Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential.
It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or
disclosed to any third party without Technip authorization. Technip All rights reserved.
Page 1 of 6
Somkiat Cherdsantia
Senior Piping engineer
Professional Experience Summary
Total eighteen (18) years of experience in piping engineering work for oil and
gas, chemical and petrochemical industries. The experience covers both
onshore and offshore works for feasibility study, conceptual design, detail
design, and pipe stress analysis.
The above experience included nine (10) years of experience on offshore work
on both Wellhead platform and Central Processing platform.
Also included eight (8) years of experience on managerial duties on resources
and design tools planning, piping construction management as well as
preparing proposals i.e. man-hour estimation, identifying scope of work and
preparing project execution plan.
I enjoy working in a dynamic and challenging environment and proactive in
problem solving and delivering to a high standard.
Oversea Experience
 Power plant cycle check at KL, MALAYSIA
 Building services Construction training at Hong Kong, China
Education
 Bachelor of Mechanical Engineering
 Rajamungala University, 1999
Professional Qualifications
/ Registration
 Senior professional Engineer License
Number วก.938
Nationality
 Thai
Languages
 English, Fluent
Year of Birth
 1975
Experience in Software
 Microsoft Office
 AutoCAD 2013/ Microstation
 Autodesk Navisworks (3D Reviews)
 Intergraph SmartPlant (3D Reviews)
 PDS/PDMS (3D piping design)
 AutoPlant (3D piping design)
 AutoPipe (Pipe Stress Analysis)
 CAESAR II (Pipe Stress Analysis)
Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential.
It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or
disclosed to any third party without Technip authorization. Technip All rights reserved.
Page 2 of 6
Rev. Date Checked Approved
31/01/17 SKC KKS
Somkiat Cherdsantia
Senior Piping engineer
Employment History
Period Company Name Position Held
11/2008 - PRESENT TECHNIP ENGINEERING(THAILAND) SENIOR PIPING ENGINEER
05/1999 - 03/2008 THAI SHINRYO LIMITED SENIOR ENGINEER
Course Attended
12/2014 Pulse Coaching
11/2014 Lean Six Sigma Green Belt Core Skill
Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential.
It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or
disclosed to any third party without Technip authorization. Technip All rights reserved.
Page 3 of 6
Rev. Date Checked Approved
31/01/17 SKC KKS
Somkiat Cherdsantia
Senior Piping engineer
Detailed Professional Experience
TECHNIP ENGINEERING (THAILAND) LTD.
Senior Piping Engineer (Assignment: RBO Piping Section Head)
2016 – Present
2014 – 2016
Client:
Project Title /
Description:
Project Position:
Responsibilities:
Client:
Project Title /
Description:
PTT Global Chemical Public Company Limited
 TE4338 Installation of new Packinox Project
 Relocate 52 FRC708 DSL new line to Jetty Project
 Oil Skimmer installation Project
 C9a Project
 Benzene to Flare Project
 Re-rating CAD system for Unit 2450 Project
Lead Piping Engineer for onshore brownfield projects
 Monitored man-hour and schedule and control quality of the work
produced
 Executed all piping technical coordination both internal and external
clarifications
 Prepared/Reviewed Plot Plan
 Reviewed piping general arrangement, isometric, pipe support details
and tie-in schedule
 Prepared/Reviewed piping data sheets for special items
 Reviewed piping materials take off
 Reviewed piping stress analysis and reports
 Performed data consistency check / clash check for 3-D model
 Participated in 3-D model review
 Performed vendor data review
Poyry Engineering Limited
 12SPP Power Plant Project
(6 Months Secondment) to involve Power plant piping Design and 3D
Review and drawing preparations
Client: Chevron Offshore (Thailand) Limited and Chevron Thailand Exploration
and Production Limited
Project Title /
Description:  TC&S for North Pailin flare and relief system Project
 Modify Lube Oil Refilled Line of RC Project (8 Platform including of
SAWA,SAWC,SAWD,SAWE,SAWF,SAWL,TRWA,TRWB )
 FUWA bundle infill Project
 BNWL bundle infill Project
 TRWA infill Detail design Project
 NPWJ bundle infill Project
 BEWF bundle infill Project
 PLCPP compressor upgrade construction support Project
 PLCPP comp upgrade punch list close-out Project
 PLATONG Hazop close-out Part II Project
 TAWD Infill Program Topsides Modification Project
 PSI for Benjamas Project
 PSI for TFPSO Project
Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential.
It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or
disclosed to any third party without Technip authorization. Technip All rights reserved.
Page 4 of 6
Rev. Date Checked Approved
31/01/17 SKC KKS
Somkiat Cherdsantia
Senior Piping engineer
Project Position: Lead Piping Engineer for offshore brownfield projects
Responsibilities:  Monitored man-hour and schedule and control quality of the work
produced
 Executed all piping technical coordination both internal and external
clarifications
 Prepared/Reviewed Plot Plan
 Reviewed piping general arrangement, isometric, pipe support details
and tie-in schedule
 Prepared/Reviewed piping data sheets for special items
 Reviewed piping materials take off
 Reviewed piping stress analysis and reports
 Performed data consistency check / clash check for 3-D model
 Participated in 3-D model review
 Performed vendor data review, technical bid evaluation
2013 – 2014 Client: Chevron Offshore (Thailand) Limited and Chevron Thailand Exploration
and Production Limited
Project Title /
Description:  PLCPP1 Compressor upgrade Feed&DD
 PLATONG Complex misc. hazop close-out
 PLCPP2 Louver install for reduce sale gas high temp
 PLCPP1 Chemical injection skid relocation
Project Position: Lead Piping Engineer for offshore brownfield projects
Responsibilities:  Monitored man-hour and schedule and control quality of the work
produced
 Executed all piping technical coordination both internal and external
clarifications
 Prepared/Reviewed Plot Plan
 Reviewed piping general arrangement, isometric, pipe support details
and tie-in schedule
 Prepared/Reviewed piping data sheets for special items
 Reviewed piping materials take off
 Reviewed piping stress analysis and reports
 Performed data consistency check / clash check for 3-D model
 Participated in 3-D model review
 Performed vendor data review, technical bid evaluation
2012 – 2013 Client: IRPC Public company limited
Project Title /
Description:  DPCU Project
 EBSM Project
Project Position: Lead Piping Engineer for offshore brownfield projects
Responsibilities:  Monitored man-hour and schedule and control quality of the work
produced
 Executed all piping technical coordination both internal and external
clarifications
 Prepared/Reviewed Plot Plan
 Reviewed piping general arrangement, isometric, pipe support details
and tie-in schedule
Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential.
It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or
disclosed to any third party without Technip authorization. Technip All rights reserved.
Page 5 of 6
Rev. Date Checked Approved
31/01/17 SKC KKS
Somkiat Cherdsantia
Senior Piping engineer
 Prepared/Reviewed piping data sheets for special items
 Reviewed piping materials take off
 Reviewed piping stress analysis and reports
 Performed data consistency check / clash check for 3-D model
 Participated in 3-D model review
 Performed vendor data review, technical bid evaluation
2010 – 2012 Client: PTT exploration and Production Public company limited
Project Title /
Description:  LKU-C Local dehydration
 LKU-D Local dehydration
Project Position: Lead Piping Engineer for onshore field projects
Responsibilities:  Monitored man-hour and schedule and control quality of the work
produced
 Executed all piping technical coordination both internal and external
clarifications
 Prepared/Reviewed Plot Plan
 Reviewed piping general arrangement, isometric, pipe support details
and tie-in schedule
 Prepared/Reviewed piping data sheets for special items
 Reviewed piping materials take off
 Reviewed piping stress analysis and reports
 Performed data consistency check / clash check for 3-D model
 Participated in 3-D model review
 Performed vendor data review, technical bid evaluation
2008 – 2010 Client: Chevron Thailand Exploration and Production Limited
Thai oil refinery Public company limited
Alliance refining company limited
Project Title /
Description:  SATUN de-bottle necking
 TPX cooling tower
 MRU&WET NHT
Project Position: Lead Piping Engineer for offshore brownfield projects
Responsibilities:  Monitored man-hour and schedule and control quality of the work
produced
 Executed all piping technical coordination both internal and external
clarifications
 Prepared/Reviewed Plot Plan
 Reviewed piping general arrangement, isometric, pipe support details
and tie-in schedule
 Prepared/Reviewed piping data sheets for special items
 Reviewed piping materials take off
 Reviewed piping stress analysis and reports
 Performed data consistency check / clash check for 3-D model
 Participated in 3-D model review
 Performed vendor data review, technical bid evaluation
2004 – 2008 Client: PTT Utility company limited
Bangchark Public company limited
Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential.
It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or
disclosed to any third party without Technip authorization. Technip All rights reserved.
Page 6 of 6
Rev. Date Checked Approved
31/01/17 SKC KKS
Somkiat Cherdsantia
Senior Piping engineer
Project Title /
Description:  PTT-CUP II (Power Plant)
 Power plant Project for Suvarnabhumi International Airport
(Power Plant)
 Bangchark refinery (Power Plant)
Project Position: Piping Engineer for onshore projects
Responsibilities:  Performed pipe stress analysis report
 Performed 3-D model (AutoPlant)
 Performed data consistency check / clash check for 3-D model
 Prepared/Reviewed Plot Plan
 Reviewed piping general arrangement, isometric, pipe support details
and tie-in schedule
 Prepared/Reviewed piping data sheets for special items
 Reviewed piping materials take off
1999 – 2004 Client: Listed Factories at Industrial estate
Project Title /
Description:  KOITO Paintaplas Project
 TOKYO Coil Project
 MC Plastic Project
 KLOCKER Project
 TOC Project
 Thai Kansai Paint Project
 METCO Phase I and Phase II
 META Project Phase I and Phase II
 KOITO Phase I and Phase II
 Thai Asahi Project
Project Position: Piping Engineer for onshore projects
Responsibilities:  Executed all piping construction activities on the assigned project
 Planned construction schedule to achieve project requirement
 Planned and provided construction manpower required for project
 Supervised, checked, corrected and approved work done by piping
supervisor and other personnel under control
 Monitored the manpower performance during construction phase
 Coordinated with client to clarify all technical and construction problem
Built up corrective action to ensure that the construction work will be
completed within the required schedule with the good quality of
workmanship and safety and under budget.

More Related Content

What's hot

CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_externalKen Loh
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor ResumeRoy Firtha
 
GregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeaderGregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeaderGreg Philpott
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)Rittiporn Pinrod
 
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16Leonardo Villamil
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designermilaya_25 mani
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015Larry Smock
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekar ramamurthy
 
Veerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress EngineerVeerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress Engineerveerappa panchal
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)hitesh desai
 

What's hot (20)

CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
Curriculum Vitae - Rama Narayana Murty
Curriculum Vitae - Rama Narayana MurtyCurriculum Vitae - Rama Narayana Murty
Curriculum Vitae - Rama Narayana Murty
 
CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_external
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
GregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeaderGregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeader
 
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)EN Mr.Rittiporn Pinrod resume(update 13-03-15)
EN Mr.Rittiporn Pinrod resume(update 13-03-15)
 
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCX
 
MVTatel
MVTatelMVTatel
MVTatel
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
 
GOPINATH DEVANI
GOPINATH DEVANIGOPINATH DEVANI
GOPINATH DEVANI
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Resume for Pipeline Designer
Resume for Pipeline DesignerResume for Pipeline Designer
Resume for Pipeline Designer
 
Resume - Shabeer
Resume - ShabeerResume - Shabeer
Resume - Shabeer
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
 
Veerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress EngineerVeerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress Engineer
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
 

Viewers also liked

Dam song tren bo vuc
Dam song tren bo vucDam song tren bo vuc
Dam song tren bo vucLong Do Hoang
 
Buoc tim hieu trong tinh yeu
Buoc tim hieu trong tinh yeuBuoc tim hieu trong tinh yeu
Buoc tim hieu trong tinh yeuLong Do Hoang
 
Key elements in drawing up an effective budget for a local homeless strategy
Key elements in drawing up an effective budget for a local homeless strategyKey elements in drawing up an effective budget for a local homeless strategy
Key elements in drawing up an effective budget for a local homeless strategyFEANTSA
 
Help Havilla Children's Center
Help Havilla Children's CenterHelp Havilla Children's Center
Help Havilla Children's Centerhavillacc144
 
Nay sa tan hay nghe day
Nay sa tan hay nghe dayNay sa tan hay nghe day
Nay sa tan hay nghe dayLong Do Hoang
 
Th s31 060_biện pháp đào tạo hệ đại học tại các trung tâm giáo dục thường xuy...
Th s31 060_biện pháp đào tạo hệ đại học tại các trung tâm giáo dục thường xuy...Th s31 060_biện pháp đào tạo hệ đại học tại các trung tâm giáo dục thường xuy...
Th s31 060_biện pháp đào tạo hệ đại học tại các trung tâm giáo dục thường xuy...https://www.facebook.com/garmentspace
 
Persediaan mengajar psv tahun 4
Persediaan mengajar psv tahun 4Persediaan mengajar psv tahun 4
Persediaan mengajar psv tahun 4Adle Fahsha
 
Semanario / País Interior 23-01-2017
Semanario / País Interior 23-01-2017Semanario / País Interior 23-01-2017
Semanario / País Interior 23-01-2017Adrian Ramirez
 
Thien dang thuot ve ai
Thien dang thuot ve aiThien dang thuot ve ai
Thien dang thuot ve aiLong Do Hoang
 
Using the CGC's Fully Automated Vulnerability Detection Tools in Security Eva...
Using the CGC's Fully Automated Vulnerability Detection Tools in Security Eva...Using the CGC's Fully Automated Vulnerability Detection Tools in Security Eva...
Using the CGC's Fully Automated Vulnerability Detection Tools in Security Eva...Seungjoo Kim
 
Seven Steps For Effective Problem Solving
Seven Steps For Effective Problem SolvingSeven Steps For Effective Problem Solving
Seven Steps For Effective Problem SolvingDarci Stanford
 
Ciclos biogeoquímicos
Ciclos biogeoquímicosCiclos biogeoquímicos
Ciclos biogeoquímicosavsolarisuarez
 

Viewers also liked (20)

Dam song tren bo vuc
Dam song tren bo vucDam song tren bo vuc
Dam song tren bo vuc
 
Buoc tim hieu trong tinh yeu
Buoc tim hieu trong tinh yeuBuoc tim hieu trong tinh yeu
Buoc tim hieu trong tinh yeu
 
Key elements in drawing up an effective budget for a local homeless strategy
Key elements in drawing up an effective budget for a local homeless strategyKey elements in drawing up an effective budget for a local homeless strategy
Key elements in drawing up an effective budget for a local homeless strategy
 
Help Havilla Children's Center
Help Havilla Children's CenterHelp Havilla Children's Center
Help Havilla Children's Center
 
Qué es internet2
Qué es internet2Qué es internet2
Qué es internet2
 
Primera entrega ingles
Primera entrega inglesPrimera entrega ingles
Primera entrega ingles
 
Nay sa tan hay nghe day
Nay sa tan hay nghe dayNay sa tan hay nghe day
Nay sa tan hay nghe day
 
Th s31 060_biện pháp đào tạo hệ đại học tại các trung tâm giáo dục thường xuy...
Th s31 060_biện pháp đào tạo hệ đại học tại các trung tâm giáo dục thường xuy...Th s31 060_biện pháp đào tạo hệ đại học tại các trung tâm giáo dục thường xuy...
Th s31 060_biện pháp đào tạo hệ đại học tại các trung tâm giáo dục thường xuy...
 
Persediaan mengajar psv tahun 4
Persediaan mengajar psv tahun 4Persediaan mengajar psv tahun 4
Persediaan mengajar psv tahun 4
 
certificates (1)
certificates (1)certificates (1)
certificates (1)
 
Semanario / País Interior 23-01-2017
Semanario / País Interior 23-01-2017Semanario / País Interior 23-01-2017
Semanario / País Interior 23-01-2017
 
Acuérdate de mí
Acuérdate de míAcuérdate de mí
Acuérdate de mí
 
Thien dang thuot ve ai
Thien dang thuot ve aiThien dang thuot ve ai
Thien dang thuot ve ai
 
Meditation [Dhyan] Versus Relaxation : A Review With Comprehensive Bibliography
Meditation [Dhyan] Versus Relaxation : A Review With Comprehensive BibliographyMeditation [Dhyan] Versus Relaxation : A Review With Comprehensive Bibliography
Meditation [Dhyan] Versus Relaxation : A Review With Comprehensive Bibliography
 
Using the CGC's Fully Automated Vulnerability Detection Tools in Security Eva...
Using the CGC's Fully Automated Vulnerability Detection Tools in Security Eva...Using the CGC's Fully Automated Vulnerability Detection Tools in Security Eva...
Using the CGC's Fully Automated Vulnerability Detection Tools in Security Eva...
 
Tajuk 4 -pergerakan
Tajuk 4 -pergerakanTajuk 4 -pergerakan
Tajuk 4 -pergerakan
 
Seven Steps For Effective Problem Solving
Seven Steps For Effective Problem SolvingSeven Steps For Effective Problem Solving
Seven Steps For Effective Problem Solving
 
Cloud Infrastructure Mechanisms
Cloud Infrastructure MechanismsCloud Infrastructure Mechanisms
Cloud Infrastructure Mechanisms
 
Nghi ngo
Nghi ngoNghi ngo
Nghi ngo
 
Ciclos biogeoquímicos
Ciclos biogeoquímicosCiclos biogeoquímicos
Ciclos biogeoquímicos
 

Similar to PI_Somkiat C

Similar to PI_Somkiat C (20)

CV_Piyapol
CV_PiyapolCV_Piyapol
CV_Piyapol
 
CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016
 
Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
Ramajitti P_Resume 14 Jan 16 (1)
Ramajitti P_Resume 14 Jan 16 (1)Ramajitti P_Resume 14 Jan 16 (1)
Ramajitti P_Resume 14 Jan 16 (1)
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
 
T Pearce CV PIPNG MANAGER ENGINEER 2015
T Pearce CV PIPNG MANAGER  ENGINEER 2015T Pearce CV PIPNG MANAGER  ENGINEER 2015
T Pearce CV PIPNG MANAGER ENGINEER 2015
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
Resume_Phensri_Prasansaeng_Comment
Resume_Phensri_Prasansaeng_CommentResume_Phensri_Prasansaeng_Comment
Resume_Phensri_Prasansaeng_Comment
 
Technip fmc cv_hoang cong quoc khanh
Technip fmc cv_hoang cong quoc khanhTechnip fmc cv_hoang cong quoc khanh
Technip fmc cv_hoang cong quoc khanh
 
Crisostomo, Jose M Resume 2016_General
Crisostomo, Jose M Resume 2016_GeneralCrisostomo, Jose M Resume 2016_General
Crisostomo, Jose M Resume 2016_General
 
BBA resume_2017
BBA resume_2017BBA resume_2017
BBA resume_2017
 
CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
SRINIVASAN_LATEST RESUME_01-12-2016
SRINIVASAN_LATEST RESUME_01-12-2016SRINIVASAN_LATEST RESUME_01-12-2016
SRINIVASAN_LATEST RESUME_01-12-2016
 
cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015
 

PI_Somkiat C

  • 1. Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential. It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or disclosed to any third party without Technip authorization. Technip All rights reserved. Page 1 of 6 Somkiat Cherdsantia Senior Piping engineer Professional Experience Summary Total eighteen (18) years of experience in piping engineering work for oil and gas, chemical and petrochemical industries. The experience covers both onshore and offshore works for feasibility study, conceptual design, detail design, and pipe stress analysis. The above experience included nine (10) years of experience on offshore work on both Wellhead platform and Central Processing platform. Also included eight (8) years of experience on managerial duties on resources and design tools planning, piping construction management as well as preparing proposals i.e. man-hour estimation, identifying scope of work and preparing project execution plan. I enjoy working in a dynamic and challenging environment and proactive in problem solving and delivering to a high standard. Oversea Experience  Power plant cycle check at KL, MALAYSIA  Building services Construction training at Hong Kong, China Education  Bachelor of Mechanical Engineering  Rajamungala University, 1999 Professional Qualifications / Registration  Senior professional Engineer License Number วก.938 Nationality  Thai Languages  English, Fluent Year of Birth  1975 Experience in Software  Microsoft Office  AutoCAD 2013/ Microstation  Autodesk Navisworks (3D Reviews)  Intergraph SmartPlant (3D Reviews)  PDS/PDMS (3D piping design)  AutoPlant (3D piping design)  AutoPipe (Pipe Stress Analysis)  CAESAR II (Pipe Stress Analysis)
  • 2. Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential. It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or disclosed to any third party without Technip authorization. Technip All rights reserved. Page 2 of 6 Rev. Date Checked Approved 31/01/17 SKC KKS Somkiat Cherdsantia Senior Piping engineer Employment History Period Company Name Position Held 11/2008 - PRESENT TECHNIP ENGINEERING(THAILAND) SENIOR PIPING ENGINEER 05/1999 - 03/2008 THAI SHINRYO LIMITED SENIOR ENGINEER Course Attended 12/2014 Pulse Coaching 11/2014 Lean Six Sigma Green Belt Core Skill
  • 3. Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential. It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or disclosed to any third party without Technip authorization. Technip All rights reserved. Page 3 of 6 Rev. Date Checked Approved 31/01/17 SKC KKS Somkiat Cherdsantia Senior Piping engineer Detailed Professional Experience TECHNIP ENGINEERING (THAILAND) LTD. Senior Piping Engineer (Assignment: RBO Piping Section Head) 2016 – Present 2014 – 2016 Client: Project Title / Description: Project Position: Responsibilities: Client: Project Title / Description: PTT Global Chemical Public Company Limited  TE4338 Installation of new Packinox Project  Relocate 52 FRC708 DSL new line to Jetty Project  Oil Skimmer installation Project  C9a Project  Benzene to Flare Project  Re-rating CAD system for Unit 2450 Project Lead Piping Engineer for onshore brownfield projects  Monitored man-hour and schedule and control quality of the work produced  Executed all piping technical coordination both internal and external clarifications  Prepared/Reviewed Plot Plan  Reviewed piping general arrangement, isometric, pipe support details and tie-in schedule  Prepared/Reviewed piping data sheets for special items  Reviewed piping materials take off  Reviewed piping stress analysis and reports  Performed data consistency check / clash check for 3-D model  Participated in 3-D model review  Performed vendor data review Poyry Engineering Limited  12SPP Power Plant Project (6 Months Secondment) to involve Power plant piping Design and 3D Review and drawing preparations Client: Chevron Offshore (Thailand) Limited and Chevron Thailand Exploration and Production Limited Project Title / Description:  TC&S for North Pailin flare and relief system Project  Modify Lube Oil Refilled Line of RC Project (8 Platform including of SAWA,SAWC,SAWD,SAWE,SAWF,SAWL,TRWA,TRWB )  FUWA bundle infill Project  BNWL bundle infill Project  TRWA infill Detail design Project  NPWJ bundle infill Project  BEWF bundle infill Project  PLCPP compressor upgrade construction support Project  PLCPP comp upgrade punch list close-out Project  PLATONG Hazop close-out Part II Project  TAWD Infill Program Topsides Modification Project  PSI for Benjamas Project  PSI for TFPSO Project
  • 4. Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential. It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or disclosed to any third party without Technip authorization. Technip All rights reserved. Page 4 of 6 Rev. Date Checked Approved 31/01/17 SKC KKS Somkiat Cherdsantia Senior Piping engineer Project Position: Lead Piping Engineer for offshore brownfield projects Responsibilities:  Monitored man-hour and schedule and control quality of the work produced  Executed all piping technical coordination both internal and external clarifications  Prepared/Reviewed Plot Plan  Reviewed piping general arrangement, isometric, pipe support details and tie-in schedule  Prepared/Reviewed piping data sheets for special items  Reviewed piping materials take off  Reviewed piping stress analysis and reports  Performed data consistency check / clash check for 3-D model  Participated in 3-D model review  Performed vendor data review, technical bid evaluation 2013 – 2014 Client: Chevron Offshore (Thailand) Limited and Chevron Thailand Exploration and Production Limited Project Title / Description:  PLCPP1 Compressor upgrade Feed&DD  PLATONG Complex misc. hazop close-out  PLCPP2 Louver install for reduce sale gas high temp  PLCPP1 Chemical injection skid relocation Project Position: Lead Piping Engineer for offshore brownfield projects Responsibilities:  Monitored man-hour and schedule and control quality of the work produced  Executed all piping technical coordination both internal and external clarifications  Prepared/Reviewed Plot Plan  Reviewed piping general arrangement, isometric, pipe support details and tie-in schedule  Prepared/Reviewed piping data sheets for special items  Reviewed piping materials take off  Reviewed piping stress analysis and reports  Performed data consistency check / clash check for 3-D model  Participated in 3-D model review  Performed vendor data review, technical bid evaluation 2012 – 2013 Client: IRPC Public company limited Project Title / Description:  DPCU Project  EBSM Project Project Position: Lead Piping Engineer for offshore brownfield projects Responsibilities:  Monitored man-hour and schedule and control quality of the work produced  Executed all piping technical coordination both internal and external clarifications  Prepared/Reviewed Plot Plan  Reviewed piping general arrangement, isometric, pipe support details and tie-in schedule
  • 5. Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential. It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or disclosed to any third party without Technip authorization. Technip All rights reserved. Page 5 of 6 Rev. Date Checked Approved 31/01/17 SKC KKS Somkiat Cherdsantia Senior Piping engineer  Prepared/Reviewed piping data sheets for special items  Reviewed piping materials take off  Reviewed piping stress analysis and reports  Performed data consistency check / clash check for 3-D model  Participated in 3-D model review  Performed vendor data review, technical bid evaluation 2010 – 2012 Client: PTT exploration and Production Public company limited Project Title / Description:  LKU-C Local dehydration  LKU-D Local dehydration Project Position: Lead Piping Engineer for onshore field projects Responsibilities:  Monitored man-hour and schedule and control quality of the work produced  Executed all piping technical coordination both internal and external clarifications  Prepared/Reviewed Plot Plan  Reviewed piping general arrangement, isometric, pipe support details and tie-in schedule  Prepared/Reviewed piping data sheets for special items  Reviewed piping materials take off  Reviewed piping stress analysis and reports  Performed data consistency check / clash check for 3-D model  Participated in 3-D model review  Performed vendor data review, technical bid evaluation 2008 – 2010 Client: Chevron Thailand Exploration and Production Limited Thai oil refinery Public company limited Alliance refining company limited Project Title / Description:  SATUN de-bottle necking  TPX cooling tower  MRU&WET NHT Project Position: Lead Piping Engineer for offshore brownfield projects Responsibilities:  Monitored man-hour and schedule and control quality of the work produced  Executed all piping technical coordination both internal and external clarifications  Prepared/Reviewed Plot Plan  Reviewed piping general arrangement, isometric, pipe support details and tie-in schedule  Prepared/Reviewed piping data sheets for special items  Reviewed piping materials take off  Reviewed piping stress analysis and reports  Performed data consistency check / clash check for 3-D model  Participated in 3-D model review  Performed vendor data review, technical bid evaluation 2004 – 2008 Client: PTT Utility company limited Bangchark Public company limited
  • 6. Confidentiality Class A - This document is Technip property and it is -together with the information it contains- confidential. It shall not be used for any other purposes than those for which it was supplied and shall not be reproduced and/or disclosed to any third party without Technip authorization. Technip All rights reserved. Page 6 of 6 Rev. Date Checked Approved 31/01/17 SKC KKS Somkiat Cherdsantia Senior Piping engineer Project Title / Description:  PTT-CUP II (Power Plant)  Power plant Project for Suvarnabhumi International Airport (Power Plant)  Bangchark refinery (Power Plant) Project Position: Piping Engineer for onshore projects Responsibilities:  Performed pipe stress analysis report  Performed 3-D model (AutoPlant)  Performed data consistency check / clash check for 3-D model  Prepared/Reviewed Plot Plan  Reviewed piping general arrangement, isometric, pipe support details and tie-in schedule  Prepared/Reviewed piping data sheets for special items  Reviewed piping materials take off 1999 – 2004 Client: Listed Factories at Industrial estate Project Title / Description:  KOITO Paintaplas Project  TOKYO Coil Project  MC Plastic Project  KLOCKER Project  TOC Project  Thai Kansai Paint Project  METCO Phase I and Phase II  META Project Phase I and Phase II  KOITO Phase I and Phase II  Thai Asahi Project Project Position: Piping Engineer for onshore projects Responsibilities:  Executed all piping construction activities on the assigned project  Planned construction schedule to achieve project requirement  Planned and provided construction manpower required for project  Supervised, checked, corrected and approved work done by piping supervisor and other personnel under control  Monitored the manpower performance during construction phase  Coordinated with client to clarify all technical and construction problem Built up corrective action to ensure that the construction work will be completed within the required schedule with the good quality of workmanship and safety and under budget.