SlideShare a Scribd company logo
1 of 3
Personal Data
Mr. Paramatt Prom-on
Birth Date: Aug 10, 1978
Address : 235/53 Lopburiramasuan Road M2 Phawong Muang Songkhla 90100
Email: paramattpromon@gmail.com
Tel: +66814124573,+66816902260
Education
Bachelor's Degree in Electrical Engineering , Major Control and Automatic
May. 2002, King Mongkut’s Institute of Technology North Bangkok, Bangkok GPA 2.61
High School/College
High School (Mathematics and science ),Mahavajiravudh School Songkhla GPA 2.16
Working Experience
Total working experience: 13 years
1. ISHIDA(THAILAND) Co.,Ltd , Bangkok , Thailand
Industry: Marketing and Service
Company business: the world's leading manufacturer of precision weighing and packaging equipment.
Position: Service engineer
July 2002 – Sep 2004
Responsibilities: Installation & maintenance for food packaging , inspection ,distribution system including
preventive and corrective maintenance. Customer adviser to improve productivity and production line design.
Inventory control for spare parts.
2002 Install weighing packing and inspect line in GFPT factory including commissioning and test run
2003 Install automatic product distribution system and packing line in siam ruammite factory including
commissioning and test run
2004 Install weighing and inspect machine in EFFEM FOOD factory (Project Explanation) including commissioning
and test run, Install High speed packing machine in Frito-Lays factory including commissioning and test run
2. CONOCO(THAILAND) Co.,Ltd,Bangkok,Thailand
Industry: Fuel Marketing
Company business: the world's leading Thailand leading Gas station operation
.
Position: Project Engineer
Jun 2004 – Mar 2007
Responsibilities:. Control Repair & Maintenances work to highest quality, minimized down time and best safety for
144 Jet gas station.
Full scope project management for oil storage terminal and retail station construction.
New site construction
 Responsible for project work scope, project schedules, cost estimates, and development of engineering
designs and specifications Provide on-site supervision during construction on safety and Risk management.
Reviews construction schedule with teams for maximizing quality. Insures contractor equipment, QA/QC
and project costs are being tracked during construction.
Product Terminal storage tank construction with gasohol blending system (Equipment& Instrument)
 A part of design team to determine area classification and instrument selection according to NEC and IEC
standard
 Instrument and Equipment selection. Monitor and control project progress safety Quality schedule and
expenditure for responsible work. Assists in preparation and participation of HAZOP reviews
Underground Storage Tank replacement 8 station for HSE reason
 Responsible for project work scope, project schedules, cost estimates and budget
control
3. Baker Hughes Inc.
Position: Maintenance Engineer (Wireline Services)
Apr 2007 – Apr 2011
Responsibilities:. Down Hole and surface wireline logging Equipment maintenance for Opened and Cased hole
special assign for Reservoir Fluid testing instruments maintenance
Position: Field Engineer (Wireline Services)
May 2011 – Nov 2015
Responsibilities:
Job preparation Planning at customer office together will client representative to meet operation objective select
suitable equipment and instrument according to customer needed. Review operation procedure to complied
customer and company safety requirement
Operation at Job site As Team leader and overall field responsible on Cased hole wireline operation as
international operation assignment ensure all equipment are meet customer requirement and valid inspection
certificate
Plan and Execute wireline well intervention and complexly rig up and wireline deployment risk management, (logging
and perforation )
Work together with client and other service company to design well program ,operation procedure, rig up schematic
in order to meet international well control standard, maximize safe work and reasonable time spending
Design downhole tool string and rig up equipment to meet client requirement
conduct safe operation for hazard material usage and transportation (Explosive and Radioactive material)
Work as Engineer In Charge(Acting Mamager) at Kemaman wireline in 2015
working country : Vietnam, Malaysia and Thailand
Experience
Well understand about oil & gas well drilling ,evaluation ,completion and production , well control in order to perform
well intervention
coil tubing convey wireline logging and perforation,
wireline operation with Tractor equipment loggng and perforation
Wireine operation in Hydraulic fracturing with complexly rig up
10 K wireline Pressure control equipment operation on drilling rig and production platform with maximum well head
pressure had been operation is 7000 psi
Help customer to analysis reservoir performance before and post production for future oil and gas production plan
Passed IWCF for well intervention level 2
Strengths
1. Ambitious / Achievement oriented
I am very ambitious to achieve my life's goals. I never think of being just an employee. I set goals and devise
approaches to reach those goals. I am willing to sacrifice myself
2. Able to be committed/Responsible
I am committed to my jobs. I willingly take on projects assigned to me and see them through to completion.
Additional Information
Based on my professional background and experiences, I believe that I will make significant contributions to your
company. I am seeking a challenging position which provides the opportunity to further my career.
resume paramatt1

More Related Content

What's hot (18)

Saif cv(1)
Saif cv(1)Saif cv(1)
Saif cv(1)
 
chayana
chayanachayana
chayana
 
Quality Engineer CV
Quality Engineer CVQuality Engineer CV
Quality Engineer CV
 
NISHANT SAXENA QUALITY ENGINEER RESUME
NISHANT SAXENA QUALITY ENGINEER  RESUMENISHANT SAXENA QUALITY ENGINEER  RESUME
NISHANT SAXENA QUALITY ENGINEER RESUME
 
PRAKASH RESUME
PRAKASH RESUMEPRAKASH RESUME
PRAKASH RESUME
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical Engineer
 
Cv melwin samuel w lt
Cv melwin samuel w ltCv melwin samuel w lt
Cv melwin samuel w lt
 
rushikesh cv revision 1 8-12-2016
rushikesh cv revision 1 8-12-2016rushikesh cv revision 1 8-12-2016
rushikesh cv revision 1 8-12-2016
 
Gopal senior Engineer
Gopal senior EngineerGopal senior Engineer
Gopal senior Engineer
 
Cv melwin samuel w lt 2
Cv melwin samuel w lt 2Cv melwin samuel w lt 2
Cv melwin samuel w lt 2
 
Cv melwin samuel w lt
Cv melwin samuel w ltCv melwin samuel w lt
Cv melwin samuel w lt
 
Akashkore Ravi
Akashkore RaviAkashkore Ravi
Akashkore Ravi
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
cpk
cpkcpk
cpk
 
kamlesh_joshi At GSCC. 01
kamlesh_joshi At GSCC. 01kamlesh_joshi At GSCC. 01
kamlesh_joshi At GSCC. 01
 
Cv ejaz ahmad
Cv ejaz ahmadCv ejaz ahmad
Cv ejaz ahmad
 
Up DATED CV
Up DATED CVUp DATED CV
Up DATED CV
 

Viewers also liked (16)

Resume
ResumeResume
Resume
 
Majeed khan resume with passport+photo+cnic
Majeed khan resume with passport+photo+cnicMajeed khan resume with passport+photo+cnic
Majeed khan resume with passport+photo+cnic
 
LeonCordeau_resume_2016.1
LeonCordeau_resume_2016.1LeonCordeau_resume_2016.1
LeonCordeau_resume_2016.1
 
Aakash Resume
Aakash ResumeAakash Resume
Aakash Resume
 
Brenda K Lorentzen Resume
Brenda K Lorentzen ResumeBrenda K Lorentzen Resume
Brenda K Lorentzen Resume
 
Burnett resume
Burnett resumeBurnett resume
Burnett resume
 
BRIAN MICHAEL DUNLAP-RESUME
BRIAN MICHAEL DUNLAP-RESUMEBRIAN MICHAEL DUNLAP-RESUME
BRIAN MICHAEL DUNLAP-RESUME
 
Resume August16
Resume August16Resume August16
Resume August16
 
Resume
ResumeResume
Resume
 
Steve Armstrong Resume' (2)
Steve Armstrong Resume' (2)Steve Armstrong Resume' (2)
Steve Armstrong Resume' (2)
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Tim_Schrader Resume
Tim_Schrader ResumeTim_Schrader Resume
Tim_Schrader Resume
 
Prabaa Resume
Prabaa ResumePrabaa Resume
Prabaa Resume
 
M Renee Brown Resume
M Renee Brown ResumeM Renee Brown Resume
M Renee Brown Resume
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
Brief Resume about Me
Brief Resume about MeBrief Resume about Me
Brief Resume about Me
 

Similar to resume paramatt1 (20)

Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016
 
Wp 241016
Wp 241016Wp 241016
Wp 241016
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Bangun CV
Bangun CVBangun CV
Bangun CV
 
RAVI CV
RAVI CVRAVI CV
RAVI CV
 
CV
CVCV
CV
 
Kyaw Myo Hlaing
Kyaw Myo HlaingKyaw Myo Hlaing
Kyaw Myo Hlaing
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)
 
Cv pisalsart and attach file
Cv pisalsart and attach fileCv pisalsart and attach file
Cv pisalsart and attach file
 
Mochamad Kholik - CV
Mochamad Kholik - CVMochamad Kholik - CV
Mochamad Kholik - CV
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 

resume paramatt1

  • 1. Personal Data Mr. Paramatt Prom-on Birth Date: Aug 10, 1978 Address : 235/53 Lopburiramasuan Road M2 Phawong Muang Songkhla 90100 Email: paramattpromon@gmail.com Tel: +66814124573,+66816902260 Education Bachelor's Degree in Electrical Engineering , Major Control and Automatic May. 2002, King Mongkut’s Institute of Technology North Bangkok, Bangkok GPA 2.61 High School/College High School (Mathematics and science ),Mahavajiravudh School Songkhla GPA 2.16 Working Experience Total working experience: 13 years 1. ISHIDA(THAILAND) Co.,Ltd , Bangkok , Thailand Industry: Marketing and Service Company business: the world's leading manufacturer of precision weighing and packaging equipment. Position: Service engineer July 2002 – Sep 2004 Responsibilities: Installation & maintenance for food packaging , inspection ,distribution system including preventive and corrective maintenance. Customer adviser to improve productivity and production line design. Inventory control for spare parts. 2002 Install weighing packing and inspect line in GFPT factory including commissioning and test run 2003 Install automatic product distribution system and packing line in siam ruammite factory including commissioning and test run 2004 Install weighing and inspect machine in EFFEM FOOD factory (Project Explanation) including commissioning and test run, Install High speed packing machine in Frito-Lays factory including commissioning and test run 2. CONOCO(THAILAND) Co.,Ltd,Bangkok,Thailand Industry: Fuel Marketing Company business: the world's leading Thailand leading Gas station operation . Position: Project Engineer Jun 2004 – Mar 2007 Responsibilities:. Control Repair & Maintenances work to highest quality, minimized down time and best safety for 144 Jet gas station. Full scope project management for oil storage terminal and retail station construction. New site construction  Responsible for project work scope, project schedules, cost estimates, and development of engineering designs and specifications Provide on-site supervision during construction on safety and Risk management. Reviews construction schedule with teams for maximizing quality. Insures contractor equipment, QA/QC and project costs are being tracked during construction. Product Terminal storage tank construction with gasohol blending system (Equipment& Instrument)
  • 2.  A part of design team to determine area classification and instrument selection according to NEC and IEC standard  Instrument and Equipment selection. Monitor and control project progress safety Quality schedule and expenditure for responsible work. Assists in preparation and participation of HAZOP reviews Underground Storage Tank replacement 8 station for HSE reason  Responsible for project work scope, project schedules, cost estimates and budget control 3. Baker Hughes Inc. Position: Maintenance Engineer (Wireline Services) Apr 2007 – Apr 2011 Responsibilities:. Down Hole and surface wireline logging Equipment maintenance for Opened and Cased hole special assign for Reservoir Fluid testing instruments maintenance Position: Field Engineer (Wireline Services) May 2011 – Nov 2015 Responsibilities: Job preparation Planning at customer office together will client representative to meet operation objective select suitable equipment and instrument according to customer needed. Review operation procedure to complied customer and company safety requirement Operation at Job site As Team leader and overall field responsible on Cased hole wireline operation as international operation assignment ensure all equipment are meet customer requirement and valid inspection certificate Plan and Execute wireline well intervention and complexly rig up and wireline deployment risk management, (logging and perforation ) Work together with client and other service company to design well program ,operation procedure, rig up schematic in order to meet international well control standard, maximize safe work and reasonable time spending Design downhole tool string and rig up equipment to meet client requirement conduct safe operation for hazard material usage and transportation (Explosive and Radioactive material) Work as Engineer In Charge(Acting Mamager) at Kemaman wireline in 2015 working country : Vietnam, Malaysia and Thailand Experience Well understand about oil & gas well drilling ,evaluation ,completion and production , well control in order to perform well intervention coil tubing convey wireline logging and perforation, wireline operation with Tractor equipment loggng and perforation Wireine operation in Hydraulic fracturing with complexly rig up 10 K wireline Pressure control equipment operation on drilling rig and production platform with maximum well head pressure had been operation is 7000 psi Help customer to analysis reservoir performance before and post production for future oil and gas production plan Passed IWCF for well intervention level 2 Strengths 1. Ambitious / Achievement oriented I am very ambitious to achieve my life's goals. I never think of being just an employee. I set goals and devise approaches to reach those goals. I am willing to sacrifice myself 2. Able to be committed/Responsible I am committed to my jobs. I willingly take on projects assigned to me and see them through to completion. Additional Information Based on my professional background and experiences, I believe that I will make significant contributions to your company. I am seeking a challenging position which provides the opportunity to further my career.