SlideShare a Scribd company logo
1 of 7
Download to read offline
1
OBJECTIVE
“Seeking for a job environment as an opportunity to gain new experience,
Enhance use my knowledge and skills. It’s my
Intention to join an organization with excellent and growth impurity”
PERSONAL INFORMATION
NRIC : 880922-11-5751 Health : Excellent
Date of Birth : 22 September 1988 Gender : Male
Age : 28 Years Old Marital Status : Married
Nationality : Malaysian Expected Salary : MYR 4500.00 (Negotiable)
Religion : Islam Availability : 1 Month notice
EDUCATIONAL, TRAINING AND CERTIFICATION BACKGROUND
YEAR : 2016
TRAINING/COURSE : Welding Inspector (PCN Level 1)
PCN NUMBER : 331545
YEAR : 2014
TRAINING/COURSE : Mis-BOSET & PCSB PTW
QUALIFICATION : Offshore passport and certificate of competency PCSB Permit to Work System
YEAR : 2014
TRAINING/COURSE : IECX Explosion Proof Training
QUALIFICATION : Certificated of Competency “to repair and service of Ex d, Ex e and Ex n Explosion
Proof Equipment”.
YEAR : 2009-2012
INSTITUTE/UNIVERSITY : TATI University College, Terengganu
PROGRAMME : Bachelor’s of Manufacturing Engineering Technology
MAJOR : Mechanical Tooling
CGPA : 3.15/3
MOHD FIKRUDDIEN BIN YUSOF
1st PROJECT ENGINEER
2nd QA/QC ENGINEER
PERMANENT ADDRESS (MAILING)
No 273A Kampung TitianRawa,
Pengadang Buloh,
21070 K.Terengganu,
Terengganu Darul Iman.
CONTACT
Mobile: 014-5252808
Email: fikruddien@gmail.com
2
YEAR : 2006-2009
INSTITUTE/UNIVERSITY : TATI University College, Terengganu
PROGRAMME : Diploma in Manufacturing Engineering
MAJOR : Tool & Die Design
CGPA : 3.29/3
YEAR : 2001-2005
SCHOOL : Sekolah Menengah Kebangsaan Sultan Mansor, K.Terengganu
QUALIFICATION : PMR (3A, 3B, 1C, 2D) , SPM [1(1A), 2(2A), 3(4B), 1(6C), 2(7D)]
MAJOR : Science
WORK EXPERIENCES
Company : Kay Engineering Sdn Bhd, Terengganu.
Position : Project Engineer cum QA/QC Engineer
Duration : April 2015 – Present
Duties:
 Carried out QC Inspection based on approved drawing, standard and client specification for instant,
material receiving, marking and layout, welding fit-up, welding inspection (before, during and after)
and final inspection.
 Incoming material Inspection (Mill Certificates Check, Record Heat Number, Check Dimensional) and
Material Verification Report (Piece mark Recorded and Dimensional Checked).
 Witness and verify all inspection and testing activities including material receiving, welder
qualification test (WQT), Welding Procedure Specification (WPS) testing, Non - Destructive Testing
(NDT), blasting & painting, dimensional check, insulation, hydro test to ensure compliance with
approved project procedures specification, code & standard, regulation of authority and
construction drawing.
 Specific duties include plan, direct, supervise and control the various aspects of technical services
activities including maintenance management and procurement.
 Prepare job proposals, estimating and tender documentations.
 Lead, manage and provide advice as necessary for the overall project progress to ensure high quality
and timely project delivery within budget and meeting quality expectations. Monitor and report
project progress to top management and recommend solutions for implementation.
 Prepare progress payment for work satisfactory completed to the client.
 Responsible in handling the planning and control functions include project planning, scheduling,
monitoring, construction forecasting and implementation, and reporting progress evaluation of
project activities and coordination.
List of Project/Maintenance Involved;
 Provision of Architectural works for KNPG-B Phase II Kinabalu Non-Associated Gas (NAG)
Development Project for Petronas Carigali Sdn Bhd.
 PCC for extension permanent vacuum line Bagging Silo bas at Petronas Chemical LDPE, Terengganu.
 Provision of manpower supply to remove Hydrazine flow totalizer at Petronas Chemical LDPE,
Terengganu.
 Provision for Pipe Replacement as Per Inspection Report for PETRONAS Penapisan (Terengganu) Sdn
Bhd.
3
Company : Elektro Serve (M) Sdn Bhd, Paka, Terengganu.
Position : Mechanical Engineer / Project Engineer
Duration : August 2013 – April 2015
Duties:
 Team Leader to coordinate and manage the jobs that carried out in accordance with required
specification, quality, and safety standard and affecting the optimum speed of services.
 Planning, organising, scheduling and controlling the project teams to achieve the required objective
of the project.
 Liaise with clients, consultants, sub-contractor, suppliers and project team and ensuring excellent
communications between all parties.
 To ensure all works carried out are in compliance with the drawing specification and procedure
standard (IECX repair & service for equipment and PTS standard).
 Responsible for the completion of all maintenance service at the time requested from the end user.
 Able to use Phenix tester for Core loss & Hotspot test, and SPM vibration.
List of Project/Maintenance Involved;
 As a project engineer for TA MTBE Shutdown 2014 with the scope of work remove/install and
perform servicing for 130 units LV motor, 8 units HT motor and 6 units for Sleeve Bearing
inspection.
 Site Engineer for POLYPLASTIC Shutdown 2014 with the scope of work remove & install and perform
servicing for 78 units LV motor and 2 units HT motor for Sleeve Bearing Inspection.
 As a Service engineer for Provision of overhaul and servicing work for HT motor (11Kv, 2.7MW) from
PETRONAS MLNG, Sarawak.
 Person in Charge to monitor PPM work for the motor, alternator and generator with Price
Agreement contract such as the client (PETRONAS MTBE, PPT, POLYETHYLENE, TCOT, CUFK, and
LYNAS).
 As a Field Engineer to monitor cabling and termination work for Portable Standby Genset at Dulang
Bravo Platform.
 As a Field Engineer to monitor installation and commissioning work of new unit Sea Water Lift
Pump (SWLP’S) 3.3 KV at ANGSI platform.
Company : MIE-INDUSTRIAL SDN BHD, Paka, Terengganu.
Position : Site Engineer (E & I)
Duration : November 2012 – August 2013
Project Involved : FLARE GAS RECOVERY UNIT CONSTRUCTION – PETRONAS GAS BERHAD, TRG.
Duties :
 Assist project engineer for monitoring site job come out with the daily report and attend work
progress meeting.
 As a scheduler to manage all activities on site, equipment preparation and material delivery.
 Assist QC team to perform inspection/testing for equipment delivery.
 Fully monitoring for installation of electrical and instrument equipment such as ;
• New cableway installation for cable ladder, cable tray and cable trench and ensure complete
with correct support, approved material and as per typical drawing.
• Laying electrical and instrument cable from control room to substation and compressor
house.
• Install new transformer (3.3kv and 6.6kv), Transmitter, Junction Box and etc.
 Prepared for BQ and progress claim.
4
Company : PFCE-PONTEROSSO SDN BHD, Paka, Terengganu.
Position : 1st
QC Assistant 2nd
Material Controller
Duration : June 2012 – October 2012
Project Involved : GPP3 PLANT REJUNEVATION AND REVAMP 2 – PETRONAS GAS TERENGGANU
(Valve Installation)
Duties:
 Assist QC team to conduct WCS (Work Control Sheet) and together to perform the functional test.
 Prepared material and equipment for Valve installation base on PI&D using MRF (Material Request
Form) and submit to MISC.
 Monitoring and control all equipment at the site.
 Ensure all calibration certificates for equipment used still within period.
INTERNSHIP EXPERIENCES
Name of Company : Global Dynamic Packaging Sdn. Bhd.
Lot T6 & T7, Kawasan Industri MARA,
Bukit Kor, 21600 Marang,
Terengganu Darul Iman.
Duration : Dec 2010 – April 2011 (Industrial training)
Position : Technician/Quality Control
Duties : Operated blow moulding and blow film machine.
: Troubleshooting, repair and service for a problem arising from mould and jig.
: Keep up the quality of product with control and checking the dimensional during
production.
Name of Company : IXMATION Sdn. Bhd.
Bukit Minyak, Industrial Park,
Penang.
Duration : Dec 2008 – April 2009 (Industrial training)
Position : Technician/Quality Control
Duties : As an assistant to Production Engineer/ attached to QC department
: Rechecking all delivery part as per drawing given.
: Assist to testing engineer to perform a functional test upon receive item.
5
ACADEMIC COURSES TAKEN
BACHELOR’S DEGREE DIPLOMA
 Accomplishment of final year project
research
 Quality Management
 Industrial safety Management
 Jig & Fixtures Design
 Statics & Dynamics
 Solid mechanics
 Advanced CAD & Modeling
 Rapid Prototyping & Reverse Engineering
 Mechanic of Material
 Engineering Economic
 Engineering Metrology
 Professional Ethics
 Accomplishment of final year project in
mould design
 CNC Programming
 Jigs & Fixture Design
 CAD/CAM Application
 Quality Tools & Management
 Advanced mould design
 Advanced press tool design
SKILL AND LANGUAGES
(Proficiency: Advanced - Highly experienced; Intermediate - Familiar with all the basic functionalities; Beginner - Just
started using or learning the skill)
Skill Years Proficiency
Operating milling, lathe, wire cut
Microsoft Project
3
3
Intermediate
Advanced
AutoCAD Software >6 Advanced
Solid Works 2 Beginner
Wildfire Pro-Engineer 4 Advanced
Microsoft Office >5 Advanced
Adobe Photoshop 2 Intermediate
Mould Design 2 Intermediate
Press Tool Design 2 Intermediate
Product design 2 Intermediate
Finite Element Analysis
(COSMOSWORKs)
2 Beginner
Languages
(Proficiency: 0=Poor - 5=Excellent)
Language Written Spoken
Bahasa Malaysia 4 5
English 3 3
6
ADDITIONAL INFO
Hobby & Interest:
Football, Futsal, Badminton, Cycling, Writing, Art & Design, Product design, Entrepreneurship.
Summary of achievement:
1. 2009-2012 – Bachelor’s degree in Manufacturing Engineering Technology (TATI University
College)
AWARD
Dean’s List semester 2, 2009-2010
Dean’s List semester 2, 2011-2012
2. 2006-2009 – Diploma in Manufacturing Engineering (TATI University College)
AWARD
Dean’s List semester 2, 2008-2009
Dean’s List semester 2, 2007-2008
3. 2001-2005 – Sekolah Menengah Kebangsaan Sultan Mansor, Kuala Terengganu.
SPM [ 1(1A ), 2(2A), 3(4B), 1(6C), 2(7D) ]
PMR (3A, 3B, 1C, 2D)
Curricular Activities:
• Participant, Kejohanan Badminton Tertutup TATIUC (2012)
• Participant , Kejohanan Bola Sepak TATIUC Piala Menteri Besar ( 2011)
• Represent TATIUC Football Club to IPTS Football competition at UKM (2012)
• Represent TATIUC Football Club to Sukan MASISWA Zon Pantai Timur (2011)
• Represent TATIUC Badminton Club to Sukan MASISWA Zon Pantai Timur (2007 -2009)
Organization:
• Vice President, Tool and Die Society, TADS (2009-2010)
• Member of , Tool and Die Society, TADS (2006-2008)
• Committee member of Borneo Tour PMIT 1 (2011)
• Secretary, TATIUC Skills Competition (2010)
• Secretary, Academic & Industrial Visit to Metaltech (2010)
• Secretary, Organized The English Night at TATIUC 2008/2009
7
References:
Name: Mr Zaidi Bin Muda Name: Mr Mohd Zainuddin Bin Moktar.
Contact Number: 019-9157074 Contact Number: 019-9896609
Position: Dean Position: Project Engineer
Faculty: Manufacturing Engineering Technology PFCE-PONTEROSSO Sdn Bhd
Institution: TATI University College Open Yard KSB Fasa 2
Email: zaidi@tatiuc.edu.my Kemaman Supply Base
24007 Kemaman,Terengganu.
Name: Mr Muhktar Awang
Contact Number: 019-9157074
ELEKTRO SERVE (M) SDN BHD PT18880,
Industry Park & Technology Paka,
23100 Dungun, Terengganu D.I.

More Related Content

What's hot

TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
Allan g hardy cv feb 2020_master
Allan g hardy cv feb 2020_masterAllan g hardy cv feb 2020_master
Allan g hardy cv feb 2020_masterAllan Hardy
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer MechanicalFaizan Raza
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016Dayananda Hebbar
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitaeHarvey Sarda
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQCvignesh k
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515newaffendy ali
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanShabin Shajahan
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 

What's hot (20)

TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Hamza qadeer cv
Hamza qadeer cvHamza qadeer cv
Hamza qadeer cv
 
QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 
Allan g hardy cv feb 2020_master
Allan g hardy cv feb 2020_masterAllan g hardy cv feb 2020_master
Allan g hardy cv feb 2020_master
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
Suneesh-QAQC Inspector-CV
Suneesh-QAQC Inspector-CVSuneesh-QAQC Inspector-CV
Suneesh-QAQC Inspector-CV
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQC
 
Resume_Anjanna
Resume_AnjannaResume_Anjanna
Resume_Anjanna
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
Amir QC
Amir QCAmir QC
Amir QC
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Resume NMN 5b _3_
Resume NMN 5b _3_Resume NMN 5b _3_
Resume NMN 5b _3_
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 

Similar to Resume_rev.3 (20)

FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
resume paramatt
resume paramattresume paramatt
resume paramatt
 
resume paramatt1
resume paramatt1resume paramatt1
resume paramatt1
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
RESUME=
RESUME=RESUME=
RESUME=
 
ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUME
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Pramod Kumar Das
Pramod Kumar Das Pramod Kumar Das
Pramod Kumar Das
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
QA.QC E&I feb
QA.QC E&I febQA.QC E&I feb
QA.QC E&I feb
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
YOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUMEYOGESH M PADIYA NEW RESUME
YOGESH M PADIYA NEW RESUME
 
Koti (assistant manager mech)
Koti (assistant manager mech)Koti (assistant manager mech)
Koti (assistant manager mech)
 

Resume_rev.3

  • 1. 1 OBJECTIVE “Seeking for a job environment as an opportunity to gain new experience, Enhance use my knowledge and skills. It’s my Intention to join an organization with excellent and growth impurity” PERSONAL INFORMATION NRIC : 880922-11-5751 Health : Excellent Date of Birth : 22 September 1988 Gender : Male Age : 28 Years Old Marital Status : Married Nationality : Malaysian Expected Salary : MYR 4500.00 (Negotiable) Religion : Islam Availability : 1 Month notice EDUCATIONAL, TRAINING AND CERTIFICATION BACKGROUND YEAR : 2016 TRAINING/COURSE : Welding Inspector (PCN Level 1) PCN NUMBER : 331545 YEAR : 2014 TRAINING/COURSE : Mis-BOSET & PCSB PTW QUALIFICATION : Offshore passport and certificate of competency PCSB Permit to Work System YEAR : 2014 TRAINING/COURSE : IECX Explosion Proof Training QUALIFICATION : Certificated of Competency “to repair and service of Ex d, Ex e and Ex n Explosion Proof Equipment”. YEAR : 2009-2012 INSTITUTE/UNIVERSITY : TATI University College, Terengganu PROGRAMME : Bachelor’s of Manufacturing Engineering Technology MAJOR : Mechanical Tooling CGPA : 3.15/3 MOHD FIKRUDDIEN BIN YUSOF 1st PROJECT ENGINEER 2nd QA/QC ENGINEER PERMANENT ADDRESS (MAILING) No 273A Kampung TitianRawa, Pengadang Buloh, 21070 K.Terengganu, Terengganu Darul Iman. CONTACT Mobile: 014-5252808 Email: fikruddien@gmail.com
  • 2. 2 YEAR : 2006-2009 INSTITUTE/UNIVERSITY : TATI University College, Terengganu PROGRAMME : Diploma in Manufacturing Engineering MAJOR : Tool & Die Design CGPA : 3.29/3 YEAR : 2001-2005 SCHOOL : Sekolah Menengah Kebangsaan Sultan Mansor, K.Terengganu QUALIFICATION : PMR (3A, 3B, 1C, 2D) , SPM [1(1A), 2(2A), 3(4B), 1(6C), 2(7D)] MAJOR : Science WORK EXPERIENCES Company : Kay Engineering Sdn Bhd, Terengganu. Position : Project Engineer cum QA/QC Engineer Duration : April 2015 – Present Duties:  Carried out QC Inspection based on approved drawing, standard and client specification for instant, material receiving, marking and layout, welding fit-up, welding inspection (before, during and after) and final inspection.  Incoming material Inspection (Mill Certificates Check, Record Heat Number, Check Dimensional) and Material Verification Report (Piece mark Recorded and Dimensional Checked).  Witness and verify all inspection and testing activities including material receiving, welder qualification test (WQT), Welding Procedure Specification (WPS) testing, Non - Destructive Testing (NDT), blasting & painting, dimensional check, insulation, hydro test to ensure compliance with approved project procedures specification, code & standard, regulation of authority and construction drawing.  Specific duties include plan, direct, supervise and control the various aspects of technical services activities including maintenance management and procurement.  Prepare job proposals, estimating and tender documentations.  Lead, manage and provide advice as necessary for the overall project progress to ensure high quality and timely project delivery within budget and meeting quality expectations. Monitor and report project progress to top management and recommend solutions for implementation.  Prepare progress payment for work satisfactory completed to the client.  Responsible in handling the planning and control functions include project planning, scheduling, monitoring, construction forecasting and implementation, and reporting progress evaluation of project activities and coordination. List of Project/Maintenance Involved;  Provision of Architectural works for KNPG-B Phase II Kinabalu Non-Associated Gas (NAG) Development Project for Petronas Carigali Sdn Bhd.  PCC for extension permanent vacuum line Bagging Silo bas at Petronas Chemical LDPE, Terengganu.  Provision of manpower supply to remove Hydrazine flow totalizer at Petronas Chemical LDPE, Terengganu.  Provision for Pipe Replacement as Per Inspection Report for PETRONAS Penapisan (Terengganu) Sdn Bhd.
  • 3. 3 Company : Elektro Serve (M) Sdn Bhd, Paka, Terengganu. Position : Mechanical Engineer / Project Engineer Duration : August 2013 – April 2015 Duties:  Team Leader to coordinate and manage the jobs that carried out in accordance with required specification, quality, and safety standard and affecting the optimum speed of services.  Planning, organising, scheduling and controlling the project teams to achieve the required objective of the project.  Liaise with clients, consultants, sub-contractor, suppliers and project team and ensuring excellent communications between all parties.  To ensure all works carried out are in compliance with the drawing specification and procedure standard (IECX repair & service for equipment and PTS standard).  Responsible for the completion of all maintenance service at the time requested from the end user.  Able to use Phenix tester for Core loss & Hotspot test, and SPM vibration. List of Project/Maintenance Involved;  As a project engineer for TA MTBE Shutdown 2014 with the scope of work remove/install and perform servicing for 130 units LV motor, 8 units HT motor and 6 units for Sleeve Bearing inspection.  Site Engineer for POLYPLASTIC Shutdown 2014 with the scope of work remove & install and perform servicing for 78 units LV motor and 2 units HT motor for Sleeve Bearing Inspection.  As a Service engineer for Provision of overhaul and servicing work for HT motor (11Kv, 2.7MW) from PETRONAS MLNG, Sarawak.  Person in Charge to monitor PPM work for the motor, alternator and generator with Price Agreement contract such as the client (PETRONAS MTBE, PPT, POLYETHYLENE, TCOT, CUFK, and LYNAS).  As a Field Engineer to monitor cabling and termination work for Portable Standby Genset at Dulang Bravo Platform.  As a Field Engineer to monitor installation and commissioning work of new unit Sea Water Lift Pump (SWLP’S) 3.3 KV at ANGSI platform. Company : MIE-INDUSTRIAL SDN BHD, Paka, Terengganu. Position : Site Engineer (E & I) Duration : November 2012 – August 2013 Project Involved : FLARE GAS RECOVERY UNIT CONSTRUCTION – PETRONAS GAS BERHAD, TRG. Duties :  Assist project engineer for monitoring site job come out with the daily report and attend work progress meeting.  As a scheduler to manage all activities on site, equipment preparation and material delivery.  Assist QC team to perform inspection/testing for equipment delivery.  Fully monitoring for installation of electrical and instrument equipment such as ; • New cableway installation for cable ladder, cable tray and cable trench and ensure complete with correct support, approved material and as per typical drawing. • Laying electrical and instrument cable from control room to substation and compressor house. • Install new transformer (3.3kv and 6.6kv), Transmitter, Junction Box and etc.  Prepared for BQ and progress claim.
  • 4. 4 Company : PFCE-PONTEROSSO SDN BHD, Paka, Terengganu. Position : 1st QC Assistant 2nd Material Controller Duration : June 2012 – October 2012 Project Involved : GPP3 PLANT REJUNEVATION AND REVAMP 2 – PETRONAS GAS TERENGGANU (Valve Installation) Duties:  Assist QC team to conduct WCS (Work Control Sheet) and together to perform the functional test.  Prepared material and equipment for Valve installation base on PI&D using MRF (Material Request Form) and submit to MISC.  Monitoring and control all equipment at the site.  Ensure all calibration certificates for equipment used still within period. INTERNSHIP EXPERIENCES Name of Company : Global Dynamic Packaging Sdn. Bhd. Lot T6 & T7, Kawasan Industri MARA, Bukit Kor, 21600 Marang, Terengganu Darul Iman. Duration : Dec 2010 – April 2011 (Industrial training) Position : Technician/Quality Control Duties : Operated blow moulding and blow film machine. : Troubleshooting, repair and service for a problem arising from mould and jig. : Keep up the quality of product with control and checking the dimensional during production. Name of Company : IXMATION Sdn. Bhd. Bukit Minyak, Industrial Park, Penang. Duration : Dec 2008 – April 2009 (Industrial training) Position : Technician/Quality Control Duties : As an assistant to Production Engineer/ attached to QC department : Rechecking all delivery part as per drawing given. : Assist to testing engineer to perform a functional test upon receive item.
  • 5. 5 ACADEMIC COURSES TAKEN BACHELOR’S DEGREE DIPLOMA  Accomplishment of final year project research  Quality Management  Industrial safety Management  Jig & Fixtures Design  Statics & Dynamics  Solid mechanics  Advanced CAD & Modeling  Rapid Prototyping & Reverse Engineering  Mechanic of Material  Engineering Economic  Engineering Metrology  Professional Ethics  Accomplishment of final year project in mould design  CNC Programming  Jigs & Fixture Design  CAD/CAM Application  Quality Tools & Management  Advanced mould design  Advanced press tool design SKILL AND LANGUAGES (Proficiency: Advanced - Highly experienced; Intermediate - Familiar with all the basic functionalities; Beginner - Just started using or learning the skill) Skill Years Proficiency Operating milling, lathe, wire cut Microsoft Project 3 3 Intermediate Advanced AutoCAD Software >6 Advanced Solid Works 2 Beginner Wildfire Pro-Engineer 4 Advanced Microsoft Office >5 Advanced Adobe Photoshop 2 Intermediate Mould Design 2 Intermediate Press Tool Design 2 Intermediate Product design 2 Intermediate Finite Element Analysis (COSMOSWORKs) 2 Beginner Languages (Proficiency: 0=Poor - 5=Excellent) Language Written Spoken Bahasa Malaysia 4 5 English 3 3
  • 6. 6 ADDITIONAL INFO Hobby & Interest: Football, Futsal, Badminton, Cycling, Writing, Art & Design, Product design, Entrepreneurship. Summary of achievement: 1. 2009-2012 – Bachelor’s degree in Manufacturing Engineering Technology (TATI University College) AWARD Dean’s List semester 2, 2009-2010 Dean’s List semester 2, 2011-2012 2. 2006-2009 – Diploma in Manufacturing Engineering (TATI University College) AWARD Dean’s List semester 2, 2008-2009 Dean’s List semester 2, 2007-2008 3. 2001-2005 – Sekolah Menengah Kebangsaan Sultan Mansor, Kuala Terengganu. SPM [ 1(1A ), 2(2A), 3(4B), 1(6C), 2(7D) ] PMR (3A, 3B, 1C, 2D) Curricular Activities: • Participant, Kejohanan Badminton Tertutup TATIUC (2012) • Participant , Kejohanan Bola Sepak TATIUC Piala Menteri Besar ( 2011) • Represent TATIUC Football Club to IPTS Football competition at UKM (2012) • Represent TATIUC Football Club to Sukan MASISWA Zon Pantai Timur (2011) • Represent TATIUC Badminton Club to Sukan MASISWA Zon Pantai Timur (2007 -2009) Organization: • Vice President, Tool and Die Society, TADS (2009-2010) • Member of , Tool and Die Society, TADS (2006-2008) • Committee member of Borneo Tour PMIT 1 (2011) • Secretary, TATIUC Skills Competition (2010) • Secretary, Academic & Industrial Visit to Metaltech (2010) • Secretary, Organized The English Night at TATIUC 2008/2009
  • 7. 7 References: Name: Mr Zaidi Bin Muda Name: Mr Mohd Zainuddin Bin Moktar. Contact Number: 019-9157074 Contact Number: 019-9896609 Position: Dean Position: Project Engineer Faculty: Manufacturing Engineering Technology PFCE-PONTEROSSO Sdn Bhd Institution: TATI University College Open Yard KSB Fasa 2 Email: zaidi@tatiuc.edu.my Kemaman Supply Base 24007 Kemaman,Terengganu. Name: Mr Muhktar Awang Contact Number: 019-9157074 ELEKTRO SERVE (M) SDN BHD PT18880, Industry Park & Technology Paka, 23100 Dungun, Terengganu D.I.