SlideShare a Scribd company logo
CURRICULUM VITAE
OF
Kisanga kalema
1. PERSONAL INFORMATION
Address: 88 st George.
Cnr lever rd and George rd
Midrand johannesburg
Nationality : Congolese
E-mail address: kisangakalema@gmail.com
Contact Number: 0738326336
0764763090 {Alternative}
Home languages: French
Other languages: English
2. EDUCATIONAL BACKGROUND
2.1 Tertiary education: DRCongo University of Technology
1996-2000
Course: Electrical Engineering (Heavy current)
National Diploma
2.2 Johannesburg Technical College Industrial electronics 2000-2001
National certificate
2.3 Institute technical of CONGO senior certificate matriculate
1990-1996
2.4 Computer literacy: M S office, Excel, Power point,
introduction to PLC
2.5 Training: Quality Assurance and Quality
Control
ISO 9001 Auditors training
Working at height certificate
3. WORKING HISTORY
Company: B&W instrumentation and electrical limited.
Project name: Sasol utility expansion project
(S.U.E.P). Sasolburg site
Position: electrical supervisor
Duration: From: 04 July2012 up to date
Key responsibilities:
 Assist Project Manager with the compiling of Scope of work.
 Process Appointments and assure adherence to Legal requirements
Of Contractors.
 Ensure task completion is aligned with critical project constraints:
Time; Cost; Quality; Adherence to Scope of Work.
 Ensure site supervision
 Verification that company procedures and process are being implemented in
accordance with the project quality program and the company integrated
management system (IMS).
 Responsible of all the new substations installation.
 Lighting installation of conveyor, crushers, water process
 Responsible of glanding and terminations of isolators motors. Installations of the UPS
for change over and Instrument
 Renovations of Old Jigs Plant.
 cable joints, cable faulty finding, termination of distribution board & wiring, fault
finding, identification of motors, motors testing, motors connections.
 Issuing, acceptance and signing of on various permits such as:
 Intelli /excavating / hot permits.
 Order, accept and arrange basic consumables or free issue items.
 Responsible for progress measurements, timely and accurate
Feedback.
 Adhere to the SHEC programs at all times (toolbox talks, audits etc..)
All incidents and accidents are reported immediately to the
Superintendent according to set procedures. All necessary SHEC
precautions are taken to ensure accident free hours (pre-shift
inspections, brakes etc). Personal protective equipment is worn at
all times. Tools and equipment is inspected daily prior to being
used, according to SHEC practices and statutory requirements. The
work area is cleaned and the environment restored to its original
state after completion of a job.
 Follow-up on deliveries of free-issue equipment.
 New earthing installations on the Screening and Beneficiation substations from the
transformer’s bays to the substation.
 Controlling and inspecting all earthing drawings.
Company: Wade Walker Electrical & instrumentation
Engineers & Contractors.
Exxaro coal mine in Limpopo (site)
Project name: Grootegeluk Medupi Expansion
Project. (GMEP)
Position: Electrical supervisor
Duration: From: 01 July. 2011 to 29 June 2012
Key responsibilities:
 Assist Project Manager with the compiling of Scope of work.
 Process Appointments and assure adherence to Legal requirements
Of Contractors.
Ensure task completion is aligned with critical project constraints:
Time; Cost; Quality; Adherence to Scope of Work.
 Ensure site supervision
 Site Control and Supervision
 Verification that company procedures and process are being implemented in
accordance with the project quality program and the company integrated
management system (IMS).
 Responsible of all the new substations installation.
 Lighting installation of conveyor, crushers, water process
 Responsible of glanding and terminations of isolators motors. Installations of the UPS
for change over and Instrument
 Renovations of Old Jigs Plant.
 cable joints, cable faulty finding, termination of distribution board & wiring, fault
finding, identification of motors, motors testing, motors connections.
 Issuing, acceptance and signing of on various permits such as:
 Intelli /excavating / hot permits.
 Order, accept and arrange basic consumables or free issue items.
Responsible for progress measurements, timely and accurate Feedback.
 Adhere to the SHEC programs at all times (toolbox talks, audits etc..)
All incidents and accidents are reported immediately to the
Superintendent according to set procedures. All necessary SHEC
Precautions are taken to ensure accident free hours (pre-shift
Inspections, brakes etc). Personal protective equipment is worn at all times.
 Tools and equipment is inspected daily prior to being
used, according to SHEC practices and statutory requirements. The
work area is cleaned and the environment restored to its original
state after completion of a job.
 Follow-up on deliveries of free-issue equipment.
Company: Kentz Engineers & Contractors
Kusile Power Station (site)
Project name: Kusile Power Station project
Position: Electrical supervisor
Duration: From October 2008 to 15 June 2011
Key responsibilities:
 Verification that company procedures and process are being implemented in
accordance with the project quality program and the company integrated
management system (IMS).
 Responsible of all the new substations installation.
 Lighting installation of conveyor, crushers, water process
 Responsible of glanding and terminations of isolators motors. Installations of the UPS
for change over and Instrument
 Renovations of Old Jigs Plant.
 cable joints, cable faulty finding, termination of distribution board & wiring, fault
finding, identification of motors, motors testing, motors connections.
 Issuing, acceptance and signing of on various permits such as:
 Intelli /excavating / hot permits.
 Order, accept and arrange basic consumables or free issue items.
 Responsible for progress measurements, timely and accurate
Feedback.
 Adhere to the SHEC programs at all times (toolbox talks, audits etc..)
All incidents and accidents are reported immediately to the
Superintendent according to set procedures. All necessary SHEC
precautions are taken to ensure accident free hours (pre-shift
inspections, brakes etc). Personal protective equipment is worn at
all times. Tools and equipment is inspected daily prior to being
used, according to SHEC practices and statutory requirements. The
work area is cleaned and the environment restored to its original
state after completion of a job Follow-up on deliveries of free-issue equipment.
 Assist Project Manager with the compiling of Scope of work.
 Process Appointments and assure adherence to Legal requirements
Of Contractors.
Ensure task completion is aligned with critical project constraints:
Time; Cost; Quality; Adherence to Scope of Work.
 Ensure site supervision
 Site Control and Supervision
Company: Tubular Electrical & Instrumentation
International Ferro metal (site)
Position: Electrical QA/QC inspector
Duration: June 2008 to September 2008
Key responsibilities:
 Verification that company procedures and process are being implemented in
accordance with the project quality program and the company integrated
management system (IMS).
 Inspection of all electrical installations, cables testing, lightings, electrical
motor etc….
 Identify any problems and difficulties encountered.
 Attend all necessary inspections as identified in the approved inspection and
test plan (ITP).
 Preparation, co-ordination and approval of procured quality operating plans.
 Inspect and megger cables, pumps on the reel prior to installation.
 Inspect all MCC panel, UPS panel, PLC panel, from the manufacture before
installation to substation, verifier all testing certificate
 Evaluate the validity and acceptability of inspection results.
 Installations, maintenances and commissioning of electrical equipment.
 Adherence to all procedures and specifications.
 Participation in critical analysis meetings, generating and closing action plans.
 Liaise with clients, suppliers and contractors on quality matters.
 Compiling the inspection and the test plan.
 Compile project reports, prepare project specification procedures and work
instruction.
 Review and approve project data books.
 Review quality records and identify recurring problems areas (Trends)
 Liaise with clients, suppliers and contractors on quality matters
 Adherence to all procedures and specifications
 Making sure that grounding installations and termination to equipment’s
conform to project standard drawings and specifications.
 Record, keeping of all tests results, reports, documentation and revisions on
build drawings, completion of form No. 6Qs, 7Qs and commissioning.
 Evaluate the validity and acceptability of inspection results.
Company: B&W instrumentation and electrical limited
Ambatovy nickel project Madagascar (site)
Position: Electrical QA/QC Inspector
Duration: February 2006 to May 2008
Company: ACTOM (Alstom)
Position: Switchgear tester technician Supervisor
Duration: January 2004 to December 2005
Key Responsibilities:
 Testing, installation, maintenance and commissioning.
 Operating and wiring of all switchgears and networks, panels, control panels,
high, medium and low voltage panels.
 Testing of vacuum circuit breaker, ring main unit, voltage and current
transformers, mini substations, generators, bus bars, breakers, dog box, and
isolators.
 Construction of HV AC.
 Final inspection on the units.
 Sales of LV, MV HV and other electrical equipments.
 Good knowledge of LV,MV,HV equipments
 Good knowledge of automation and operating three –phase test set in order to
do primary and secondary injection on protection equipment.
 Good knowledge of plc and scales and inverters.
 Low Voltage motor starting panels.
 Knowledge of Medium Voltage motor starting panels.
 Good knowledge of Variable, speed drives for slip ring motors typically 3-
5MW, using liquid rotor controllers.
 Knowledge of Liquid resistance motor starters for slip ring motors.
 Knowledge of Local assembly of Nokian low voltage capacitors.
 Knowledge of Low Voltage Power Factor Correction and harmonic filter
equipment.
 Knowledge of Medium voltage Power Factor Correction and harmonic filter
equipment.
Company: Goldfield Mining (Limpopo)
Position: Underground Electrician
Duration: July 2003 to December 2003
Key Responsibilities:
 Maintenance of underground distribution cables, transformers, panels etc..
 Changing the underground cable PILC and XPLE type.
 Trackless machinery and conveyer systems.
 Supervising and maintaining of PLC equipment.
Company: Condra Crane (Alberton)
Position: Electrician
Duration: January 2003 to June 2003
Key Responsibilities:
 Wiring all types of control panels and cranes
 Fixing breakdown and services. wiring all types of remote control, wiring of
demac direction line starter.
 Wiring and set the parameters of all types AC and DC variable speed drives
 Weg CFW08, CFW09, Sew Euro Drive, Invertek Optidrives as well as Electrical
soft start controllers.
4. SAFETY AND QUALITY RESPONSIBILITIES
Maintain standard of safety and comply with company s health, safety & environment
Management system requirements. Take reasonable care of one sown health and safety
And that of others in the work place. Follow and maintain company standards of
quality
In accordance with company quality system requirement
5. EMPLOYMENT MOTIVATION
To be able to offer the best and latest electrical engineering knowledge and technology
know-how, to move hand in hand, to contribute to the progress and productivity of
the company in order to improve the quality of the service as well as efficiently.
6. REFFERENCES
6.1 B&W instrumentation and electrical limited.
Contact number: (011)907-1663
Mr.: Adrian, Project Manager.
6.2 Wade Walker electrical & instrumentation. Engineers & contractors.
Contact number: tel: (011) 466-0374
Mr.: Dieter Textores Project Manager
Cell: 0735860329
MR Henry mvanza Construction Manager
Cell: 0742829057
6.3 Kentz Electrical & instrumentation. Engineer & constructors South Africa.
Contact number. Tel (011) 203-9600
Mr.: C Kola Construction Manager
Cell: 0723048130
6.4 B&W instrumentation and Electrical Limited.
Mr. van zil card HR manager b&w Madagascar
Contact number: +26134 260021
Mr. Alfie dunnis electrical QA/QC supervisor b&w Madagascar ambatovy nickel
project
Contact number:+261 33 787 7965
Mr. Hanris electrical QA/QC manager b&w Madagascar ambatovy nickel project
Contact number: +26134 413 2036
6.5 Tubular electrical & instrumentation
Contact no: (011)553-2000
Mr. Roger Lemair. Electrical superintendent
Cell No: 0784614746
6.6 Mr. Patrick Lenda
Switch gear And High Voltage Testing Department Manager: ACTOM
Contact Number: 0114526388 / 0760393947
6.7 Mr. Andriuss
Technical Manager: GOLDFIELD MINING
Contact Number: 0724532675

More Related Content

What's hot

Current Job Description
Current Job DescriptionCurrent Job Description
Current Job Descriptiontariq ghareb
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)sharib reza
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
Noor Ali Sy
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
Yacine Sayad
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
Khaled EL-Hag Ahmed
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
Tahir Mahmood
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-Stevie Nimmo
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERNguyen Thuc
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updatedMOHAMED ILYAS
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMohammed Akbar
 

What's hot (20)

Current Job Description
Current Job DescriptionCurrent Job Description
Current Job Description
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
nestor
nestornestor
nestor
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
 
SARAVANAN RESUME
SARAVANAN RESUMESARAVANAN RESUME
SARAVANAN RESUME
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
F. CV
F. CVF. CV
F. CV
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Colin Crossley New CV
Colin Crossley New CVColin Crossley New CV
Colin Crossley New CV
 
RA CV Current
RA CV CurrentRA CV Current
RA CV Current
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 

Viewers also liked

Backup Academy Certified Professional
Backup Academy Certified ProfessionalBackup Academy Certified Professional
Backup Academy Certified ProfessionalWaled Wageh
 
4_tips_to_manage_your_leads_and_improve_your_conversion_rate
4_tips_to_manage_your_leads_and_improve_your_conversion_rate4_tips_to_manage_your_leads_and_improve_your_conversion_rate
4_tips_to_manage_your_leads_and_improve_your_conversion_rateTricia Andreassen
 
Knowledge Exploitation and Exploration in a Higher Education Merger: A Perfor...
Knowledge Exploitation and Exploration in a Higher Education Merger: A Perfor...Knowledge Exploitation and Exploration in a Higher Education Merger: A Perfor...
Knowledge Exploitation and Exploration in a Higher Education Merger: A Perfor...
Universidade Técnica de Lisboa
 
Université de Montréal REP2300 - Cours 3 - 2013
Université de Montréal REP2300 - Cours 3 - 2013Université de Montréal REP2300 - Cours 3 - 2013
Université de Montréal REP2300 - Cours 3 - 2013Michelle Sullivan
 
CASTRO NAVARRETE Francisco
CASTRO NAVARRETE FranciscoCASTRO NAVARRETE Francisco
CASTRO NAVARRETE FranciscoFrancisco Castro
 
Obvious User Interface
Obvious User InterfaceObvious User Interface
Obvious User Interface
Cody Landefeld
 
N17 5 (1)
N17 5 (1)N17 5 (1)
N17 5 (1)
tkachenko_anna
 
Legislation Tracking App for Government Affairs Personnel
Legislation Tracking App for Government Affairs PersonnelLegislation Tracking App for Government Affairs Personnel
Legislation Tracking App for Government Affairs Personnel
Softweb Solutions
 
Livelihoods, Equity, and Sustainability
Livelihoods, Equity, and SustainabilityLivelihoods, Equity, and Sustainability
Livelihoods, Equity, and Sustainability
Ashish Kothari
 
Biomecanica basica del sistema muscoesqueletico nordin
Biomecanica basica del sistema muscoesqueletico nordinBiomecanica basica del sistema muscoesqueletico nordin
Biomecanica basica del sistema muscoesqueletico nordin
Dario Estrada
 

Viewers also liked (13)

Backup Academy Certified Professional
Backup Academy Certified ProfessionalBackup Academy Certified Professional
Backup Academy Certified Professional
 
This won
This wonThis won
This won
 
4_tips_to_manage_your_leads_and_improve_your_conversion_rate
4_tips_to_manage_your_leads_and_improve_your_conversion_rate4_tips_to_manage_your_leads_and_improve_your_conversion_rate
4_tips_to_manage_your_leads_and_improve_your_conversion_rate
 
Knowledge Exploitation and Exploration in a Higher Education Merger: A Perfor...
Knowledge Exploitation and Exploration in a Higher Education Merger: A Perfor...Knowledge Exploitation and Exploration in a Higher Education Merger: A Perfor...
Knowledge Exploitation and Exploration in a Higher Education Merger: A Perfor...
 
Université de Montréal REP2300 - Cours 3 - 2013
Université de Montréal REP2300 - Cours 3 - 2013Université de Montréal REP2300 - Cours 3 - 2013
Université de Montréal REP2300 - Cours 3 - 2013
 
The King who never was
The King who never wasThe King who never was
The King who never was
 
CASTRO NAVARRETE Francisco
CASTRO NAVARRETE FranciscoCASTRO NAVARRETE Francisco
CASTRO NAVARRETE Francisco
 
Erika mansilla
Erika mansillaErika mansilla
Erika mansilla
 
Obvious User Interface
Obvious User InterfaceObvious User Interface
Obvious User Interface
 
N17 5 (1)
N17 5 (1)N17 5 (1)
N17 5 (1)
 
Legislation Tracking App for Government Affairs Personnel
Legislation Tracking App for Government Affairs PersonnelLegislation Tracking App for Government Affairs Personnel
Legislation Tracking App for Government Affairs Personnel
 
Livelihoods, Equity, and Sustainability
Livelihoods, Equity, and SustainabilityLivelihoods, Equity, and Sustainability
Livelihoods, Equity, and Sustainability
 
Biomecanica basica del sistema muscoesqueletico nordin
Biomecanica basica del sistema muscoesqueletico nordinBiomecanica basica del sistema muscoesqueletico nordin
Biomecanica basica del sistema muscoesqueletico nordin
 

Similar to kkalema

USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2usman ahmed
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,IQBAL KHAN
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
TOM VAN WYK
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady CENGADAM
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.SAJID MALLICK
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)Umar Akbar
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 

Similar to kkalema (20)

USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
 
QA.QC E&I feb
QA.QC E&I febQA.QC E&I feb
QA.QC E&I feb
 
FREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVEFREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVE
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
Muthuselvan Bio
Muthuselvan BioMuthuselvan Bio
Muthuselvan Bio
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
QC
QCQC
QC
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
Abraham CV 03.06.2015
Abraham CV 03.06.2015Abraham CV 03.06.2015
Abraham CV 03.06.2015
 

kkalema

  • 1. CURRICULUM VITAE OF Kisanga kalema 1. PERSONAL INFORMATION Address: 88 st George. Cnr lever rd and George rd Midrand johannesburg Nationality : Congolese E-mail address: kisangakalema@gmail.com Contact Number: 0738326336 0764763090 {Alternative} Home languages: French Other languages: English 2. EDUCATIONAL BACKGROUND 2.1 Tertiary education: DRCongo University of Technology 1996-2000 Course: Electrical Engineering (Heavy current) National Diploma 2.2 Johannesburg Technical College Industrial electronics 2000-2001 National certificate 2.3 Institute technical of CONGO senior certificate matriculate 1990-1996 2.4 Computer literacy: M S office, Excel, Power point, introduction to PLC 2.5 Training: Quality Assurance and Quality Control ISO 9001 Auditors training Working at height certificate 3. WORKING HISTORY
  • 2. Company: B&W instrumentation and electrical limited. Project name: Sasol utility expansion project (S.U.E.P). Sasolburg site Position: electrical supervisor Duration: From: 04 July2012 up to date Key responsibilities:  Assist Project Manager with the compiling of Scope of work.  Process Appointments and assure adherence to Legal requirements Of Contractors.  Ensure task completion is aligned with critical project constraints: Time; Cost; Quality; Adherence to Scope of Work.  Ensure site supervision  Verification that company procedures and process are being implemented in accordance with the project quality program and the company integrated management system (IMS).  Responsible of all the new substations installation.  Lighting installation of conveyor, crushers, water process  Responsible of glanding and terminations of isolators motors. Installations of the UPS for change over and Instrument  Renovations of Old Jigs Plant.  cable joints, cable faulty finding, termination of distribution board & wiring, fault finding, identification of motors, motors testing, motors connections.  Issuing, acceptance and signing of on various permits such as:  Intelli /excavating / hot permits.  Order, accept and arrange basic consumables or free issue items.  Responsible for progress measurements, timely and accurate Feedback.  Adhere to the SHEC programs at all times (toolbox talks, audits etc..) All incidents and accidents are reported immediately to the Superintendent according to set procedures. All necessary SHEC precautions are taken to ensure accident free hours (pre-shift inspections, brakes etc). Personal protective equipment is worn at all times. Tools and equipment is inspected daily prior to being used, according to SHEC practices and statutory requirements. The work area is cleaned and the environment restored to its original state after completion of a job.  Follow-up on deliveries of free-issue equipment.  New earthing installations on the Screening and Beneficiation substations from the transformer’s bays to the substation.  Controlling and inspecting all earthing drawings.
  • 3. Company: Wade Walker Electrical & instrumentation Engineers & Contractors. Exxaro coal mine in Limpopo (site) Project name: Grootegeluk Medupi Expansion Project. (GMEP) Position: Electrical supervisor Duration: From: 01 July. 2011 to 29 June 2012 Key responsibilities:  Assist Project Manager with the compiling of Scope of work.  Process Appointments and assure adherence to Legal requirements Of Contractors. Ensure task completion is aligned with critical project constraints: Time; Cost; Quality; Adherence to Scope of Work.  Ensure site supervision  Site Control and Supervision  Verification that company procedures and process are being implemented in accordance with the project quality program and the company integrated management system (IMS).  Responsible of all the new substations installation.  Lighting installation of conveyor, crushers, water process  Responsible of glanding and terminations of isolators motors. Installations of the UPS for change over and Instrument  Renovations of Old Jigs Plant.  cable joints, cable faulty finding, termination of distribution board & wiring, fault finding, identification of motors, motors testing, motors connections.  Issuing, acceptance and signing of on various permits such as:  Intelli /excavating / hot permits.  Order, accept and arrange basic consumables or free issue items. Responsible for progress measurements, timely and accurate Feedback.  Adhere to the SHEC programs at all times (toolbox talks, audits etc..) All incidents and accidents are reported immediately to the Superintendent according to set procedures. All necessary SHEC Precautions are taken to ensure accident free hours (pre-shift Inspections, brakes etc). Personal protective equipment is worn at all times.  Tools and equipment is inspected daily prior to being used, according to SHEC practices and statutory requirements. The work area is cleaned and the environment restored to its original
  • 4. state after completion of a job.  Follow-up on deliveries of free-issue equipment. Company: Kentz Engineers & Contractors Kusile Power Station (site) Project name: Kusile Power Station project Position: Electrical supervisor Duration: From October 2008 to 15 June 2011 Key responsibilities:  Verification that company procedures and process are being implemented in accordance with the project quality program and the company integrated management system (IMS).  Responsible of all the new substations installation.  Lighting installation of conveyor, crushers, water process  Responsible of glanding and terminations of isolators motors. Installations of the UPS for change over and Instrument  Renovations of Old Jigs Plant.  cable joints, cable faulty finding, termination of distribution board & wiring, fault finding, identification of motors, motors testing, motors connections.  Issuing, acceptance and signing of on various permits such as:  Intelli /excavating / hot permits.  Order, accept and arrange basic consumables or free issue items.  Responsible for progress measurements, timely and accurate Feedback.  Adhere to the SHEC programs at all times (toolbox talks, audits etc..) All incidents and accidents are reported immediately to the Superintendent according to set procedures. All necessary SHEC precautions are taken to ensure accident free hours (pre-shift inspections, brakes etc). Personal protective equipment is worn at all times. Tools and equipment is inspected daily prior to being used, according to SHEC practices and statutory requirements. The work area is cleaned and the environment restored to its original state after completion of a job Follow-up on deliveries of free-issue equipment.  Assist Project Manager with the compiling of Scope of work.  Process Appointments and assure adherence to Legal requirements Of Contractors. Ensure task completion is aligned with critical project constraints:
  • 5. Time; Cost; Quality; Adherence to Scope of Work.  Ensure site supervision  Site Control and Supervision Company: Tubular Electrical & Instrumentation International Ferro metal (site) Position: Electrical QA/QC inspector Duration: June 2008 to September 2008 Key responsibilities:  Verification that company procedures and process are being implemented in accordance with the project quality program and the company integrated management system (IMS).  Inspection of all electrical installations, cables testing, lightings, electrical motor etc….  Identify any problems and difficulties encountered.  Attend all necessary inspections as identified in the approved inspection and test plan (ITP).  Preparation, co-ordination and approval of procured quality operating plans.  Inspect and megger cables, pumps on the reel prior to installation.  Inspect all MCC panel, UPS panel, PLC panel, from the manufacture before installation to substation, verifier all testing certificate  Evaluate the validity and acceptability of inspection results.  Installations, maintenances and commissioning of electrical equipment.  Adherence to all procedures and specifications.  Participation in critical analysis meetings, generating and closing action plans.  Liaise with clients, suppliers and contractors on quality matters.  Compiling the inspection and the test plan.  Compile project reports, prepare project specification procedures and work instruction.  Review and approve project data books.  Review quality records and identify recurring problems areas (Trends)  Liaise with clients, suppliers and contractors on quality matters  Adherence to all procedures and specifications  Making sure that grounding installations and termination to equipment’s conform to project standard drawings and specifications.  Record, keeping of all tests results, reports, documentation and revisions on build drawings, completion of form No. 6Qs, 7Qs and commissioning.  Evaluate the validity and acceptability of inspection results.
  • 6. Company: B&W instrumentation and electrical limited Ambatovy nickel project Madagascar (site) Position: Electrical QA/QC Inspector Duration: February 2006 to May 2008 Company: ACTOM (Alstom) Position: Switchgear tester technician Supervisor Duration: January 2004 to December 2005 Key Responsibilities:  Testing, installation, maintenance and commissioning.  Operating and wiring of all switchgears and networks, panels, control panels, high, medium and low voltage panels.  Testing of vacuum circuit breaker, ring main unit, voltage and current transformers, mini substations, generators, bus bars, breakers, dog box, and isolators.  Construction of HV AC.  Final inspection on the units.  Sales of LV, MV HV and other electrical equipments.  Good knowledge of LV,MV,HV equipments  Good knowledge of automation and operating three –phase test set in order to do primary and secondary injection on protection equipment.  Good knowledge of plc and scales and inverters.  Low Voltage motor starting panels.  Knowledge of Medium Voltage motor starting panels.  Good knowledge of Variable, speed drives for slip ring motors typically 3- 5MW, using liquid rotor controllers.  Knowledge of Liquid resistance motor starters for slip ring motors.  Knowledge of Local assembly of Nokian low voltage capacitors.  Knowledge of Low Voltage Power Factor Correction and harmonic filter equipment.  Knowledge of Medium voltage Power Factor Correction and harmonic filter equipment. Company: Goldfield Mining (Limpopo)
  • 7. Position: Underground Electrician Duration: July 2003 to December 2003 Key Responsibilities:  Maintenance of underground distribution cables, transformers, panels etc..  Changing the underground cable PILC and XPLE type.  Trackless machinery and conveyer systems.  Supervising and maintaining of PLC equipment. Company: Condra Crane (Alberton) Position: Electrician Duration: January 2003 to June 2003 Key Responsibilities:  Wiring all types of control panels and cranes  Fixing breakdown and services. wiring all types of remote control, wiring of demac direction line starter.  Wiring and set the parameters of all types AC and DC variable speed drives  Weg CFW08, CFW09, Sew Euro Drive, Invertek Optidrives as well as Electrical soft start controllers. 4. SAFETY AND QUALITY RESPONSIBILITIES Maintain standard of safety and comply with company s health, safety & environment Management system requirements. Take reasonable care of one sown health and safety And that of others in the work place. Follow and maintain company standards of quality In accordance with company quality system requirement 5. EMPLOYMENT MOTIVATION To be able to offer the best and latest electrical engineering knowledge and technology know-how, to move hand in hand, to contribute to the progress and productivity of the company in order to improve the quality of the service as well as efficiently. 6. REFFERENCES 6.1 B&W instrumentation and electrical limited. Contact number: (011)907-1663
  • 8. Mr.: Adrian, Project Manager. 6.2 Wade Walker electrical & instrumentation. Engineers & contractors. Contact number: tel: (011) 466-0374 Mr.: Dieter Textores Project Manager Cell: 0735860329 MR Henry mvanza Construction Manager Cell: 0742829057 6.3 Kentz Electrical & instrumentation. Engineer & constructors South Africa. Contact number. Tel (011) 203-9600 Mr.: C Kola Construction Manager Cell: 0723048130 6.4 B&W instrumentation and Electrical Limited. Mr. van zil card HR manager b&w Madagascar Contact number: +26134 260021 Mr. Alfie dunnis electrical QA/QC supervisor b&w Madagascar ambatovy nickel project Contact number:+261 33 787 7965 Mr. Hanris electrical QA/QC manager b&w Madagascar ambatovy nickel project Contact number: +26134 413 2036 6.5 Tubular electrical & instrumentation Contact no: (011)553-2000 Mr. Roger Lemair. Electrical superintendent Cell No: 0784614746 6.6 Mr. Patrick Lenda Switch gear And High Voltage Testing Department Manager: ACTOM Contact Number: 0114526388 / 0760393947 6.7 Mr. Andriuss Technical Manager: GOLDFIELD MINING Contact Number: 0724532675