Resume:
Name: Vishweshkumar Chhotubhai Patel
Date of Birth: 19-Dec-1970
Birth Place: Surat, India. Nationality: Indian
Passport no: Z 2713627, Validity29-Dec-2023
PROFESSIONAL EXPERIENCE
 Worked as GE SiteLead,Technical Advisor,ContractPerfManager &ProjectManager for GEGasTurbines
 Gasturbine minor/majoroverhauls,unitrebuilds, erection,commissioning,androutinemaintenanceexperience
 Expertise in GE frame9FA,9FA+e, frame5, 6FA, 6FA+e,6B, 9E, AlstomGT8C2,Mitsubishi W701DGasTurbines,
 Experiencein erection,commissioning andmaintenance/shutdowns/overhaulsof equipments likepumps,compressors,
turbines, engines,fans, blowers,gearboxes,valves, heatexchangersandpipinginOilandGasprocessingplants(LPG,
CFU,GSU, KRU) and Powerplants
 Planning,schedulingandreporting ofGasTurbineoverhauls,erection &commissioning,plantshutdowns
 Awarded andAppreciatedby GE/ GSII/ Customersfor the outstandingperformanceandreceivedpositiveresponsefrom
customersforfinishingprojectsprofessionallywithqualityandsafety andwithinthe schedule
EDUCATION & TRAINING:
 BE (Mechanical)from SVRegionalEngineeringCollege(RECSuratnowSVNIT, Surat), June 1992,Ist classDistinction
 MBA(Marketing)from SouthGujaratUniversity, Surat, Evening programme,Sept1997, IInd class
 GE Energy:GEcertified trainingofGasturbines,Generators,Basic engineeringtechniques,NDT,Borescopic
inspection,Safetyand First Aid training at GE EnergyTraining center,Schenectady,USA andGasturbine and
Generatormanufacturingunit,Greenville,USA
 GE SiteLeadership Training:GE Tower,Singapore:SiteLeadershipandprojectmanagementtrainingprovidedat GE
trainingcentre,SingaporeduringJuly2009
 Alstom:OperationandMaintenanceofGasturbines& Steam turbines by ABB Alstom, PumpsbyKSB andKBL Pumps,
Fire& Safety training
PERSONAL DETAILS:
Address: B2/801, PrashiddhiApt, B/H PiplodJakat Naka, Piplod,Surat, Gujarat,India-395007
Tel:91-261-2252178,Mo:91-9898582551,91-8460836384,EMAIL: vishweshpatel@ymail.com,parvavpatel@yahoo.co.in
COMPUTER KNOWLEDGE:
 MS Office-Word, Excel, Power Point, MS Project, AutoCAD, Primavera, Photoshop, GE Field engineer’s work software
PREVIOUS ABROAD VISITS: Argentina, USA, Qatar, Oman, Abu Dhabi, Dubai and Singapore
WORK EXPERIENCE: Total MORE THAN 22 YEARS
1) March2016toApril 2016:CommissioningworkofGE makeFrame6BDLN1GasTurbineasaCommissioning Manager with
Cegelec EPC at LG7 project, ADGAS, Das Island, Abu Dhabi:
 Performed Gas Turbine and Systems commissioning and start up activities
2) GSII/GE Energy Field Engineer Services as a Lead Technical Advisor for Erection, commissioning, Overhauls &
RebuildsofGEGasTurbines frame5,6B,6FA, 9E and 9FA with Granite Services Intl. Inc. for India and Middle east
September2012-July2013: GEGas Turbine frame9EMajoroverhaulandUprate
 Assigned as a GSII Project Manager for Major overhaul and Renovation and Modernization/Uprate of 18 year old GE
Frame 9E Gas turbine at NTPC Kawas Power Project, Hazira, India
 Managed manpower and other resources for successful completion of the project
 Day and Night activityplanning and monitored progress
 Replaced compressor rotor, replaced combustion and HGP parts with all the uprated parts.
 Renovation Fr # 9E with modification in piping, ducting, bearing replacement.
 Supported Casing Optical alignment of all the casings and bearing housings.
 Supported for implementation of TILs, FMI
Page 2 of 7
June 2012: GE Gas Turbine frame 9FA+e Installation and commissioning
 Assigned on emergency basis for trouble shoot of GT rotor turning problem during commissioning stage of GE frame
9FA+e unit at OTPC project, Tripura, India
 Worked with GE site team and resolved the issue of GT rotor lift and turning
March- May2012: GE Gas Turbine frame 9FA+e Installation and commissioning
 Assigned as a GE Site Leadfor Gas turbineand auxiliaries erection activities for EPC contactor BHEL from March 2010
for GE frame 9FA+e unit at 350MW CCPP expansion project, GSEG, Hazira, Surat India
 Independently worked for GE for Erection activities from foundation check of GE frame 9FA+e and unit on
foundation.Erectionofeach and everyGT components,auxiliariesand GT piping.Commissioning and start-up
of the unit. Loaded unit to Base load and performance test of the gas turbine
 Prepared schedules, advised and controlled BHEL engineers for the all the erection and commissioning activities
 GT balance shot in Dec 2011
 GT synchronization and loading to base load and iDLN tuning and Performance testing
October- November 2011: GE ALSTOM Gas Turbine frame 9E
 Assigned as a Site Lead for Major overhaul job of GE frame 9E unit at Alkamil Power Plant, Oman
 Independently carried out Gas turbine and auxiliaries Major overhaul work with Granite Supervisors and Granite
manpower, night shift TAand local contractor manpower for scaffolds, bucket techs, NDT
 Prepared Major Inspection Report in eCRT with inspection protocols
 Attended customer dailymeetings, raised PAC cases, prepared GE dailyreporting- RT, CDS, DORs.
 Visited customersitein June 2011for pre outagepreparationandcustomermeetingandprepare report for laydown area
and outage preparedness and recommended suggestions for the upcoming outage.
April 2011: GE Gas Turbine frame 6FA+e
 Assigned as a GE Site Lead for Gas turbineand auxiliaries Erection/ commissioning activities for GE frame 6FA+e units
at Shravanthi Power project, Kashipura, Utranchal, India
March 2011: GE Gas Turbine frame 9FA+e
 Assigned as a MechanicalLeadTAforFuelgas leakidentificationandproblem rectificationfor phase2 unitduringMarch
2011 for phase 2 GE frame 9FA+e at Lanco Kondapalli Power Plant, Andhra Pradesh, India
 Independentlycarried out trouble shooting, rectification and restarted the unit
 Received appreciation from customer for the support provided byGE during the problem
January2011: GE Gas Turbine frame 9FA+e
 Assigned as a Site Lead for CombustionInspection andmodificationactivities of phase 2 unit during January2011 of GE
frame 9FA+e at Lanco Kondapalli Power Plant, Andhra Pradesh, India
 IndependentlycarriedoutCombustionInspection andmodificationactivitieswithalocalmanpower contractor team of 10
crews, 1 Supervisor in each shift, one control TAin dayshift and one Mechanical TAin night shift
 Prepared unit CI overhaul and modification report in eCRT with inspection protocols and pictures
September- October 2010: GE Gas Turbine frame 6FARebuild and Commissioning
 Independentlyworked as Lead GT Mechanical for Rebuild of 6FAGE gas turbine at Dhuvaran Power Plant, Gujarat
 Unit rebuild work for GE- compressor stator vanes replacement, turbine bucketing, inspected Gas turbine components,
decided repair/ replacements, implemented FMI, TILs, assembled Turbine components.
 Assembly of GT components after compressor failure/breakdown, raised PAC cases, implemented recommendations,
attendedRFRand conferencecalls,completedgreenrotorrun in with consultation with M&D center, Atlanta and loading
of the unit.
 Systems RFR checks, Commissioning and Start up of unit, green rotor run in
July 2010: GE Gas Turbine 9FA+e
 Assigned as CBM Inspector for 9FA+e Combustion components at Vemagiri Power Plant, Andhra Pradesh
July 2010: GE Gas Turbine 6FA+e
 Assigned as CBM Inspector for 6FA+e HGP and combustion components at GSEC, Dhuvaran Power Plant, India
May2010: GE Gas Turbine frame 9FA+e
 Assigned as a Site Lead for Combustion Inspection and compressor casing BHM modification activities of phase 1 unit
during May2010 of GE frame 9FA+e at Vemagiri Power Plant, Andhra Pradesh, India
Page 3 of 7
 IndependentlycarriedoutCombustionInspection andmodificationactivitieswithalocalmanpower contractor team of 10
crews, 1 Supervisor in each shift, one control TA in dayshift and one Mechanical TAin night shift
 Prepared unit CI overhaul and modification report in eCRT with inspection protocols and pictures
April 2010: Major overhaul/ NP-T upgrade of frame 5
 Assigned as a Technical Advisor for GE Frame 5 unit P to N/T uprate FMI/ Major overhaul for BGGTs work at Oil and
Natural Gas Corporation, Hazira Gas Processing complex, Surat, India during April 2010.
March 2010: GE Gas Turbine frame 9FA+e Installation
 Assigned as a Site Lead for Installation job of GE frame 9FA+e unit at Bawana Power Plant, New Delhi, India
Worked for erection of GE frame 9FA+e Gas Turbine unit no 3 at Bawana with Customer manpower
February- March 2010: GE Gas Turbine frame 9FA
 Assigned as a Site Lead for CombustionInspectionjobduringFebruary-March2010forunit 1A, GE frame9FA at RGPPL
unit at Dabhol, Ratnagiri power plant, India
 Combustion Inspection and modification activities with a team of 10 crews, 1 Supervisor in each shift, one control TAin
day shift and one Mechanical TAin night shift
 Prepared unit CI overhaul and modification report in FSR Auto with inspection protocols and pictures
February2010: GE Gas Turbine frame 9FA
 Assigned as a Technical Advisorfor No1bearingproblem rectification forced outage work during February- 2010 for unit
1B, GE frame 9FAat RGPPL unit at Dabhol, Ratnagiri power plant, India
 Worked for no 1 bearing replacement and associated work with a team of 10 crews, 1 Supervisor in night shift
December 2009: January2010- GE Gas Turbine frame 9FA+e
 Assigned as a Site Lead for Rehabilitationworkofunit 2A duringNovember2009andCombustioninspection and Rehab
work for unit 3B, GE frame 9FA+e at RGPPL unit at Dabhol, Ratnagiri power plant, India
 IndependentlycarriedoutCombustionInspectionandmodificationactivitieswithateam of 10crews,1 Supervisorin each
shift, one control TAin dayshift and one Mechanical TAin night shift
 Prepared unit CI overhaul and modification report in FSR Auto with inspection protocols and pictures
November 2009: GE Gas Turbine frame 9FA+e: Installation
 Assigned as Installation Site Lead for Erection of GE 9FA+e gas turbine (unit 2) on foundation, pre and post erection
checks at Bawana, India during November 2009
October-2009: GE Gas Turbine frame 6B
 Assigned as a Site Lead for Hot Gas path Inspection of GE frame 6B unit at QVC Power Plant, Qatar
 Independentlycarried out Hot Gas path Inspection with a team of 8 crews and One control TAin dayShift and 07 crews
and one Mechanical TA in night shift, received positive Feedback/ response from Customer as outage was finished
successfully03 days before scheduled date
 Prepared HGPI overhaul Report in FSR Auto with inspection protocols and pictures
July 2009: Attended Site Leadership Training at GE Tower, Singapore from 19.07.09 to 31.07.09
May- July 2009: GE Gas Turbine frame 9FA+e Installation
 Assigned as a Site Lead for Installation job of GE frame 9FA+e unit at LANCO Power Plant, India
 Worked as Site Lead for Gas Turbine, Auxiliaries, Generator, Filter house and Piping erection work with supporting
Technical Advisor and Customer provided manpower
February- April 2009: GE ALSTOM Gas Turbine frame 9E
 Assigned as a Site Lead for Major over haul job of GE frame 9E unit at United Power Company, Oman
 Independentlycarried out Major Inspection work with Supervisor and a Customer provided Technicians
 Prepared Major Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
January2009: GE Gas Turbine frame 6FA+e:
 Assigned as a Site Lead for Liner Replacement + turbine casing lifting job of GE frame 6FA+e unit at Dhuvaran, GSEC
Power Plant, Gujarat, India
 Independentlycarried out liner replacement work with supporting contractor Supervisors and Technicians
 Prepared Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
Page 4 of 7
December 2008: GE Gas Turbine frame 6FA
 Assigned as a Site Lead for Major Overhaul of GE frame 6FAunit at Dhuvaran, GSEC Power Plant, Gujarat, India
 Independentlycarried out Major Inspection work with supporting GE TAs, contractor Supervisors and Technicians
 Prepared Major overhaul Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
November 2008: GE Gas Turbine frame 6FA+e
 Assigned as a Site Lead for Combustion inspection job of GE frame 6FA+e unit at Dhuvaran Power Plant, Gujarat, India
 IndependentlycarriedoutCombustionInspectionworkwithsupportingGE TAs, contractor Supervisors and Technicians
 Prepared Combustion Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS,
DORs.
October 2008: GE Gas Turbine frame 9E
 Assigned as a Site Lead for Combustion inspection job of GE frame 9E unit at Al Kamil Power Plant, Oman
 Independentlycarried out Combustion Inspection work with a Supervisor and 08 Technicians
 Prepared Combustion Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS,
DORs.
August 2008: GE Gas Turbine frame 9E
 Assigned as Site Lead for Combustion inspection + S1N replacement of 9E unit at LANCO, Kondapalli, Vijaywada, India
 Independentlycarried out Combustion Inspection and stage 1 nozzle replacement work
 Prepared Combustion Inspection Report with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
May- August 2008 : GE Gas Turbines- frame 6FA+2 and 6FA
 Worked as a GE Contract Performance Manager for 214.5 MW CCPP with GE frame 6FA+e and 6FAunits at GSEC,
Dhuvaran, Gujarat, India
 Managed as a First CPM on site for commencing the GE LTSAwith GSEC, Dhuvaran
May2008: GE Gas Turbine 9FA+2
 Assigned as a Borescope TAfor GE frame 9FA+e unit at Vemagiri Power Plant, Andhra Pradesh, India
 Borescope inspection work with Olympus make Borescope
April-2008 to May2008: GE Gas Turbine frame 6B
 Assigned as a Site Lead for Major Overhaul of GE frame 6B unit at Qatar Vinyl Chloride Power Plant, Qatar
 Independently carried out Major Overhaul work with a team of 10 crews and One control TAin dayShift and 07 crews
and one Mechanical TAin night shift, GE received positive Feedback/ response from Customer
 Prepared Major overhaul Report in FSR Auto with inspection protocols and pictures
March-2008 to April-2008: GE Gas Turbine frame 9E
 Assigned as a Site Lead for Hot Gas Path Inspection of GE frame 9E, unit 1 B at Al Kamil Power Plant, Oman
 Independentlycarried out Hot Gas Path Inspection work with a team of 09 crews in One Shift
 Prepared Hot Gas Path Inspection Report in FSR Auto with inspection protocols and pictures
 GE receivedappreciationletterfrom the Customerfor the professionalworkfor the outage, Rewarded byGE and Granite
for the outage work
Jan-2008 to February-2008 : GE Gas Turbine frame 9FA+2
 Assigned as a MechanicalTechnicalAdvisor for CombustionInspection andR0compressorbladereplacement of GT21,
GT22 and GT23: total 03 units 9FA+2 with Dual Fuel at Umm Al Nar Power Plant, Abu Dhabi.
 Independentlycarried out Combustion Inspection work with a team of 10 crews in Night Shift
GT21:CarriedoutCombustionInspectionandR0compressorbladereplacementandgeneratorH2 seal replacement for Unit
Serial no 298444 from 01-Dec-07 to 08-Dec-07
 Prepared Combustion Inspection and R0 replacement Report in FSR Auto with inspection protocols.
GT22: Carried out Combustion Inspection of GT22- Unit Serial no 298446 from 09-Dec-07 to 15-Dec-07
 Prepared Combustion Inspection Report in FSR Auto with inspection protocols.
GT23:CarriedoutHot GasPath Inspection andcompressorstatorshim pinning TIL of GT23- Unit Serial no 298447 from 19-
Jan-08 to 21-Feb-08
 Removed Roof and enclosure for removing Compressor and Turbine casings, replaced First stage nozzles, carried out
R0 compressor blade and compressor stator vanes shim pinning, replaced Combustor components
Page 5 of 7
Dec-2007: GE Gas Turbine frame 9E
 Assigned as a MechanicalTechnicalAdvisor from 21-Dec-07 to 24-Dec-07 for Alignment and Coupling job for GE frame
9E unit at Taweelah Power Plant, Abu Dhabi
 IndependentlyCarriedout Generatorto Loadcouplingalignment,fixingthe load coupling- generator, Coupling bolt fixing
and bolt stretching for GE make 9E unit- serial no 295231
Nov-2007 to Dec-2007 : GE Gas Turbine frame 9FA+2
 Assigned as a MechanicalTechnical Advisor for Combustion Inspection of total 02 units of Dual Fuel 9FA+2 at Umm Al
Nar Power Plant, Abu Dhabi.
 Independentlycarried out Combustion Inspection work with a team of 10 crews in Night Shift
 Prepared Combustion Inspection Report in FSR Auto with inspection protocols.
 Carried out RO compressor blade replacement for GT24-unit serial no 298448.
 GT24: Combustion Inspection of GT24- Unit Serial no 298448 from 01-Dec-07 to 08-Dec-07
 R0 Compressor blade replacement of GT24 Unit Serial no 298448 from 16-Dec-07 to 19-Dec-07
 GT25: Combustion Inspection of GT25- Unit Serial no 298449 from 09-Dec-07 to 15-Dec-07
Sep-2007 to Oct-2007: GE Gas Turbine 9FA+2
 Assigned as a Mechanical Technical Advisor for Dabhol/ RGPPL Power Plant revival of GE 9FAGas turbines
 GE Frame 9 FABlock 1 unit rebuild- 9FA/ DLN to 9FA+2/ DLN2+ combustion system upgrade for Block 1 units
 Dismantling of turbine components- casings, Removal of Turbine compressor rotor, casings for repair
 Inspection of dismantled turbine components-turbine, combustor, compressor
 Documentation for Field Modification Instruction (FMI) implementation
 Structural fabrication and erection for 9FA-337X Generator rotor removal
August 2007:
 Attended GE Field Engineer Conference –AIM region at Dubai between 26 Aug-2007 to 30 Aug-2007
Apr-2007 to Jul-2007: GE Gas Turbine frame 6FA+2
 Assigned as Lead GT Mechanical Field Engineer for Rebuild of 6FA+e GE gas turbine at Dhuvaran Plant, India
 Single handed carried out unit rebuild work for GE- compressor stator vanes replacement, turbine bucketing, inspected
Gas turbine components, decide repair/ replacements, implemented FMI, TILs, assembled Turbine components.
 Independently assembled the completed unit after breakdown, raised PAC cases, implemented recommendations,
attendedRFRand conferencecalls,completedgreenrotorrun in with consultation with M&D center, Atlanta and loading
of the unit.
 Gas turbine systems RFR checks, Commissioning and Start up of unit, green rotor run in
 GE received appreciation letter from the Customer for the professional work for the rebuild work
May-2007:GE GasTurbine frame6FA+2
 Assigned as GT MechanicalFieldEngineer
 CombustioninspectionofFrame6FA+2 gasturbine at Aban Power Ltd, Tamilnadu,India
 Inspectionof combustionchamber/turbinecomponents,airinlet andexhaustinspection
July- October-2006
 Attended FEP– Mechanical training atGEELC, SchenectadyUSA
 GE certifiedtrainingofGas turbinesandGenerators,Basic engineeringtechniques,NDT,Borescopicinspection,Safety
andFirst Aid trainingat GE EnergyTrainingcenter,Schenectady,USA andGasturbine andGeneratormanufacturing
unit, Greenville,USA
2)
GSPC Pipavav Power Project, GSPC, Govt. of Gujarat, India
May2006to July2006
 Designation: Mechanical Manager
 Preparationof Prebid Technical specification of Mechanical equipments of a 700 MW PipavavCombined Cycle Power
Plant project including 02 nos HeavydutyGas Turbines and one steam turbine
3)
Larsen & Toubro Ltd, EPC Power, Baroda
June2004 to April 2006
 Designation: Lead Mechanical Engineer
 Erection & Commissioning of 233 MW GE 9FA+e Gas turbine, generator, auxiliaries and piping of EPC at Vemagiri
Combined Cycle Power Plant, Andhra Pradesh, India.
Page 6 of 7
 Preorder, prereceipt documentation, prepared erection and commissioning schedules & micro schedules
 Prepared lifting devices, structures, lifting beams for erection
 FoundationChecks-Fixingofallthe embedments,measuredall the dimensions before, during and after gas turbine and
components erection, signed all protocols with GE and clients
 Erection of Gas Turbine, generator stator, rotor insertion, auxiliaries and associated equipments/ packages,
compartments
 Replacement of RO stage compressor blades at site
 Inspection of pipe fit ups, welding, cleaning and erection of piping
 Taken up/ resolved issues- fouling/ wrong supplies during erection with GE
 Prepared commissioning checklist/ plans and performed joint checks with GE and customer, prepared protocols
 Performed Red Flag Review of all systems before GT start up, GT commissioning activities
 Operation of gas turbine during GT commissioning-Turning gear operation, first fire, FSNL run, over speed,
synchronization and HRSG steam blow out operation
4)
Steag encotec (I) Pvt. Ltd.- German MNC at GSEG, Hazira, Gujarat, India
June 2001 to April 2004
 Designation: Senior Mechanical Engineer
 Assignments: Handledmechanicalerection and maintenance of 156.1 MW combined cycle power plant with 2x 52 MW
GT8C2ABB Alstom gasturbines, 52.1 MWABB Alstom steam turbineand Balanceof Plants with German multinational-
Steag encotec in India.
 ABB Alstom 52 MW GT8C2 model Gas Turbines at GSEG, Hazira.
 Erection, commissioning & Mech. Maintenance of two nos 52 MW gas turbines
 Combustion, borescopic inspections/assessment were carried out independently.
 Majoroverhauls of gas turbines (Prepared bar chart, tools/consumables requirement, dismantling of turbine casing and
other parts, assessment & NDT, replacement of compressor & turbine blades, combustor liners, before dismantling &
after assemblyclearance measurements, prepared overhaul report).
 Unit Rebuilds-Replaced all the blades of gas turbine and compressor, used blade tip grinder, witnessed balancing
activities, inserted balancing weights, used Everest VIT make borescope equipment
 Steam turbine: Make: 52 MW ABB Alstom
 Minor overhaul and Borescopic Inspection, used Everest VIT make borescope equipment
 Independentlyhandled routine maintenance of steam turbine and auxiliaries
 Replacement of LP last stage blades, rupture diaphragm, exhaust end bearings
 Balance of plant and auxiliaries: Erection, commissioning, maintenance of pumps, compressors, agitators, fans and
blowers, gearboxes, oil centrifuges, heat exchangers, oil/ gas/ air filters, valves & mechanical seals, HRSG & cooling
towers, DM plant, DG sets, gas compressor station, fuel storage area, fire pump house and 50 TR central HVAC system
in power plant.
 Carried out Condition monitoring activities of plant maintenance – equipment vibration, temperature level, lube oil –
recording, monitoring and analysis of data with SPM 2120 and SKF make Micro-vibe analyzers–recorded, monitored,
analyzed the collected data with the use of softwares and applied the corrective actions to the equipments.
 Abroad Experience:
September-October 2001
 Majoroverhaul of124MWMitsubishi Westing houseW701DGasturbineat Argentina
 Majoroverhaulof Gas Turbine -dismantle/assembleturbineparts,assessmentandmeasurementofbeforedismantling/
after assemblyclearanceandpreparedoverhaulreportat 650MW powerplant, Aqua Del Cajon,Argentina withSteag
CapimeengineerduringSeptember/October2001
5)
At Oil and Natural GasCorporation,HaziraGasProcessing complex,Surat,India
March1993toMay2001 as Mechanical Supervisor/Coordinator with
 PressureParts EngineeringCo-Mar-93toJul-95, UnitedVan Der Horst Ltd. Aug-95 to Sept-96,
 SagarConstructionCo.-Oct-96to Nov-2000, S.S. Construction -Dec 2000to May2001
 Mechanicalmaintenance,erection,commissioningofplantslikeLPG, GSU, SRU, boilerhouse& CogenerationPlantwith
GE USA-02 units/ BHEL, India-01unit, Frame5 – 25MW
 Erectionandcommissioning GEframe5gasturbines andauxiliaries
 Routinemaintenanceofgasturbinesand auxiliaries
Page 7 of 7
 Combustionandborescopic inspection,MajoroverhaulGEframe5 Gas Turbines
 Erection,commissioning,maintenanceofsinglestageand multistagecentrifugalandreciprocatingpumpsforBFP,
Hydrocarbonservice,reciprocating,centrifugalandscrewcompressors,agitators,fansand blowers,gearboxes,oil
centrifuges,heatexchangers,oil/gas/ air filters, valves & mechanicalseals,HRSG & fire tubeboilersin powerplantand
Gasprocessingplants.
6)
M/sRDS International atSteel plantprojectatEssarSteel II,HSM-HRCconstructionproject,Hazira, Surat
June1992 to March1993 asSite Engineer
 Structuralerection,ducting&pipingwork,Equipmenterectionlikefans,blowers,stack-chimney
JOB RESPONSIBILITIES PERFORMED:
 Onthe job technical consultationforerection,commissioning/overhaul,unit rebuilds uprate/R&M and trouble shooting to
customer engineers and contractor foreman/technicians/supervisors for GE Gas Turbines.
 Study drawings to decide equipment repair/ replacement/ non-consistencies.
 Carry out measurement,clearanceschecks during unit disassemblyand assembly, studyand review the measurements
with the O&M manuals, drawings.
 Fillupdatasheets/ measurementprotocolsandUploadinginformation,clearanceprotocols/measurementsto GE PAC for
review and approval byExperts
 KnowledgeaboutusingGE procedures, manuals, Erection and commissioning guide lines/ Red flag reviews, Lift plans,
Qualityand EHS requirements and Audits
 Raise issues of nonconsistencies/ abnormalities/ problems with GE PAC and implement the suggested resolution
 Carry out walk downs and checks/ inspections during assemblyand disassemblyand final checks.
 Attend the conference calls with GE Technical experts.
 Ensure compliance to OEM, ASME, ASTM, BS and ISO Standards requirements.
 Awareness of IS standards, API, ASTM, ASME, PTC codes for gas turbines, pumps, compressors, vessels, piping and
materials.
 Follow and ensure use of Permit To Work system, OSHAS 14001 safety systems and other safetyrequirements of the
plant.
 Prepare reports-daily, weekly activity reports, shutdown/ overhaul reports; Combustion/Hot Gas Path/ Major over haul
report, Gas turbine Inlet inspection report, Borescopic inspection report and Unit rebuild report.
 Plan & implement schedules for shutdowns/ overhauls/erection, preparation of work schedules-MS project/ bar chart/
Gantt chart for shutdown activities/ erection and for minor inspections/ major overhauls of Gas turbines
 RESOURCESPLANNING-Preparedlistsofrequirementsof manpower,materials- spares & consumables, tools
and activitytiming/schedulingforEquipmentand planterection, commissioning, outage, overhaul/ shutdown
 Used(after training)NDT testinglikedye penetranttest, flourocentparticletest, awareness about radiography, ultrasonic
and magnetic particle test
 Knowledge about latest tools/ tackles, consumables like gaskets, o-rings, oil seals, bearings, gland packing, fasteners,
flanges, coupling, lubricating oil, adhesives, sealants etc. used for mechanical erection and maintenance/ overhauls.
 Usedequipmentslike Hytorq and ITH make bolt stretching devices and coupling bolt tools, torque wrenches, alignment
tools andsoftwares, used vibration meterandvibration analyzers, gas turbinetools andtackles,equipmentslike blade tip
grinders, Olympus and Everest VIT make borescopes.
 Successfullycompleted assignments as a GE Contract Performance Manager, Borescope TA, CBM inspector, GE Site
Lead and as a Technical Advisor for GE Gas Turbines in India and Abroad.
AWARDS FOR GE GAS TURBINE SERVICES WORK:
 Alkamil, Oman 9E HGPI Oct 2008
 QVC, Qatar 6B Major overhaul Oct 2009
 Dhuvaran India 6FA Rebuild Oct 2010
 GSII Quality Champion award -Manila, Philippines Conference
 GE Safety Awards in March 2011 and Sept 2011

More Related Content

What's hot

What's hot (20)

Kannan resume
Kannan resumeKannan resume
Kannan resume
 
Cv Rafee
Cv Rafee Cv Rafee
Cv Rafee
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
 
1Nader-SeniorOperator-CV
1Nader-SeniorOperator-CV1Nader-SeniorOperator-CV
1Nader-SeniorOperator-CV
 
UP DATED WORD FILE CV. Master copy
UP DATED WORD FILE CV. Master copy UP DATED WORD FILE CV. Master copy
UP DATED WORD FILE CV. Master copy
 
Ghulam Farid cv
Ghulam Farid cvGhulam Farid cv
Ghulam Farid cv
 
23-01-2015(Millwright Technicion)
23-01-2015(Millwright Technicion)23-01-2015(Millwright Technicion)
23-01-2015(Millwright Technicion)
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
Field Production Operator CV
Field Production Operator CVField Production Operator CV
Field Production Operator CV
 
Ahmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP FinalAhmad Ali Khan AGP EXP Final
Ahmad Ali Khan AGP EXP Final
 
MAPS TG
MAPS TGMAPS TG
MAPS TG
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
Resume - C.P. Johny
Resume - C.P. JohnyResume - C.P. Johny
Resume - C.P. Johny
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Cruz Mech Tech
Cruz Mech TechCruz Mech Tech
Cruz Mech Tech
 
Resume - Herman Waminan 25 Jan 2014
Resume - Herman Waminan  25 Jan 2014Resume - Herman Waminan  25 Jan 2014
Resume - Herman Waminan 25 Jan 2014
 
cv
cv cv
cv
 
N.Saravanan
N.SaravananN.Saravanan
N.Saravanan
 
Mohmed ali haroun CV
Mohmed ali haroun  CVMohmed ali haroun  CV
Mohmed ali haroun CV
 
Resume R
Resume RResume R
Resume R
 

Viewers also liked

boiler operator cv
boiler operator cvboiler operator cv
boiler operator cvHamad Talhaa
 
Petrochemical hub of india gujarat
Petrochemical hub of india gujaratPetrochemical hub of india gujarat
Petrochemical hub of india gujaratKalahub
 
Top 8 power plant engineer resume samples
Top 8 power plant engineer resume samplesTop 8 power plant engineer resume samples
Top 8 power plant engineer resume samplestonychoper2305
 
Reliance petroleum limited
Reliance petroleum limitedReliance petroleum limited
Reliance petroleum limitedRavin Gandhi
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Sachin Pyasi
 
16 Enjoyable Business Lessons from Sex
16 Enjoyable Business Lessons from Sex16 Enjoyable Business Lessons from Sex
16 Enjoyable Business Lessons from SexAndrew Morrison
 

Viewers also liked (10)

SIVA RESUME JAN 2014
SIVA RESUME JAN 2014SIVA RESUME JAN 2014
SIVA RESUME JAN 2014
 
Fsd113eng turbomachinery
Fsd113eng turbomachineryFsd113eng turbomachinery
Fsd113eng turbomachinery
 
new C.v.update_antonio2
new C.v.update_antonio2new C.v.update_antonio2
new C.v.update_antonio2
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cv
 
Petrochemical hub of india gujarat
Petrochemical hub of india gujaratPetrochemical hub of india gujarat
Petrochemical hub of india gujarat
 
Top 8 power plant engineer resume samples
Top 8 power plant engineer resume samplesTop 8 power plant engineer resume samples
Top 8 power plant engineer resume samples
 
Reliance petroleum limited
Reliance petroleum limitedReliance petroleum limited
Reliance petroleum limited
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
CV-RC.-2015
CV-RC.-2015CV-RC.-2015
CV-RC.-2015
 
16 Enjoyable Business Lessons from Sex
16 Enjoyable Business Lessons from Sex16 Enjoyable Business Lessons from Sex
16 Enjoyable Business Lessons from Sex
 

Similar to Resume_vishwesh_April 16

Similar to Resume_vishwesh_April 16 (20)

CV - Hussin Bin Ahmad
CV - Hussin Bin AhmadCV - Hussin Bin Ahmad
CV - Hussin Bin Ahmad
 
Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.
 
Sudipto Bhattacharjee Resume
Sudipto Bhattacharjee ResumeSudipto Bhattacharjee Resume
Sudipto Bhattacharjee Resume
 
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
 
Iqbal cv...final
Iqbal cv...finalIqbal cv...final
Iqbal cv...final
 
Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013Gencos Rehabilitation 27.03.2013
Gencos Rehabilitation 27.03.2013
 
Gencos rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013Gencos rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
GSShukla 2016
GSShukla 2016GSShukla 2016
GSShukla 2016
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
CV 杨文超英文版
CV 杨文超英文版CV 杨文超英文版
CV 杨文超英文版
 
Uks resum 14.02.2014
Uks resum   14.02.2014Uks resum   14.02.2014
Uks resum 14.02.2014
 
ANUPAM RESUME
ANUPAM RESUMEANUPAM RESUME
ANUPAM RESUME
 
Detailed Profile K Soma Sekhar
Detailed Profile K Soma SekharDetailed Profile K Soma Sekhar
Detailed Profile K Soma Sekhar
 
WAQAR ZEB CV
WAQAR ZEB CVWAQAR ZEB CV
WAQAR ZEB CV
 
CV Tulus Widianto Update
CV Tulus Widianto UpdateCV Tulus Widianto Update
CV Tulus Widianto Update
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
 
CustomerCopy final
CustomerCopy finalCustomerCopy final
CustomerCopy final
 
Koneru_Raj_kumar_2
Koneru_Raj_kumar_2Koneru_Raj_kumar_2
Koneru_Raj_kumar_2
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 

Resume_vishwesh_April 16

  • 1. Page 1 of 7 Resume: Name: Vishweshkumar Chhotubhai Patel Date of Birth: 19-Dec-1970 Birth Place: Surat, India. Nationality: Indian Passport no: Z 2713627, Validity29-Dec-2023 PROFESSIONAL EXPERIENCE  Worked as GE SiteLead,Technical Advisor,ContractPerfManager &ProjectManager for GEGasTurbines  Gasturbine minor/majoroverhauls,unitrebuilds, erection,commissioning,androutinemaintenanceexperience  Expertise in GE frame9FA,9FA+e, frame5, 6FA, 6FA+e,6B, 9E, AlstomGT8C2,Mitsubishi W701DGasTurbines,  Experiencein erection,commissioning andmaintenance/shutdowns/overhaulsof equipments likepumps,compressors, turbines, engines,fans, blowers,gearboxes,valves, heatexchangersandpipinginOilandGasprocessingplants(LPG, CFU,GSU, KRU) and Powerplants  Planning,schedulingandreporting ofGasTurbineoverhauls,erection &commissioning,plantshutdowns  Awarded andAppreciatedby GE/ GSII/ Customersfor the outstandingperformanceandreceivedpositiveresponsefrom customersforfinishingprojectsprofessionallywithqualityandsafety andwithinthe schedule EDUCATION & TRAINING:  BE (Mechanical)from SVRegionalEngineeringCollege(RECSuratnowSVNIT, Surat), June 1992,Ist classDistinction  MBA(Marketing)from SouthGujaratUniversity, Surat, Evening programme,Sept1997, IInd class  GE Energy:GEcertified trainingofGasturbines,Generators,Basic engineeringtechniques,NDT,Borescopic inspection,Safetyand First Aid training at GE EnergyTraining center,Schenectady,USA andGasturbine and Generatormanufacturingunit,Greenville,USA  GE SiteLeadership Training:GE Tower,Singapore:SiteLeadershipandprojectmanagementtrainingprovidedat GE trainingcentre,SingaporeduringJuly2009  Alstom:OperationandMaintenanceofGasturbines& Steam turbines by ABB Alstom, PumpsbyKSB andKBL Pumps, Fire& Safety training PERSONAL DETAILS: Address: B2/801, PrashiddhiApt, B/H PiplodJakat Naka, Piplod,Surat, Gujarat,India-395007 Tel:91-261-2252178,Mo:91-9898582551,91-8460836384,EMAIL: vishweshpatel@ymail.com,parvavpatel@yahoo.co.in COMPUTER KNOWLEDGE:  MS Office-Word, Excel, Power Point, MS Project, AutoCAD, Primavera, Photoshop, GE Field engineer’s work software PREVIOUS ABROAD VISITS: Argentina, USA, Qatar, Oman, Abu Dhabi, Dubai and Singapore WORK EXPERIENCE: Total MORE THAN 22 YEARS 1) March2016toApril 2016:CommissioningworkofGE makeFrame6BDLN1GasTurbineasaCommissioning Manager with Cegelec EPC at LG7 project, ADGAS, Das Island, Abu Dhabi:  Performed Gas Turbine and Systems commissioning and start up activities 2) GSII/GE Energy Field Engineer Services as a Lead Technical Advisor for Erection, commissioning, Overhauls & RebuildsofGEGasTurbines frame5,6B,6FA, 9E and 9FA with Granite Services Intl. Inc. for India and Middle east September2012-July2013: GEGas Turbine frame9EMajoroverhaulandUprate  Assigned as a GSII Project Manager for Major overhaul and Renovation and Modernization/Uprate of 18 year old GE Frame 9E Gas turbine at NTPC Kawas Power Project, Hazira, India  Managed manpower and other resources for successful completion of the project  Day and Night activityplanning and monitored progress  Replaced compressor rotor, replaced combustion and HGP parts with all the uprated parts.  Renovation Fr # 9E with modification in piping, ducting, bearing replacement.  Supported Casing Optical alignment of all the casings and bearing housings.  Supported for implementation of TILs, FMI
  • 2. Page 2 of 7 June 2012: GE Gas Turbine frame 9FA+e Installation and commissioning  Assigned on emergency basis for trouble shoot of GT rotor turning problem during commissioning stage of GE frame 9FA+e unit at OTPC project, Tripura, India  Worked with GE site team and resolved the issue of GT rotor lift and turning March- May2012: GE Gas Turbine frame 9FA+e Installation and commissioning  Assigned as a GE Site Leadfor Gas turbineand auxiliaries erection activities for EPC contactor BHEL from March 2010 for GE frame 9FA+e unit at 350MW CCPP expansion project, GSEG, Hazira, Surat India  Independently worked for GE for Erection activities from foundation check of GE frame 9FA+e and unit on foundation.Erectionofeach and everyGT components,auxiliariesand GT piping.Commissioning and start-up of the unit. Loaded unit to Base load and performance test of the gas turbine  Prepared schedules, advised and controlled BHEL engineers for the all the erection and commissioning activities  GT balance shot in Dec 2011  GT synchronization and loading to base load and iDLN tuning and Performance testing October- November 2011: GE ALSTOM Gas Turbine frame 9E  Assigned as a Site Lead for Major overhaul job of GE frame 9E unit at Alkamil Power Plant, Oman  Independently carried out Gas turbine and auxiliaries Major overhaul work with Granite Supervisors and Granite manpower, night shift TAand local contractor manpower for scaffolds, bucket techs, NDT  Prepared Major Inspection Report in eCRT with inspection protocols  Attended customer dailymeetings, raised PAC cases, prepared GE dailyreporting- RT, CDS, DORs.  Visited customersitein June 2011for pre outagepreparationandcustomermeetingandprepare report for laydown area and outage preparedness and recommended suggestions for the upcoming outage. April 2011: GE Gas Turbine frame 6FA+e  Assigned as a GE Site Lead for Gas turbineand auxiliaries Erection/ commissioning activities for GE frame 6FA+e units at Shravanthi Power project, Kashipura, Utranchal, India March 2011: GE Gas Turbine frame 9FA+e  Assigned as a MechanicalLeadTAforFuelgas leakidentificationandproblem rectificationfor phase2 unitduringMarch 2011 for phase 2 GE frame 9FA+e at Lanco Kondapalli Power Plant, Andhra Pradesh, India  Independentlycarried out trouble shooting, rectification and restarted the unit  Received appreciation from customer for the support provided byGE during the problem January2011: GE Gas Turbine frame 9FA+e  Assigned as a Site Lead for CombustionInspection andmodificationactivities of phase 2 unit during January2011 of GE frame 9FA+e at Lanco Kondapalli Power Plant, Andhra Pradesh, India  IndependentlycarriedoutCombustionInspection andmodificationactivitieswithalocalmanpower contractor team of 10 crews, 1 Supervisor in each shift, one control TAin dayshift and one Mechanical TAin night shift  Prepared unit CI overhaul and modification report in eCRT with inspection protocols and pictures September- October 2010: GE Gas Turbine frame 6FARebuild and Commissioning  Independentlyworked as Lead GT Mechanical for Rebuild of 6FAGE gas turbine at Dhuvaran Power Plant, Gujarat  Unit rebuild work for GE- compressor stator vanes replacement, turbine bucketing, inspected Gas turbine components, decided repair/ replacements, implemented FMI, TILs, assembled Turbine components.  Assembly of GT components after compressor failure/breakdown, raised PAC cases, implemented recommendations, attendedRFRand conferencecalls,completedgreenrotorrun in with consultation with M&D center, Atlanta and loading of the unit.  Systems RFR checks, Commissioning and Start up of unit, green rotor run in July 2010: GE Gas Turbine 9FA+e  Assigned as CBM Inspector for 9FA+e Combustion components at Vemagiri Power Plant, Andhra Pradesh July 2010: GE Gas Turbine 6FA+e  Assigned as CBM Inspector for 6FA+e HGP and combustion components at GSEC, Dhuvaran Power Plant, India May2010: GE Gas Turbine frame 9FA+e  Assigned as a Site Lead for Combustion Inspection and compressor casing BHM modification activities of phase 1 unit during May2010 of GE frame 9FA+e at Vemagiri Power Plant, Andhra Pradesh, India
  • 3. Page 3 of 7  IndependentlycarriedoutCombustionInspection andmodificationactivitieswithalocalmanpower contractor team of 10 crews, 1 Supervisor in each shift, one control TA in dayshift and one Mechanical TAin night shift  Prepared unit CI overhaul and modification report in eCRT with inspection protocols and pictures April 2010: Major overhaul/ NP-T upgrade of frame 5  Assigned as a Technical Advisor for GE Frame 5 unit P to N/T uprate FMI/ Major overhaul for BGGTs work at Oil and Natural Gas Corporation, Hazira Gas Processing complex, Surat, India during April 2010. March 2010: GE Gas Turbine frame 9FA+e Installation  Assigned as a Site Lead for Installation job of GE frame 9FA+e unit at Bawana Power Plant, New Delhi, India Worked for erection of GE frame 9FA+e Gas Turbine unit no 3 at Bawana with Customer manpower February- March 2010: GE Gas Turbine frame 9FA  Assigned as a Site Lead for CombustionInspectionjobduringFebruary-March2010forunit 1A, GE frame9FA at RGPPL unit at Dabhol, Ratnagiri power plant, India  Combustion Inspection and modification activities with a team of 10 crews, 1 Supervisor in each shift, one control TAin day shift and one Mechanical TAin night shift  Prepared unit CI overhaul and modification report in FSR Auto with inspection protocols and pictures February2010: GE Gas Turbine frame 9FA  Assigned as a Technical Advisorfor No1bearingproblem rectification forced outage work during February- 2010 for unit 1B, GE frame 9FAat RGPPL unit at Dabhol, Ratnagiri power plant, India  Worked for no 1 bearing replacement and associated work with a team of 10 crews, 1 Supervisor in night shift December 2009: January2010- GE Gas Turbine frame 9FA+e  Assigned as a Site Lead for Rehabilitationworkofunit 2A duringNovember2009andCombustioninspection and Rehab work for unit 3B, GE frame 9FA+e at RGPPL unit at Dabhol, Ratnagiri power plant, India  IndependentlycarriedoutCombustionInspectionandmodificationactivitieswithateam of 10crews,1 Supervisorin each shift, one control TAin dayshift and one Mechanical TAin night shift  Prepared unit CI overhaul and modification report in FSR Auto with inspection protocols and pictures November 2009: GE Gas Turbine frame 9FA+e: Installation  Assigned as Installation Site Lead for Erection of GE 9FA+e gas turbine (unit 2) on foundation, pre and post erection checks at Bawana, India during November 2009 October-2009: GE Gas Turbine frame 6B  Assigned as a Site Lead for Hot Gas path Inspection of GE frame 6B unit at QVC Power Plant, Qatar  Independentlycarried out Hot Gas path Inspection with a team of 8 crews and One control TAin dayShift and 07 crews and one Mechanical TA in night shift, received positive Feedback/ response from Customer as outage was finished successfully03 days before scheduled date  Prepared HGPI overhaul Report in FSR Auto with inspection protocols and pictures July 2009: Attended Site Leadership Training at GE Tower, Singapore from 19.07.09 to 31.07.09 May- July 2009: GE Gas Turbine frame 9FA+e Installation  Assigned as a Site Lead for Installation job of GE frame 9FA+e unit at LANCO Power Plant, India  Worked as Site Lead for Gas Turbine, Auxiliaries, Generator, Filter house and Piping erection work with supporting Technical Advisor and Customer provided manpower February- April 2009: GE ALSTOM Gas Turbine frame 9E  Assigned as a Site Lead for Major over haul job of GE frame 9E unit at United Power Company, Oman  Independentlycarried out Major Inspection work with Supervisor and a Customer provided Technicians  Prepared Major Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs. January2009: GE Gas Turbine frame 6FA+e:  Assigned as a Site Lead for Liner Replacement + turbine casing lifting job of GE frame 6FA+e unit at Dhuvaran, GSEC Power Plant, Gujarat, India  Independentlycarried out liner replacement work with supporting contractor Supervisors and Technicians  Prepared Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs.
  • 4. Page 4 of 7 December 2008: GE Gas Turbine frame 6FA  Assigned as a Site Lead for Major Overhaul of GE frame 6FAunit at Dhuvaran, GSEC Power Plant, Gujarat, India  Independentlycarried out Major Inspection work with supporting GE TAs, contractor Supervisors and Technicians  Prepared Major overhaul Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs. November 2008: GE Gas Turbine frame 6FA+e  Assigned as a Site Lead for Combustion inspection job of GE frame 6FA+e unit at Dhuvaran Power Plant, Gujarat, India  IndependentlycarriedoutCombustionInspectionworkwithsupportingGE TAs, contractor Supervisors and Technicians  Prepared Combustion Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs. October 2008: GE Gas Turbine frame 9E  Assigned as a Site Lead for Combustion inspection job of GE frame 9E unit at Al Kamil Power Plant, Oman  Independentlycarried out Combustion Inspection work with a Supervisor and 08 Technicians  Prepared Combustion Inspection Report in FSR Auto with inspection protocols, raised PAC cases, prepared RT, CDS, DORs. August 2008: GE Gas Turbine frame 9E  Assigned as Site Lead for Combustion inspection + S1N replacement of 9E unit at LANCO, Kondapalli, Vijaywada, India  Independentlycarried out Combustion Inspection and stage 1 nozzle replacement work  Prepared Combustion Inspection Report with inspection protocols, raised PAC cases, prepared RT, CDS, DORs. May- August 2008 : GE Gas Turbines- frame 6FA+2 and 6FA  Worked as a GE Contract Performance Manager for 214.5 MW CCPP with GE frame 6FA+e and 6FAunits at GSEC, Dhuvaran, Gujarat, India  Managed as a First CPM on site for commencing the GE LTSAwith GSEC, Dhuvaran May2008: GE Gas Turbine 9FA+2  Assigned as a Borescope TAfor GE frame 9FA+e unit at Vemagiri Power Plant, Andhra Pradesh, India  Borescope inspection work with Olympus make Borescope April-2008 to May2008: GE Gas Turbine frame 6B  Assigned as a Site Lead for Major Overhaul of GE frame 6B unit at Qatar Vinyl Chloride Power Plant, Qatar  Independently carried out Major Overhaul work with a team of 10 crews and One control TAin dayShift and 07 crews and one Mechanical TAin night shift, GE received positive Feedback/ response from Customer  Prepared Major overhaul Report in FSR Auto with inspection protocols and pictures March-2008 to April-2008: GE Gas Turbine frame 9E  Assigned as a Site Lead for Hot Gas Path Inspection of GE frame 9E, unit 1 B at Al Kamil Power Plant, Oman  Independentlycarried out Hot Gas Path Inspection work with a team of 09 crews in One Shift  Prepared Hot Gas Path Inspection Report in FSR Auto with inspection protocols and pictures  GE receivedappreciationletterfrom the Customerfor the professionalworkfor the outage, Rewarded byGE and Granite for the outage work Jan-2008 to February-2008 : GE Gas Turbine frame 9FA+2  Assigned as a MechanicalTechnicalAdvisor for CombustionInspection andR0compressorbladereplacement of GT21, GT22 and GT23: total 03 units 9FA+2 with Dual Fuel at Umm Al Nar Power Plant, Abu Dhabi.  Independentlycarried out Combustion Inspection work with a team of 10 crews in Night Shift GT21:CarriedoutCombustionInspectionandR0compressorbladereplacementandgeneratorH2 seal replacement for Unit Serial no 298444 from 01-Dec-07 to 08-Dec-07  Prepared Combustion Inspection and R0 replacement Report in FSR Auto with inspection protocols. GT22: Carried out Combustion Inspection of GT22- Unit Serial no 298446 from 09-Dec-07 to 15-Dec-07  Prepared Combustion Inspection Report in FSR Auto with inspection protocols. GT23:CarriedoutHot GasPath Inspection andcompressorstatorshim pinning TIL of GT23- Unit Serial no 298447 from 19- Jan-08 to 21-Feb-08  Removed Roof and enclosure for removing Compressor and Turbine casings, replaced First stage nozzles, carried out R0 compressor blade and compressor stator vanes shim pinning, replaced Combustor components
  • 5. Page 5 of 7 Dec-2007: GE Gas Turbine frame 9E  Assigned as a MechanicalTechnicalAdvisor from 21-Dec-07 to 24-Dec-07 for Alignment and Coupling job for GE frame 9E unit at Taweelah Power Plant, Abu Dhabi  IndependentlyCarriedout Generatorto Loadcouplingalignment,fixingthe load coupling- generator, Coupling bolt fixing and bolt stretching for GE make 9E unit- serial no 295231 Nov-2007 to Dec-2007 : GE Gas Turbine frame 9FA+2  Assigned as a MechanicalTechnical Advisor for Combustion Inspection of total 02 units of Dual Fuel 9FA+2 at Umm Al Nar Power Plant, Abu Dhabi.  Independentlycarried out Combustion Inspection work with a team of 10 crews in Night Shift  Prepared Combustion Inspection Report in FSR Auto with inspection protocols.  Carried out RO compressor blade replacement for GT24-unit serial no 298448.  GT24: Combustion Inspection of GT24- Unit Serial no 298448 from 01-Dec-07 to 08-Dec-07  R0 Compressor blade replacement of GT24 Unit Serial no 298448 from 16-Dec-07 to 19-Dec-07  GT25: Combustion Inspection of GT25- Unit Serial no 298449 from 09-Dec-07 to 15-Dec-07 Sep-2007 to Oct-2007: GE Gas Turbine 9FA+2  Assigned as a Mechanical Technical Advisor for Dabhol/ RGPPL Power Plant revival of GE 9FAGas turbines  GE Frame 9 FABlock 1 unit rebuild- 9FA/ DLN to 9FA+2/ DLN2+ combustion system upgrade for Block 1 units  Dismantling of turbine components- casings, Removal of Turbine compressor rotor, casings for repair  Inspection of dismantled turbine components-turbine, combustor, compressor  Documentation for Field Modification Instruction (FMI) implementation  Structural fabrication and erection for 9FA-337X Generator rotor removal August 2007:  Attended GE Field Engineer Conference –AIM region at Dubai between 26 Aug-2007 to 30 Aug-2007 Apr-2007 to Jul-2007: GE Gas Turbine frame 6FA+2  Assigned as Lead GT Mechanical Field Engineer for Rebuild of 6FA+e GE gas turbine at Dhuvaran Plant, India  Single handed carried out unit rebuild work for GE- compressor stator vanes replacement, turbine bucketing, inspected Gas turbine components, decide repair/ replacements, implemented FMI, TILs, assembled Turbine components.  Independently assembled the completed unit after breakdown, raised PAC cases, implemented recommendations, attendedRFRand conferencecalls,completedgreenrotorrun in with consultation with M&D center, Atlanta and loading of the unit.  Gas turbine systems RFR checks, Commissioning and Start up of unit, green rotor run in  GE received appreciation letter from the Customer for the professional work for the rebuild work May-2007:GE GasTurbine frame6FA+2  Assigned as GT MechanicalFieldEngineer  CombustioninspectionofFrame6FA+2 gasturbine at Aban Power Ltd, Tamilnadu,India  Inspectionof combustionchamber/turbinecomponents,airinlet andexhaustinspection July- October-2006  Attended FEP– Mechanical training atGEELC, SchenectadyUSA  GE certifiedtrainingofGas turbinesandGenerators,Basic engineeringtechniques,NDT,Borescopicinspection,Safety andFirst Aid trainingat GE EnergyTrainingcenter,Schenectady,USA andGasturbine andGeneratormanufacturing unit, Greenville,USA 2) GSPC Pipavav Power Project, GSPC, Govt. of Gujarat, India May2006to July2006  Designation: Mechanical Manager  Preparationof Prebid Technical specification of Mechanical equipments of a 700 MW PipavavCombined Cycle Power Plant project including 02 nos HeavydutyGas Turbines and one steam turbine 3) Larsen & Toubro Ltd, EPC Power, Baroda June2004 to April 2006  Designation: Lead Mechanical Engineer  Erection & Commissioning of 233 MW GE 9FA+e Gas turbine, generator, auxiliaries and piping of EPC at Vemagiri Combined Cycle Power Plant, Andhra Pradesh, India.
  • 6. Page 6 of 7  Preorder, prereceipt documentation, prepared erection and commissioning schedules & micro schedules  Prepared lifting devices, structures, lifting beams for erection  FoundationChecks-Fixingofallthe embedments,measuredall the dimensions before, during and after gas turbine and components erection, signed all protocols with GE and clients  Erection of Gas Turbine, generator stator, rotor insertion, auxiliaries and associated equipments/ packages, compartments  Replacement of RO stage compressor blades at site  Inspection of pipe fit ups, welding, cleaning and erection of piping  Taken up/ resolved issues- fouling/ wrong supplies during erection with GE  Prepared commissioning checklist/ plans and performed joint checks with GE and customer, prepared protocols  Performed Red Flag Review of all systems before GT start up, GT commissioning activities  Operation of gas turbine during GT commissioning-Turning gear operation, first fire, FSNL run, over speed, synchronization and HRSG steam blow out operation 4) Steag encotec (I) Pvt. Ltd.- German MNC at GSEG, Hazira, Gujarat, India June 2001 to April 2004  Designation: Senior Mechanical Engineer  Assignments: Handledmechanicalerection and maintenance of 156.1 MW combined cycle power plant with 2x 52 MW GT8C2ABB Alstom gasturbines, 52.1 MWABB Alstom steam turbineand Balanceof Plants with German multinational- Steag encotec in India.  ABB Alstom 52 MW GT8C2 model Gas Turbines at GSEG, Hazira.  Erection, commissioning & Mech. Maintenance of two nos 52 MW gas turbines  Combustion, borescopic inspections/assessment were carried out independently.  Majoroverhauls of gas turbines (Prepared bar chart, tools/consumables requirement, dismantling of turbine casing and other parts, assessment & NDT, replacement of compressor & turbine blades, combustor liners, before dismantling & after assemblyclearance measurements, prepared overhaul report).  Unit Rebuilds-Replaced all the blades of gas turbine and compressor, used blade tip grinder, witnessed balancing activities, inserted balancing weights, used Everest VIT make borescope equipment  Steam turbine: Make: 52 MW ABB Alstom  Minor overhaul and Borescopic Inspection, used Everest VIT make borescope equipment  Independentlyhandled routine maintenance of steam turbine and auxiliaries  Replacement of LP last stage blades, rupture diaphragm, exhaust end bearings  Balance of plant and auxiliaries: Erection, commissioning, maintenance of pumps, compressors, agitators, fans and blowers, gearboxes, oil centrifuges, heat exchangers, oil/ gas/ air filters, valves & mechanical seals, HRSG & cooling towers, DM plant, DG sets, gas compressor station, fuel storage area, fire pump house and 50 TR central HVAC system in power plant.  Carried out Condition monitoring activities of plant maintenance – equipment vibration, temperature level, lube oil – recording, monitoring and analysis of data with SPM 2120 and SKF make Micro-vibe analyzers–recorded, monitored, analyzed the collected data with the use of softwares and applied the corrective actions to the equipments.  Abroad Experience: September-October 2001  Majoroverhaul of124MWMitsubishi Westing houseW701DGasturbineat Argentina  Majoroverhaulof Gas Turbine -dismantle/assembleturbineparts,assessmentandmeasurementofbeforedismantling/ after assemblyclearanceandpreparedoverhaulreportat 650MW powerplant, Aqua Del Cajon,Argentina withSteag CapimeengineerduringSeptember/October2001 5) At Oil and Natural GasCorporation,HaziraGasProcessing complex,Surat,India March1993toMay2001 as Mechanical Supervisor/Coordinator with  PressureParts EngineeringCo-Mar-93toJul-95, UnitedVan Der Horst Ltd. Aug-95 to Sept-96,  SagarConstructionCo.-Oct-96to Nov-2000, S.S. Construction -Dec 2000to May2001  Mechanicalmaintenance,erection,commissioningofplantslikeLPG, GSU, SRU, boilerhouse& CogenerationPlantwith GE USA-02 units/ BHEL, India-01unit, Frame5 – 25MW  Erectionandcommissioning GEframe5gasturbines andauxiliaries  Routinemaintenanceofgasturbinesand auxiliaries
  • 7. Page 7 of 7  Combustionandborescopic inspection,MajoroverhaulGEframe5 Gas Turbines  Erection,commissioning,maintenanceofsinglestageand multistagecentrifugalandreciprocatingpumpsforBFP, Hydrocarbonservice,reciprocating,centrifugalandscrewcompressors,agitators,fansand blowers,gearboxes,oil centrifuges,heatexchangers,oil/gas/ air filters, valves & mechanicalseals,HRSG & fire tubeboilersin powerplantand Gasprocessingplants. 6) M/sRDS International atSteel plantprojectatEssarSteel II,HSM-HRCconstructionproject,Hazira, Surat June1992 to March1993 asSite Engineer  Structuralerection,ducting&pipingwork,Equipmenterectionlikefans,blowers,stack-chimney JOB RESPONSIBILITIES PERFORMED:  Onthe job technical consultationforerection,commissioning/overhaul,unit rebuilds uprate/R&M and trouble shooting to customer engineers and contractor foreman/technicians/supervisors for GE Gas Turbines.  Study drawings to decide equipment repair/ replacement/ non-consistencies.  Carry out measurement,clearanceschecks during unit disassemblyand assembly, studyand review the measurements with the O&M manuals, drawings.  Fillupdatasheets/ measurementprotocolsandUploadinginformation,clearanceprotocols/measurementsto GE PAC for review and approval byExperts  KnowledgeaboutusingGE procedures, manuals, Erection and commissioning guide lines/ Red flag reviews, Lift plans, Qualityand EHS requirements and Audits  Raise issues of nonconsistencies/ abnormalities/ problems with GE PAC and implement the suggested resolution  Carry out walk downs and checks/ inspections during assemblyand disassemblyand final checks.  Attend the conference calls with GE Technical experts.  Ensure compliance to OEM, ASME, ASTM, BS and ISO Standards requirements.  Awareness of IS standards, API, ASTM, ASME, PTC codes for gas turbines, pumps, compressors, vessels, piping and materials.  Follow and ensure use of Permit To Work system, OSHAS 14001 safety systems and other safetyrequirements of the plant.  Prepare reports-daily, weekly activity reports, shutdown/ overhaul reports; Combustion/Hot Gas Path/ Major over haul report, Gas turbine Inlet inspection report, Borescopic inspection report and Unit rebuild report.  Plan & implement schedules for shutdowns/ overhauls/erection, preparation of work schedules-MS project/ bar chart/ Gantt chart for shutdown activities/ erection and for minor inspections/ major overhauls of Gas turbines  RESOURCESPLANNING-Preparedlistsofrequirementsof manpower,materials- spares & consumables, tools and activitytiming/schedulingforEquipmentand planterection, commissioning, outage, overhaul/ shutdown  Used(after training)NDT testinglikedye penetranttest, flourocentparticletest, awareness about radiography, ultrasonic and magnetic particle test  Knowledge about latest tools/ tackles, consumables like gaskets, o-rings, oil seals, bearings, gland packing, fasteners, flanges, coupling, lubricating oil, adhesives, sealants etc. used for mechanical erection and maintenance/ overhauls.  Usedequipmentslike Hytorq and ITH make bolt stretching devices and coupling bolt tools, torque wrenches, alignment tools andsoftwares, used vibration meterandvibration analyzers, gas turbinetools andtackles,equipmentslike blade tip grinders, Olympus and Everest VIT make borescopes.  Successfullycompleted assignments as a GE Contract Performance Manager, Borescope TA, CBM inspector, GE Site Lead and as a Technical Advisor for GE Gas Turbines in India and Abroad. AWARDS FOR GE GAS TURBINE SERVICES WORK:  Alkamil, Oman 9E HGPI Oct 2008  QVC, Qatar 6B Major overhaul Oct 2009  Dhuvaran India 6FA Rebuild Oct 2010  GSII Quality Champion award -Manila, Philippines Conference  GE Safety Awards in March 2011 and Sept 2011