SlideShare a Scribd company logo
1 of 4
CURRICULUM VITAE Page 1 of 4
NAME : ANIRBAN DATTA
ADDRESS : FD – 217/7, Sector – III, Salt Lake City, Kolkata – 700106
CONTACT DETAILS : Mobile: +91-9830431908, Email: ani_dat@yahoo.co.in
DATE OF BIRTH : August 08, 1975
NATIONALITY : Indian
PASSPORT NO : L5509988 (Valid upto 18-11-2023)
PROFESSIONAL MEMBERSHIP : Life Member of The Institution of Engineers (India)
CERTIFICATION : Chartered Engineer
PROFILE:
Mechanical Engineer (Piping Design with Specialization in Pipe Stress Analysis, and Detailed Engineering for Power
Plant, Oil & Gas and Ferrous & Non-Ferrous Plant Piping Works)
KEY SKILLS:
Stress Analysis of Piping Systems using CAESAR II and AutoPipe including (Static and Dynamic Analysis), Hydraulic
Analysis (Steady State & Transient) and Pressure Drop Calculations, Selection of Pipe Hangers & Supports, Piping
Layout, Piping & Valves Materials Specifications, Power Cycle Heat Balance Calculations
EDUCATIONAL QUALIFICATION:
Completed AMIE Section ‘A’ and ‘B’ of The Institution of Engineers (India) in Mechanical Engineering
Completed Post Graduate Diploma (Equivalent to Masters Degree) in Energy Technology and Management from
University of Calcutta, standing FIRST in the order of merit, in 1999
Completed Bachelor of Science with Mathematics, Physics and Chemistry from University of Calcutta, in 1996
PROFESSIONAL EXPERIENCE (Major Projects):
From June 2008 – Till Date
TATA Consulting Engineers Limited : Asstt. Manager (Mechanical) → Manager (Mechanical) → Senior Manager
(Mechanical – Piping)
MAJOR PROJECTS
1) Guru Govind Singh Refinery Project at Bhatinda, of HPCL–Mittal Energy Limited
• Stress Analysis for Main Steam (123 bar(g), 513O
C) Piping between HRSG & Boilers to Condensing & Back
Pressure Turbines, HP Steam Piping, MP Steam Piping and LP Steam Piping, HSD, LCO, FO and Naptha
Piping
• Preparation of Support & Hanger Schedule
• Working as Lead Piping Engineer and leading the team of Engineers and Designers.
2) Coke Dry Quenching Plant of TATA Steel Limited – Jamshedpur
3) Coke Dry Quenching Plant of TATA Steel Limited – Kalinganagar
• Stress Analysis for Main Steam (120 bar(g), 540O
C) Piping between HRSG to Turbines, and LP Steam Piping
• Preparation of Support & Hanger Schedule
• Preparation of Piping Materials Specification (PMS) and Supervision of Piping Layout Modelling in 3D
• Working as Lead Piping Engineer and leading the team of Engineers and Designers.
4) National Mineral Development Corporation Limited – Nagarnar – Blast Furnace 1 Project;
5) SAIL – Rourkela Steel Plant – Blast Furnace 5 Project;
6) SAIL – Bokaro Steel Plant – Blast Furnace 2 Augmentation;
7) 2 x 204 m2
Sinter Plant in Iron & Steel Plant Meramandali, Orissa, of Bhushan Steel Limited
• Stress Analysis for Misc. Piping (HP & MP Steam, Hot Blast Main & Cold Blast Main, Hot Water, Blast Furnace
Gas, Coke Oven Gas, HP Oxygen, Nitrogen, and other Utilities, including dynamic analysis for Compressor
Piping)
• Review and Checking of Piping GA drawings, Rack Piping, and Pipe Support Arrangement Details
• Working as Lead Piping Engineer and leading the team of Engineers and Designers.
8) 2 x 300 MW Thermal Power Project at Haldia, West Bengal, of Haldia Energy Limted (Subsidiary of CESC);
CURRICULUM VITAE Page 2 of 4
9) 2 x 300 MW Thermal Power Project at Tarali-Chandrapur, Maharastra, of Dhariwal Infrastruture Private Limted
(Subsidiary of CESC);
10) 2 x 270 MW (Phase – 1) MP Super Thermal Power Project at Padampur, Jharkhand, of Adhunik Power & Natural
Resources Limited
• Stress Analysis for Condenser Inlet & Outlet Piping, and Selection of Spring Hangers and Expansion Joints.
• Detailed Engineering for BOP Package, comprising of Complete Plant Water System, CW System, LP Piping
Package, Fuel Oil System, Fire Protection System, Compressed Air System, Various Pumps, etc, including
Pipe Stress Analysis, Transient Analysis and Hydraulic Analysis of CW, ACW and Raw Water Systems
• Review Engineering for Main Plant Piping (Critical Piping) Package, including Stress Analysis of Critical Piping
(inclusive of Main Steam, Reheat Steam, Feed Water), Spring Hanger Vendor Drawings, Power Cycle Heat
Balance
• Working as Lead Piping Engineer and leading the team of Engineers and Designers.
From November 2007 – May 2008
Indian Oiltanking Limited : Deputy Manager – Mechanical (Piping)
MAJOR PROJECTS
1) COREX Gas based DRI Plant of JSW Limited
• Stress analysis of HP and MP Steam Lines, and large diameter process gas lines, including dynamic analysis
(harmonic) for compressor piping
• Selection of Spring Hangers and large diameter Expansion Joints, and preparation of specification, review of
vendor drawings.
2) Assam Renewal Project of ONGC
• Pre-Bid Engineering for Gas Gathering Station, Water Injection Plant, Captive Power Plant, Effluent Treatment
Plant
3) Oil Storage and Terminal Facility at Sohar Port, Oman
• Stress Analysis of Various in-plant and interconnecting process lines, including ammonia and refrigerated
product piping
• Review and checking of Piping GA drawing of Oil Storage Tank Pit area.
4) Residue Upgradation and MS/HSD Quality Improvement Project of Gujarat Refinery of Indian Oil Corporation
Limited - Isomerization & Naphtha Splitter Unit
• Pre-Bid Engineering for Piping Works, preparation of Bill of Quantities for Pipes, Fittings, Valves and Supports
for process lines
• Review of Package Vendor offer for Fire Protection System package.
5) Oil Terminal Project at Siliguri for Numaligar Refinery Limited
• Stress Analysis for Various Product Piping
• Checking of Mechanical GA, P & ID, Piping GA, Support Details, Line List, Valve List, Hydraulic Calculation,
etc.
• Review of Package Vendor Drawings
• Preparation of Tender Document for Piping Erection Package.
From December 1999 – October 2007
Consulting Engineering Services (India) Private Limited : Asstt. Engineer → Engineer → Senior Engineer
MAJOR PROJECTS
1) Liquid Product Loading/Unloading Berths 1A & 1B of Qatar Petroleum at Ras Laffan, State of Qatar;
2) Liquid Product Loading/Unloading Berths 3A & 3B of Qatar Petroleum at Ras Laffan, State of Qatar;
3) Berth 18 Extension under Qatofin Marine Works Package at Mesaieed, State of Qatar;
4) Methanol Plant Revamping Package of Qatar Fuel Additive Company (QAFAC) at Mesaieed, State of Qatar
• Review of Basic Engineering (FEED) Documents
• Preparation of Design Basis Report for Stress Analysis of Hydrocarbon Lines
• Stress Analysis of Hydrocarbon Lines, including Jet Fuel, Heavy & Light Naptha, Diesel, Fuel Oil, Propane,
Butane, Methanol, Fusel Oil, Sulfur Guard Stripper lines using CAESAR II
• Hydraulic Design for the Sea Water Cooling System and Fire Water & Foam Solution piping network, using the
software PIPENET, including Transient Analysis
• Sizing calculation for Pressure Breakdown Orifice
• Review and Checking of Piping GA, Support Details, Piping Isometric Drawings
CURRICULUM VITAE Page 3 of 4
• Preparation of Technical Specifications and Material Requisitions for Misc. Piping Components.
5) 1 x 500 MW Ramagundam Super Thermal Power Project (Stage – III) of National Thermal Power Corporation
Limited - CW System Turnkey Package
• Stress Analysis for Condenser Inlet & Outlet Piping, and Selection of Spring Hangers and Expansion Joints
• Calculation for CW Intake Channel
• Review and Checking of Piping GA and Support Arrangement Details
• Preparation of Technical Specifications for Pipes, Valves and Expansion Joints
• Preparation of Erection Specification for Piping Works.
6) 130 MW New Cossipore Generating Station, CESC Limited – Retrofitting of Wet Electrostatic Precipitator in the
Flue Gas Discharge System
• Calculation of Pressure Drop in the Flue Gas Path and Prediction of Generation Loss due to installation of Wet
ESP
• Preparation of Design Basis Report
• Checking of Wet ESP Installation Drawings, Flue Gas Ducting Layout, P & ID, Piping GA, ESP Fabrication
Drawings
• Preparation of Technical Specifications for ESP’s Auxiliaries, and Piping Works
• Preparation of Erection Specification for Mechanical and Piping Works.
7) 4 x 500 MW Talcher Super Thermal Power Project (Stage – II) of National Thermal Power Corporation Limited –
Design of 7 km long Ash Water Recirculation Pipeline
8) 4 x 60 MW & 2 X 110 MW Talcher Thermal Power Project (Stage – I & II) of National Thermal Power Corporation
Limited – Design of 4.5 km long Ash Water Recirculation Pipeline
• Stress Analysis of Ash Water Recirculation Pipeline
• Review and checking of Piping GA
• Calculation of temperature of Ash Water Recirculation Piping (exposed to sun) due to solar radiation, using
self-developed EXCEL program
• Hydraulic Transient Analysis for Ash Water Recirculation Piping.
From February 1999 – December 1999
4 x 60 MW Titagarh Generating Station, CESC Limited : Trainee Engineer (O & M)
o Working in Main Plant, Coal Handling Plant and Control Room
o Monitoring and assessment of the performance of power station auxiliaries and coordinating the energy saving
measures
o Maintenance of Boiler Tubes and Turbine Blades
PROFICIENCY IN SOFTAWARE PACKAGES:
CAESAR II, AUTOPIPE, CAEPIPE, ALGOR PIPE PACK, TRIFLEX, SIMFLEX, PV-ELITE, MECAStack,
PIPENET (Standard, Spray/Sprinkler and Transient Modules), CADWorx, EPlant, Thermoflow, Complete MS-
OFFICE family, AutoCAD R14 to 2015
PROFICIENCY IN LANGUAGE:
Speak Read Write
English Excellent Excellent Excellent
Bengali Excellent Excellent Excellent
Hindi Excellent Good Nil
HOBBIES:
Reading Books, Playing Cricket, Photography, Listening to Music, Net-surfing, etc.
EXTRA-CURRICULAR ACTIVITIES:
1. Represented School, College, University, and U-16 and U-19 State Teams in Cricket
2. Obtained Black-Belt from The Japan Karate Association in Shotokan style Karate
CERTIFICATION
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe my qualifications,
my experience and me.
CURRICULUM VITAE Page 4 of 4
ANIRBAN DATTA
Date: 25-03-2016
Place: Kolkata

More Related Content

What's hot

Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine SystemPeter Bright
 
nVent RAYCHEM STS (Skin-Effect Trace-Heating Systems) Global Application Loca...
nVent RAYCHEM STS (Skin-Effect Trace-Heating Systems) Global Application Loca...nVent RAYCHEM STS (Skin-Effect Trace-Heating Systems) Global Application Loca...
nVent RAYCHEM STS (Skin-Effect Trace-Heating Systems) Global Application Loca...Will Wright
 
Czero Engineering - Feb 2017
Czero Engineering  - Feb 2017Czero Engineering  - Feb 2017
Czero Engineering - Feb 2017Czero
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015Sandeep Bhowmick
 
High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009Shaun West
 
Esteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater CompanyEsteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater CompanyTanveer Singh
 
JJones Professional Resume
JJones Professional ResumeJJones Professional Resume
JJones Professional ResumeJoe Jones
 
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...Kevin Perry
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraProSIM R & D Pvt. Ltd.
 
AISI Direct Steelmaking Final Report
AISI Direct Steelmaking Final ReportAISI Direct Steelmaking Final Report
AISI Direct Steelmaking Final ReportRobert Meegan
 

What's hot (19)

Atef_2015_linkedin
Atef_2015_linkedinAtef_2015_linkedin
Atef_2015_linkedin
 
Final Project Presentation
Final Project PresentationFinal Project Presentation
Final Project Presentation
 
Hossein emadi CV
Hossein emadi CVHossein emadi CV
Hossein emadi CV
 
AA-CV-LinkedIn
AA-CV-LinkedInAA-CV-LinkedIn
AA-CV-LinkedIn
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine System
 
nVent RAYCHEM STS (Skin-Effect Trace-Heating Systems) Global Application Loca...
nVent RAYCHEM STS (Skin-Effect Trace-Heating Systems) Global Application Loca...nVent RAYCHEM STS (Skin-Effect Trace-Heating Systems) Global Application Loca...
nVent RAYCHEM STS (Skin-Effect Trace-Heating Systems) Global Application Loca...
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Czero Engineering - Feb 2017
Czero Engineering  - Feb 2017Czero Engineering  - Feb 2017
Czero Engineering - Feb 2017
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
 
High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009
 
Esteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater CompanyEsteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater Company
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
JJones Professional Resume
JJones Professional ResumeJJones Professional Resume
JJones Professional Resume
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
AISI Direct Steelmaking Final Report
AISI Direct Steelmaking Final ReportAISI Direct Steelmaking Final Report
AISI Direct Steelmaking Final Report
 
Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 

Similar to CV-AnirbanDatta-Stress Analysis-2016-03-25

Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docMuthukumar RajaGounder
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisNikhil Kumar Rai
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015sathiya prabhu
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newlisa zhang
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experienceSachin Patil
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineerashwin mahale
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs expSudipto Majumder
 
OTC Asia 2014 Petronas
OTC Asia 2014 PetronasOTC Asia 2014 Petronas
OTC Asia 2014 PetronasSteven Kennedy
 

Similar to CV-AnirbanDatta-Stress Analysis-2016-03-25 (20)

Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
RESUME-01
RESUME-01RESUME-01
RESUME-01
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 
Rajesh
RajeshRajesh
Rajesh
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -new
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
 
RESUME
RESUMERESUME
RESUME
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
 
OTC Asia 2014 Petronas
OTC Asia 2014 PetronasOTC Asia 2014 Petronas
OTC Asia 2014 Petronas
 
Resume_Hariprasad
Resume_HariprasadResume_Hariprasad
Resume_Hariprasad
 
RESUME-Latest
RESUME-LatestRESUME-Latest
RESUME-Latest
 
CV Jalaj Verma
CV Jalaj VermaCV Jalaj Verma
CV Jalaj Verma
 

CV-AnirbanDatta-Stress Analysis-2016-03-25

  • 1. CURRICULUM VITAE Page 1 of 4 NAME : ANIRBAN DATTA ADDRESS : FD – 217/7, Sector – III, Salt Lake City, Kolkata – 700106 CONTACT DETAILS : Mobile: +91-9830431908, Email: ani_dat@yahoo.co.in DATE OF BIRTH : August 08, 1975 NATIONALITY : Indian PASSPORT NO : L5509988 (Valid upto 18-11-2023) PROFESSIONAL MEMBERSHIP : Life Member of The Institution of Engineers (India) CERTIFICATION : Chartered Engineer PROFILE: Mechanical Engineer (Piping Design with Specialization in Pipe Stress Analysis, and Detailed Engineering for Power Plant, Oil & Gas and Ferrous & Non-Ferrous Plant Piping Works) KEY SKILLS: Stress Analysis of Piping Systems using CAESAR II and AutoPipe including (Static and Dynamic Analysis), Hydraulic Analysis (Steady State & Transient) and Pressure Drop Calculations, Selection of Pipe Hangers & Supports, Piping Layout, Piping & Valves Materials Specifications, Power Cycle Heat Balance Calculations EDUCATIONAL QUALIFICATION: Completed AMIE Section ‘A’ and ‘B’ of The Institution of Engineers (India) in Mechanical Engineering Completed Post Graduate Diploma (Equivalent to Masters Degree) in Energy Technology and Management from University of Calcutta, standing FIRST in the order of merit, in 1999 Completed Bachelor of Science with Mathematics, Physics and Chemistry from University of Calcutta, in 1996 PROFESSIONAL EXPERIENCE (Major Projects): From June 2008 – Till Date TATA Consulting Engineers Limited : Asstt. Manager (Mechanical) → Manager (Mechanical) → Senior Manager (Mechanical – Piping) MAJOR PROJECTS 1) Guru Govind Singh Refinery Project at Bhatinda, of HPCL–Mittal Energy Limited • Stress Analysis for Main Steam (123 bar(g), 513O C) Piping between HRSG & Boilers to Condensing & Back Pressure Turbines, HP Steam Piping, MP Steam Piping and LP Steam Piping, HSD, LCO, FO and Naptha Piping • Preparation of Support & Hanger Schedule • Working as Lead Piping Engineer and leading the team of Engineers and Designers. 2) Coke Dry Quenching Plant of TATA Steel Limited – Jamshedpur 3) Coke Dry Quenching Plant of TATA Steel Limited – Kalinganagar • Stress Analysis for Main Steam (120 bar(g), 540O C) Piping between HRSG to Turbines, and LP Steam Piping • Preparation of Support & Hanger Schedule • Preparation of Piping Materials Specification (PMS) and Supervision of Piping Layout Modelling in 3D • Working as Lead Piping Engineer and leading the team of Engineers and Designers. 4) National Mineral Development Corporation Limited – Nagarnar – Blast Furnace 1 Project; 5) SAIL – Rourkela Steel Plant – Blast Furnace 5 Project; 6) SAIL – Bokaro Steel Plant – Blast Furnace 2 Augmentation; 7) 2 x 204 m2 Sinter Plant in Iron & Steel Plant Meramandali, Orissa, of Bhushan Steel Limited • Stress Analysis for Misc. Piping (HP & MP Steam, Hot Blast Main & Cold Blast Main, Hot Water, Blast Furnace Gas, Coke Oven Gas, HP Oxygen, Nitrogen, and other Utilities, including dynamic analysis for Compressor Piping) • Review and Checking of Piping GA drawings, Rack Piping, and Pipe Support Arrangement Details • Working as Lead Piping Engineer and leading the team of Engineers and Designers. 8) 2 x 300 MW Thermal Power Project at Haldia, West Bengal, of Haldia Energy Limted (Subsidiary of CESC);
  • 2. CURRICULUM VITAE Page 2 of 4 9) 2 x 300 MW Thermal Power Project at Tarali-Chandrapur, Maharastra, of Dhariwal Infrastruture Private Limted (Subsidiary of CESC); 10) 2 x 270 MW (Phase – 1) MP Super Thermal Power Project at Padampur, Jharkhand, of Adhunik Power & Natural Resources Limited • Stress Analysis for Condenser Inlet & Outlet Piping, and Selection of Spring Hangers and Expansion Joints. • Detailed Engineering for BOP Package, comprising of Complete Plant Water System, CW System, LP Piping Package, Fuel Oil System, Fire Protection System, Compressed Air System, Various Pumps, etc, including Pipe Stress Analysis, Transient Analysis and Hydraulic Analysis of CW, ACW and Raw Water Systems • Review Engineering for Main Plant Piping (Critical Piping) Package, including Stress Analysis of Critical Piping (inclusive of Main Steam, Reheat Steam, Feed Water), Spring Hanger Vendor Drawings, Power Cycle Heat Balance • Working as Lead Piping Engineer and leading the team of Engineers and Designers. From November 2007 – May 2008 Indian Oiltanking Limited : Deputy Manager – Mechanical (Piping) MAJOR PROJECTS 1) COREX Gas based DRI Plant of JSW Limited • Stress analysis of HP and MP Steam Lines, and large diameter process gas lines, including dynamic analysis (harmonic) for compressor piping • Selection of Spring Hangers and large diameter Expansion Joints, and preparation of specification, review of vendor drawings. 2) Assam Renewal Project of ONGC • Pre-Bid Engineering for Gas Gathering Station, Water Injection Plant, Captive Power Plant, Effluent Treatment Plant 3) Oil Storage and Terminal Facility at Sohar Port, Oman • Stress Analysis of Various in-plant and interconnecting process lines, including ammonia and refrigerated product piping • Review and checking of Piping GA drawing of Oil Storage Tank Pit area. 4) Residue Upgradation and MS/HSD Quality Improvement Project of Gujarat Refinery of Indian Oil Corporation Limited - Isomerization & Naphtha Splitter Unit • Pre-Bid Engineering for Piping Works, preparation of Bill of Quantities for Pipes, Fittings, Valves and Supports for process lines • Review of Package Vendor offer for Fire Protection System package. 5) Oil Terminal Project at Siliguri for Numaligar Refinery Limited • Stress Analysis for Various Product Piping • Checking of Mechanical GA, P & ID, Piping GA, Support Details, Line List, Valve List, Hydraulic Calculation, etc. • Review of Package Vendor Drawings • Preparation of Tender Document for Piping Erection Package. From December 1999 – October 2007 Consulting Engineering Services (India) Private Limited : Asstt. Engineer → Engineer → Senior Engineer MAJOR PROJECTS 1) Liquid Product Loading/Unloading Berths 1A & 1B of Qatar Petroleum at Ras Laffan, State of Qatar; 2) Liquid Product Loading/Unloading Berths 3A & 3B of Qatar Petroleum at Ras Laffan, State of Qatar; 3) Berth 18 Extension under Qatofin Marine Works Package at Mesaieed, State of Qatar; 4) Methanol Plant Revamping Package of Qatar Fuel Additive Company (QAFAC) at Mesaieed, State of Qatar • Review of Basic Engineering (FEED) Documents • Preparation of Design Basis Report for Stress Analysis of Hydrocarbon Lines • Stress Analysis of Hydrocarbon Lines, including Jet Fuel, Heavy & Light Naptha, Diesel, Fuel Oil, Propane, Butane, Methanol, Fusel Oil, Sulfur Guard Stripper lines using CAESAR II • Hydraulic Design for the Sea Water Cooling System and Fire Water & Foam Solution piping network, using the software PIPENET, including Transient Analysis • Sizing calculation for Pressure Breakdown Orifice • Review and Checking of Piping GA, Support Details, Piping Isometric Drawings
  • 3. CURRICULUM VITAE Page 3 of 4 • Preparation of Technical Specifications and Material Requisitions for Misc. Piping Components. 5) 1 x 500 MW Ramagundam Super Thermal Power Project (Stage – III) of National Thermal Power Corporation Limited - CW System Turnkey Package • Stress Analysis for Condenser Inlet & Outlet Piping, and Selection of Spring Hangers and Expansion Joints • Calculation for CW Intake Channel • Review and Checking of Piping GA and Support Arrangement Details • Preparation of Technical Specifications for Pipes, Valves and Expansion Joints • Preparation of Erection Specification for Piping Works. 6) 130 MW New Cossipore Generating Station, CESC Limited – Retrofitting of Wet Electrostatic Precipitator in the Flue Gas Discharge System • Calculation of Pressure Drop in the Flue Gas Path and Prediction of Generation Loss due to installation of Wet ESP • Preparation of Design Basis Report • Checking of Wet ESP Installation Drawings, Flue Gas Ducting Layout, P & ID, Piping GA, ESP Fabrication Drawings • Preparation of Technical Specifications for ESP’s Auxiliaries, and Piping Works • Preparation of Erection Specification for Mechanical and Piping Works. 7) 4 x 500 MW Talcher Super Thermal Power Project (Stage – II) of National Thermal Power Corporation Limited – Design of 7 km long Ash Water Recirculation Pipeline 8) 4 x 60 MW & 2 X 110 MW Talcher Thermal Power Project (Stage – I & II) of National Thermal Power Corporation Limited – Design of 4.5 km long Ash Water Recirculation Pipeline • Stress Analysis of Ash Water Recirculation Pipeline • Review and checking of Piping GA • Calculation of temperature of Ash Water Recirculation Piping (exposed to sun) due to solar radiation, using self-developed EXCEL program • Hydraulic Transient Analysis for Ash Water Recirculation Piping. From February 1999 – December 1999 4 x 60 MW Titagarh Generating Station, CESC Limited : Trainee Engineer (O & M) o Working in Main Plant, Coal Handling Plant and Control Room o Monitoring and assessment of the performance of power station auxiliaries and coordinating the energy saving measures o Maintenance of Boiler Tubes and Turbine Blades PROFICIENCY IN SOFTAWARE PACKAGES: CAESAR II, AUTOPIPE, CAEPIPE, ALGOR PIPE PACK, TRIFLEX, SIMFLEX, PV-ELITE, MECAStack, PIPENET (Standard, Spray/Sprinkler and Transient Modules), CADWorx, EPlant, Thermoflow, Complete MS- OFFICE family, AutoCAD R14 to 2015 PROFICIENCY IN LANGUAGE: Speak Read Write English Excellent Excellent Excellent Bengali Excellent Excellent Excellent Hindi Excellent Good Nil HOBBIES: Reading Books, Playing Cricket, Photography, Listening to Music, Net-surfing, etc. EXTRA-CURRICULAR ACTIVITIES: 1. Represented School, College, University, and U-16 and U-19 State Teams in Cricket 2. Obtained Black-Belt from The Japan Karate Association in Shotokan style Karate CERTIFICATION I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe my qualifications, my experience and me.
  • 4. CURRICULUM VITAE Page 4 of 4 ANIRBAN DATTA Date: 25-03-2016 Place: Kolkata