1. CURRICULUM VITAE
Name: Quang-Thao TA
Sex: Male
Date of birth: 11-10-1981
Marital status: Married
Nationality: Vietnamese
Home Address: No. 105, Alley 59, Duong Khue Str., Cau Giay Dist., Hanoi.
Email: rare.earth.1110@gmail.com
Mobile: (+84) 985-735-488
or (+84) 888-688-356
Education
Sep. 2008 ~ Feb. 2012: Doctor course at Faculty of Applied Chemistry, Ajou University,
Suwon, South Korea. (Completed)
Sep. 2005~Sep. 2007: Master program at Hanoi University of Science, Vietnam National
University, Hanoi.
Sep. 1999~ June 2003: Bachelor of Physics at Hanoi University of Science, Vietnam
National University, Hanoi
SPECIFIC QUALIFICATION & TRAINING COURSE
TIME TRAINING COURSE QUALIFICATION ISSUED BY
6-2018 Temperature Calibration
Temperature Calibration,
ISO 17025:2017
T-Group and Vietnam
Metrology Institute (VMI)
4-2018 Pressure Calibration
Pressure Calibration, ISO
17025:2017
T-Group and Vietnam
Metrology Institute (VMI)
1-2016
Training, Qualification &
Certification for Heat
treatments
ASME I &VIII,
ASME B31.1, B31.3
AWS D1.1
EMETC
9-2015
Training, Qualification &
Certification for NDT
SNT-TC-1A – NDT Level II
Center for Non-
Destructive Evaluation
10-2014
Training, Qualification &
Certification for NDT
SNT-TC-1A – RT
Interpretation Level II
Center for Non-
Destructive Evaluation
3-2007
Training, Qualification &
Cert. for Radiation Protect
Certificate
Japan Atomic Energy
Agency
2. Work activities
Apr. 2017 ~ present: Work for Erection and Electromechanic Testing Joint stock Company
(Affiliate of LILAMA) – Song Hau 1 Thermal Power Plant (SH1 TPP)
Project.
Position and Major field:
Pressure and Temp. Calibration Site Manager: Apr. 2018 ~ Present.
Facility, equipments:
− Manage and control a Calibration Lab.
− 05 Pressure Calibration Standard systems in working range of (-1.0 ~
2800) bar with the uncertainty of 0.02 %FS (consist of Additel (ADT)
Standard Pressure Generator System, ADT and Fluke Standard
Pressure Gauges…)
− 05 Temperature Calibration Standard systems in working range of (-45
~ 700) o
C with the uncertainty of 25 ppm of measurement (consist of
Metrology 917x Standard Temperature well, 1586-2588/1586A Super
DAQ scanner and Fluke PRT 5628…)
Managements: 5 people
Job Duty:
− Coordinate with clients, receive all UUC (Unit under Calibration) from
client and make records of delivery.
− Plan and issue UUCs to Calibration technicians and directly supervise
their work.
− Instruct and supervise all Calibration technicians to follow Calibration
Procedure.
− Review all original Minute of Observations.
− Make and sign all Calibration Certificates.
− Ensure the Calibration work on schedule.
− Explain all client inquiries on Calibration results.
− Responsible for all Calibration results in front of clients and Vietnam
Law.
− Daily and directly report to General Director.
PWHT Deputy Project Manager: PWHT Package at Song Hau 1 Thermal
Power Plant (Apr. 2017 ~ Apr. 2018).
Facility, equipments:
− Manage and control 26 PWWT machines (Power Transformers, Auto
Programmers and Auto Recorders, Heating elements and other
consumable supplies…) and many Hardness Testing machines.
Managements: 39 PWHT technicians and 02 clerks.
Job Duty:
3. − Manipulate, plan and directly supervise preparation, execution and
reports Pre-heat, Post-heat and Post-Weld Heat treatments (PWHT) for
2 Boilers and Turbine system.
− Coordinated with clients and keeping work on schedule.
− Discuss with clients and resolve problems in time.
− Reviewed and approved all PWHT reports before submitting to clients
(LILAMA and DOOSAN).
− Explain all client inquiries.
− Daily and directly report/ explain the General Director on technical and
financial problems.
NDT Supervisor:
− Plan and supervise the RT conducting work for 2 Boilers and Turbine
system at SH1 TPP.
− Coordinated, received, review and summarized all NDT requests or
specimens from clients before issuing to NDT technicians.
− Keeping good/ smooth relationships with clients (LILAMA and
DOOSAN). When any problems arise, directly discuss with clients to
find out the best solutions.
− Ensure the RT work on schedule set by clients.
− Supervised NDT technicians.
− Reviewed and approved all NDT reports before submitting to clients
(LILAMA and DOOSAN).
− Explain all client inquiries.
− Daily and directly report/ explain the General Director on technical and
financial problems.
Oct. 2014 ~ Apr. 2017: Work for Erection and Electromechanics Testing Joint stock
Company – Nghi Son Refinery and Petrochemical Complex (NSRP) Project.
Position and Major field:
Project Manager: Sep. 2016 ~ Apr. 2017
Facility, equipments:
− Manage and control 28 PWHT machines (Power Transformers, Auto
Programmers and Auto Recorders, Heating elements and other
consumable supplies…) and many Hardness Testing machines.
Managements: 20 PWHT technicians and 01 clerk.
Job Duty:
− Manipulating, Making plan and Directly Supervise preparation and
execution PWHT for Refractory lining work.
− Coordinated with clients and keeping work on schedule.
− Discuss with clients and resolve problems in time.
− Reviewed and approved all Refractory Lining reports before
submitting to clients (JGCS, IPMT and NSRP).
4. − Explain all client inquiries.
− Control materials and equipments.
− Daily report/ explain and advise the Project Director on technical
solution.
Project Manager: Jan. 2016 ~ Sep. 2016
Facility, equipments:
− Manage and control 16 PWHT machines (Power Transformers, Auto
Programmers and Auto Recorders, Heating elements and other
consumable supplies…) and many Hardness Testing machines.
Managements: 32 PWHT technicians and 2 officers.
Job Duty:
− Managed Pre-heat (PrH), Post-heat PH) and Post-Weld Heat treatment
(PWHT) work.
− Prepared PWHT procedures for Refractory Lining instead of
combustion method.
− Keeping good/ smooth relationships with clients. When any problems
arise, directly discuss with clients to find out the best solutions.
− Ensure the work on schedule set by clients.
− Instructed and supervised NDT technicians.
− Reviewed and approved all NDT reports before submitting to clients
(JGCS and IPMT).
− Explain all client inquiries.
− Responsible for materials and equipments control.
− Daily report/ explain and advise the Project Director on technical
solution.
NDT Deputy Project Manager - Zone 3 (Oct. 2014 ~ Dec. 2015).
Facility, equipments:
− Manage and control 15 radiation sources and 01 darkroom (Films
Developing Room consists of 03 film developing tanks, 02 film driers,
03 film viewers and consumable supplies, such as films and film
developer …).
Managements: 50 NDT technicians and officers (15 NDT teams and 4
officers).
Job Duty:
− Prepare NDT procedures (RT, MT, PT and VT).
− Coordinated, received, review and summarized all NDT requests or
specimens from clients before issuing to NDT technicians.
− Keeping good/ smooth relationships with clients. When any problems
arise, directly discuss with clients to find out the best solutions.
− Ensure the work on schedule set by clients.
− Instructed and supervised NDT technicians.
− Directly conducted films interpretation.
5. − Reviewed and approved all NDT reports before submitting to clients
(KETS, JGCS and IPMT).
− Explain all client inquiries.
− Responsible for materials and equipments control.
− Daily report/ explain and advise the Project Director on technical
issues.
Safety Manager:
− Prepared all PTWs (Permit to Work).
− Ensure all NDT technicians work safely on site.
− Instructed and supervised the NDT technicians to follow safety
procedures.
Oct. 2013 ~ Oct. 2014: Researcher at Laboratory of Applied Spectroscopy and Gemmology,
Institute of Materials Science, Vietnam Academy of Science and
Technology, 18 Hoang Quoc Viet st., Cau Giay Dist., Hanoi, Vietnam.
Mar. 2012 ~Sep. 2013: Work for MyungHwa Engineering Ltd. Co as an engineer. At
Chungju Industrial Complex. Chungju, South Korea.
Sep. 2008 ~ Feb. 2012: Researcher, working on cathode materials at Division of Energy
Systems Research, Ajou University, Suwon, South Korea.
Sep. 2006 ~ Aug. 2008: Working as Radiation Engineer at Hanoi Cancer Hospital.
July 2003 ~ Sep. 2006: Researcher at Laboratory of Applied Spectroscopy and Gemmology,
Institute of Materials Science, Vietnam Academy of Science and
Technology, 18 Hoang Quoc Viet st., Cau Giay Dist., Hanoi, Vietnam.
Aug. 2002 ~ June 2003: Researcher at Laboratory of Applied Physics, Hanoi University of
Science, Vietnam National University, 334 Nguyen Trai st., Thanh Xuan
Dist., Hanoi, Vietnam.
Scholarship and Fellowship
• Brain Korea 21 (BK21) scholarship for researchers (2008-2012).
• Research Assistant Scholarship of the Research Project from National Research Foundation
of Korea (2008-2012).
• Ajou University Graduate Honor Scholarship (2008-2012). Degree
• Hanoi National University Honor Scholarship (2000-2003). Degree
Honor and Awards
• Merit list from University of Natural Science (Hanoi National University) based on
study grade (2002).
• Merit list for the Best Entrance of Graduate school, Vietnam National University,
Hanoi (2005).