Vishweshkumar Chhotubhai Patel has over 22 years of experience working with GE gas turbines. He has served as a site lead, project manager, and technical advisor on projects involving major overhauls, installations, commissioning, and repairs of GE frame 5, 6, and 9 gas turbines in India and the Middle East. He is skilled in inspection, maintenance, planning, and reporting tasks and has received positive feedback from GE and customers.
1. Page 1 of 7
Resume:
Name: Vishweshkumar Chhotubhai Patel
Date of Birth: 19-Dec-1970
Birth Place: Surat, India. Nationality: Indian
Passport no: Z 2713627, Validity29-Dec-2023
PROFESSIONAL EXPERIENCE
Worked as GE SiteLead,Technical Advisor,ContractPerfManager &ProjectManager for GEGasTurbines
Gasturbine minor/majoroverhauls,unitrebuilds, erection,commissioning,androutinemaintenanceexperience
Expertise in GE frame9FA,9FA+e, frame5, 6FA, 6FA+e,6B, 9E, AlstomGT8C2,Mitsubishi W701DGasTurbines,
Experiencein erection,commissioning andmaintenance/shutdowns/overhaulsof equipments likepumps,compressors,
turbines, engines,fans, blowers,gearboxes,valves, heatexchangersandpipinginOilandGasprocessingplants(LPG,
CFU,GSU, KRU) and Powerplants
Planning,schedulingandreporting ofGasTurbineoverhauls,erection &commissioning,plantshutdowns
Awarded andAppreciatedby GE/ GSII/ Customersfor the outstandingperformanceandreceivedpositiveresponsefrom
customersforfinishingprojectsprofessionallywithqualityandsafety andwithinthe schedule
EDUCATION & TRAINING:
BE (Mechanical)from SVRegionalEngineeringCollege(RECSuratnowSVNIT, Surat), June 1992,Ist classDistinction
MBA(Marketing)from SouthGujaratUniversity, Surat, Evening programme,Sept1997, IInd class
GE Energy:GEcertified trainingofGasturbines,Generators,Basic engineeringtechniques,NDT,Borescopic
inspection,Safetyand First Aid training at GE EnergyTraining center,Schenectady,USA andGasturbine and
Generatormanufacturingunit,Greenville,USA
GE SiteLeadership Training:GE Tower,Singapore:SiteLeadershipandprojectmanagementtrainingprovidedat GE
trainingcentre,SingaporeduringJuly2009
Alstom:OperationandMaintenanceofGasturbines& Steam turbines by ABB Alstom, PumpsbyKSB andKBL Pumps,
Fire& Safety training
PERSONAL DETAILS:
Address: B2/801, PrashiddhiApt, B/H PiplodJakat Naka, Piplod,Surat, Gujarat,India-395007
Tel:91-261-2252178,Mo:91-9898582551,91-8460836384,EMAIL: vishweshpatel@ymail.com,parvavpatel@yahoo.co.in
COMPUTER KNOWLEDGE:
MS Office-Word, Excel, Power Point, MS Project, AutoCAD, Primavera, Photoshop, GE Field engineer’s work software
PREVIOUS ABROAD VISITS: Argentina, USA, Qatar, Oman, Abu Dhabi, Dubai and Singapore
WORK EXPERIENCE: Total MORE THAN 22 YEARS
1) March2016toApril 2016:CommissioningworkofGE makeFrame6BDLN1GasTurbineasaCommissioning Manager with
Cegelec EPC at LG7 project, ADGAS, Das Island, Abu Dhabi:
Performed Gas Turbine and Systems commissioning and start up activities
2) GSII/GE Energy Field Engineer Services as a Lead Technical Advisor for Erection, commissioning, Overhauls &
RebuildsofGEGasTurbines frame5,6B,6FA, 9E and 9FA with Granite Services Intl. Inc. for India and Middle east
September2012-July2013: GEGas Turbine frame9EMajoroverhaulandUprate
Assigned as a GSII Project Manager for Major overhaul and Renovation and Modernization/Uprate of 18 year old GE
Frame 9E Gas turbine at NTPC Kawas Power Project, Hazira, India
Managed manpower and other resources for successful completion of the project
Day and Night activityplanning and monitored progress
Replaced compressor rotor, replaced combustion and HGP parts with all the uprated parts.
Renovation Fr # 9E with modification in piping, ducting, bearing replacement.
Supported Casing Optical alignment of all the casings and bearing housings.
Supported for implementation of TILs, FMI
2. Page 2 of 7
June 2012: GE Gas Turbine frame 9FA+e Installation and commissioning
Assigned on emergency basis for trouble shoot of GT rotor turning problem during commissioning stage of GE frame
9FA+e unit at OTPC project, Tripura, India
Worked with GE site team and resolved the issue of GT rotor lift and turning
March- May2012: GE Gas Turbine frame 9FA+e Installation and commissioning
Assigned as a GE Site Leadfor Gas turbineand auxiliaries erection activities for EPC contactor BHEL from March 2010
for GE frame 9FA+e unit at 350MW CCPP expansion project, GSEG, Hazira, Surat India
Independently worked for GE for Erection activities from foundation check of GE frame 9FA+e and unit on
foundation.Erectionofeach and everyGT components,auxiliariesand GT piping.Commissioning and start-up
of the unit. Loaded unit to Base load and performance test of the gas turbine
Prepared schedules, advised and controlled BHEL engineers for the all the erection and commissioning activities
GT balance shot in Dec 2011
GT synchronization and loading to base load and iDLN tuning and Performance testing
October- November 2011: GE ALSTOM Gas Turbine frame 9E
Assigned as a Site Lead for Major overhaul job of GE frame 9E unit at Alkamil Power Plant, Oman
Independently carried out Gas turbine and auxiliaries Major overhaul work with Granite Supervisors and Granite
manpower, night shift TAand local contractor manpower for scaffolds, bucket techs, NDT
Prepared Major Inspection Report in eCRT with inspection protocols
Attended customer dailymeetings, raised PAC cases, prepared GE dailyreporting- RT, CDS, DORs.
Visited customersitein June 2011for pre outagepreparationandcustomermeetingandprepare report for laydown area
and outage preparedness and recommended suggestions for the upcoming outage.
April 2011: GE Gas Turbine frame 6FA+e
Assigned as a GE Site Lead for Gas turbineand auxiliaries Erection/ commissioning activities for GE frame 6FA+e units
at Shravanthi Power project, Kashipura, Utranchal, India
March 2011: GE Gas Turbine frame 9FA+e
Assigned as a MechanicalLeadTAforFuelgas leakidentificationandproblem rectificationfor phase2 unitduringMarch
2011 for phase 2 GE frame 9FA+e at Lanco Kondapalli Power Plant, Andhra Pradesh, India
Independentlycarried out trouble shooting, rectification and restarted the unit
Received appreciation from customer for the support provided byGE during the problem
January2011: GE Gas Turbine frame 9FA+e
Assigned as a Site Lead for CombustionInspection andmodificationactivities of phase 2 unit during January2011 of GE
frame 9FA+e at Lanco Kondapalli Power Plant, Andhra Pradesh, India
IndependentlycarriedoutCombustionInspection andmodificationactivitieswithalocalmanpower contractor team of 10
crews, 1 Supervisor in each shift, one control TAin dayshift and one Mechanical TAin night shift
Prepared unit CI overhaul and modification report in eCRT with inspection protocols and pictures
September- October 2010: GE Gas Turbine frame 6FARebuild and Commissioning
Independentlyworked as Lead GT Mechanical for Rebuild of 6FAGE gas turbine at Dhuvaran Power Plant, Gujarat
Unit rebuild work for GE- compressor stator vanes replacement, turbine bucketing, inspected Gas turbine components,
decided repair/ replacements, implemented FMI, TILs, assembled Turbine components.
Assembly of GT components after compressor failure/breakdown, raised PAC cases, implemented recommendations,
attendedRFRand conferencecalls,completedgreenrotorrun in with consultation with M&D center, Atlanta and loading
of the unit.
Systems RFR checks, Commissioning and Start up of unit, green rotor run in
July 2010: GE Gas Turbine 9FA+e
Assigned as CBM Inspector for 9FA+e Combustion components at Vemagiri Power Plant, Andhra Pradesh
July 2010: GE Gas Turbine 6FA+e
Assigned as CBM Inspector for 6FA+e HGP and combustion components at GSEC, Dhuvaran Power Plant, India
May2010: GE Gas Turbine frame 9FA+e
Assigned as a Site Lead for Combustion Inspection and compressor casing BHM modification activities of phase 1 unit
during May2010 of GE frame 9FA+e at Vemagiri Power Plant, Andhra Pradesh, India
3. Page 3 of 7
IndependentlycarriedoutCombustionInspection andmodificationactivitieswithalocalmanpower contractor team of 10
crews, 1 Supervisor in each shift, one control TA in dayshift and one Mechanical TAin night shift
Prepared unit CI overhaul and modification report in eCRT with inspection protocols and pictures
April 2010: Major overhaul/ NP-T upgrade of frame 5
Assigned as a Technical Advisor for GE Frame 5 unit P to N/T uprate FMI/ Major overhaul for BGGTs work at Oil and
Natural Gas Corporation, Hazira Gas Processing complex, Surat, India during April 2010.
March 2010: GE Gas Turbine frame 9FA+e Installation
Assigned as a Site Lead for Installation job of GE frame 9FA+e unit at Bawana Power Plant, New Delhi, India
Worked for erection of GE frame 9FA+e Gas Turbine unit no 3 at Bawana with Customer manpower
February- March 2010: GE Gas Turbine frame 9FA
Assigned as a Site Lead for CombustionInspectionjobduringFebruary-March2010forunit 1A, GE frame9FA at RGPPL
unit at Dabhol, Ratnagiri power plant, India
Combustion Inspection and modification activities with a team of 10 crews, 1 Supervisor in each shift, one control TAin
day shift and one Mechanical TAin night shift
Prepared unit CI overhaul and modification report in FSR Auto with inspection protocols and pictures
February2010: GE Gas Turbine frame 9FA
Assigned as a Technical Advisorfor No1bearingproblem rectification forced outage work during February- 2010 for unit
1B, GE frame 9FAat RGPPL unit at Dabhol, Ratnagiri power plant, India
Worked for no 1 bearing replacement and associated work with a team of 10 crews, 1 Supervisor in night shift
December 2009: January2010- GE Gas Turbine frame 9FA+e
Assigned as a Site Lead for Rehabilitationworkofunit 2A duringNovember2009andCombustioninspection and Rehab
work for unit 3B, GE frame 9FA+e at RGPPL unit at Dabhol, Ratnagiri power plant, India
IndependentlycarriedoutCombustionInspectionandmodificationactivitieswithateam of 10crews,1 Supervisorin each
shift, one control TAin dayshift and one Mechanical TAin night shift
Prepared unit CI overhaul and modification report in FSR Auto with inspection protocols and pictures
November 2009: GE Gas Turbine frame 9FA+e: Installation
Assigned as Installation Site Lead for Erection of GE 9FA+e gas turbine (unit 2) on foundation, pre and post erection
checks at Bawana, India during November 2009
October-2009: GE Gas Turbine frame 6B
Assigned as a Site Lead for Hot Gas path Inspection of GE frame 6B unit at QVC Power Plant, Qatar
Independentlycarried out Hot Gas path Inspection with a team of 8 crews and One control TAin dayShift and 07 crews
and one Mechanical TA in night shift, received positive Feedback/ response from Customer as outage was finished
successfully03 days before scheduled date
Prepared HGPI overhaul Report in FSR Auto with inspection protocols and pictures
July 2009: Attended Site Leadership Training at GE Tower, Singapore from 19.07.09 to 31.07.09
May- July 2009: GE Gas Turbine frame 9FA+e Installation
Assigned as a Site Lead for Installation job of GE frame 9FA+e unit at LANCO Power Plant, India
Worked as Site Lead for Gas Turbine, Auxiliaries, Generator, Filter house and Piping erection work with supporting
Technical Advisor and Customer provided manpower
February- April 2009: GE ALSTOM Gas Turbine frame 9E
Assigned as a Site Lead for Major over haul job of GE frame 9E unit at United Power Company, Oman
Independentlycarried out Major Inspection work with Supervisor and a Customer provided Technicians
Prepared Major Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
January2009: GE Gas Turbine frame 6FA+e:
Assigned as a Site Lead for Liner Replacement + turbine casing lifting job of GE frame 6FA+e unit at Dhuvaran, GSEC
Power Plant, Gujarat, India
Independentlycarried out liner replacement work with supporting contractor Supervisors and Technicians
Prepared Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
4. Page 4 of 7
December 2008: GE Gas Turbine frame 6FA
Assigned as a Site Lead for Major Overhaul of GE frame 6FAunit at Dhuvaran, GSEC Power Plant, Gujarat, India
Independentlycarried out Major Inspection work with supporting GE TAs, contractor Supervisors and Technicians
Prepared Major overhaul Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
November 2008: GE Gas Turbine frame 6FA+e
Assigned as a Site Lead for Combustion inspection job of GE frame 6FA+e unit at Dhuvaran Power Plant, Gujarat, India
IndependentlycarriedoutCombustionInspectionworkwithsupportingGE TAs, contractor Supervisors and Technicians
Prepared Combustion Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS,
DORs.
October 2008: GE Gas Turbine frame 9E
Assigned as a Site Lead for Combustion inspection job of GE frame 9E unit at Al Kamil Power Plant, Oman
Independentlycarried out Combustion Inspection work with a Supervisor and 08 Technicians
Prepared Combustion Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS,
DORs.
August 2008: GE Gas Turbine frame 9E
Assigned as Site Lead for Combustion inspection + S1N replacement of 9E unit at LANCO, Kondapalli, Vijaywada, India
Independentlycarried out Combustion Inspection and stage 1 nozzle replacement work
Prepared Combustion Inspection Report with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
May- August 2008 : GE Gas Turbines- frame 6FA+2 and 6FA
Worked as a GE Contract Performance Manager for 214.5 MW CCPP with GE frame 6FA+e and 6FAunits at GSEC,
Dhuvaran, Gujarat, India
Managed as a First CPM on site for commencing the GE LTSAwith GSEC, Dhuvaran
May2008: GE Gas Turbine 9FA+2
Assigned as a Borescope TAfor GE frame 9FA+e unit at Vemagiri Power Plant, Andhra Pradesh, India
Borescope inspection work with Olympus make Borescope
April-2008 to May2008: GE Gas Turbine frame 6B
Assigned as a Site Lead for Major Overhaul of GE frame 6B unit at Qatar Vinyl Chloride Power Plant, Qatar
Independently carried out Major Overhaul work with a team of 10 crews and One control TAin dayShift and 07 crews
and one Mechanical TAin night shift, GE received positive Feedback/ response from Customer
Prepared Major overhaul Report in FSR Auto with inspection protocols and pictures
March-2008 to April-2008: GE Gas Turbine frame 9E
Assigned as a Site Lead for Hot Gas Path Inspection of GE frame 9E, unit 1 B at Al Kamil Power Plant, Oman
Independentlycarried out Hot Gas Path Inspection work with a team of 09 crews in One Shift
Prepared Hot Gas Path Inspection Report in FSR Auto with inspection protocols and pictures
GE receivedappreciationletterfrom the Customerfor the professionalworkfor the outage, Rewarded byGE and Granite
for the outage work
Jan-2008 to February-2008 : GE Gas Turbine frame 9FA+2
Assigned as a MechanicalTechnicalAdvisor for CombustionInspection andR0compressorbladereplacement of GT21,
GT22 and GT23: total 03 units 9FA+2 with Dual Fuel at Umm Al Nar Power Plant, Abu Dhabi.
Independentlycarried out Combustion Inspection work with a team of 10 crews in Night Shift
GT21:CarriedoutCombustionInspectionandR0compressorbladereplacementandgeneratorH2 seal replacement for Unit
Serial no 298444 from 01-Dec-07 to 08-Dec-07
Prepared Combustion Inspection and R0 replacement Report in FSR Auto with inspection protocols.
GT22: Carried out Combustion Inspection of GT22- Unit Serial no 298446 from 09-Dec-07 to 15-Dec-07
Prepared Combustion Inspection Report in FSR Auto with inspection protocols.
GT23:CarriedoutHot GasPath Inspection andcompressorstatorshim pinning TIL of GT23- Unit Serial no 298447 from 19-
Jan-08 to 21-Feb-08
Removed Roof and enclosure for removing Compressor and Turbine casings, replaced First stage nozzles, carried out
R0 compressor blade and compressor stator vanes shim pinning, replaced Combustor components
5. Page 5 of 7
Dec-2007: GE Gas Turbine frame 9E
Assigned as a MechanicalTechnicalAdvisor from 21-Dec-07 to 24-Dec-07 for Alignment and Coupling job for GE frame
9E unit at Taweelah Power Plant, Abu Dhabi
IndependentlyCarriedout Generatorto Loadcouplingalignment,fixingthe load coupling- generator, Coupling bolt fixing
and bolt stretching for GE make 9E unit- serial no 295231
Nov-2007 to Dec-2007 : GE Gas Turbine frame 9FA+2
Assigned as a MechanicalTechnical Advisor for Combustion Inspection of total 02 units of Dual Fuel 9FA+2 at Umm Al
Nar Power Plant, Abu Dhabi.
Independentlycarried out Combustion Inspection work with a team of 10 crews in Night Shift
Prepared Combustion Inspection Report in FSR Auto with inspection protocols.
Carried out RO compressor blade replacement for GT24-unit serial no 298448.
GT24: Combustion Inspection of GT24- Unit Serial no 298448 from 01-Dec-07 to 08-Dec-07
R0 Compressor blade replacement of GT24 Unit Serial no 298448 from 16-Dec-07 to 19-Dec-07
GT25: Combustion Inspection of GT25- Unit Serial no 298449 from 09-Dec-07 to 15-Dec-07
Sep-2007 to Oct-2007: GE Gas Turbine 9FA+2
Assigned as a Mechanical Technical Advisor for Dabhol/ RGPPL Power Plant revival of GE 9FAGas turbines
GE Frame 9 FABlock 1 unit rebuild- 9FA/ DLN to 9FA+2/ DLN2+ combustion system upgrade for Block 1 units
Dismantling of turbine components- casings, Removal of Turbine compressor rotor, casings for repair
Inspection of dismantled turbine components-turbine, combustor, compressor
Documentation for Field Modification Instruction (FMI) implementation
Structural fabrication and erection for 9FA-337X Generator rotor removal
August 2007:
Attended GE Field Engineer Conference –AIM region at Dubai between 26 Aug-2007 to 30 Aug-2007
Apr-2007 to Jul-2007: GE Gas Turbine frame 6FA+2
Assigned as Lead GT Mechanical Field Engineer for Rebuild of 6FA+e GE gas turbine at Dhuvaran Plant, India
Single handed carried out unit rebuild work for GE- compressor stator vanes replacement, turbine bucketing, inspected
Gas turbine components, decide repair/ replacements, implemented FMI, TILs, assembled Turbine components.
Independently assembled the completed unit after breakdown, raised PAC cases, implemented recommendations,
attendedRFRand conferencecalls,completedgreenrotorrun in with consultation with M&D center, Atlanta and loading
of the unit.
Gas turbine systems RFR checks, Commissioning and Start up of unit, green rotor run in
GE received appreciation letter from the Customer for the professional work for the rebuild work
May-2007:GE GasTurbine frame6FA+2
Assigned as GT MechanicalFieldEngineer
CombustioninspectionofFrame6FA+2 gasturbine at Aban Power Ltd, Tamilnadu,India
Inspectionof combustionchamber/turbinecomponents,airinlet andexhaustinspection
July- October-2006
Attended FEP– Mechanical training atGEELC, SchenectadyUSA
GE certifiedtrainingofGas turbinesandGenerators,Basic engineeringtechniques,NDT,Borescopicinspection,Safety
andFirst Aid trainingat GE EnergyTrainingcenter,Schenectady,USA andGasturbine andGeneratormanufacturing
unit, Greenville,USA
2)
GSPC Pipavav Power Project, GSPC, Govt. of Gujarat, India
May2006to July2006
Designation: Mechanical Manager
Preparationof Prebid Technical specification of Mechanical equipments of a 700 MW PipavavCombined Cycle Power
Plant project including 02 nos HeavydutyGas Turbines and one steam turbine
3)
Larsen & Toubro Ltd, EPC Power, Baroda
June2004 to April 2006
Designation: Lead Mechanical Engineer
Erection & Commissioning of 233 MW GE 9FA+e Gas turbine, generator, auxiliaries and piping of EPC at Vemagiri
Combined Cycle Power Plant, Andhra Pradesh, India.
6. Page 6 of 7
Preorder, prereceipt documentation, prepared erection and commissioning schedules & micro schedules
Prepared lifting devices, structures, lifting beams for erection
FoundationChecks-Fixingofallthe embedments,measuredall the dimensions before, during and after gas turbine and
components erection, signed all protocols with GE and clients
Erection of Gas Turbine, generator stator, rotor insertion, auxiliaries and associated equipments/ packages,
compartments
Replacement of RO stage compressor blades at site
Inspection of pipe fit ups, welding, cleaning and erection of piping
Taken up/ resolved issues- fouling/ wrong supplies during erection with GE
Prepared commissioning checklist/ plans and performed joint checks with GE and customer, prepared protocols
Performed Red Flag Review of all systems before GT start up, GT commissioning activities
Operation of gas turbine during GT commissioning-Turning gear operation, first fire, FSNL run, over speed,
synchronization and HRSG steam blow out operation
4)
Steag encotec (I) Pvt. Ltd.- German MNC at GSEG, Hazira, Gujarat, India
June 2001 to April 2004
Designation: Senior Mechanical Engineer
Assignments: Handledmechanicalerection and maintenance of 156.1 MW combined cycle power plant with 2x 52 MW
GT8C2ABB Alstom gasturbines, 52.1 MWABB Alstom steam turbineand Balanceof Plants with German multinational-
Steag encotec in India.
ABB Alstom 52 MW GT8C2 model Gas Turbines at GSEG, Hazira.
Erection, commissioning & Mech. Maintenance of two nos 52 MW gas turbines
Combustion, borescopic inspections/assessment were carried out independently.
Majoroverhauls of gas turbines (Prepared bar chart, tools/consumables requirement, dismantling of turbine casing and
other parts, assessment & NDT, replacement of compressor & turbine blades, combustor liners, before dismantling &
after assemblyclearance measurements, prepared overhaul report).
Unit Rebuilds-Replaced all the blades of gas turbine and compressor, used blade tip grinder, witnessed balancing
activities, inserted balancing weights, used Everest VIT make borescope equipment
Steam turbine: Make: 52 MW ABB Alstom
Minor overhaul and Borescopic Inspection, used Everest VIT make borescope equipment
Independentlyhandled routine maintenance of steam turbine and auxiliaries
Replacement of LP last stage blades, rupture diaphragm, exhaust end bearings
Balance of plant and auxiliaries: Erection, commissioning, maintenance of pumps, compressors, agitators, fans and
blowers, gearboxes, oil centrifuges, heat exchangers, oil/ gas/ air filters, valves & mechanical seals, HRSG & cooling
towers, DM plant, DG sets, gas compressor station, fuel storage area, fire pump house and 50 TR central HVAC system
in power plant.
Carried out Condition monitoring activities of plant maintenance – equipment vibration, temperature level, lube oil –
recording, monitoring and analysis of data with SPM 2120 and SKF make Micro-vibe analyzers–recorded, monitored,
analyzed the collected data with the use of softwares and applied the corrective actions to the equipments.
Abroad Experience:
September-October 2001
Majoroverhaul of124MWMitsubishi Westing houseW701DGasturbineat Argentina
Majoroverhaulof Gas Turbine -dismantle/assembleturbineparts,assessmentandmeasurementofbeforedismantling/
after assemblyclearanceandpreparedoverhaulreportat 650MW powerplant, Aqua Del Cajon,Argentina withSteag
CapimeengineerduringSeptember/October2001
5)
At Oil and Natural GasCorporation,HaziraGasProcessing complex,Surat,India
March1993toMay2001 as Mechanical Supervisor/Coordinator with
PressureParts EngineeringCo-Mar-93toJul-95, UnitedVan Der Horst Ltd. Aug-95 to Sept-96,
SagarConstructionCo.-Oct-96to Nov-2000, S.S. Construction -Dec 2000to May2001
Mechanicalmaintenance,erection,commissioningofplantslikeLPG, GSU, SRU, boilerhouse& CogenerationPlantwith
GE USA-02 units/ BHEL, India-01unit, Frame5 – 25MW
Erectionandcommissioning GEframe5gasturbines andauxiliaries
Routinemaintenanceofgasturbinesand auxiliaries
7. Page 7 of 7
Combustionandborescopic inspection,MajoroverhaulGEframe5 Gas Turbines
Erection,commissioning,maintenanceofsinglestageand multistagecentrifugalandreciprocatingpumpsforBFP,
Hydrocarbonservice,reciprocating,centrifugalandscrewcompressors,agitators,fansand blowers,gearboxes,oil
centrifuges,heatexchangers,oil/gas/ air filters, valves & mechanicalseals,HRSG & fire tubeboilersin powerplantand
Gasprocessingplants.
6)
M/sRDS International atSteel plantprojectatEssarSteel II,HSM-HRCconstructionproject,Hazira, Surat
June1992 to March1993 asSite Engineer
Structuralerection,ducting&pipingwork,Equipmenterectionlikefans,blowers,stack-chimney
JOB RESPONSIBILITIES PERFORMED:
Onthe job technical consultationforerection,commissioning/overhaul,unit rebuilds uprate/R&M and trouble shooting to
customer engineers and contractor foreman/technicians/supervisors for GE Gas Turbines.
Study drawings to decide equipment repair/ replacement/ non-consistencies.
Carry out measurement,clearanceschecks during unit disassemblyand assembly, studyand review the measurements
with the O&M manuals, drawings.
Fillupdatasheets/ measurementprotocolsandUploadinginformation,clearanceprotocols/measurementsto GE PAC for
review and approval byExperts
KnowledgeaboutusingGE procedures, manuals, Erection and commissioning guide lines/ Red flag reviews, Lift plans,
Qualityand EHS requirements and Audits
Raise issues of nonconsistencies/ abnormalities/ problems with GE PAC and implement the suggested resolution
Carry out walk downs and checks/ inspections during assemblyand disassemblyand final checks.
Attend the conference calls with GE Technical experts.
Ensure compliance to OEM, ASME, ASTM, BS and ISO Standards requirements.
Awareness of IS standards, API, ASTM, ASME, PTC codes for gas turbines, pumps, compressors, vessels, piping and
materials.
Follow and ensure use of Permit To Work system, OSHAS 14001 safety systems and other safetyrequirements of the
plant.
Prepare reports-daily, weekly activity reports, shutdown/ overhaul reports; Combustion/Hot Gas Path/ Major over haul
report, Gas turbine Inlet inspection report, Borescopic inspection report and Unit rebuild report.
Plan & implement schedules for shutdowns/ overhauls/erection, preparation of work schedules-MS project/ bar chart/
Gantt chart for shutdown activities/ erection and for minor inspections/ major overhauls of Gas turbines
RESOURCESPLANNING-Preparedlistsofrequirementsof manpower,materials- spares & consumables, tools
and activitytiming/schedulingforEquipmentand planterection, commissioning, outage, overhaul/ shutdown
Used(after training)NDT testinglikedye penetranttest, flourocentparticletest, awareness about radiography, ultrasonic
and magnetic particle test
Knowledge about latest tools/ tackles, consumables like gaskets, o-rings, oil seals, bearings, gland packing, fasteners,
flanges, coupling, lubricating oil, adhesives, sealants etc. used for mechanical erection and maintenance/ overhauls.
Usedequipmentslike Hytorq and ITH make bolt stretching devices and coupling bolt tools, torque wrenches, alignment
tools andsoftwares, used vibration meterandvibration analyzers, gas turbinetools andtackles,equipmentslike blade tip
grinders, Olympus and Everest VIT make borescopes.
Successfullycompleted assignments as a GE Contract Performance Manager, Borescope TA, CBM inspector, GE Site
Lead and as a Technical Advisor for GE Gas Turbines in India and Abroad.
AWARDS FOR GE GAS TURBINE SERVICES WORK:
Alkamil, Oman 9E HGPI Oct 2008
QVC, Qatar 6B Major overhaul Oct 2009
Dhuvaran India 6FA Rebuild Oct 2010
GSII Quality Champion award -Manila, Philippines Conference
GE Safety Awards in March 2011 and Sept 2011