SlideShare a Scribd company logo
Curriculum Vitae
NAME: Mr.Pisalsart Prasaingam
CONTACT DETAILS
Mobile Phone: (+66)0885952699
E-Mail: Pisalsart@gmail.com, Pisalsart-p@thainippon.co.th
Address: 221 Group 6 Chompha Sub-District, Chompha District, Surin Province,
Postal code 32180.
OBJECTIVE
For apply professional position of Power-Electrical Engineer, Electrical Engineer and Instrument Engineer.
JOB TARGET
Job type: Permanent and Full Time
Expected Salary 44,000-50,000 Bath per month OR Negotiable
PERSONAL DATA
Date of birth: 11 April 1984
Age: 33
Nationality: Thai
Religion: Buddha
Engineering license: AEEP 43016 (Power-Electrical Engineer)
Military Status: Complete
EDUCATION
2004-2008, Bachelor of Engineering Burapha University Major in Electrical Power Engineer (GPA 2.83)
2000-2003, Surawitthayakarn School Surin (science-math) (GPA 2.63)
1997-2000, Thatum Prachasermvit School.
1987-1997, Chom-Pha Curator Primary School.
UNIVERSITY PROJECT
-Automation machine for visual inspections system by Image processing for sorting head bolts that have been damaged and not
quality in the hard disk drive industry.
EXTRA CURRICULUM
-High Voltage and sub-station, PEA, Thailand. 2008
-Embedded System of TESA seminar at Burapha University 2008
Internship Program
-Training with Union Technology Co., Ltd and Hitachi Global Storage (Hard disk drive industry) on April 2007
ACTIVITIES
-Staff of Student council Faculty of Engineering Burapha University 2005-2006
-Member and represent of Team University for Racing in Recue Robot tournament 2005, 2006
-Staff of Electronic-Camp Burapha University 2006, 2007
-Staff of TESA Burapha University 2008
TRAINING & CERTIFICATIONS
- Has Certificated for Six-Sigma (Brown Belt) Methodology at Seagate technology since June 2011.
- Has Certificated for Thailand’s Control Engineering in Power Electrical Engineer field Associate level from
Thailand Engineering Council since March 2012/2017.
- Has Certificated for Safety officer in level supervisor from Thailand Association promoted safety & health at working Area
since December 2011/2015.
- Has English TOEIC Certificated Scores = 540.
- Has Certificated for Basic Offshore Safety Induction & Emergency training BOSIET From MOG Industry Training Co., Ltd
since Feb 2014.
- Has Certificated for Instrument Calibration Part I&II since Sep 2016
- Has Certificated for Instrument Part I (Measurement) since Aug 2016
- Has Certificated for Safety valve, Fitting and Tube bending from Swagelok since 2012/2016.
- Has certificated for archive onshore & offshore safety work in Nongyao Project’s Mubadara Petroleum (Thailand) Public
Company ltd. since 2012/2016.
- Training safety & health at working Area from Thai Nippon Steel since 2012.
SKILLS
English Skill: Listening workable, Speaking workable, Reading workable and Writing workable.
Computer Program skill: Microsoft Office, C-&C++programming.
Others Skill: Programmable Logic Control PLC (Omron, Mitsubishi, Allen-Bradley), Microcontroller (MCS-51, PIC),
Mat lab, AutoCAD & Solid work, Navigations Work,
Circuit Designer.
P&ID (Piping & Instrument Diagram) System,
Pneumatic System,
Vale, Fitting & switching, Tubing Bending Installation.
Automation System,
WORKING EXPERIENCE
August 2012 - Now
: Thai-Nippon Steel and Sumikin Engineering and Constructions Corp. Ltd.
: Position Electrical and Instrument Engineer Production Department
∙ Review and checked over all control drawing documents has approved to constructions (AFC Drawing) from designer team.
∙ Plan sequence of work, manpower and plan and control Electrical and Instrument installation, Hook Up working activity by
accordance with plan overall of construction phase plan in project schedule on-shore and off-shore.
∙ Monitor and control subordinate, subcontractors working progress by ensure all of plan activities are carry out with the overall
project schedule plan and confirm they are scope of work and control quality of installation work are done and pass qualification
from the customer site representations inspector.
∙ Monitor and control subordinate, subcontractors working by follow up regulation of company hazard area and safety
environments policy (HSE) by inspect personal protect equipment in toolbox talk meeting every morning before start working.
∙ Focus areas of concern problem and clarify with other section by implement for clarify point by point and pushing every work
are done by follow up with plan of project.
∙ Responsible and coordination with Quality Control Section for support the customer site representations inspector for direct
check qualify of Electrical and Instrument work in project.
∙ Responsible for coordination daily activities with other discipline at other section filed engineers.
∙ Allocate and set-up all necessary tools, equipment and ensure all tools & equipment are sufficient in project and correctly with
control drawing documents.
∙ Pre-Commissioning & Commissioning Electrical and Instrument system overall in project or test and modify necessary job at
offshore or onshore site.
Thai-Nippon Steel’s Projects Co-operate concern.
∙ BLPMB Project
Oil wellhead platform of Salamander Energy Bualuang Field.
- Assistances On-off Valve& Choke Valve Commissioning work.
∙ MACEDON Project
Gas module process plant of BHP Billiton Petroleum, FEED by Technip Corporation Services.
- Hook Up & Installation overall of Electrical and Instrument work and site.
∙ Big Bundle Project phase 2B/4B/2C and Long-Term Project
Gas wellhead platform of Petroleum Thai Exploration & Production Public Company ltd.
(8 Wellhead Platforms Building for Big Bundle Project and 2 Wellhead Platforms Building for Long-Term Project)
- Control over all of fabrications and install support, installation equipment of Electrical and Instrument, Telecom system on
platform building. Cable test and pressure test of tubing line, system test follow up Pre-Commissioning & Commissioning
activity.
∙ Nong Yao Project WHP-B &WPP-A
Oil wellhead platform and oil process platform of Mubadara Petroleum (Thailand) Public Company ltd.
(WHP-B Wellhead Platform Building and WPP-A Process Platform Building)
- Control over all of fabrications and install support, installation equipment of Electrical and Instrument, Telecom system on
platform building. Cable test and pressure test of tubing line, system test follow up Pre-Commissioning & Commissioning
activity.
: September 2010 – August 2012
Seagate Technology Thailand Co., Ltd., Nakornratchasima.
Position: Test Engineering (System task force Leader team)
∙ Focus and improve for reduce downtime of electric automation tester machines. -Analyze data machines by statistical data
analysis combined with engineering technical with a reliable measurements tool for the analysis by find condition to repair that
machine -Over all jobs to repair, maintenance or impact studies refer by Six-Sigma theory.
: June 2008 – June 2010
Maxim Integrated Product (Thailand) Co., Ltd. Amata Nakorn industrial Estate, Chonburi
Position: Test Engineering (Maintenance Shift Leader)
∙ Test and control qualification of a company’s product have a best performance by each of device testing program and develop a
new version testing program if company’s product change specific -Contract Design Engineer and term production at Overseas
Headquarter for communicate solving a problem about product or tester machines, -Leader and management control about
maintenance tester machines and electrical systems for tester machines include design electrical systems in production line -
Checking due for calibration’s tester machines for control performance of tester machines and checks 5S in line plant.
Cv pisalsart and attach file
Cv pisalsart and attach file
Cv pisalsart and attach file
Cv pisalsart and attach file
Cv pisalsart and attach file
Cv pisalsart and attach file
Cv pisalsart and attach file
Cv pisalsart and attach file
Cv pisalsart and attach file

More Related Content

What's hot

CV-Eng-Aseel-Final
CV-Eng-Aseel-FinalCV-Eng-Aseel-Final
CV-Eng-Aseel-Finalaseel ryashi
 
Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation EngineerAkash Patel
 
Sudheer instrumentation engineer Resume
Sudheer instrumentation engineer ResumeSudheer instrumentation engineer Resume
Sudheer instrumentation engineer ResumeSudheer B
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVmohammed zameel zainudheen
 
CV ไตรสิทธิ์ (Eng)
CV ไตรสิทธิ์ (Eng)CV ไตรสิทธิ์ (Eng)
CV ไตรสิทธิ์ (Eng)Traisit Yutthavisut
 
LinkedinSuresh Kumar S BE
LinkedinSuresh Kumar S BELinkedinSuresh Kumar S BE
LinkedinSuresh Kumar S BESuresh Kumar
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
isamhasbi
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
Sally Al-Gazzar
 
Resume raj bharath be
Resume raj bharath beResume raj bharath be
Resume raj bharath be
RajBharath Rathinam
 
IT Manager (20160510)
IT Manager (20160510)IT Manager (20160510)
IT Manager (20160510)kelvin chak
 
My cv
My cvMy cv

What's hot (20)

Somchai J.'s CV_2016
Somchai J.'s CV_2016Somchai J.'s CV_2016
Somchai J.'s CV_2016
 
CV _Mustafa ARSLAN
CV _Mustafa ARSLANCV _Mustafa ARSLAN
CV _Mustafa ARSLAN
 
Nagappa
NagappaNagappa
Nagappa
 
CV-Eng-Aseel-Final
CV-Eng-Aseel-FinalCV-Eng-Aseel-Final
CV-Eng-Aseel-Final
 
Update CV
Update CVUpdate CV
Update CV
 
Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation Engineer
 
Sudheer instrumentation engineer Resume
Sudheer instrumentation engineer ResumeSudheer instrumentation engineer Resume
Sudheer instrumentation engineer Resume
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
CV Engr. Asad Rasheed
CV Engr. Asad RasheedCV Engr. Asad Rasheed
CV Engr. Asad Rasheed
 
walid madi CV
walid madi CVwalid madi CV
walid madi CV
 
Rajnish_1971
Rajnish_1971Rajnish_1971
Rajnish_1971
 
CV ไตรสิทธิ์ (Eng)
CV ไตรสิทธิ์ (Eng)CV ไตรสิทธิ์ (Eng)
CV ไตรสิทธิ์ (Eng)
 
LinkedinSuresh Kumar S BE
LinkedinSuresh Kumar S BELinkedinSuresh Kumar S BE
LinkedinSuresh Kumar S BE
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
 
Resume raj bharath be
Resume raj bharath beResume raj bharath be
Resume raj bharath be
 
IT Manager (20160510)
IT Manager (20160510)IT Manager (20160510)
IT Manager (20160510)
 
kvrao resume
kvrao resumekvrao resume
kvrao resume
 
Chetan R Ingale
Chetan R IngaleChetan R Ingale
Chetan R Ingale
 
My cv
My cvMy cv
My cv
 

Viewers also liked

Carolina melocandidodepaula
Carolina melocandidodepaulaCarolina melocandidodepaula
Carolina melocandidodepaula
grazieleguimaraes
 
Aspectos generales del ecuador
Aspectos generales del ecuadorAspectos generales del ecuador
Aspectos generales del ecuador
Brayan David Cordova Granda
 
Cuando cierras los ojos
Cuando cierras los ojosCuando cierras los ojos
Cuando cierras los ojos
svvmariana
 
Pasado de cristiano ronaldo
Pasado de cristiano ronaldoPasado de cristiano ronaldo
Pasado de cristiano ronaldo
sebastian04052016
 
Pasos de seleccion
Pasos de seleccionPasos de seleccion
Pasos de seleccion
Angelicamasr
 
Concepts of educational technology
Concepts of educational technologyConcepts of educational technology
Concepts of educational technology
izarjamili
 
Lengua bloque 7
Lengua   bloque 7Lengua   bloque 7
Lengua bloque 7
migueangelbrena
 
Logsheet.compressed
Logsheet.compressedLogsheet.compressed
Logsheet.compressed
WC Yan
 

Viewers also liked (8)

Carolina melocandidodepaula
Carolina melocandidodepaulaCarolina melocandidodepaula
Carolina melocandidodepaula
 
Aspectos generales del ecuador
Aspectos generales del ecuadorAspectos generales del ecuador
Aspectos generales del ecuador
 
Cuando cierras los ojos
Cuando cierras los ojosCuando cierras los ojos
Cuando cierras los ojos
 
Pasado de cristiano ronaldo
Pasado de cristiano ronaldoPasado de cristiano ronaldo
Pasado de cristiano ronaldo
 
Pasos de seleccion
Pasos de seleccionPasos de seleccion
Pasos de seleccion
 
Concepts of educational technology
Concepts of educational technologyConcepts of educational technology
Concepts of educational technology
 
Lengua bloque 7
Lengua   bloque 7Lengua   bloque 7
Lengua bloque 7
 
Logsheet.compressed
Logsheet.compressedLogsheet.compressed
Logsheet.compressed
 

Similar to Cv pisalsart and attach file

Mochamad Kholik - CV
Mochamad Kholik - CVMochamad Kholik - CV
Mochamad Kholik - CVPk Kholik
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
Noor Ali Sy
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog
 
Resume2
Resume2Resume2
Resume Electrical
Resume ElectricalResume Electrical
Resume Electrical
Shahid Ali
 
Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence
 
Wp 241016
Wp 241016Wp 241016
seshu resume (1)
seshu resume (1)seshu resume (1)
seshu resume (1)seshu kumar
 

Similar to Cv pisalsart and attach file (20)

Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
Romeo Idris Hutabarat (1)
Romeo Idris Hutabarat (1)Romeo Idris Hutabarat (1)
Romeo Idris Hutabarat (1)
 
Mochamad Kholik - CV
Mochamad Kholik - CVMochamad Kholik - CV
Mochamad Kholik - CV
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
 
Resume2
Resume2Resume2
Resume2
 
Resume Electrical
Resume ElectricalResume Electrical
Resume Electrical
 
FILTHER RIEOALEX
FILTHER RIEOALEXFILTHER RIEOALEX
FILTHER RIEOALEX
 
KS Resume_3
KS Resume_3KS Resume_3
KS Resume_3
 
resume paramatt1
resume paramatt1resume paramatt1
resume paramatt1
 
Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015
 
Wp 241016
Wp 241016Wp 241016
Wp 241016
 
Roongroj_CV
Roongroj_CVRoongroj_CV
Roongroj_CV
 
Athar CV updated
Athar CV updatedAthar CV updated
Athar CV updated
 
resume paramatt
resume paramattresume paramatt
resume paramatt
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Mari's CV
Mari's CVMari's CV
Mari's CV
 
seshu resume (1)
seshu resume (1)seshu resume (1)
seshu resume (1)
 
resume
resumeresume
resume
 

Recently uploaded

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 

Recently uploaded (20)

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 

Cv pisalsart and attach file

  • 1. Curriculum Vitae NAME: Mr.Pisalsart Prasaingam CONTACT DETAILS Mobile Phone: (+66)0885952699 E-Mail: Pisalsart@gmail.com, Pisalsart-p@thainippon.co.th Address: 221 Group 6 Chompha Sub-District, Chompha District, Surin Province, Postal code 32180. OBJECTIVE For apply professional position of Power-Electrical Engineer, Electrical Engineer and Instrument Engineer. JOB TARGET Job type: Permanent and Full Time Expected Salary 44,000-50,000 Bath per month OR Negotiable PERSONAL DATA Date of birth: 11 April 1984 Age: 33 Nationality: Thai Religion: Buddha Engineering license: AEEP 43016 (Power-Electrical Engineer) Military Status: Complete EDUCATION 2004-2008, Bachelor of Engineering Burapha University Major in Electrical Power Engineer (GPA 2.83) 2000-2003, Surawitthayakarn School Surin (science-math) (GPA 2.63) 1997-2000, Thatum Prachasermvit School. 1987-1997, Chom-Pha Curator Primary School. UNIVERSITY PROJECT -Automation machine for visual inspections system by Image processing for sorting head bolts that have been damaged and not quality in the hard disk drive industry. EXTRA CURRICULUM -High Voltage and sub-station, PEA, Thailand. 2008 -Embedded System of TESA seminar at Burapha University 2008 Internship Program -Training with Union Technology Co., Ltd and Hitachi Global Storage (Hard disk drive industry) on April 2007 ACTIVITIES -Staff of Student council Faculty of Engineering Burapha University 2005-2006 -Member and represent of Team University for Racing in Recue Robot tournament 2005, 2006 -Staff of Electronic-Camp Burapha University 2006, 2007 -Staff of TESA Burapha University 2008 TRAINING & CERTIFICATIONS - Has Certificated for Six-Sigma (Brown Belt) Methodology at Seagate technology since June 2011. - Has Certificated for Thailand’s Control Engineering in Power Electrical Engineer field Associate level from Thailand Engineering Council since March 2012/2017. - Has Certificated for Safety officer in level supervisor from Thailand Association promoted safety & health at working Area since December 2011/2015. - Has English TOEIC Certificated Scores = 540. - Has Certificated for Basic Offshore Safety Induction & Emergency training BOSIET From MOG Industry Training Co., Ltd since Feb 2014. - Has Certificated for Instrument Calibration Part I&II since Sep 2016 - Has Certificated for Instrument Part I (Measurement) since Aug 2016 - Has Certificated for Safety valve, Fitting and Tube bending from Swagelok since 2012/2016. - Has certificated for archive onshore & offshore safety work in Nongyao Project’s Mubadara Petroleum (Thailand) Public Company ltd. since 2012/2016. - Training safety & health at working Area from Thai Nippon Steel since 2012.
  • 2. SKILLS English Skill: Listening workable, Speaking workable, Reading workable and Writing workable. Computer Program skill: Microsoft Office, C-&C++programming. Others Skill: Programmable Logic Control PLC (Omron, Mitsubishi, Allen-Bradley), Microcontroller (MCS-51, PIC), Mat lab, AutoCAD & Solid work, Navigations Work, Circuit Designer. P&ID (Piping & Instrument Diagram) System, Pneumatic System, Vale, Fitting & switching, Tubing Bending Installation. Automation System, WORKING EXPERIENCE August 2012 - Now : Thai-Nippon Steel and Sumikin Engineering and Constructions Corp. Ltd. : Position Electrical and Instrument Engineer Production Department ∙ Review and checked over all control drawing documents has approved to constructions (AFC Drawing) from designer team. ∙ Plan sequence of work, manpower and plan and control Electrical and Instrument installation, Hook Up working activity by accordance with plan overall of construction phase plan in project schedule on-shore and off-shore. ∙ Monitor and control subordinate, subcontractors working progress by ensure all of plan activities are carry out with the overall project schedule plan and confirm they are scope of work and control quality of installation work are done and pass qualification from the customer site representations inspector. ∙ Monitor and control subordinate, subcontractors working by follow up regulation of company hazard area and safety environments policy (HSE) by inspect personal protect equipment in toolbox talk meeting every morning before start working. ∙ Focus areas of concern problem and clarify with other section by implement for clarify point by point and pushing every work are done by follow up with plan of project. ∙ Responsible and coordination with Quality Control Section for support the customer site representations inspector for direct check qualify of Electrical and Instrument work in project. ∙ Responsible for coordination daily activities with other discipline at other section filed engineers. ∙ Allocate and set-up all necessary tools, equipment and ensure all tools & equipment are sufficient in project and correctly with control drawing documents. ∙ Pre-Commissioning & Commissioning Electrical and Instrument system overall in project or test and modify necessary job at offshore or onshore site. Thai-Nippon Steel’s Projects Co-operate concern. ∙ BLPMB Project Oil wellhead platform of Salamander Energy Bualuang Field. - Assistances On-off Valve& Choke Valve Commissioning work. ∙ MACEDON Project Gas module process plant of BHP Billiton Petroleum, FEED by Technip Corporation Services. - Hook Up & Installation overall of Electrical and Instrument work and site. ∙ Big Bundle Project phase 2B/4B/2C and Long-Term Project Gas wellhead platform of Petroleum Thai Exploration & Production Public Company ltd. (8 Wellhead Platforms Building for Big Bundle Project and 2 Wellhead Platforms Building for Long-Term Project) - Control over all of fabrications and install support, installation equipment of Electrical and Instrument, Telecom system on platform building. Cable test and pressure test of tubing line, system test follow up Pre-Commissioning & Commissioning activity. ∙ Nong Yao Project WHP-B &WPP-A Oil wellhead platform and oil process platform of Mubadara Petroleum (Thailand) Public Company ltd. (WHP-B Wellhead Platform Building and WPP-A Process Platform Building) - Control over all of fabrications and install support, installation equipment of Electrical and Instrument, Telecom system on platform building. Cable test and pressure test of tubing line, system test follow up Pre-Commissioning & Commissioning activity. : September 2010 – August 2012 Seagate Technology Thailand Co., Ltd., Nakornratchasima. Position: Test Engineering (System task force Leader team) ∙ Focus and improve for reduce downtime of electric automation tester machines. -Analyze data machines by statistical data analysis combined with engineering technical with a reliable measurements tool for the analysis by find condition to repair that machine -Over all jobs to repair, maintenance or impact studies refer by Six-Sigma theory. : June 2008 – June 2010 Maxim Integrated Product (Thailand) Co., Ltd. Amata Nakorn industrial Estate, Chonburi Position: Test Engineering (Maintenance Shift Leader) ∙ Test and control qualification of a company’s product have a best performance by each of device testing program and develop a new version testing program if company’s product change specific -Contract Design Engineer and term production at Overseas Headquarter for communicate solving a problem about product or tester machines, -Leader and management control about maintenance tester machines and electrical systems for tester machines include design electrical systems in production line - Checking due for calibration’s tester machines for control performance of tester machines and checks 5S in line plant.