SlideShare a Scribd company logo
1 of 6
CURRICULUMVITAE
ARUN CHOWDHURY
19 YEARS EXP IN OPERATION/PRODUCTION ON STEEL INDS . Hot Rolling Mill
SEAMLESS Pipe, Heat treatment, angle& flat bar, Z angle, square bar rolling. WORK
WITH JINDAL (I) LTD, WELSPUN, MAHARASHTRA SEAMLESS (D.P.JINDAL
GROUP) & currently work at TEMBO STEEL, AFRICA.
TEMBO STEEL (UGANDA) LTD Permanent address : vill & P.O – Kantali.
IGANGA. UGANDA. AFRICA. Dist. – Hooghly. West Bengal – 712614
Mb-+91 9561076981 / 8408941307
Passport no – J6192137, validity up to 2021.
Email Id – arunchowdhury7413@gmail.com
BRIEF OBJECTIVES : My main objectives are-
To implement corporate / management strategy into
Reality by – increase productivity, cost & time
Efficiency and world class quality through degree of
Automation, B2B Explosion, Manufacturing Flexibility
Motivation & Training of subordinate, Increase Tool
Life, Fuel & power savings and buildings Team work,
Quality- culture in every people within Organization
and developed Inter-relationship organization behavior.
BRIEF OVERVIEW :
PERSONAL DATA :
AGE : 41 (date of birth: 10/08/1974)
CURRENT COMPANY : TEMBO STEEL (UGANDA) LTD.
As a WORKS MANAGER HOT ROLLING MILL
From march 2015.
ORG. EXPERIENCE : 19 years, Steel hot rolling / industry (Operation/production)
1. ANAND TEKNOW ENGINEERING (INDIA) LTD
2. WELSPUN CORPORATION LTD.
3. MAHARASHTRA SEAMLESS LTD
(D.P.JINDAL GROUP CO.)
4. HEAVY METAL & TUBES LTD.
5. SURAJ STAINLESS LTD.
6. JINDAL (INDIA) LTD. (B.C JINDAL GROUP CO).
QUALIFICATION :
TECHNICAL : 1. MBA – in OPERATION MANAGEMENT (2 yrs)
2. DIPLOMA in MECHANICAL ENGINEERING
ACADEMIC : 1. HIGHER SECONDARY EXAMS
2. SECONDARY EXAMS
EXPART ON : Hot rolling mill operation –SEAMLESS PIPE
OPERATION, HEAT TREATMENT,
FLAT & ANGLE ROLLING.
PROJECT WORK : 1) LEAD & SET UP TIME REDUCTION-on rough &
Inter mill at ATAEIL.
2) Furnace shutdown maintenance project at ATAEIL.
3) Furnace oil fire to coal fire project by palvariser
Installation.
4) new stand commissioning at tembo steel for strips mill.
PERSONAL SKILLS : 1. Result oriented, Successful pass ISO audit as a MR.
2. Turning ideas into profitable & sustainable business.
3. Time study & cost analysis.
4. Process Improvement Skill (Continuous Improvement)
5. Exp. In SAP / ERP, project.
6. Knowledge 5S, SIX SIGMA, KAIZEN, HSE/OSHAS.
BRIEF DETAILS :
ORG. EXPERIENCE :
EXPERIENCE 1. : TEMBO STEEL (UGANDA) LTD.
As a works manager from March 2015.
Overall in charge of rolling mill, strips mill&furnace
Operation-FLAT BAR, V ANGLE, Z ANGLE, SQUARE
TWIST & ROUND BAR and STRIPS mill Operation.
COMPANY PROFILE : TEMBO STEEL (UGANDA) LTD having
SMS(CASTING FURNACE),AOD,CCM,
ROLLING MILL, STRIPS MILL & TUBE MILL.
Annual capacity 96000 mt. Locate UGANDA,AFRICA.
KRA : overall in charge of three automatic rolling mill FLAT
BAR MILL , SECTION MILL & STRIPS MILL
continuous operation from
FURNACE (CASTING)-AOD-CCM –ROLLING MILL
And also from FURNACE/BOILER .PROECT for new
stand commissioning on strips mill.
Daily production planning & DPR analysis, finding gap
For continuous Improvement, manufacturing cost
Analysis, MIS report, prepared budget for monthly
Consumable & spare list. Cost control. Yield %
Improvement up to 95% to 96 % wrt RM. Men power
Handling. Subordinate development.
EXPERIENCE 2. : ANAND TEKNOW AIDS ENGINEERING
(INDIA)LTD
As a manager / unit head &MR (management
Representative) of hot rolling mill, furnace,
From July 2011 to march 2015.
COMPANY PROFILE : ATAEIL is a group of company having rolling mill,
Greetings, Galvanizing, valve & tool division. Annual
Turnover of 1000 cr.
CORE VALUE : Innovation & creativity.
KRA :
1. TECH ASPECT – Production & billet cutting Plan, furnace operation, roughing &
Inter mill Operation.
2. OPERATION ASPECT – Daily production, stock and dispatch report. Men power
Management, dispatch schd, order status wrt prodn & dispatch,
94% yield wrt 100% RM. Short length & scrap minimization,
Continues improvement wrt manufacturing cost. MIS report.
3. PROJECT ASPECT – Furnace repairing & shut down maintenance, palvariser
Installation, lead time & set time Reduction. Project at furnace
From oil fire to coal fire operation. Operation project for change
mill from flat bar to angle production.
4. COMMERCIAL ASPECT- Spare & consumable inventory control,
Consumable budget fixed. Indent, RM inventory,
5. QUALITY ASPECT – Overall resp of quality product, customer relationship, billet &
Product chemistry, standard. Subordinate training of
TQM.QMS,
6. FINANCIAL ASPECT – Operation with lower manufacturing cost, billet to final product
Accountability wrt cost, product costing wrt scrap losses &
Direct variable cost.
7. AUDIT ASPECT - Appoint as Management Representative (MR) to lead ISO audit.
8. SAFETY ASPECT – Appoint as a chairperson of SAFETY COMMITTEE, overall
Awareness of safety, Training of employees about HSE,
9. HR/ADMIN ASPECT – contractor agreement, foremen team control, payroll check,
Other approval.
10. IT ASPECT - Expart in ERP & SAP entry system.
ACHIVEMENTS : 1. Yearly Furnace repairing project & convert oil fired to coal
Fire for oil consumption cost reduction
2. Bring down manufacturing cost 3700/mt. from 5000/mt.
3. Build up customer by deliver quality product @ low MC.
4. Manual to automatic mill and cost reduction.
5. Achieve ok prodn qty of flat bar up to 94% & angle 95%
EXPERIENCE 3. : WELSPUN CORP. LTD. at Anjar, Gujarat.
As a Sr. Engr. On SPIRAL PIPE MILL
From 1st April 2010 to July 2011.
Company Profile : Mkt. Capt. $4bn, turn over $2bn, manufacturing of
Seamless, Saw Pipe, Plate Mill, Power Generation,
Infrastructure, Textiles, TMT Bar, Billet.
Core Values : Adaptability, Customer Care, Discipline, Employees
Development, Empowerment, Ethics, Integrity,
Ownership & Commitment, Speed & Trust.
Main Milestone : 1. Application of SAP System, PMS& MPS (All Unit)
2. Operation under SOP (STANDARD OPERATION
PROCUDURE)
3. Operation under CPCM & PPC
KRA : 1. Welding (GMAW) operation at forming unit of SAW.
2. Plate quality Check & feedback given to plate mill.
3. ISO, TQM.HSE, training to subordinate.
4. Increase manufacturing flexibility & automation.
5. All ISO logbooks maintained.
6. Check welding surface quality & defects.
7. Maintenance work of mill & safety.
8. Manpower handling & development.
9. Cost control within allocating budget.
10. SAP entry.
EXPERIENCE 4. : MAHARASHTRA SEAMLESS Ltd. (A D.P.JINDAL
Group of company) as an Assistant Engineer on 14”
SEAMLESS Pipe hot rolling mill from feb 2006 to march
2010.
(Hot rolling/WBF (furnace) operation/Sizing, SRM)
Billet used 160mm to 310mm.
Company profile : Largest manuf. Of seamless pipes, ERW pipe (C.S,
Alloy steel from ½” to 14”), annual capacity
2, 00,000mtpa.The co. uses cross roll piercing technology
Acquired through a technical collaboration with
Mannesmann Damage Huttntechnik, Germany (First co.
Worldwide to set up a plant for manuf. State-of-art
Seamless pipes & tubes through this process.
KRA (MSL) : 1. Knowledge of different stages of Sequential operation
RHF(furnace)/PIERCING/PLUGMILL/REELER/WBF
(Furnace)/SIZING
2. Increase yield efficiency by reduced % of scrap.
3. Reduced Work in Process (WIP) & Ovality Control.
4. Improve Productivity by increase product quality and
Cost &Time efficiency.
5. All quality parameters checked & maintained at
Different stages of operation.
6. Heat treatment work (NORMALISING) work at WBF.
7. Improve& training of subordinate development.
8. Verifying pipe stressibility.
9. All ISO documentation maintained.
10. Maintained ERP system.
EXPERIENCE 5. : HEAVY METAL & TUBES Ltd. manuf. of seamless
Tubes & pipes (C.S, S.S, from ½” to 10”) from March
2001 to Feb 2006.
As an Assist. Production Engineer.
Hot rolling mill, seamless pipe at Chhatral,
Gujarat.
KRA : 1. All operation of different stages maintained and
Developed-hot rolling, piercing, sizing, normalizing,
Annealing. Cold drawing.
2. Heat treatment work. ANNEALING, NORMLISING.
.DIE HARDENENING.
3. Improve productivity by increase yield efficiency and
Reduced scrap & oil consumption.
4. Increase manufacturing flexibility& automation.
5. All ISO logbooks maintained.
6. Heat treatment work (normalizing), Annealing
7. Pipe dimension checking.
8. Manpower handling & development.
EXPERIENCE 6 : SURAJ STAINLESS Ltd.Manuf. of S.S seamless
Tubes from May 1999 to March 2001
At Kadi, Gujarat, as a Jr. Engineer (production).
KRA : Annealing, furnace operation. Cold drawing of S.S tube;
scrap generation
Report, ISO documentation, Subordinate development.
Same as exp on heavy metal & tubes ltd.
EXPERIENCE 7 : Carrier start with JINDAL (INDIA) Ltd. B.C JINDAL
Group of CO.
(Manuf. of steel pipes, Cold rolled & Galv. strips etc.)
From April 98 to March 99 as a Apprentice Engineer.
KRA : Knowledge gathered from diff. types of m/c and their
Function. Continuous galvanizing (CGL), continuous
Annealing, cold Rolling.
QUALIFICATION : 1. MBA in OPERATION MANAGEMENT from
DETAILS S.P.MANDALI’S ‘WELINGKAR’ Institute of
Management Development & Research, Mumbai, with
1st class in dec.2009.
2. DIPLOMA in MECHANICAL ENGINEERING from
North Calcutta Polytechnic, Kolkata, under W.B state
Council of Eng. & Tech. Education. Recognized by
AICTE With 1st class in 1997.
3. Higher Secondary Exams from W.B Council of
Higher Secondary Education in 1993.
4. Secondary Exams from Ramakrishna Mission School,
Kamarpukur, Hooghly, under W.B Board with
1st Div. In1991.
CURRENT CTC : INR 1.2 laks / month + other facilities
EXPECTED CTC : Negotietable
NOTICE PERIOD : Immediate
PLACE : PUNE. INDIA
DATE : 13/12/2015.
ARUN CHOWDHURY
(Signature)
09561076981 / 08408941307

More Related Content

What's hot

VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTGunjesh Jha
 
BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]Subham Shit
 
Energy optimization at EAF
Energy optimization at EAFEnergy optimization at EAF
Energy optimization at EAFmetudgn
 
Continuous casting of billets
Continuous casting of billetsContinuous casting of billets
Continuous casting of billetsAyaz Akhtar
 
Training report on bokaro steel plant
Training report on bokaro steel plantTraining report on bokaro steel plant
Training report on bokaro steel plantPrashant Kumar
 
Secondary steel making processes
Secondary steel making processesSecondary steel making processes
Secondary steel making processeschandrakant jally
 
Ppt on bokaro steel plant
Ppt on bokaro steel plantPpt on bokaro steel plant
Ppt on bokaro steel plantPrashant Kumar
 
Continuous casting-tundish technology
Continuous casting-tundish technologyContinuous casting-tundish technology
Continuous casting-tundish technologyÖZGÜR ÜSKÜP
 
Industrial Training Report on Rolling Mill
Industrial Training Report on Rolling MillIndustrial Training Report on Rolling Mill
Industrial Training Report on Rolling MillShani Kumar Singh
 
Bhilai steel plant plate mill & mars 1
Bhilai steel plant  plate mill & mars 1Bhilai steel plant  plate mill & mars 1
Bhilai steel plant plate mill & mars 1Akhilesh Rathiya
 
Steel melting shop (sms) - 2
Steel melting shop (sms) - 2Steel melting shop (sms) - 2
Steel melting shop (sms) - 2NIT - ROURKELA
 
Summer Training at JSW
Summer Training at JSWSummer Training at JSW
Summer Training at JSWArpan Paul
 

What's hot (20)

VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORT
 
BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]
 
Raw Material In Iron Making
Raw Material In Iron MakingRaw Material In Iron Making
Raw Material In Iron Making
 
Energy optimization at EAF
Energy optimization at EAFEnergy optimization at EAF
Energy optimization at EAF
 
Continuous casting of billets
Continuous casting of billetsContinuous casting of billets
Continuous casting of billets
 
Sponge iron making process
Sponge iron making processSponge iron making process
Sponge iron making process
 
Training report on bokaro steel plant
Training report on bokaro steel plantTraining report on bokaro steel plant
Training report on bokaro steel plant
 
final_report
final_reportfinal_report
final_report
 
Secondary steel making processes
Secondary steel making processesSecondary steel making processes
Secondary steel making processes
 
Ppt on bokaro steel plant
Ppt on bokaro steel plantPpt on bokaro steel plant
Ppt on bokaro steel plant
 
Continuous casting-tundish technology
Continuous casting-tundish technologyContinuous casting-tundish technology
Continuous casting-tundish technology
 
Copper Mould
Copper MouldCopper Mould
Copper Mould
 
RMHS Manual 2.1
RMHS Manual 2.1RMHS Manual 2.1
RMHS Manual 2.1
 
Steel Making: Ingot casting defects
Steel Making: Ingot casting defectsSteel Making: Ingot casting defects
Steel Making: Ingot casting defects
 
MAINTENANCE MANAGER
MAINTENANCE MANAGERMAINTENANCE MANAGER
MAINTENANCE MANAGER
 
Industrial Training Report on Rolling Mill
Industrial Training Report on Rolling MillIndustrial Training Report on Rolling Mill
Industrial Training Report on Rolling Mill
 
SMS PROJECT
SMS PROJECTSMS PROJECT
SMS PROJECT
 
Bhilai steel plant plate mill & mars 1
Bhilai steel plant  plate mill & mars 1Bhilai steel plant  plate mill & mars 1
Bhilai steel plant plate mill & mars 1
 
Steel melting shop (sms) - 2
Steel melting shop (sms) - 2Steel melting shop (sms) - 2
Steel melting shop (sms) - 2
 
Summer Training at JSW
Summer Training at JSWSummer Training at JSW
Summer Training at JSW
 

Viewers also liked

RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016ravi randham
 
Resume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - DetailedResume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - DetailedVincent Le Cornu
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visUlimella Siva Sankar
 
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalDurgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalAbhishek Gorai
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentationrajkumar_sm
 
Baskaran Vaithyam Devendran SCM PP QM Resume (1)
Baskaran Vaithyam Devendran SCM PP QM Resume (1)Baskaran Vaithyam Devendran SCM PP QM Resume (1)
Baskaran Vaithyam Devendran SCM PP QM Resume (1)Baskaran Vaithyam
 
Mining objective answers
Mining objective answersMining objective answers
Mining objective answersBhaskar Naidu
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systemsArnab Chakraborty
 

Viewers also liked (20)

RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
Cv of nur kutub ul-alam chowdhury
Cv of nur kutub ul-alam chowdhuryCv of nur kutub ul-alam chowdhury
Cv of nur kutub ul-alam chowdhury
 
RAJESH CV
RAJESH CVRAJESH CV
RAJESH CV
 
naukri resume
naukri resumenaukri resume
naukri resume
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Resume - Mahipal Singh Bisht
Resume - Mahipal Singh BishtResume - Mahipal Singh Bisht
Resume - Mahipal Singh Bisht
 
mukesh Resume (1)
mukesh Resume (1)mukesh Resume (1)
mukesh Resume (1)
 
Resume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - DetailedResume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - Detailed
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Pillar design
Pillar designPillar design
Pillar design
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
 
Coal india limited
Coal india limitedCoal india limited
Coal india limited
 
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalDurgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
 
CSR of Coal India ltd.
CSR of Coal India ltd.CSR of Coal India ltd.
CSR of Coal India ltd.
 
Baskaran Vaithyam Devendran SCM PP QM Resume (1)
Baskaran Vaithyam Devendran SCM PP QM Resume (1)Baskaran Vaithyam Devendran SCM PP QM Resume (1)
Baskaran Vaithyam Devendran SCM PP QM Resume (1)
 
Mining objective answers
Mining objective answersMining objective answers
Mining objective answers
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systems
 

Similar to CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Management

Similar to CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Management (20)

resume new
resume newresume new
resume new
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
kumsi
kumsikumsi
kumsi
 
resume_Prasanna_-2_by_shine
resume_Prasanna_-2_by_shineresume_Prasanna_-2_by_shine
resume_Prasanna_-2_by_shine
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
HL Resume
HL ResumeHL Resume
HL Resume
 
MAINTENANCE C V
MAINTENANCE C V MAINTENANCE C V
MAINTENANCE C V
 
Gnanam resume(1)
Gnanam resume(1)Gnanam resume(1)
Gnanam resume(1)
 
Devendra_Singh_1
Devendra_Singh_1Devendra_Singh_1
Devendra_Singh_1
 
Sanmukh cv (2017)
Sanmukh cv (2017)Sanmukh cv (2017)
Sanmukh cv (2017)
 
Vikas_Bajpai_090915
Vikas_Bajpai_090915Vikas_Bajpai_090915
Vikas_Bajpai_090915
 
Employment_Resume_Mechanical_Engineer
Employment_Resume_Mechanical_EngineerEmployment_Resume_Mechanical_Engineer
Employment_Resume_Mechanical_Engineer
 
11+ Years Experience in Murugappa groups
11+ Years Experience in Murugappa groups11+ Years Experience in Murugappa groups
11+ Years Experience in Murugappa groups
 
d.p15
d.p15d.p15
d.p15
 
Resume Production
Resume ProductionResume Production
Resume Production
 
SamKrg Pistons and Rings Presentation
SamKrg Pistons and Rings PresentationSamKrg Pistons and Rings Presentation
SamKrg Pistons and Rings Presentation
 
RESUME_J K Saraff
RESUME_J K SaraffRESUME_J K Saraff
RESUME_J K Saraff
 
RESUME(NEW)
RESUME(NEW)RESUME(NEW)
RESUME(NEW)
 
cpk
cpkcpk
cpk
 

CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Management

  • 1. CURRICULUMVITAE ARUN CHOWDHURY 19 YEARS EXP IN OPERATION/PRODUCTION ON STEEL INDS . Hot Rolling Mill SEAMLESS Pipe, Heat treatment, angle& flat bar, Z angle, square bar rolling. WORK WITH JINDAL (I) LTD, WELSPUN, MAHARASHTRA SEAMLESS (D.P.JINDAL GROUP) & currently work at TEMBO STEEL, AFRICA. TEMBO STEEL (UGANDA) LTD Permanent address : vill & P.O – Kantali. IGANGA. UGANDA. AFRICA. Dist. – Hooghly. West Bengal – 712614 Mb-+91 9561076981 / 8408941307 Passport no – J6192137, validity up to 2021. Email Id – arunchowdhury7413@gmail.com BRIEF OBJECTIVES : My main objectives are- To implement corporate / management strategy into Reality by – increase productivity, cost & time Efficiency and world class quality through degree of Automation, B2B Explosion, Manufacturing Flexibility Motivation & Training of subordinate, Increase Tool Life, Fuel & power savings and buildings Team work, Quality- culture in every people within Organization and developed Inter-relationship organization behavior. BRIEF OVERVIEW : PERSONAL DATA : AGE : 41 (date of birth: 10/08/1974) CURRENT COMPANY : TEMBO STEEL (UGANDA) LTD. As a WORKS MANAGER HOT ROLLING MILL From march 2015. ORG. EXPERIENCE : 19 years, Steel hot rolling / industry (Operation/production) 1. ANAND TEKNOW ENGINEERING (INDIA) LTD 2. WELSPUN CORPORATION LTD. 3. MAHARASHTRA SEAMLESS LTD (D.P.JINDAL GROUP CO.) 4. HEAVY METAL & TUBES LTD. 5. SURAJ STAINLESS LTD. 6. JINDAL (INDIA) LTD. (B.C JINDAL GROUP CO).
  • 2. QUALIFICATION : TECHNICAL : 1. MBA – in OPERATION MANAGEMENT (2 yrs) 2. DIPLOMA in MECHANICAL ENGINEERING ACADEMIC : 1. HIGHER SECONDARY EXAMS 2. SECONDARY EXAMS EXPART ON : Hot rolling mill operation –SEAMLESS PIPE OPERATION, HEAT TREATMENT, FLAT & ANGLE ROLLING. PROJECT WORK : 1) LEAD & SET UP TIME REDUCTION-on rough & Inter mill at ATAEIL. 2) Furnace shutdown maintenance project at ATAEIL. 3) Furnace oil fire to coal fire project by palvariser Installation. 4) new stand commissioning at tembo steel for strips mill. PERSONAL SKILLS : 1. Result oriented, Successful pass ISO audit as a MR. 2. Turning ideas into profitable & sustainable business. 3. Time study & cost analysis. 4. Process Improvement Skill (Continuous Improvement) 5. Exp. In SAP / ERP, project. 6. Knowledge 5S, SIX SIGMA, KAIZEN, HSE/OSHAS. BRIEF DETAILS : ORG. EXPERIENCE : EXPERIENCE 1. : TEMBO STEEL (UGANDA) LTD. As a works manager from March 2015. Overall in charge of rolling mill, strips mill&furnace Operation-FLAT BAR, V ANGLE, Z ANGLE, SQUARE TWIST & ROUND BAR and STRIPS mill Operation. COMPANY PROFILE : TEMBO STEEL (UGANDA) LTD having SMS(CASTING FURNACE),AOD,CCM, ROLLING MILL, STRIPS MILL & TUBE MILL. Annual capacity 96000 mt. Locate UGANDA,AFRICA. KRA : overall in charge of three automatic rolling mill FLAT BAR MILL , SECTION MILL & STRIPS MILL continuous operation from FURNACE (CASTING)-AOD-CCM –ROLLING MILL And also from FURNACE/BOILER .PROECT for new stand commissioning on strips mill. Daily production planning & DPR analysis, finding gap For continuous Improvement, manufacturing cost Analysis, MIS report, prepared budget for monthly Consumable & spare list. Cost control. Yield % Improvement up to 95% to 96 % wrt RM. Men power Handling. Subordinate development.
  • 3. EXPERIENCE 2. : ANAND TEKNOW AIDS ENGINEERING (INDIA)LTD As a manager / unit head &MR (management Representative) of hot rolling mill, furnace, From July 2011 to march 2015. COMPANY PROFILE : ATAEIL is a group of company having rolling mill, Greetings, Galvanizing, valve & tool division. Annual Turnover of 1000 cr. CORE VALUE : Innovation & creativity. KRA : 1. TECH ASPECT – Production & billet cutting Plan, furnace operation, roughing & Inter mill Operation. 2. OPERATION ASPECT – Daily production, stock and dispatch report. Men power Management, dispatch schd, order status wrt prodn & dispatch, 94% yield wrt 100% RM. Short length & scrap minimization, Continues improvement wrt manufacturing cost. MIS report. 3. PROJECT ASPECT – Furnace repairing & shut down maintenance, palvariser Installation, lead time & set time Reduction. Project at furnace From oil fire to coal fire operation. Operation project for change mill from flat bar to angle production. 4. COMMERCIAL ASPECT- Spare & consumable inventory control, Consumable budget fixed. Indent, RM inventory, 5. QUALITY ASPECT – Overall resp of quality product, customer relationship, billet & Product chemistry, standard. Subordinate training of TQM.QMS, 6. FINANCIAL ASPECT – Operation with lower manufacturing cost, billet to final product Accountability wrt cost, product costing wrt scrap losses & Direct variable cost. 7. AUDIT ASPECT - Appoint as Management Representative (MR) to lead ISO audit. 8. SAFETY ASPECT – Appoint as a chairperson of SAFETY COMMITTEE, overall Awareness of safety, Training of employees about HSE, 9. HR/ADMIN ASPECT – contractor agreement, foremen team control, payroll check, Other approval. 10. IT ASPECT - Expart in ERP & SAP entry system. ACHIVEMENTS : 1. Yearly Furnace repairing project & convert oil fired to coal Fire for oil consumption cost reduction 2. Bring down manufacturing cost 3700/mt. from 5000/mt. 3. Build up customer by deliver quality product @ low MC. 4. Manual to automatic mill and cost reduction. 5. Achieve ok prodn qty of flat bar up to 94% & angle 95%
  • 4. EXPERIENCE 3. : WELSPUN CORP. LTD. at Anjar, Gujarat. As a Sr. Engr. On SPIRAL PIPE MILL From 1st April 2010 to July 2011. Company Profile : Mkt. Capt. $4bn, turn over $2bn, manufacturing of Seamless, Saw Pipe, Plate Mill, Power Generation, Infrastructure, Textiles, TMT Bar, Billet. Core Values : Adaptability, Customer Care, Discipline, Employees Development, Empowerment, Ethics, Integrity, Ownership & Commitment, Speed & Trust. Main Milestone : 1. Application of SAP System, PMS& MPS (All Unit) 2. Operation under SOP (STANDARD OPERATION PROCUDURE) 3. Operation under CPCM & PPC KRA : 1. Welding (GMAW) operation at forming unit of SAW. 2. Plate quality Check & feedback given to plate mill. 3. ISO, TQM.HSE, training to subordinate. 4. Increase manufacturing flexibility & automation. 5. All ISO logbooks maintained. 6. Check welding surface quality & defects. 7. Maintenance work of mill & safety. 8. Manpower handling & development. 9. Cost control within allocating budget. 10. SAP entry. EXPERIENCE 4. : MAHARASHTRA SEAMLESS Ltd. (A D.P.JINDAL Group of company) as an Assistant Engineer on 14” SEAMLESS Pipe hot rolling mill from feb 2006 to march 2010. (Hot rolling/WBF (furnace) operation/Sizing, SRM) Billet used 160mm to 310mm. Company profile : Largest manuf. Of seamless pipes, ERW pipe (C.S, Alloy steel from ½” to 14”), annual capacity 2, 00,000mtpa.The co. uses cross roll piercing technology Acquired through a technical collaboration with Mannesmann Damage Huttntechnik, Germany (First co. Worldwide to set up a plant for manuf. State-of-art Seamless pipes & tubes through this process.
  • 5. KRA (MSL) : 1. Knowledge of different stages of Sequential operation RHF(furnace)/PIERCING/PLUGMILL/REELER/WBF (Furnace)/SIZING 2. Increase yield efficiency by reduced % of scrap. 3. Reduced Work in Process (WIP) & Ovality Control. 4. Improve Productivity by increase product quality and Cost &Time efficiency. 5. All quality parameters checked & maintained at Different stages of operation. 6. Heat treatment work (NORMALISING) work at WBF. 7. Improve& training of subordinate development. 8. Verifying pipe stressibility. 9. All ISO documentation maintained. 10. Maintained ERP system. EXPERIENCE 5. : HEAVY METAL & TUBES Ltd. manuf. of seamless Tubes & pipes (C.S, S.S, from ½” to 10”) from March 2001 to Feb 2006. As an Assist. Production Engineer. Hot rolling mill, seamless pipe at Chhatral, Gujarat. KRA : 1. All operation of different stages maintained and Developed-hot rolling, piercing, sizing, normalizing, Annealing. Cold drawing. 2. Heat treatment work. ANNEALING, NORMLISING. .DIE HARDENENING. 3. Improve productivity by increase yield efficiency and Reduced scrap & oil consumption. 4. Increase manufacturing flexibility& automation. 5. All ISO logbooks maintained. 6. Heat treatment work (normalizing), Annealing 7. Pipe dimension checking. 8. Manpower handling & development. EXPERIENCE 6 : SURAJ STAINLESS Ltd.Manuf. of S.S seamless Tubes from May 1999 to March 2001 At Kadi, Gujarat, as a Jr. Engineer (production). KRA : Annealing, furnace operation. Cold drawing of S.S tube; scrap generation Report, ISO documentation, Subordinate development. Same as exp on heavy metal & tubes ltd.
  • 6. EXPERIENCE 7 : Carrier start with JINDAL (INDIA) Ltd. B.C JINDAL Group of CO. (Manuf. of steel pipes, Cold rolled & Galv. strips etc.) From April 98 to March 99 as a Apprentice Engineer. KRA : Knowledge gathered from diff. types of m/c and their Function. Continuous galvanizing (CGL), continuous Annealing, cold Rolling. QUALIFICATION : 1. MBA in OPERATION MANAGEMENT from DETAILS S.P.MANDALI’S ‘WELINGKAR’ Institute of Management Development & Research, Mumbai, with 1st class in dec.2009. 2. DIPLOMA in MECHANICAL ENGINEERING from North Calcutta Polytechnic, Kolkata, under W.B state Council of Eng. & Tech. Education. Recognized by AICTE With 1st class in 1997. 3. Higher Secondary Exams from W.B Council of Higher Secondary Education in 1993. 4. Secondary Exams from Ramakrishna Mission School, Kamarpukur, Hooghly, under W.B Board with 1st Div. In1991. CURRENT CTC : INR 1.2 laks / month + other facilities EXPECTED CTC : Negotietable NOTICE PERIOD : Immediate PLACE : PUNE. INDIA DATE : 13/12/2015. ARUN CHOWDHURY (Signature) 09561076981 / 08408941307