ + π‘€π‘Žπ‘‘π‘’π‘Ÿπ‘–π‘Žπ‘™ + πΆπ‘Žπ‘π‘–π‘‘π‘Žπ‘™ + π‘‚π‘‘β„Žπ‘’π‘Ÿ 𝐼𝑛𝑝𝑒𝑑𝑠
  • 11. Importance of Productivity  The aim should be optimum use of resources so as to provide maximum satisfaction with minimum efforts and expenditure. Productivity analysis and measures indicate the stages and situations where improvement in the working inputs is possible to increase the output.
  • 12. National Productivity Council (NPC)  Autonomous organization  Established in 1958 and has 5 regional productivity directorates in the country.  47 local councils at various industrial centres in the country.
  • 13. Means of Increasing Productivity  Every management tries to improve the productivity. The productivity can be improved broadly by the following two ways: 1. Increasing the resources and thereby production. 2. Effective utilization of resources. I. By increasing the output from the same input. II. By reducing the input for the same output. III. By a small increase in input, archiving a substantial increase in output.
  • 14. Means of Increasing Productivity  Thus, the productivity of the enterprise will be increased when: 1. The quality and quantity of output is increased by better management, by using best possible method determined by method study. 2. The input is reduced by avoiding waste in all forms. 3. For better utilization of existing resources, a small increase is made in inputs resulting in a large increase in output.
  • 15. Role of Government for Productivity improvement 1. By having balanced program of economic development. 2. By taking steps necessary to maintain employment. 3. By trying to make opportunities for employment for those who are unemployed or under-employed, and for those who have lost their jobs as a result of productivity improvement in individual plants.
  • 16. Role of Management (Employer) for Productivity improvement 1. Balancing the use of one resources against another and by coordinating the efforts of everyone in the organization to achieve the best results. 2. Motivating workers through the introduction of incentives schemes. 3. Maintaining good relations with the workers to seek their cooperation. 4. Keeping equipment and machinery in good working condition and planning the work to have effective utilization of the available resources.
  • 17. Improving Productivity by Reducing Work Content Work content means the amount of work β€œcontained in” a given product or process measured in man-hour or machine-hour. Total work content = Basic work content + Excess time. Basic work content is the irreducible minimum time theoretically required to produce one unit of time. The excess time = Time defects in design or specification + time due to inefficient methods of manufacturing or operation.
  • 18. Productivity Improvement Procedure 1. Improving the existing method of plant operation. 2. Purpose of operation. 3. Design of part 4. Tolerance and specifications. 5. Effective utilization of materials. 6. Process of manufacture. 7. Setup and tools. 8. Work conditions 9. Material Handling 10. Plant Layout Lighting Control of Temperature Provide adequate ventilation Control Sound Promote orderliness, cleanliness, and good Housekeeping Arrange for disposal of irritating and harmful dusts, fumes, gases etc. Provide necessary personal protective equipment
  • 19. β€œSIX LINES OF ATTACK” to Improve the Productivity 1. Improve the basic process by research and development. 2. Provide more and improved physical means to motivate the workers. 3. Simplify and improve the product and reduce the variety i.e. standardize the product. 4. Improve the methods of operation. 5. Improve organization, production planning and control. 6. Improve manpower efficiency at all levels.
  • 20. Productivity and Fatigue Rate of production increases during the first few hours but, thereafter, output starts falling and then goes on declining steadily till the day lasts, i.e. the principles of diminishing return applies to human energy also. Unnecessary fatigue is the decreased capacity for work, induced not only by the nature of work but also by unfavorable working conditions and methods.
  • 21. Benefits of Increasing Productivity  For management 1. To earn good profit because of reduction in costs. 2. To sell more, to earn profit. 3. To have better utilization of resources. 4. To stand better in the market. 5. Provide overall prosperity and reputation of the company.  For workers 1. Higher wages. 2. Better working conditions, improved morale. 3. Higher standards of living 4. Job security and satisfaction.
  • 22. Benefits of Increasing Productivity  For Consumers 1. Better quality goods at reduced prices which helps to raise their standard of living. 2. More satisfaction.  To Government 1. Higher profits earned by factories will bring more revenue to the government by taxation. 2. Export trades may develop bringing more foreign exchange to the nation. 3. It helps to increase the welfare of the nation and development of national economy. 4. It helps better utilization of resources of the nation. 5. It increases per capita income. 6. Development of the nation.