CV-Chatchawal Yodpol Page: 1 of 11
MR.CHATCHAWALYODPOL
Curriculum Vitae
Personnel Particulars
Name : Mr. Chatchawal Yodpol Age : 34 years
Gender : Male Health : Good
Height/Weight : 180 Cms. / 85 Kgs. Nationality : Thai
Marital Status : Marries Race : Thai
Mobile : (66)8‐4729‐4573 Religions : Buddhism
E‐mail : chawal_j@hotmail.com Date of Birth : 21 March 1981
Address : 180/352 M.5 T.Banchang, Banchang
District, Rayong 21130 Thailand
Academic Background
Education : Rajamangala University of Technology Thanyabury (year 2005)
Bachelor's Degree of Mechanical Engineering (GPA: 2.45)
: Rajamangala Institute of Technology Surin Campus (2002)
Diploma Degree of Industrial Farm mechanic (GPA: 3.12)
Technical Background
Objective : More than 11 years' experience performs a variety in static equipment and
package equipment of engineering functions in Basic design, FEED, Detail Engineering, Purchase and
Project Control in the field of engineering for oil and gas, onshore refinery, petrochemical plants. Major
activities in design, preparation of equipment specification, datasheet, material selection, mechanical
calculation, material take-off, requisition, technical bid evaluation and vendor document review for static
equipment, and package equipment.
Also involves perform coordination with other discipline, vendor and Clients, manage a team of
engineers and designers, work with co-workers, clients and vendors. And design according to client
specification and familiar relevant with the international standard code such ASME, ASME/ANSI, TEMA,
BS, API, NACE, ASTM NFPA, AWS, DNV 2.7-1, EN12079, IMDG.
In addition of design by rule are designs by finite element methods such as Stress Analysis,
Thermal-Stress Analysis, and Fatigue Analysis
Proficiency in Language : English ‐ Speaking, Reading and Writing Good
Thai ‐ Speaking, Reading and Writing Excellent
CV-Chatchawal Yodpol Page: 2 of 11
Good communication skills:
- I can work in career as professional do this in my attitude.
- Co-ordination in with such parties to achievement project and analysis supplier, sub-contractor.
- Be honest and confidential in my career.
- Full respond support to revolve work and colleague to do best job in project.
- Construction Planning & Scheduling Preparing and critical path activity analysis.
- To award “Thailand CAE Workshop seminar 2008 by DECC & NSTDA”
- Certificate of completion Offshore Containers (Design, Testing, Inspection and Examination).
- Certificate of completion IADC Drilling Industry Training (DIT) Accreditation Program.
Computer Literacy : Able to use and operate Personal Computer in the following Programs;
- Microsoft Excel, Microsoft Word, Microsoft Power Point
- Comos for generate data sheet
- SAP
- Adobe Photo shop, E‐mail and Internet
- Compress; Vessel design program of ASME
- PVElite; Vessel design program of ASME, PD5500, EN13445
- E‐Tank; Tank design program of API650/620
- Codecalc; Vessel Component Analysis
- MSC Software; finite element analysis program
- Autocad 2D, 3D; Drafting program
- Solid work, Inventor, UG; 3D Design program
- Microsoft Project; Project planning program
- Navisworks
Basic Code Knowledge:
ASME, ASME/ANSI, TEMA, BS, API, NACE, ASTM NFPA, AWS, DNV 2.7-1, EN12079 and
IMDG.
Training Course :
- Inventor program in N.R Automation System Co., Ltd
- PV Elite program in COADE engineering software
- MSC program (Finite element program) in Sigma Solution Co., Ltd
1. Basic Training Course
2. Implicit Nonlinear Analysis Course
3. Explicit Nonlinear Analysis Course
- SolidWorks Essentials Course, DETI Training Center
-Offshore Containers Training Couse (Design, Testing, Inspection and Examination).
Application for : Senior Mechanical Engineer/Project Engineer
Expected Salary : Negotiable
CV-Chatchawal Yodpol Page: 3 of 11
Previous Employment
Company : Suretank (Thailand) Co., Ltd,
Nature Business : Suretank is a world-leading manufacturer of CCUs (Cargo Carrying
Units) for the Offshore Oil and Gas Industry. Established in 1995 in
Ireland to supply offshore chemical tanks to the North Sea, the company
is now a global supplier of offshore tanks and offshore containers and
the largest manufacturer of DNV 2.7-1 certified products and the only
company to produce ALL products to DNV standards.
Design and manufacturing facilities are located in Ireland, UK, Poland,
USA, Brazil, Thailand and China with sales offices in USA, Norway and
Brazil. Suretank's product range includes chemical and acid transport
tanks, helifueltanks, offshore containers, baskets, offshore mud
skips and cryogenic ISO tank containers.
Duration : June 2015 – Present
Position : Assistant Engineering Manager
Project Description :
- Managing product development team to assure design, drawing and engineering document
are Accurate and meet quality, cost, and delivery plan.
- Managing production control to continuous improves manufacturing operational process.
- Managing and support Lean manufacturing.
- Project management and cooperate between all parties concern.
- To lead and manage the engineering group effectively.
- Liaise with Suretank (Ireland) for drawing/engineering changes, obtaining approvals and
informing all concerned
- Working in management teams especially production and job quotation.
- Lead the Job quotation process, and liaise with Suretank sales to assist design approval
- Supervise preparation of bills of material based on drawings.
- On request liaise with sub-contractors in relation to purchased parts and components To
maintain knowledge and quickly absorb, understand and apply the DNV 2.7-1 standards.
- Liaise with third party inspectors and clients
- Work well with the DNV 2.7-1/GL surveyor on site, learn from him and then be able to hold
your own discussions as necessary.
CV-Chatchawal Yodpol Page: 4 of 11
Company : Samsung C&T
Nature Business : Samsung C&T, as a global project organizer, offers a total solution for
customers around the world with our financing, risk management and
off-take capabilities in power generation, renewable energy, plant,
shipbuilding and infrastructure industries.
Duration : April 2014 – June 2015
Position : Project Coordinator Engineer
Project Name : The Expansion of LPG Facilities at Khao Bo Ya LPG Terminal Project
Client : PTT Public Company Limited
Location : Leamchabang Port, Thailand
Project Description :
This project is for the extension of the PTT owned Marine Terminal which was installed in 1985.
This terminal is operated to the maximum capacity at 132,000 tons/month. The capacity shall be
extended to 250,000 tons/month to take care of LPG national demand. The additional facilities and
modifications to the existing facilities at the Marine Terminal located at Khao Bo Ya, in the province of
Chonburi.
The PLANT comprises Refrigerated Tanks and related system, New Berth and Dolphin and Top Side
Facilities, Import/Export pipeline, Custody Metering, Utilities, Fire Fighting and related Facilities.
Description of work :
- Prepare mechanical data sheet according to process data sheet.
- Prepare requisition for quotation.
- Prepare technical bidding evaluate.
- Vendor clarification.
- Review all vendor documents.
- Coordinate with each discipline and vendor.
- Support construction team.
- To responsible to establish relations and coordinate project process among project team
members (Samsung C&T, the Client, contractors, vendors, architect etc.).
- Held coordination meetings with project involved stakeholders to hedge risks and to solve
problems.
- Attend project coordination and owner/contractor/architect/engineer meetings as requested or
required.
- Coordinate submittals and procure all close-out documents including warranties and Operating
and Maintenance Manuals.
- Monitor field work, including contract work, to ensure compliance with company standards,
procedures, specifications and codes.
- Coordinate periodic job-related photographs for records.
- Perform additional assignments and responsibilities as assumed or requested by supervision.
CV-Chatchawal Yodpol Page: 5 of 11
Company : ThyssenKrupp Industrial Solutions (Thailand) Ltd. [UHDE
(THAILAND) LTD.]
Nature Business : Engineering design and construction contractor provides world
class process plant solutions in the chemical, petrochemical,
refining, oil and gas, and biotech industry sectors.
Location : Rayong,
Position : Mechanical Engineer
Duration : October 2011- April 2014
Project Name : APT/BTO Plant Project
Client : Nui Phao Mining Company Ltd. and H.C. Starck GmbH (NHTCM)
Location : Thai Nguyen, Vietnam
Year : September 2013 - Present
Project Description : Ammonium Paratungstate (APT) and Blue Tungsten Oxide (BTO)
Engineering Procurement and Construction (EPCM)
(Static Equipment, Package Equipment, Material Handing)
Position : Mechanical Engineer
Description of work :
- Prepare mechanical data sheet according to process data sheet.
- Prepare requisition for quotation.
- Prepare technical bidding evaluate.
- Vendor clarification.
- Review all vendor documents.
- Coordinate with each discipline and vendor.
- Support construction team.
Project Name : VINACOMIN Project
Client : Mining Chemical Industry Holding Corporation Limited (MICCO)
Location : Hanoi, Vietnam
Year : October 2012 – September 2013
Project Description : Ammonium Nitrate Plant
Engineering Procurement and Construction (EPC)
(Static Equipment, Package Equipment, Material Handing)
Position : Lead Mechanical Engineer
(4 months for basic design engineering in UHDE Germany and
Detail engineering in UHDE Thailand)
Description of work :
- Prepare mechanical data sheet according to process data sheet (At
UHDE Germany).
CV-Chatchawal Yodpol Page: 6 of 11
- Prepare requisition for quotation (RFQ) (At UHDE Germany).
- Prepare technical bidding evaluate (TBE) (At UHDE Germany).
- Vendor clarification.
- Review all vendor documents.
- Coordinate with each discipline and vendor.
- Progress report to project manager.
- Support construction team.
Project Name : SAN III Expansion Project
Client : IRPC Public Company Limited
Location : Rayong, Thailand
Year : 2011
Project Description : SAN (styrene-acrylonitrile copolymer) Plant
Engineering Procurement Construction and Management (EPCM)
(Static Equipment, Package Equipment, Material Handing)
Position : Mechanical Engineer
Description of work :
- Prepare mechanical data sheet according to process data sheet.
- Prepare requisition for quotation (RFQ).
- Prepare technical bidding evaluate (TBE).
- Vendor clarification.
- Review all vendor documents.
- Coordinate with each discipline and vendor.
- Support construction team.
Company : Thai Woo Ree Engineering Co., Ltd.
(Affiliated company of SK Engineering & Construction Co., Ltd.)
Nature Business : EPC CONTRACTOR (Oil & Gas, Petrochemical plant)
Location : Rayong, Thailand
Position : Mechanical Engineer
Duration : January 2008 – October 2011
Salary : N/A
Project Name : BST NB LATEX Project
Client : BANGKOK SYNTHETICS CO.LTD
Location : Map Ta Phut, Thailand
CV-Chatchawal Yodpol Page: 7 of 11
Year : 2011
Project Description : Engineering, Procurement and Construction (EPC)
(Vessel, Heat Exchangers, Storage Tanks, Reactor)
Position : Mechanical Engineer
Description of work :
- Project cost estimate and coordinator.
- Prepare proposals for bidding.
- Prepare mechanical data sheet according to process data sheet.
- Material take-off
- Design and Procurement of Mechanical Equipment.
- Prepare requisition for quotation (RFQ).
- Prepare technical bidding evaluate (TBE).
- Specification clarification with client.
- Engineering procedure preparation and verify.
Project Name : DOW Propylene Glycol Project (PG Project)
Client : DOW Chemical Thailand Limited
Location : Rayong, Thailand
Year : 2011
Project Description : Engineering, Procurement and Construction (EPC Utilities)
Position : Mechanical Engineer
Description of work :
- Project cost estimate and coordinator.
- Specification clarification with client.
- Equipments design & Calculation follow API650 with drawing summary
for fabrication.
- Material take-off
- Material purchasing and requisition.
- Engineering procedure preparation and verify.
Project Name : PTT TANK TERMINAL Project
Client : PTT TANK TERMINAL CO., LTD
Location : Rayong, Thailand
Year : 2010
Project Description : Engineering, Procurement and Construction (EPC)
The main handling fluids of this project are defined Acrylonitrile(hereafter AN), Methyl
Methacrylate(here after MMA) and Sulfuric Acid(here after SA)
(Vessel, Heat Exchangers, Storage Tanks)
Position : Mechanical Engineer
CV-Chatchawal Yodpol Page: 8 of 11
Description of work :
- Project cost estimate and coordinator.
- Specification clarification with client.
- Equipment strength Calculation follows ASME Sec.VIII Div.1 with
drawing summary for fabrication.
- Equipments design & Calculation follow API650 with drawing summary
for fabrication.
- Material take-off
- Material purchasing and requisition.
- Engineering procedure preparation and verify.
Project Name : DOW‐Power Utilities and Infrastructures Project (PU&I Project)
Client : MTP HPPO MANUFACTURING COMPANY LIMITED.
Location : Rayong, Thailand
Year : 2009
Project Description : Engineering, Procurement and Construction (EPC)
Position : Mechanical Engineer
Description of work :
- Project cost estimate and coordinator in bidding.
- Specification clarification with client.
- Equipments design & Calculation follow API650,620 with drawing
summary for fabrication.
- Material take-off
- Material purchasing and requisition.
- Engineering procedure preparation and verify.
Project Name : DOW‐Thai Propylene Oxide Project (TPO Project)
Client : MTP HPPO MANUFACTURING COMPANY LIMITED.
Location : Rayong, Thailand
Year : 2009
Project Description : Engineering, Procurement and Construction (EPC)
Position : Mechanical Engineer
Description of work :
- Project cost estimate and coordinator in bidding.
- Specification clarification with client.
- Equipments design & Calculation follow API620 with drawing summary
for fabrication.
- Material take-off
- Material purchasing and requisition.
- Engineering procedure preparation and verify.
CV-Chatchawal Yodpol Page: 9 of 11
Project Name : U2 DEMO Project
Project Description : Registration code U2 stamp
Position : Mechanical Engineer
Description of work :
-Engineer Coordination with authorization inspector (AI).
- Prepare the user design specification for design the demo vessel
follow ASME SEC.VIII Div.2
- Prepare the calculation Follow ASME SEC.VIII Div.2 include
drawing.
- Prepare material purchase specification.
- Specification clarification with authorization inspector (AI) witness.
- Specification clarification with authorization inspector agency (AIA).
Project Name : FABRICATE GHU FEED FILER (G‐580A‐S) Project
Client : PTTCHEM PUBLIC COMPANY.
Location : Rayong, Thailand
Year : 2009
Project Description : -ADD NEW FILTER GASIFIER G580 A/S (NEW FABRICATION)
-FABRICATE NEW FUEL OIL STRIPPER (A‐230) Project
(Vessel request U1 Stamp)
Position : Mechanical Engineer
Description of work :
- Engineer Coordination with client and authorization inspector (AI).
- Design & Calculation follow ASME SEC.VIII Div.1 include check
drawing.
- Specification clarification with authorization inspector (AI) witness.
- Prepare material purchase specification for issue PR.
- Material take-off
- Material purchasing and prepare status report to client.
Project Name : TANK GAUGING MODIFICATION Project
Client : PTTCHEM PUBLIC COMPANY.
Location : Rayong, Thailand
Year : 2009
Project Description : Modification Sphere tank
(Sphere tank request R Stamp)
Position : Mechanical Engineer
Description of work : - Engineer Coordination with client and authorization inspector (AI).
- Design & Calculation follow ASME SEC.VIII Div.1 include check
CV-Chatchawal Yodpol Page: 10 of 11
drawing.
- Specification clarification with authorization inspector (AI) witness.
- Prepare material purchase specification for issue PR.
Company Name : Sutee Tankers and SpecialTrucks Co.,Ltd
(Vessels, Petroleum trucks, Chemical Trucks, Tanks, Bulk Tipping Trucks)
Nature Business : SUB CONTRACTOR (Petrochemical)
Location : Rayong, Thailand
Position : Design Engineer
Duration : March 2005 – December 2008
Salary : N/A
Project Name : MOC Clacker 2 Project.
Client : MAP TA PHUT OLEFINS CO., LTD.
Location : Rayong, Thailand
Year : 2008
Project Description : Design & Fabrication Vessels, Sludge Hopper,De‐gasified for Water
Position : Design Engineer
Description of work :
- Design Vessels, Sludge hopper, De‐gasified Tank,
- Specification clarification with client.
- Prepare engineering status report to client
- Material take-off
- Material purchasing and prepare status report to client.
- Engineering procedure preparation and verify.
Project Name : Origin Energy Kupe Gas Project (New Zealand)
Client : Aker Cool Sorption Siam Limited.
Location : Rayong, Thailand
Year : 2008
Position : Design Engineer
Project Description : Design & Fabrication Vessel request U1 Stamp and national board
NB.
Description of work :
- Engineer Coordination with client and authorization inspector (AI).
- Design & Calculation follow ASME SEC.VIII Div.1 include check
drawing.
- Specification clarification with authorization inspector (AI) witness.
- Prepare material purchase specification for issue PR.
- Material take-off
CV-Chatchawal Yodpol Page: 11 of 11
- Material purchasing and prepare status report to client.
Project Name : Shedden Uhde Co,. Ltd. (The Ethanol Amines) U-stamp
Client : ASIAN CHEMCAL & ENGINEERING CO., LTD
Location : Rayong, Thailand
Year : 2008
Position : Design Engineer
Project Description : Design & Fabrication Vessel request U1 Stamp
Description of work :
- Engineer Coordination with client and authorization inspector (AI).
-Design & Calculation follow ASME SEC.VIII Div.1 include check
drawing.
- Specification clarification with authorization inspector (AI) witness.
- Prepare material purchase specification for issue PR.
- Bill of Material (BOM)
- Material purchasing and prepare status report to client.
Project Name : U1 DEMO Project
Project Description : Registration code U1 stamp
Year : 2007
Position : Mechanical Engineer
Description of work :
- Engineer Coordination with authorization inspector (AI).
- Prepare the design specification for design the demo vessel follow
ASME SEC.VIII Div.1
- Prepare the calculation Follow ASME SEC.VIII Div.1 include
drawing.
- Prepare material purchase specification.
- Specification clarification with authorization inspector (AI) witness.
- Specification clarification with authorization inspector agency (AIA)
Reference
1. Mr.Nawapol Reewet
Project Planning & Control
BJC HEAVY INDUSTRIES PUBLIC COMPANY
Tel: 6681-6419516
2.Mr. Wittaya Kumsibut
Production Manager
Thai Woo Ree Engineering
Tel: 6681-5916448

CV_Chatchawal_Yodpol_16-03-2016

  • 1.
    CV-Chatchawal Yodpol Page:1 of 11 MR.CHATCHAWALYODPOL Curriculum Vitae Personnel Particulars Name : Mr. Chatchawal Yodpol Age : 34 years Gender : Male Health : Good Height/Weight : 180 Cms. / 85 Kgs. Nationality : Thai Marital Status : Marries Race : Thai Mobile : (66)8‐4729‐4573 Religions : Buddhism E‐mail : chawal_j@hotmail.com Date of Birth : 21 March 1981 Address : 180/352 M.5 T.Banchang, Banchang District, Rayong 21130 Thailand Academic Background Education : Rajamangala University of Technology Thanyabury (year 2005) Bachelor's Degree of Mechanical Engineering (GPA: 2.45) : Rajamangala Institute of Technology Surin Campus (2002) Diploma Degree of Industrial Farm mechanic (GPA: 3.12) Technical Background Objective : More than 11 years' experience performs a variety in static equipment and package equipment of engineering functions in Basic design, FEED, Detail Engineering, Purchase and Project Control in the field of engineering for oil and gas, onshore refinery, petrochemical plants. Major activities in design, preparation of equipment specification, datasheet, material selection, mechanical calculation, material take-off, requisition, technical bid evaluation and vendor document review for static equipment, and package equipment. Also involves perform coordination with other discipline, vendor and Clients, manage a team of engineers and designers, work with co-workers, clients and vendors. And design according to client specification and familiar relevant with the international standard code such ASME, ASME/ANSI, TEMA, BS, API, NACE, ASTM NFPA, AWS, DNV 2.7-1, EN12079, IMDG. In addition of design by rule are designs by finite element methods such as Stress Analysis, Thermal-Stress Analysis, and Fatigue Analysis Proficiency in Language : English ‐ Speaking, Reading and Writing Good Thai ‐ Speaking, Reading and Writing Excellent
  • 2.
    CV-Chatchawal Yodpol Page:2 of 11 Good communication skills: - I can work in career as professional do this in my attitude. - Co-ordination in with such parties to achievement project and analysis supplier, sub-contractor. - Be honest and confidential in my career. - Full respond support to revolve work and colleague to do best job in project. - Construction Planning & Scheduling Preparing and critical path activity analysis. - To award “Thailand CAE Workshop seminar 2008 by DECC & NSTDA” - Certificate of completion Offshore Containers (Design, Testing, Inspection and Examination). - Certificate of completion IADC Drilling Industry Training (DIT) Accreditation Program. Computer Literacy : Able to use and operate Personal Computer in the following Programs; - Microsoft Excel, Microsoft Word, Microsoft Power Point - Comos for generate data sheet - SAP - Adobe Photo shop, E‐mail and Internet - Compress; Vessel design program of ASME - PVElite; Vessel design program of ASME, PD5500, EN13445 - E‐Tank; Tank design program of API650/620 - Codecalc; Vessel Component Analysis - MSC Software; finite element analysis program - Autocad 2D, 3D; Drafting program - Solid work, Inventor, UG; 3D Design program - Microsoft Project; Project planning program - Navisworks Basic Code Knowledge: ASME, ASME/ANSI, TEMA, BS, API, NACE, ASTM NFPA, AWS, DNV 2.7-1, EN12079 and IMDG. Training Course : - Inventor program in N.R Automation System Co., Ltd - PV Elite program in COADE engineering software - MSC program (Finite element program) in Sigma Solution Co., Ltd 1. Basic Training Course 2. Implicit Nonlinear Analysis Course 3. Explicit Nonlinear Analysis Course - SolidWorks Essentials Course, DETI Training Center -Offshore Containers Training Couse (Design, Testing, Inspection and Examination). Application for : Senior Mechanical Engineer/Project Engineer Expected Salary : Negotiable
  • 3.
    CV-Chatchawal Yodpol Page:3 of 11 Previous Employment Company : Suretank (Thailand) Co., Ltd, Nature Business : Suretank is a world-leading manufacturer of CCUs (Cargo Carrying Units) for the Offshore Oil and Gas Industry. Established in 1995 in Ireland to supply offshore chemical tanks to the North Sea, the company is now a global supplier of offshore tanks and offshore containers and the largest manufacturer of DNV 2.7-1 certified products and the only company to produce ALL products to DNV standards. Design and manufacturing facilities are located in Ireland, UK, Poland, USA, Brazil, Thailand and China with sales offices in USA, Norway and Brazil. Suretank's product range includes chemical and acid transport tanks, helifueltanks, offshore containers, baskets, offshore mud skips and cryogenic ISO tank containers. Duration : June 2015 – Present Position : Assistant Engineering Manager Project Description : - Managing product development team to assure design, drawing and engineering document are Accurate and meet quality, cost, and delivery plan. - Managing production control to continuous improves manufacturing operational process. - Managing and support Lean manufacturing. - Project management and cooperate between all parties concern. - To lead and manage the engineering group effectively. - Liaise with Suretank (Ireland) for drawing/engineering changes, obtaining approvals and informing all concerned - Working in management teams especially production and job quotation. - Lead the Job quotation process, and liaise with Suretank sales to assist design approval - Supervise preparation of bills of material based on drawings. - On request liaise with sub-contractors in relation to purchased parts and components To maintain knowledge and quickly absorb, understand and apply the DNV 2.7-1 standards. - Liaise with third party inspectors and clients - Work well with the DNV 2.7-1/GL surveyor on site, learn from him and then be able to hold your own discussions as necessary.
  • 4.
    CV-Chatchawal Yodpol Page:4 of 11 Company : Samsung C&T Nature Business : Samsung C&T, as a global project organizer, offers a total solution for customers around the world with our financing, risk management and off-take capabilities in power generation, renewable energy, plant, shipbuilding and infrastructure industries. Duration : April 2014 – June 2015 Position : Project Coordinator Engineer Project Name : The Expansion of LPG Facilities at Khao Bo Ya LPG Terminal Project Client : PTT Public Company Limited Location : Leamchabang Port, Thailand Project Description : This project is for the extension of the PTT owned Marine Terminal which was installed in 1985. This terminal is operated to the maximum capacity at 132,000 tons/month. The capacity shall be extended to 250,000 tons/month to take care of LPG national demand. The additional facilities and modifications to the existing facilities at the Marine Terminal located at Khao Bo Ya, in the province of Chonburi. The PLANT comprises Refrigerated Tanks and related system, New Berth and Dolphin and Top Side Facilities, Import/Export pipeline, Custody Metering, Utilities, Fire Fighting and related Facilities. Description of work : - Prepare mechanical data sheet according to process data sheet. - Prepare requisition for quotation. - Prepare technical bidding evaluate. - Vendor clarification. - Review all vendor documents. - Coordinate with each discipline and vendor. - Support construction team. - To responsible to establish relations and coordinate project process among project team members (Samsung C&T, the Client, contractors, vendors, architect etc.). - Held coordination meetings with project involved stakeholders to hedge risks and to solve problems. - Attend project coordination and owner/contractor/architect/engineer meetings as requested or required. - Coordinate submittals and procure all close-out documents including warranties and Operating and Maintenance Manuals. - Monitor field work, including contract work, to ensure compliance with company standards, procedures, specifications and codes. - Coordinate periodic job-related photographs for records. - Perform additional assignments and responsibilities as assumed or requested by supervision.
  • 5.
    CV-Chatchawal Yodpol Page:5 of 11 Company : ThyssenKrupp Industrial Solutions (Thailand) Ltd. [UHDE (THAILAND) LTD.] Nature Business : Engineering design and construction contractor provides world class process plant solutions in the chemical, petrochemical, refining, oil and gas, and biotech industry sectors. Location : Rayong, Position : Mechanical Engineer Duration : October 2011- April 2014 Project Name : APT/BTO Plant Project Client : Nui Phao Mining Company Ltd. and H.C. Starck GmbH (NHTCM) Location : Thai Nguyen, Vietnam Year : September 2013 - Present Project Description : Ammonium Paratungstate (APT) and Blue Tungsten Oxide (BTO) Engineering Procurement and Construction (EPCM) (Static Equipment, Package Equipment, Material Handing) Position : Mechanical Engineer Description of work : - Prepare mechanical data sheet according to process data sheet. - Prepare requisition for quotation. - Prepare technical bidding evaluate. - Vendor clarification. - Review all vendor documents. - Coordinate with each discipline and vendor. - Support construction team. Project Name : VINACOMIN Project Client : Mining Chemical Industry Holding Corporation Limited (MICCO) Location : Hanoi, Vietnam Year : October 2012 – September 2013 Project Description : Ammonium Nitrate Plant Engineering Procurement and Construction (EPC) (Static Equipment, Package Equipment, Material Handing) Position : Lead Mechanical Engineer (4 months for basic design engineering in UHDE Germany and Detail engineering in UHDE Thailand) Description of work : - Prepare mechanical data sheet according to process data sheet (At UHDE Germany).
  • 6.
    CV-Chatchawal Yodpol Page:6 of 11 - Prepare requisition for quotation (RFQ) (At UHDE Germany). - Prepare technical bidding evaluate (TBE) (At UHDE Germany). - Vendor clarification. - Review all vendor documents. - Coordinate with each discipline and vendor. - Progress report to project manager. - Support construction team. Project Name : SAN III Expansion Project Client : IRPC Public Company Limited Location : Rayong, Thailand Year : 2011 Project Description : SAN (styrene-acrylonitrile copolymer) Plant Engineering Procurement Construction and Management (EPCM) (Static Equipment, Package Equipment, Material Handing) Position : Mechanical Engineer Description of work : - Prepare mechanical data sheet according to process data sheet. - Prepare requisition for quotation (RFQ). - Prepare technical bidding evaluate (TBE). - Vendor clarification. - Review all vendor documents. - Coordinate with each discipline and vendor. - Support construction team. Company : Thai Woo Ree Engineering Co., Ltd. (Affiliated company of SK Engineering & Construction Co., Ltd.) Nature Business : EPC CONTRACTOR (Oil & Gas, Petrochemical plant) Location : Rayong, Thailand Position : Mechanical Engineer Duration : January 2008 – October 2011 Salary : N/A Project Name : BST NB LATEX Project Client : BANGKOK SYNTHETICS CO.LTD Location : Map Ta Phut, Thailand
  • 7.
    CV-Chatchawal Yodpol Page:7 of 11 Year : 2011 Project Description : Engineering, Procurement and Construction (EPC) (Vessel, Heat Exchangers, Storage Tanks, Reactor) Position : Mechanical Engineer Description of work : - Project cost estimate and coordinator. - Prepare proposals for bidding. - Prepare mechanical data sheet according to process data sheet. - Material take-off - Design and Procurement of Mechanical Equipment. - Prepare requisition for quotation (RFQ). - Prepare technical bidding evaluate (TBE). - Specification clarification with client. - Engineering procedure preparation and verify. Project Name : DOW Propylene Glycol Project (PG Project) Client : DOW Chemical Thailand Limited Location : Rayong, Thailand Year : 2011 Project Description : Engineering, Procurement and Construction (EPC Utilities) Position : Mechanical Engineer Description of work : - Project cost estimate and coordinator. - Specification clarification with client. - Equipments design & Calculation follow API650 with drawing summary for fabrication. - Material take-off - Material purchasing and requisition. - Engineering procedure preparation and verify. Project Name : PTT TANK TERMINAL Project Client : PTT TANK TERMINAL CO., LTD Location : Rayong, Thailand Year : 2010 Project Description : Engineering, Procurement and Construction (EPC) The main handling fluids of this project are defined Acrylonitrile(hereafter AN), Methyl Methacrylate(here after MMA) and Sulfuric Acid(here after SA) (Vessel, Heat Exchangers, Storage Tanks) Position : Mechanical Engineer
  • 8.
    CV-Chatchawal Yodpol Page:8 of 11 Description of work : - Project cost estimate and coordinator. - Specification clarification with client. - Equipment strength Calculation follows ASME Sec.VIII Div.1 with drawing summary for fabrication. - Equipments design & Calculation follow API650 with drawing summary for fabrication. - Material take-off - Material purchasing and requisition. - Engineering procedure preparation and verify. Project Name : DOW‐Power Utilities and Infrastructures Project (PU&I Project) Client : MTP HPPO MANUFACTURING COMPANY LIMITED. Location : Rayong, Thailand Year : 2009 Project Description : Engineering, Procurement and Construction (EPC) Position : Mechanical Engineer Description of work : - Project cost estimate and coordinator in bidding. - Specification clarification with client. - Equipments design & Calculation follow API650,620 with drawing summary for fabrication. - Material take-off - Material purchasing and requisition. - Engineering procedure preparation and verify. Project Name : DOW‐Thai Propylene Oxide Project (TPO Project) Client : MTP HPPO MANUFACTURING COMPANY LIMITED. Location : Rayong, Thailand Year : 2009 Project Description : Engineering, Procurement and Construction (EPC) Position : Mechanical Engineer Description of work : - Project cost estimate and coordinator in bidding. - Specification clarification with client. - Equipments design & Calculation follow API620 with drawing summary for fabrication. - Material take-off - Material purchasing and requisition. - Engineering procedure preparation and verify.
  • 9.
    CV-Chatchawal Yodpol Page:9 of 11 Project Name : U2 DEMO Project Project Description : Registration code U2 stamp Position : Mechanical Engineer Description of work : -Engineer Coordination with authorization inspector (AI). - Prepare the user design specification for design the demo vessel follow ASME SEC.VIII Div.2 - Prepare the calculation Follow ASME SEC.VIII Div.2 include drawing. - Prepare material purchase specification. - Specification clarification with authorization inspector (AI) witness. - Specification clarification with authorization inspector agency (AIA). Project Name : FABRICATE GHU FEED FILER (G‐580A‐S) Project Client : PTTCHEM PUBLIC COMPANY. Location : Rayong, Thailand Year : 2009 Project Description : -ADD NEW FILTER GASIFIER G580 A/S (NEW FABRICATION) -FABRICATE NEW FUEL OIL STRIPPER (A‐230) Project (Vessel request U1 Stamp) Position : Mechanical Engineer Description of work : - Engineer Coordination with client and authorization inspector (AI). - Design & Calculation follow ASME SEC.VIII Div.1 include check drawing. - Specification clarification with authorization inspector (AI) witness. - Prepare material purchase specification for issue PR. - Material take-off - Material purchasing and prepare status report to client. Project Name : TANK GAUGING MODIFICATION Project Client : PTTCHEM PUBLIC COMPANY. Location : Rayong, Thailand Year : 2009 Project Description : Modification Sphere tank (Sphere tank request R Stamp) Position : Mechanical Engineer Description of work : - Engineer Coordination with client and authorization inspector (AI). - Design & Calculation follow ASME SEC.VIII Div.1 include check
  • 10.
    CV-Chatchawal Yodpol Page:10 of 11 drawing. - Specification clarification with authorization inspector (AI) witness. - Prepare material purchase specification for issue PR. Company Name : Sutee Tankers and SpecialTrucks Co.,Ltd (Vessels, Petroleum trucks, Chemical Trucks, Tanks, Bulk Tipping Trucks) Nature Business : SUB CONTRACTOR (Petrochemical) Location : Rayong, Thailand Position : Design Engineer Duration : March 2005 – December 2008 Salary : N/A Project Name : MOC Clacker 2 Project. Client : MAP TA PHUT OLEFINS CO., LTD. Location : Rayong, Thailand Year : 2008 Project Description : Design & Fabrication Vessels, Sludge Hopper,De‐gasified for Water Position : Design Engineer Description of work : - Design Vessels, Sludge hopper, De‐gasified Tank, - Specification clarification with client. - Prepare engineering status report to client - Material take-off - Material purchasing and prepare status report to client. - Engineering procedure preparation and verify. Project Name : Origin Energy Kupe Gas Project (New Zealand) Client : Aker Cool Sorption Siam Limited. Location : Rayong, Thailand Year : 2008 Position : Design Engineer Project Description : Design & Fabrication Vessel request U1 Stamp and national board NB. Description of work : - Engineer Coordination with client and authorization inspector (AI). - Design & Calculation follow ASME SEC.VIII Div.1 include check drawing. - Specification clarification with authorization inspector (AI) witness. - Prepare material purchase specification for issue PR. - Material take-off
  • 11.
    CV-Chatchawal Yodpol Page:11 of 11 - Material purchasing and prepare status report to client. Project Name : Shedden Uhde Co,. Ltd. (The Ethanol Amines) U-stamp Client : ASIAN CHEMCAL & ENGINEERING CO., LTD Location : Rayong, Thailand Year : 2008 Position : Design Engineer Project Description : Design & Fabrication Vessel request U1 Stamp Description of work : - Engineer Coordination with client and authorization inspector (AI). -Design & Calculation follow ASME SEC.VIII Div.1 include check drawing. - Specification clarification with authorization inspector (AI) witness. - Prepare material purchase specification for issue PR. - Bill of Material (BOM) - Material purchasing and prepare status report to client. Project Name : U1 DEMO Project Project Description : Registration code U1 stamp Year : 2007 Position : Mechanical Engineer Description of work : - Engineer Coordination with authorization inspector (AI). - Prepare the design specification for design the demo vessel follow ASME SEC.VIII Div.1 - Prepare the calculation Follow ASME SEC.VIII Div.1 include drawing. - Prepare material purchase specification. - Specification clarification with authorization inspector (AI) witness. - Specification clarification with authorization inspector agency (AIA) Reference 1. Mr.Nawapol Reewet Project Planning & Control BJC HEAVY INDUSTRIES PUBLIC COMPANY Tel: 6681-6419516 2.Mr. Wittaya Kumsibut Production Manager Thai Woo Ree Engineering Tel: 6681-5916448