1. RESUME
Mr. ANGEL V. VACARO Jr.
INDUSTRIAL / ELECTRICAL / ELECTRONICS/ INSTRUMENT TECHNICIAN
E-mail: angelvacarojr@yahoo.com CP nos. 09292642391
09993051946
PERSONAL DATA:
Name : Angel Verde Vacaro Jr.
Address : 27 Magtanggol St., Caloocan City
Date of Birth : May 9, 1963
Place of Birth : Masgarao, Jamindan, Capiz
Citizenship : Filipino
Weight : 64 kg
Height : 167 cm
Status : Married
Spouse’s Name : Marissa Rentino Vacaro
Father’s Name : Angel Vacaro Sr.
Mother’s Name : Melitona Verde Vacaro
Religion : Roman Catholic
Dialects : Tagalog, Bisaya,Arabic
Languages : English, Filipino
Skills : Electrical and Electronics Technician, Driving
EDUCATIONAL ATTAINMENT:
Elementary : Gregoria de Jesus Elementary School, 1971~1977
Primary and Intermediate Course
Tondo, Manila
High School : Lakan Dula High School, 1977~1981
Secondary Course
Solis Tondo, Manila
College : National Radio school Institute of Technology, 1981~1982
Master Electrician (Practical Electricity)
Recto, Manila
: Guzman Institute of Electronics, 1983~1985
Industrial Electronics Technician
Recto, Manila
2. TRAINING COURSE ATTENDED:
Electrical Building Wiring Installation
National Manpower and Youth Council (NCR), November 11, 1987
Industrial Electricity Skills Upgrading
National Manpower and Youth Council (NCR), December 10, 1986
Calibration for Process Instrumentation
Meralco Foundation Institute, June 13~30, 2000
WORKING EXPERIENCE
1 .February 11, 2013 to October 03, 2014 Analyzer Metering Technician
Maintenance Lyon Angola LNG
Soyo, Angola Africa
Duties and Responsibilities
Assisting to Vendor Analyzer Specialist trouble shooting and Calibration of Gas
Chromatograph (G.C.) by using Lap Top, Validation, Replacement of not Working Properly PH
Sensor Chlorine Analyzer, and Maintenance up Pressent.
Sap Training, Hydrocarbon Accounting Training Program, First Aid Training,
PTWUSER Assessment for PTW-WTL,
2. Dec. 10, 2011 to Sept.10, 2012 Inst. Commissioning Start-Up
Bechtel Angola LNG Project
Soyo, Angola Africa
Duties and Responsibilities
Functional Test for Interlock
On the DCS/SIS Engineering workstation view logic flow and insure the logic is
healthy for interlock.
Black out Pressurized C4 Vapor return Arm (Loading Arm Required) Isolation Valve
required from the Process.
Force the other Valve required from logic Sequence to open the other Valve involve
respectively.
Verify that ZSO of the Valve and other ZSO Valve involve are initialized.
On the DCS/SIS Engineering work station view logic flow and insure the logic has
activated signal XY (solenoid) Signal for enrichment Fuel Gas to Marine Flare
isolation valve involved open.
Verify that XV (other valves involve) is open.
Reconnect, Check and Unblock the involve in Interlock.
Normalize the valve involve in Interlock.
Confirm the ZSO of the Valve and other ZSO Valve involve Signal return to healthy
state.
Verify that the Valve involve is closed.
3. Assisting to Vendor Analyzer Specialist
Maintain the Gross Cylinder Bottles are full and Right Output Pressure and On
Service (Zero Grade , Hydrogen , Nitrogen )
Be sure the Gas Monitor , H2S Detector and Fire Detector are Working Normally
inside the Analyzer House
Leak Test all Instrument fitting’s , Be sure has No leak
Trouble shooting the Gas Chromatograph. Some Need to Replace the Electronics
Circuit Board or pre-amp are not Working Properly
Replacement of Gas kit from the Valve’s of Gas chromatograph (G.C.) and
temperature Detector
Checking the pick’s of Component Wave form by Using Laptop
Before Starting G.C. Calibration, make sure the calibration Gas Cylinder is Open and
the Valve in Sample Panel are Open and Have Flow
The Vendor Analyzer , Start to Calibrate the Pick’s Component of Gas
chromatograph (G.C.) by Using Laptop Computer
3. Oct. 29, 2010 to June 12, 2011 Instrument Foreman/ Promoted as
Instrument General Foreman
Kentz Engineering and Construction
Ambatoby Nickel Cobalt Project
Toasima, Madagascar
Duties and Responsibilities
Tool box meeting from the company by Inst. Manager. Topics regarding how work
safe and safety awareness and safety environmental cleaning procedures.
Familiarization of the location area by Instrument Location Plan (ILP) Drawing and
Piping and Instrument Drawings (P&IDs)
Job Preparation according to the situation of the plant and the Engineering
Instrument Installation details.
Researching the model of instrument by its tapping points on the field and position
and also hook up drawing for this.
Supervision and Monitoring our job Activities
Organized Materials/Fabrication/Installation and Over see Work Group
Coordination to our Senior Supervisor and Consult the progress job.
Preparation Instrument’s Detail’s and other imformation Requirement’s for
Inspection’s [R.F.I.}.
4. Nov. 02, 2009 to may 18, 2010 Sr. Instrument Commissiong Tech.
O.G.D.111 Habshan (Bechtel)
Project
Abhu Dhabi U.A.E.
Duties and Responsibilities
4. Calibration of Transmitters for Performance Test
Before the work commence, apply for a PTW as per unit area.
Identify the specific tag numbers on every PTW work permit.
Once the PTW is ready inform the GASCO Operator/Instruments and explain to
them , what to do during the calibration of transmitters online when the
Plant is on service.
A. On DCS, inform the GASCO Panel Operators to make sure the transmitter
To be tested must be in CAL MODE.
B. Then check the process value, PV within the normal operation value.
Calibration of transmitter will now commence at the field.
Check the range of the transmitter as per Data Sheet.
As the Bechtel standard 5-point calibration (0%, 25%, 50%, 75% & 100%)
Will be applied and simulated against the respective 4-20Ma Signal.
We will record all data in the calibration Sheet generated during the test.
GASCO personnel will witness and verify the calibration of transmitter.
After, put the transmitter back on service on line.
On DCS, removed the CAL MODE and check again the process value become
Normal NR on faceplate.
Confirm correct measurements in the DCS.
5. April 12, 2008 to Sept 28, 2008 Instrument Commissioning Tech.
Hyundai Jetu Project,
Dubai. U.A.E.
Duties and Responsibilities:
Line checking from D.C.S. card to marshalling cabinet, to junction box going to Field
Instruments / Equipment, regarding to the Instrument Loop Diagram (ILD) &
Interconnection Wiring Diagram (IWD).
Checking core tagging, cable tagging, termination block numbers, and panel cabinet
schedule and Instrument location on the field area.
Checking of burner valves and limit switches
Checking of hand valves and limits switches
Checking of flame scanner binary signals
Trouble shooting of flame scanner analog signal
Igniters checking ( Spark Checking)
Control Valve checking and stroking
Checking of all transmitters in the burner system
D.C.S. simulation
Internal cold function testing
Checking of turbine / boiler trips related to Boiler Management System (BMS)
Clearing of punch items
5. Cold function testing with the client/ representative
6. Jan. 14, 2007 to July 2, 2007 Instrument Electrical Technician
BECHTEL – ALGERIA
Duties and Responsibilities:
Cable Arrangement going to assign Main Panel Board
Termination of Control cable core and securing plan detail like Code ID,
core tag, and technical block assigned for Refinery Plant
Inspection of cable ID and loops from Panel boards to instrument
equipment
Instrument cable core termination and check plan details.
7. Feb. 12, 2006 to Aug. 23, 2006 Instrument Electrical Technician
BECHTEL – Malabo E.G.
Duties and Responsibilities:
Installation of Cable Ladder and Cable Tray regarding to this roughing inside
the Compressor Control Building
Installation of Six (6) set Battery Rack Charger Panel, supplying an output of
110VDC
Assembly of Six (6) set Battery Rack and fixed 84 pieces Battery per set
Cable pulling, cable arranging, cable glanding and termination from panel
to panel according to schedule roughing
Cable pulling and termination of control cable from Compressor Control
Building to Compressor Area
Assist to vendor from Filter House to Turbine Compressor
8. April 14, 2004 to May 9, 2005 Instrument Mechanic Tech.
Dena BMS Co., Ltd. Aramco
Shipyard, Rastanura K.S.A.
Duties and Responsibilities;
VESSELS;
AIN DAR3
Trouble Shooting of Synchronized Generator. Two of this has Armature Grounded
and other one. SCR have leak at AVR circuit.
Trouble shooting of chiller control circuit for storage room.
6. GHAWAR
Trouble shooting of not working smoke detector circuit panel
Inspection and replace the not working sensor for engine sensor
monitor
Trouble shooting of not working chloral pack interlock with Water
Pump motor
ABUHADRIYAH
Trouble shooting of malfaction engine monitor sensor, because of 2 resistor
connected in parallel in sensor terminal block
SAFANIYAH 5
Removed / replace the Echoed sounder Transmitter and Monitor and put the
220VAC supply for this equipment
ARABBIYAH 1
General Maintenance of Electrical Electronics and Instrument equipment of this
Jack-up Barge Generator Supply
AL WHOWTAH
Trouble shooting of Engine Instrument Sensor, Monitoring the operation of the
Engine when working, like lube oil pressure and temperature. Jackets Water
Temperature and Pressure Alarm.
MARJAN
Replacement and Installation of Wind speed and Wind Direction Instrument
Gadget. Finding the earth ground fault of a circuit.
OTHER ABQUIQ, QUARAN 8 and SOME VESSEL
Same procedure of trouble shooting and maintenance was done.
9. March 18, 2003 to June 29, 2003 Electrical Technician
National Petroleum Construction
Company (NPCC) Mussafah,
Abhu Dhabi, U.A.E.
Duties and Responsibilities:
Pulling cable regarding to installation type and according to area if hazardous or
non- hazardous
Cable pulling according to cable (ladder, tray) routing schedule from Marshalling
Cabinet to other cabinet and or to electrical equipment
Secure the protection of cable insulation by using the cable glanding, shrinkable
tube for the core
Ensure the cable termination according to termination schedule, cable tagging and
core pin lugs from Marshalling cabinet terminal block and equipment terminal
block.
7. 10. Jan. 5, 2001 to March 4, 2003 Electrical Sub- Contractor
Self-employed Electronic Tech.
G.G. UY Const. 6th
St., 6th
Ave.
Grace Park Caloocan City
Philippines
Duties and Responsibilities:
Responsible for in-contract electrical wiring installation based on plan and
specification from roughing-ins. wiring up to installation of all electrical fixtures.
Repair the automation of motor control system
repair / troubleshooting of electrical appliances like
• Televisions – B/W or colored
• Stereo or component
• Beta or VHS
• Microwave Oven
11. July 17, 1998 to Dec. 13, 2000 Instrument Electrician / Tech.
Saudi Road Materials Corp.,
Jeddah, K.S.A.
Duties and Responsibilities:
Responsible for the installation and Wiring termination of:
Smoke Detector – Beam Type Transmitter / Receiver. Ionize Type. Optical
Type
Gas Detector – IR Point Type, Beam Type Transmitter / Receiver
Heat Detector- Temperature Type
Flame / Fire Detector – Fire Damper : Electrical Pneumatic Type
Manual Call Point – Alarm Shutdown and Release
Level Transmitter – Plunged and Ultrasonic Type
Audible Fire Alarm – Audible Alarm, Extinguishing Released, Site Status
Important Message
Pressure Switch
Wiring termination of Detectors and Transmitter from the equipment to
junction box to interface card box marshalling cabinet to Central Control Panel
(CCP)
Correction of address for addressable fire / smoke alarm system by each
location
Checking the looping of fire and smoke detector by using XP95 / Series 09
Test set
8. Calibration of IP Transmitter, Process Transmitter, Differential Transmitter,
Level Transmitter Plunge, Pressure Gauges, Temperature Transmitter.
12. Jan. 4, 1994 to June 15, 1998 Electrical Sub- Contractor
Self-employed; Electc'sTech.
G.G. UY Const’s. 6th
St., 6th
Ave.
Grace Park Caloocan City,
Philippines
Duties and Responsibilities:
Responsible for in-contract electrical wiring installation based on plan and
specification from roughing-answering up to installation of all electrical fixtures.
Repair the automation of motor control system
repair / troubleshooting of electrical appliances like
• Televisions – B/W or colored
• Stereo or component
• Beta or VHS
• Microwave Oven
13. Sept. 6, 1992 to Nov. 16, 1993 Ind. Electrician {Charge Hand}
Maintenance and Technician
ABV Rock Group KB
Abha, Saudi Arabia
Duties and Responsibilities:
Responsible for different type of motor control machineries, motors, power supply,
generators, and different types of computers
Troubleshooting for electrical equipment and mechanical functions, cable splicing
and automation of industrial machine and electro pneumatic, hydraulic control
14. Sept. 30, 1990 to Aug. 30, 1992 Self-employed Electrician
Electronic Equipt.Technician
Caloocan City, Philippines
Duties and Responsibilities:
Accepts repair and home services for electronics and electrical equipment
Made contractual job for residential lightings and electrical works
A part time tricycle operator / driver
15. May 5, 1989 to Sept. 1, 1990 Industrial Electrician
Abdulla Ahmad Dossary Trad.
9. Al-Khobar, K.S.A
Duties and Responsibilities:
Maintaining of electrical wirings trouble shooting of generators, motors
and Electrical Asphalt Plant Machineries.
Ensure Electrical Machine Working Normally When Operation.
16. Jul. 4, 1987 to April 1989 Electrical Technician (Manuela
Raycor, Air control System Inc.
Mandaluyong, Metro Manila
Philippines
Duties and Responsibilities:
Responsible for the wiring installation of control panel, motors, Honey well
and Air Housing Unit
Installation and connecting Package Air-conditioning, Blower, Cooling
Tower, and Chiller
Maintaining and cleaning of all electrical apparatus as per weekly schedule
17. Jan. 10, 1985 to May 8, 1987 Junior Instrument Shifter
Del Pan, Manila Philippines
Duties and Responsibilities:
Ensure electronic instruments under continues operations 24 hours daily
Responsible for shifting of plant machines one gear to another until on its
normal running condition
Report for any major trouble to Senior instrument shifter for
troubleshooting
EQUIPMENT / MACHINERIES HANDLED:
1. Teleporter - Aveling Barford (Machine) Ltd; Grantham, Liconshire NG3 6JE,
England. Serial No. ROA0020
2. Normet (Charmac) – Valmistaja Manufacturers: Orien Ythma DY: Normet 74510
Peltoosalmi Finland
3. Boomer (Atlas Copco.)- Carrier made by Palategold’s A/S; Lillestrom, Norway
Plamek DC 165H No. 468, 1969 Dril Unit Serial No. SIM
890127TypeBoomer # 175 Made in Sweden 8991-5318-42
• Carrier made by Plategold’s Norway
Plamek DC 166 No. 532, 1991, Drill Unit SN. SIM910129
Type: Boomer 353E/178 Made in Sweden 8991-5324-77
• Carrier made by Plategold’s A/Sillestone Norway
Plamek DC 165 No. 477, 1990, Drill Unit SN. SIM19000040
10. Type: Boomer #175 Made in Sweden 1991-5319-17
• Carrier made by Plategold’s A/Sillestone Norway
Plamek DC 166 No. 506, 1991, Drill Unit SN. SIM910017
Type: Boomer #175 Made in Sweden 8991-5320-06
4. Stabilator - No. SR 198; Mark: Robot: Type 7500;
Series:6552-810 Stockholm, Sweden
No. L3654; Mark LIQ ADD PUMP, Type LAP75-170;
Series:6552-847 Stockholm, Sweden
4.1.3 No. RB 26; Mark LYQ ACC TANK, Type ATH850;
Series:7552-202 Stockholm, Sweden
4.1.4 No. MI 162; Mark HYDR-LIFT, Type HL 4;
Series:6552-844 Stockholm, Sweden
4.1.5 No. VCM 71; Mark; Concrete pump; Type: BDT 702E;
Series:7552-202 Stockholm, Sweden
5. Motors 5.1.1 60Hz 75KW, 380 / 400 Volts, 133Amp.
Kortmann, Mashinemfabric written-RUH R. Baujar 1993
Type EWS9-75041
6. Typewriter – Electronic / Manual
7. Compressor – 150HP, 1500r/min, Max speed; 1992
8. Computers – 640Kbytes
9. Power Plants – Generator – 215 Megawatts
10. Other related electrical, Mechanical and electronics Machineries
CHARACTER REFERENCES:
John Noe Instruments Supervisor Kentz Engineering and
Construction
Ronnie Alilin Instrument Supervisor Bechtel,OGD 111
Hashan, Abhu Dhabi
U.A.E.
Thomas Person Electrical Superintendent ABV Rock Group KB
Site 6, Abha, K.S.A.
OTHERS:
SSS Number : 03-7097552-2
TIN : 115-381-278
NBI ID Number : V935A7AROJROOOO
Passport Number : XX4405999
Date of issue : 19 Aug 2009
Valid until : 18 Aug 2014
I hereby certify that the above mentioned dates and information is true and
Correct the best of my knowledge and belief.