SlideShare a Scribd company logo
1 of 7
Download to read offline
PROFESSIONAL RESUME
Rev. Date Checked Approved “Confidentiality Class A – Property of Technip. VPM00237
15/10/16 Unauthorized copying and disclosure are strictly prohibited.”
NAME : TRAN CONG DANH (Mr.)
NATIONALITY : Vietnam
YEAR OF BIRTH : 1988
TERTIARY
EDUCATION
: Bachelor of Aeronautical Engineering (Honor award for being the most outstanding
student with highest academic scoring among Transportation Engineering Faculty of
2006-2011 Academic session) - Vietnam National University HCMC - University of
Technology, 2011
CAREER SUMMARY
Total 6 years’ working experience in Piping Engineering (2.5 years) and Project Management (3.5 years) in both
Onshore and Offshore Projects. Also had 8 months worked at construction site.
EMPLOYMENT SUMMARY
Period Company Name Position Held
10/2013 – Present Technip Vietnam Co.Ltd Project Engineer
05/2012 – 10/2013 Danieli Vietnam Co.Ltd Piping Engineer/ Piping
Coordinator
01/2011 – 05/2012 Toyo Vietnam Co.Ltd Piping Engineer/ Piping
Coordinator
Tran Cong Danh
Page 2 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
10/2013– PRESENT TECHNIP VIETNAM CO.,LTD
Project Engineer
06/2015 – Present Client
Project title
Project size
Project
position
Project brief
description
Job
description
:
:
:
:
:
:
PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION
(PVFCCo)
Ammonia Plant Revamp Project
110 million US
Project Engineer
Lump Sum Turnkey Engineering, Procurement, Construction and
Commissioning basis
The Project is aimed at increasing the capacity of the Ammonia Plant
by 20%, thus bringing its capacity to 1620 MTPD of Ammonia.
The Project will consist of design, procurement, construction and
commissioning of the revamped and new equipment (Licensor
equipment, utilities & off-site equipment), including associated utilities,
off-sites and infrastructures required to bring the facility at the new
required capacity
 Involved in Project Management daily works, such as: weekly/
monthly progress report, project schedule controlling and expediting,
Engineering Meetings with CLIENT and other involved parties,
internal disciplines’ & external interfaces and issues
 Coordinated and followed-up with 3rd
CA (SGS) for Appraisal. Review
the comments from SGS and Discipline’s response
 Arranged & followed up Safety Studies and Instrument Studies
(HAZOP, QRA, SIL)
 Arranged & followed up 3D Model Review Workshop (30%, 60% and
90%) and Constructability Workshop (1
st
, 2
nd
and 3
rd
)
 Reviewed Engineering document/drawing for its correctness before
PM’s approval
 Followed up the Protocols & Payment Milestones
 Controlled and Interfaced with Partners (TPIT & PTSC) and Packaged
Vendors related to Procurement scope
 Prepared Project Procedures (PEP, PCP, Project Coding Procedure,
Field Design Change,…)
 Coordinated with Site for Field Engineering Activities
Tran Cong Danh
Page 3 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
06/2014 – 5/2015 Client : VIETSOVPETRO
Project
title
: Detailed Engineering Design Service for BK-TNG
Wellhead Platform
Project
position
: Project Engineer
Project
brief
description
: Detailed Engineering & Procurement Support for Green
Field Project
In order to carry out The Detailed Engineering Design
Services for BK-TNG wellhead Platform. BK-TNG platform is
designed to handle 2.05 MMSCMD gas from Thien Ung field
and 1.0 MMSCMD of associated gas from DaiHung-02
platform. After CO2 removal (future design), gas from Thien
Ung will combine with Gas from Dai Hung to Gas
Dehydration Unit, then flow into export pipeline. The contract
covers for BK-TNG Detailed Engineering for 12 wells
including jacket and topside with process equipment,
helideck, living quarter, and connecting piping (pig
launcher/receiver and risers)
Job
description
:
 Involved in Project Management daily works, such as: weekly/
monthly progress report, project schedule controlling and expediting,
Engineering Meetings with CLIENT and other involved parties,
internal disciplines’ & external interfaces and issues
 Coordinated and followed-up with 3
rd
parties BV for Design Appraisal.
Review the comments from BV and response from Project Team
 Arranged & followed up 3
rd
Party Safety Studies and Instrument
Studies (HAZID, HAZOP, Hot Plum, Dropped Object, QRA, SIL, F&G
Mapping…)
 Reviewed Engineering document/drawing for its correctness before
PM’s approval
 Followed up the Protocols & Payment Milestones
 Controlled and Interfaced with Client related to Procurement Support
 Prepared Project Procedures (i.e, PEP, PCP and Project Close Out
Report)
Tran Cong Danh
Page 4 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
10/2013 – 05/2014 Client : JAPAN VIETNAM PETROLEUM COMPANY LTD
Project
title
: Rang Dong Field HCG-EOR-FFS Project (Detailed
Engineering Design)
Project
position
: Project Engineer
Project
brief
description
: Detailed Engineering & Procurement Support for Brownfield
Project
In order to maximize oil recovery and extend the field
exploration life cycle for the existing reservoirs in Rang Dong
field, the JVPC has made the decision to utilize the
compression gas for maintaining the reservoir pressure.
This project is performing the detailed engineering design to
modify the existing facility on platforms NCWI, NULQ, WHP-
N1, WHP-C1, WHP-E1, WHP-E1A to adapt with new
installed gas injection compression system.
Job
description
:
 Involved in Project Management daily works, such as: weekly/
monthly progress report, project schedule controlling and expediting,
Engineering Meetings with CLIENT and other involved parties,
internal disciplines’ & external interfaces and issues
 Reviewed Engineering document/drawing for its correctness before
PM’s approval
 Followed up the Protocols & Payment Milestones
 Controlled and Interfaced with Client related to Procurement support
scope
 Coordinated and followed-up with 3rd
parties (LR & ABS) for Design
Appraisal
 Prepared Project Procedures (i.e, PEP, PCP and Project Close Out
Report)
Tran Cong Danh
Page 5 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
05/2012 –09/2013 DANIELI VIETNAM CO.,LTD
Piping Engineer/ Piping Coordinator
02/2013 – 09/2013 Client : DEACERO (Columbia)
Project
title
: DeAcero Steel Plant Project
Project
size
: 65 million US
Project
position
: Piping Engineer/ Piping Coordinator
Project
brief
description
: EPC Project. Engineering, Procurement and Construction for
the modern DeAcero Steel Factory in Columbia.
Job
description
:
 Equipment Layout for Utility Systems
 3D PDMS Modeling for Piping Utility systems: Air Compressor,
Cooling Water (direct & indirect), Hydraulic, Grease Lubrication, Oil
Lubrication, Air-Oil Lubrication
 Expedite and Control Schedule in Internal Piping team
 Assistant for Piping Lead Engineer to check the 2D drawings
(Equipment Layout, Piping Isometric, Piping General Arrangement)
 Interface/Coordinate with other relevant disciplines: Mechanical,
Electrical, Instrument and Civil team.
05/2012 – 02/2013 Client : POSCO VIETNAM COMPANY LTD
Project title : Posco Steel Plant Project
Project size : 55 million US
Project
position
: Piping Engineer/ Piping Coordinator
Project
brief
description
: EPC. Engineering, Procurement and Construction for Posco
Steel Factory in Vietnam.
Involved in Engineering stage.
Job
description
:
 Equipment Layout for whole Utility Systems (1 month in Thailand –
Danieli Far East)
 3D PDMS Modeling for Piping Utility Systems: Air Compressor,
Cooling Water (direct & indirect), Hydraulic, Grease Lubrication, Oil
Lubrication, Air-Oil Lubrication
 Expediting and Controlling of Piping Schedule
 Assistant for Piping Lead Engineer to check the 2D drawings
(Equipment Layout, Piping Isometric, Piping General Arrangement)
Tran Cong Danh
Page 6 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
 Interface/Coordinate with other relevant disciplines: Mechanical,
Electrical, Instrument and Civil team
01/2011 – 05/2012 TOYO VIETNAM CO.,LTD
Piping Engineer/ Piping Coordinator
05/2011 – 05/2012 Client : UNITED INTERNATIONAL PHARMA CO.,LTD
Project
title
: The United International Pharma Factory Project
Project
size
: 25 million US
Project
position
: Piping Engineer/Piping Coordinator
Project
brief
description
: EPC. Design Procurement and Construct the modern United
International Pharma Factory in Vietnam.
Job
description
: Participated in both Engineering and Construction stage
 Equipment Layout for Utility Systems (Boiler Room, Air Compressor
Room, Purified Room…)
 Piping Layout for Utility Piping system (Air, Steam, Condensate,
Cooling Water, Diesel oil, Tap water, Purified water).
 Supervisor during Construction Phase for Utility piping system ( Air,
Steam, Condensate, Diesel oil, Tap water, Purified water)
 Supervisor during Construction Phase for Waste Water Treatment
Package & Purified Water Package.
 Involved in Project Management team when working at site with daily
works, such as: weekly/ monthly progress report, project schedule
controlling and expediting, meetings with CLIENT, internal disciplines’
interfaces and issues
03/2011 – 05/2011 Client : INTEL VIETNAM CO.,LTD
Project
title
: Intel Water Reclaim Project
Project
position
: Piping Engineer/Piping Coordinator
Project
brief
description
: Feasibility and Detailed Engineering Design
Job
description
:
Tran Cong Danh
Page 7 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
 Plot Plan for Waste Water Treatment Plant, for Automatic
sprinkler location and dividing stabilizer grass zones.
 Piping Arrangement for Waste Water Treatment Plant, for irrigation
distribution & cooling water distribution.
 Bill of Material Calculation for Sprinkler, Irrigation & Cooling Water
piping system.
 Interface with 2 Vendors of Automatic Sprinklers & relevant piping
system.
 Involved in Project Management daily works, such as: project
schedule controlling and expediting, meetings with CLIENT, internal
disciplines’ & external interfaces and issues.
01/2011 – 05/2011 Client : DOW CHEMICALS COMPANY (Vietnam)
Project
title
: Dow Emulsion Plant Project
Project
size
: 20 million US
Project
position
: Piping Engineer
Project
brief
description
: EPCM
Job
description
:
 Plot Plan and Piping Arrangement for Fire Fighting Pump Station
 Piping Arrangement for Domestic water distribution
 Bill of Material Calculation for Fire Fighting Pump Station & Domestic
Water Distribution
 As-built drawings for Fire Fighting System.
OTHERS
PROFESSIONAL REGISTRATION : Not yet
LANGUAGES : Proficiency in both written and spoken English
EXPERIENCE IN SOFTWARE : 3D PDMS, Auto Cad and MS Office (especially Word, Excel, Power
Point)

More Related Content

What's hot

Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerWan Sazali
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
Resume_Periasamy_R
Resume_Periasamy_RResume_Periasamy_R
Resume_Periasamy_Rperia samy
 
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEduardo H. Pare
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021Eduardo H. Pare
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designermilaya_25 mani
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018Eduardo H. Pare
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021Eduardo H. Pare
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREduardo H. Pare
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Instrumentation and telecom engineer
Instrumentation and telecom  engineerInstrumentation and telecom  engineer
Instrumentation and telecom engineerAlfred Joe
 

What's hot (19)

Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Resume_Periasamy_R
Resume_Periasamy_RResume_Periasamy_R
Resume_Periasamy_R
 
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 
EDUARDO H. PARE CV
EDUARDO H. PARE CVEDUARDO H. PARE CV
EDUARDO H. PARE CV
 
CFF.CV_10.07.2016
CFF.CV_10.07.2016CFF.CV_10.07.2016
CFF.CV_10.07.2016
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Resume for Pipeline Designer
Resume for Pipeline DesignerResume for Pipeline Designer
Resume for Pipeline Designer
 
H pimm resume
H pimm resumeH pimm resume
H pimm resume
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Instrumentation and telecom engineer
Instrumentation and telecom  engineerInstrumentation and telecom  engineer
Instrumentation and telecom engineer
 
cv2017rvs - Copy
cv2017rvs - Copycv2017rvs - Copy
cv2017rvs - Copy
 

Viewers also liked

Nguyen Thanh Dan_Project CV
Nguyen Thanh Dan_Project CVNguyen Thanh Dan_Project CV
Nguyen Thanh Dan_Project CVDan Nguyen Thanh
 
CV - DOAN HUYEN MY
CV - DOAN HUYEN MYCV - DOAN HUYEN MY
CV - DOAN HUYEN MYMy Doan
 
Resume le hong van
Resume le hong vanResume le hong van
Resume le hong vanHong Van Le
 
SensesClub Gold - HCMC 2014
SensesClub Gold - HCMC 2014SensesClub Gold - HCMC 2014
SensesClub Gold - HCMC 2014Pham Minh-Quân
 
Le-An-Ha-Resume
Le-An-Ha-ResumeLe-An-Ha-Resume
Le-An-Ha-ResumeHa Le
 
1 Detail CV of Kenneth Vu
1 Detail CV of Kenneth Vu1 Detail CV of Kenneth Vu
1 Detail CV of Kenneth VuKenneth Vu
 
CV OF NGUYEN DAI HUAN - AUTHORIZATION OFFICER
CV OF NGUYEN DAI HUAN - AUTHORIZATION OFFICERCV OF NGUYEN DAI HUAN - AUTHORIZATION OFFICER
CV OF NGUYEN DAI HUAN - AUTHORIZATION OFFICERHUAN NGUYEN DAI
 
Resume_QUYEN_VO_2016
Resume_QUYEN_VO_2016Resume_QUYEN_VO_2016
Resume_QUYEN_VO_2016BPOC - PVGas
 
CurriculumVitae_ChauAnhTuan
CurriculumVitae_ChauAnhTuanCurriculumVitae_ChauAnhTuan
CurriculumVitae_ChauAnhTuanTuan Chau
 
CV-VO DINH TRIEU
CV-VO DINH TRIEUCV-VO DINH TRIEU
CV-VO DINH TRIEUTrieu Dinh
 
Giang Ly Lien Khang Resume updated 2015
Giang Ly Lien Khang Resume updated 2015Giang Ly Lien Khang Resume updated 2015
Giang Ly Lien Khang Resume updated 2015Alfonso Khang
 
CV-Mechanical Engineer_Doan Cong Hau
CV-Mechanical Engineer_Doan Cong HauCV-Mechanical Engineer_Doan Cong Hau
CV-Mechanical Engineer_Doan Cong HauHau Doan Cong
 

Viewers also liked (20)

Nguyen Thanh Dan_Project CV
Nguyen Thanh Dan_Project CVNguyen Thanh Dan_Project CV
Nguyen Thanh Dan_Project CV
 
CV - DOAN HUYEN MY
CV - DOAN HUYEN MYCV - DOAN HUYEN MY
CV - DOAN HUYEN MY
 
Resume le hong van
Resume le hong vanResume le hong van
Resume le hong van
 
SensesClub Gold - HCMC 2014
SensesClub Gold - HCMC 2014SensesClub Gold - HCMC 2014
SensesClub Gold - HCMC 2014
 
Thuan RESUME
Thuan RESUMEThuan RESUME
Thuan RESUME
 
Le-An-Ha-Resume
Le-An-Ha-ResumeLe-An-Ha-Resume
Le-An-Ha-Resume
 
1 Detail CV of Kenneth Vu
1 Detail CV of Kenneth Vu1 Detail CV of Kenneth Vu
1 Detail CV of Kenneth Vu
 
Huu Dong
Huu DongHuu Dong
Huu Dong
 
My CV
My CVMy CV
My CV
 
CV-Tran Thi Bich Ngoc
CV-Tran Thi Bich NgocCV-Tran Thi Bich Ngoc
CV-Tran Thi Bich Ngoc
 
Thai Sanh Hoang Nhat CV
Thai Sanh Hoang Nhat CVThai Sanh Hoang Nhat CV
Thai Sanh Hoang Nhat CV
 
CV OF NGUYEN DAI HUAN - AUTHORIZATION OFFICER
CV OF NGUYEN DAI HUAN - AUTHORIZATION OFFICERCV OF NGUYEN DAI HUAN - AUTHORIZATION OFFICER
CV OF NGUYEN DAI HUAN - AUTHORIZATION OFFICER
 
Resume_QUYEN_VO_2016
Resume_QUYEN_VO_2016Resume_QUYEN_VO_2016
Resume_QUYEN_VO_2016
 
CurriculumVitae_ChauAnhTuan
CurriculumVitae_ChauAnhTuanCurriculumVitae_ChauAnhTuan
CurriculumVitae_ChauAnhTuan
 
CV
CVCV
CV
 
CV-VO DINH TRIEU
CV-VO DINH TRIEUCV-VO DINH TRIEU
CV-VO DINH TRIEU
 
Giang Ly Lien Khang Resume updated 2015
Giang Ly Lien Khang Resume updated 2015Giang Ly Lien Khang Resume updated 2015
Giang Ly Lien Khang Resume updated 2015
 
CV_Bui Thi Bich Tuyen_S
CV_Bui Thi Bich Tuyen_SCV_Bui Thi Bich Tuyen_S
CV_Bui Thi Bich Tuyen_S
 
CV Tu
CV TuCV Tu
CV Tu
 
CV-Mechanical Engineer_Doan Cong Hau
CV-Mechanical Engineer_Doan Cong HauCV-Mechanical Engineer_Doan Cong Hau
CV-Mechanical Engineer_Doan Cong Hau
 

Similar to CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16

(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
Technip fmc cv_hoang cong quoc khanh
Technip fmc cv_hoang cong quoc khanhTechnip fmc cv_hoang cong quoc khanh
Technip fmc cv_hoang cong quoc khanhKhanh Hoang Cong Quoc
 
Adnan -updated CV
Adnan -updated CVAdnan -updated CV
Adnan -updated CVAdnan TV
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopySharvan kumar
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghushashi tr
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobJibin Jacob
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CVTods Almeron
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CVmuhammad abdullah
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CVBINH MAI
 
Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projectsPALLA NARASIMHUDU
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 

Similar to CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16 (20)

(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Technip fmc cv_hoang cong quoc khanh
Technip fmc cv_hoang cong quoc khanhTechnip fmc cv_hoang cong quoc khanh
Technip fmc cv_hoang cong quoc khanh
 
CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)
 
Adnan -updated CV
Adnan -updated CVAdnan -updated CV
Adnan -updated CV
 
CV RANJITH
CV RANJITHCV RANJITH
CV RANJITH
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
Resume_Rangarajan (1)
Resume_Rangarajan (1)Resume_Rangarajan (1)
Resume_Rangarajan (1)
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CV
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CV
 
Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projects
 
Resume-Aero
Resume-AeroResume-Aero
Resume-Aero
 
GS
GSGS
GS
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
CV
CVCV
CV
 
Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015
 

CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16

  • 1. PROFESSIONAL RESUME Rev. Date Checked Approved “Confidentiality Class A – Property of Technip. VPM00237 15/10/16 Unauthorized copying and disclosure are strictly prohibited.” NAME : TRAN CONG DANH (Mr.) NATIONALITY : Vietnam YEAR OF BIRTH : 1988 TERTIARY EDUCATION : Bachelor of Aeronautical Engineering (Honor award for being the most outstanding student with highest academic scoring among Transportation Engineering Faculty of 2006-2011 Academic session) - Vietnam National University HCMC - University of Technology, 2011 CAREER SUMMARY Total 6 years’ working experience in Piping Engineering (2.5 years) and Project Management (3.5 years) in both Onshore and Offshore Projects. Also had 8 months worked at construction site. EMPLOYMENT SUMMARY Period Company Name Position Held 10/2013 – Present Technip Vietnam Co.Ltd Project Engineer 05/2012 – 10/2013 Danieli Vietnam Co.Ltd Piping Engineer/ Piping Coordinator 01/2011 – 05/2012 Toyo Vietnam Co.Ltd Piping Engineer/ Piping Coordinator
  • 2. Tran Cong Danh Page 2 of 7 “Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.” WORKING EXPERIENCE 10/2013– PRESENT TECHNIP VIETNAM CO.,LTD Project Engineer 06/2015 – Present Client Project title Project size Project position Project brief description Job description : : : : : : PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION (PVFCCo) Ammonia Plant Revamp Project 110 million US Project Engineer Lump Sum Turnkey Engineering, Procurement, Construction and Commissioning basis The Project is aimed at increasing the capacity of the Ammonia Plant by 20%, thus bringing its capacity to 1620 MTPD of Ammonia. The Project will consist of design, procurement, construction and commissioning of the revamped and new equipment (Licensor equipment, utilities & off-site equipment), including associated utilities, off-sites and infrastructures required to bring the facility at the new required capacity  Involved in Project Management daily works, such as: weekly/ monthly progress report, project schedule controlling and expediting, Engineering Meetings with CLIENT and other involved parties, internal disciplines’ & external interfaces and issues  Coordinated and followed-up with 3rd CA (SGS) for Appraisal. Review the comments from SGS and Discipline’s response  Arranged & followed up Safety Studies and Instrument Studies (HAZOP, QRA, SIL)  Arranged & followed up 3D Model Review Workshop (30%, 60% and 90%) and Constructability Workshop (1 st , 2 nd and 3 rd )  Reviewed Engineering document/drawing for its correctness before PM’s approval  Followed up the Protocols & Payment Milestones  Controlled and Interfaced with Partners (TPIT & PTSC) and Packaged Vendors related to Procurement scope  Prepared Project Procedures (PEP, PCP, Project Coding Procedure, Field Design Change,…)  Coordinated with Site for Field Engineering Activities
  • 3. Tran Cong Danh Page 3 of 7 “Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.” WORKING EXPERIENCE 06/2014 – 5/2015 Client : VIETSOVPETRO Project title : Detailed Engineering Design Service for BK-TNG Wellhead Platform Project position : Project Engineer Project brief description : Detailed Engineering & Procurement Support for Green Field Project In order to carry out The Detailed Engineering Design Services for BK-TNG wellhead Platform. BK-TNG platform is designed to handle 2.05 MMSCMD gas from Thien Ung field and 1.0 MMSCMD of associated gas from DaiHung-02 platform. After CO2 removal (future design), gas from Thien Ung will combine with Gas from Dai Hung to Gas Dehydration Unit, then flow into export pipeline. The contract covers for BK-TNG Detailed Engineering for 12 wells including jacket and topside with process equipment, helideck, living quarter, and connecting piping (pig launcher/receiver and risers) Job description :  Involved in Project Management daily works, such as: weekly/ monthly progress report, project schedule controlling and expediting, Engineering Meetings with CLIENT and other involved parties, internal disciplines’ & external interfaces and issues  Coordinated and followed-up with 3 rd parties BV for Design Appraisal. Review the comments from BV and response from Project Team  Arranged & followed up 3 rd Party Safety Studies and Instrument Studies (HAZID, HAZOP, Hot Plum, Dropped Object, QRA, SIL, F&G Mapping…)  Reviewed Engineering document/drawing for its correctness before PM’s approval  Followed up the Protocols & Payment Milestones  Controlled and Interfaced with Client related to Procurement Support  Prepared Project Procedures (i.e, PEP, PCP and Project Close Out Report)
  • 4. Tran Cong Danh Page 4 of 7 “Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.” WORKING EXPERIENCE 10/2013 – 05/2014 Client : JAPAN VIETNAM PETROLEUM COMPANY LTD Project title : Rang Dong Field HCG-EOR-FFS Project (Detailed Engineering Design) Project position : Project Engineer Project brief description : Detailed Engineering & Procurement Support for Brownfield Project In order to maximize oil recovery and extend the field exploration life cycle for the existing reservoirs in Rang Dong field, the JVPC has made the decision to utilize the compression gas for maintaining the reservoir pressure. This project is performing the detailed engineering design to modify the existing facility on platforms NCWI, NULQ, WHP- N1, WHP-C1, WHP-E1, WHP-E1A to adapt with new installed gas injection compression system. Job description :  Involved in Project Management daily works, such as: weekly/ monthly progress report, project schedule controlling and expediting, Engineering Meetings with CLIENT and other involved parties, internal disciplines’ & external interfaces and issues  Reviewed Engineering document/drawing for its correctness before PM’s approval  Followed up the Protocols & Payment Milestones  Controlled and Interfaced with Client related to Procurement support scope  Coordinated and followed-up with 3rd parties (LR & ABS) for Design Appraisal  Prepared Project Procedures (i.e, PEP, PCP and Project Close Out Report)
  • 5. Tran Cong Danh Page 5 of 7 “Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.” WORKING EXPERIENCE 05/2012 –09/2013 DANIELI VIETNAM CO.,LTD Piping Engineer/ Piping Coordinator 02/2013 – 09/2013 Client : DEACERO (Columbia) Project title : DeAcero Steel Plant Project Project size : 65 million US Project position : Piping Engineer/ Piping Coordinator Project brief description : EPC Project. Engineering, Procurement and Construction for the modern DeAcero Steel Factory in Columbia. Job description :  Equipment Layout for Utility Systems  3D PDMS Modeling for Piping Utility systems: Air Compressor, Cooling Water (direct & indirect), Hydraulic, Grease Lubrication, Oil Lubrication, Air-Oil Lubrication  Expedite and Control Schedule in Internal Piping team  Assistant for Piping Lead Engineer to check the 2D drawings (Equipment Layout, Piping Isometric, Piping General Arrangement)  Interface/Coordinate with other relevant disciplines: Mechanical, Electrical, Instrument and Civil team. 05/2012 – 02/2013 Client : POSCO VIETNAM COMPANY LTD Project title : Posco Steel Plant Project Project size : 55 million US Project position : Piping Engineer/ Piping Coordinator Project brief description : EPC. Engineering, Procurement and Construction for Posco Steel Factory in Vietnam. Involved in Engineering stage. Job description :  Equipment Layout for whole Utility Systems (1 month in Thailand – Danieli Far East)  3D PDMS Modeling for Piping Utility Systems: Air Compressor, Cooling Water (direct & indirect), Hydraulic, Grease Lubrication, Oil Lubrication, Air-Oil Lubrication  Expediting and Controlling of Piping Schedule  Assistant for Piping Lead Engineer to check the 2D drawings (Equipment Layout, Piping Isometric, Piping General Arrangement)
  • 6. Tran Cong Danh Page 6 of 7 “Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.” WORKING EXPERIENCE  Interface/Coordinate with other relevant disciplines: Mechanical, Electrical, Instrument and Civil team 01/2011 – 05/2012 TOYO VIETNAM CO.,LTD Piping Engineer/ Piping Coordinator 05/2011 – 05/2012 Client : UNITED INTERNATIONAL PHARMA CO.,LTD Project title : The United International Pharma Factory Project Project size : 25 million US Project position : Piping Engineer/Piping Coordinator Project brief description : EPC. Design Procurement and Construct the modern United International Pharma Factory in Vietnam. Job description : Participated in both Engineering and Construction stage  Equipment Layout for Utility Systems (Boiler Room, Air Compressor Room, Purified Room…)  Piping Layout for Utility Piping system (Air, Steam, Condensate, Cooling Water, Diesel oil, Tap water, Purified water).  Supervisor during Construction Phase for Utility piping system ( Air, Steam, Condensate, Diesel oil, Tap water, Purified water)  Supervisor during Construction Phase for Waste Water Treatment Package & Purified Water Package.  Involved in Project Management team when working at site with daily works, such as: weekly/ monthly progress report, project schedule controlling and expediting, meetings with CLIENT, internal disciplines’ interfaces and issues 03/2011 – 05/2011 Client : INTEL VIETNAM CO.,LTD Project title : Intel Water Reclaim Project Project position : Piping Engineer/Piping Coordinator Project brief description : Feasibility and Detailed Engineering Design Job description :
  • 7. Tran Cong Danh Page 7 of 7 “Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.” WORKING EXPERIENCE  Plot Plan for Waste Water Treatment Plant, for Automatic sprinkler location and dividing stabilizer grass zones.  Piping Arrangement for Waste Water Treatment Plant, for irrigation distribution & cooling water distribution.  Bill of Material Calculation for Sprinkler, Irrigation & Cooling Water piping system.  Interface with 2 Vendors of Automatic Sprinklers & relevant piping system.  Involved in Project Management daily works, such as: project schedule controlling and expediting, meetings with CLIENT, internal disciplines’ & external interfaces and issues. 01/2011 – 05/2011 Client : DOW CHEMICALS COMPANY (Vietnam) Project title : Dow Emulsion Plant Project Project size : 20 million US Project position : Piping Engineer Project brief description : EPCM Job description :  Plot Plan and Piping Arrangement for Fire Fighting Pump Station  Piping Arrangement for Domestic water distribution  Bill of Material Calculation for Fire Fighting Pump Station & Domestic Water Distribution  As-built drawings for Fire Fighting System. OTHERS PROFESSIONAL REGISTRATION : Not yet LANGUAGES : Proficiency in both written and spoken English EXPERIENCE IN SOFTWARE : 3D PDMS, Auto Cad and MS Office (especially Word, Excel, Power Point)