1. PROFESSIONAL RESUME
Rev. Date Checked Approved “Confidentiality Class A – Property of Technip. VPM00237
15/10/16 Unauthorized copying and disclosure are strictly prohibited.”
NAME : TRAN CONG DANH (Mr.)
NATIONALITY : Vietnam
YEAR OF BIRTH : 1988
TERTIARY
EDUCATION
: Bachelor of Aeronautical Engineering (Honor award for being the most outstanding
student with highest academic scoring among Transportation Engineering Faculty of
2006-2011 Academic session) - Vietnam National University HCMC - University of
Technology, 2011
CAREER SUMMARY
Total 6 years’ working experience in Piping Engineering (2.5 years) and Project Management (3.5 years) in both
Onshore and Offshore Projects. Also had 8 months worked at construction site.
EMPLOYMENT SUMMARY
Period Company Name Position Held
10/2013 – Present Technip Vietnam Co.Ltd Project Engineer
05/2012 – 10/2013 Danieli Vietnam Co.Ltd Piping Engineer/ Piping
Coordinator
01/2011 – 05/2012 Toyo Vietnam Co.Ltd Piping Engineer/ Piping
Coordinator
2. Tran Cong Danh
Page 2 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
10/2013– PRESENT TECHNIP VIETNAM CO.,LTD
Project Engineer
06/2015 – Present Client
Project title
Project size
Project
position
Project brief
description
Job
description
:
:
:
:
:
:
PETROVIETNAM FERTILIZER AND CHEMICALS CORPORATION
(PVFCCo)
Ammonia Plant Revamp Project
110 million US
Project Engineer
Lump Sum Turnkey Engineering, Procurement, Construction and
Commissioning basis
The Project is aimed at increasing the capacity of the Ammonia Plant
by 20%, thus bringing its capacity to 1620 MTPD of Ammonia.
The Project will consist of design, procurement, construction and
commissioning of the revamped and new equipment (Licensor
equipment, utilities & off-site equipment), including associated utilities,
off-sites and infrastructures required to bring the facility at the new
required capacity
Involved in Project Management daily works, such as: weekly/
monthly progress report, project schedule controlling and expediting,
Engineering Meetings with CLIENT and other involved parties,
internal disciplines’ & external interfaces and issues
Coordinated and followed-up with 3rd
CA (SGS) for Appraisal. Review
the comments from SGS and Discipline’s response
Arranged & followed up Safety Studies and Instrument Studies
(HAZOP, QRA, SIL)
Arranged & followed up 3D Model Review Workshop (30%, 60% and
90%) and Constructability Workshop (1
st
, 2
nd
and 3
rd
)
Reviewed Engineering document/drawing for its correctness before
PM’s approval
Followed up the Protocols & Payment Milestones
Controlled and Interfaced with Partners (TPIT & PTSC) and Packaged
Vendors related to Procurement scope
Prepared Project Procedures (PEP, PCP, Project Coding Procedure,
Field Design Change,…)
Coordinated with Site for Field Engineering Activities
3. Tran Cong Danh
Page 3 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
06/2014 – 5/2015 Client : VIETSOVPETRO
Project
title
: Detailed Engineering Design Service for BK-TNG
Wellhead Platform
Project
position
: Project Engineer
Project
brief
description
: Detailed Engineering & Procurement Support for Green
Field Project
In order to carry out The Detailed Engineering Design
Services for BK-TNG wellhead Platform. BK-TNG platform is
designed to handle 2.05 MMSCMD gas from Thien Ung field
and 1.0 MMSCMD of associated gas from DaiHung-02
platform. After CO2 removal (future design), gas from Thien
Ung will combine with Gas from Dai Hung to Gas
Dehydration Unit, then flow into export pipeline. The contract
covers for BK-TNG Detailed Engineering for 12 wells
including jacket and topside with process equipment,
helideck, living quarter, and connecting piping (pig
launcher/receiver and risers)
Job
description
:
Involved in Project Management daily works, such as: weekly/
monthly progress report, project schedule controlling and expediting,
Engineering Meetings with CLIENT and other involved parties,
internal disciplines’ & external interfaces and issues
Coordinated and followed-up with 3
rd
parties BV for Design Appraisal.
Review the comments from BV and response from Project Team
Arranged & followed up 3
rd
Party Safety Studies and Instrument
Studies (HAZID, HAZOP, Hot Plum, Dropped Object, QRA, SIL, F&G
Mapping…)
Reviewed Engineering document/drawing for its correctness before
PM’s approval
Followed up the Protocols & Payment Milestones
Controlled and Interfaced with Client related to Procurement Support
Prepared Project Procedures (i.e, PEP, PCP and Project Close Out
Report)
4. Tran Cong Danh
Page 4 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
10/2013 – 05/2014 Client : JAPAN VIETNAM PETROLEUM COMPANY LTD
Project
title
: Rang Dong Field HCG-EOR-FFS Project (Detailed
Engineering Design)
Project
position
: Project Engineer
Project
brief
description
: Detailed Engineering & Procurement Support for Brownfield
Project
In order to maximize oil recovery and extend the field
exploration life cycle for the existing reservoirs in Rang Dong
field, the JVPC has made the decision to utilize the
compression gas for maintaining the reservoir pressure.
This project is performing the detailed engineering design to
modify the existing facility on platforms NCWI, NULQ, WHP-
N1, WHP-C1, WHP-E1, WHP-E1A to adapt with new
installed gas injection compression system.
Job
description
:
Involved in Project Management daily works, such as: weekly/
monthly progress report, project schedule controlling and expediting,
Engineering Meetings with CLIENT and other involved parties,
internal disciplines’ & external interfaces and issues
Reviewed Engineering document/drawing for its correctness before
PM’s approval
Followed up the Protocols & Payment Milestones
Controlled and Interfaced with Client related to Procurement support
scope
Coordinated and followed-up with 3rd
parties (LR & ABS) for Design
Appraisal
Prepared Project Procedures (i.e, PEP, PCP and Project Close Out
Report)
5. Tran Cong Danh
Page 5 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
05/2012 –09/2013 DANIELI VIETNAM CO.,LTD
Piping Engineer/ Piping Coordinator
02/2013 – 09/2013 Client : DEACERO (Columbia)
Project
title
: DeAcero Steel Plant Project
Project
size
: 65 million US
Project
position
: Piping Engineer/ Piping Coordinator
Project
brief
description
: EPC Project. Engineering, Procurement and Construction for
the modern DeAcero Steel Factory in Columbia.
Job
description
:
Equipment Layout for Utility Systems
3D PDMS Modeling for Piping Utility systems: Air Compressor,
Cooling Water (direct & indirect), Hydraulic, Grease Lubrication, Oil
Lubrication, Air-Oil Lubrication
Expedite and Control Schedule in Internal Piping team
Assistant for Piping Lead Engineer to check the 2D drawings
(Equipment Layout, Piping Isometric, Piping General Arrangement)
Interface/Coordinate with other relevant disciplines: Mechanical,
Electrical, Instrument and Civil team.
05/2012 – 02/2013 Client : POSCO VIETNAM COMPANY LTD
Project title : Posco Steel Plant Project
Project size : 55 million US
Project
position
: Piping Engineer/ Piping Coordinator
Project
brief
description
: EPC. Engineering, Procurement and Construction for Posco
Steel Factory in Vietnam.
Involved in Engineering stage.
Job
description
:
Equipment Layout for whole Utility Systems (1 month in Thailand –
Danieli Far East)
3D PDMS Modeling for Piping Utility Systems: Air Compressor,
Cooling Water (direct & indirect), Hydraulic, Grease Lubrication, Oil
Lubrication, Air-Oil Lubrication
Expediting and Controlling of Piping Schedule
Assistant for Piping Lead Engineer to check the 2D drawings
(Equipment Layout, Piping Isometric, Piping General Arrangement)
6. Tran Cong Danh
Page 6 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
Interface/Coordinate with other relevant disciplines: Mechanical,
Electrical, Instrument and Civil team
01/2011 – 05/2012 TOYO VIETNAM CO.,LTD
Piping Engineer/ Piping Coordinator
05/2011 – 05/2012 Client : UNITED INTERNATIONAL PHARMA CO.,LTD
Project
title
: The United International Pharma Factory Project
Project
size
: 25 million US
Project
position
: Piping Engineer/Piping Coordinator
Project
brief
description
: EPC. Design Procurement and Construct the modern United
International Pharma Factory in Vietnam.
Job
description
: Participated in both Engineering and Construction stage
Equipment Layout for Utility Systems (Boiler Room, Air Compressor
Room, Purified Room…)
Piping Layout for Utility Piping system (Air, Steam, Condensate,
Cooling Water, Diesel oil, Tap water, Purified water).
Supervisor during Construction Phase for Utility piping system ( Air,
Steam, Condensate, Diesel oil, Tap water, Purified water)
Supervisor during Construction Phase for Waste Water Treatment
Package & Purified Water Package.
Involved in Project Management team when working at site with daily
works, such as: weekly/ monthly progress report, project schedule
controlling and expediting, meetings with CLIENT, internal disciplines’
interfaces and issues
03/2011 – 05/2011 Client : INTEL VIETNAM CO.,LTD
Project
title
: Intel Water Reclaim Project
Project
position
: Piping Engineer/Piping Coordinator
Project
brief
description
: Feasibility and Detailed Engineering Design
Job
description
:
7. Tran Cong Danh
Page 7 of 7
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
Plot Plan for Waste Water Treatment Plant, for Automatic
sprinkler location and dividing stabilizer grass zones.
Piping Arrangement for Waste Water Treatment Plant, for irrigation
distribution & cooling water distribution.
Bill of Material Calculation for Sprinkler, Irrigation & Cooling Water
piping system.
Interface with 2 Vendors of Automatic Sprinklers & relevant piping
system.
Involved in Project Management daily works, such as: project
schedule controlling and expediting, meetings with CLIENT, internal
disciplines’ & external interfaces and issues.
01/2011 – 05/2011 Client : DOW CHEMICALS COMPANY (Vietnam)
Project
title
: Dow Emulsion Plant Project
Project
size
: 20 million US
Project
position
: Piping Engineer
Project
brief
description
: EPCM
Job
description
:
Plot Plan and Piping Arrangement for Fire Fighting Pump Station
Piping Arrangement for Domestic water distribution
Bill of Material Calculation for Fire Fighting Pump Station & Domestic
Water Distribution
As-built drawings for Fire Fighting System.
OTHERS
PROFESSIONAL REGISTRATION : Not yet
LANGUAGES : Proficiency in both written and spoken English
EXPERIENCE IN SOFTWARE : 3D PDMS, Auto Cad and MS Office (especially Word, Excel, Power
Point)