1. Resume of Proposed Personnel
Position Applied For:
Assistant Superintendent / Structure and Piping Module Fabrication
Supervisor. Oil and Gas Business.
1. Personnel Information:
2. Employment History :
Date: August 2013 - Present
Employer :
Chevron Unithai Engineering and Construction. ( CUEL )
Position :
Structure and Piping Fabrication Supervisor (Sub contactor Outsource)
Project Name : ICHTHYS ONSHORE LNG FACILITIES
Project Owner : INPEX BROWSE, LTD.
Consult Project : JKC AUSTRALIA LNG PTY LTD
Location of Project : AUSTRALIA
Brief of Project :
Module Fabrication and Construction for Gas plan pipe rack, ship to Australia
with relate work Steel structure, Piping, M&E and Process Instrument. Test
and commissioning to close out Punch List and Erection.
Responsibility :
Fabrication Outsource (Structure and Pipe)
Sub Contact: DEELINE Construction Co., LTD. ( Rayong )
: Control Fabrication process for structure and piping and relate work. (Outsource)
: Progress monitoring and expedite work refer toYard Erection priority requirements.
Name : Jassadaporn Koomproo
Gender: Male
Age/DOB: 38 years / DOB - 23 July 1977
Nationality: Thai
Connection : E-mail < jpkitd_007@yahoo.co.th> / Tel. +6688-2163805
Language Skill: Thai-English
Status(Single/Married) Married.
Year of Experience: 12 Year.
Highest Qualification : Bachelor Degree in Mechanical Engineer. (Kasetsart University)
Current Position : Structure and Piping Module Fabrication Supervisor.
Assistant to Superintendent. ( Outsource )
Main Sector Experience : Steel Structure and Piping Module Fabrication Engineer ,
Track Works Engineering , M&E Engineer, Field Engineer
Current Salary Package : 55,000 THB/Bath(Month)+ O.T.20,000 THB+Bonus 1 months
Expect Salary : 300,000 THB/Bath < Negotiate >
2. Resume of Proposed Personnel
: Execute work in accordance with Project Procedure Requirement.
: Review drawing, preparing inquiry of all Engineering and design activities to
ensure all available to issue
: Coordinate with QC and Client for all activities to ensure all fabrication finish work
and close out document for release to paint section.
: Review all information available and report to Superintendent.
: Transportation coordinates with Material Section and arranges shipment to Yard.
Yard Module Erection ( Pipe )
: In charge of Piping Supervisor for Module Pipe Erection. (Construction
Department )
: Review drawing and 3D Pipe Line , preparing inquiry of all Engineering and
design activities to ensure all available to issue for Erection sub contact team.
: Check status for spool fabrication status compare with erection plan schedule.
: Execute work in accordance with Project Procedure Requirement.
: Coordinator all activities and Department for carry on Module Piping erection.
( PMT , QA&QC , Engineering , JKC-Consult and Client ).
: Punch list issue and close out monitoring prepare on target schedule and sailaway.
: Progress monitoring and all information report to Superintendent.
Contact Award : August 2013 - Load out& Sail away 2015
3. Resume of Proposed Personnel
Date: Oct 2011 - 2013
Employer :
Thai Nippon Steel Engineering & Construction
Position :
Structure Fabrication Engineer
Project Name : CPOC MUDA E WELLHEAD PLATFORM
Project Owner : CPOC MALAYSIA
Location of Project : Thai Gulf
Brief of Project :
1. Construction and Fabrication structure and other work on Wellhead Platform.
2. Fabrication and Installation Pipeline and accessories fitting and equipment.
3. Installation Electrical and Mechanical Equipment for Process Hook Up.
4. Test and Commissioning.
5. Sea fastening and Load out.
Contact Award : August 2011- Load out& Sail away August 2012
Project Name : PTTEP Bundle B4B Project WELLHEAD PLATFORM
Project Owner : PTTEP Thailand
Location of Project : Thai Gulf
Brief of Project :
1. Construction and Fabrication structure and other work on Wellhead Platform.
2. Fabrication and Installation Pipeline and accessories fitting and equipment.
3. Installation Electrical and Mechanical Equipment for Process Hook Up.
4. Test and Commissioning.
5. Sea fastening and Load out.
Contact Award : August 2012- Load out& Sail away August 2013
Responsibilities :
Preparation of Technical Proposal and Review for Structure Drawing and activities from
FEED; Co-ordinate with colleague team and Preparation for commencement;
Preparation Man Power and Equipment to ensure construction perform on
Project Schedule Requirement ;
Management and execution in accordance with Project Specification, agreed
budget and Project Schedule Progress;
Progress report and Outstand requirement with Project assignments;
Monitoring, supervision and analyst Productivity and Efficiency fabrication
work; Co-field with other Department ;
Coordinate and Face to Face with CA, CY and QC to support, clarify and
maintain Particular Specification and General Specification.
Work complementation and execution with Safety Policy and procedure project
specification.
4. Resume of Proposed Personnel
Project Name : Macedon Gas Plan, Western Australia
Project Owner : Technip, Malaysia
Location of Project : Australia
Brief of Project :
Module Fabrication and Construction for Gas plan ship to Australia with relate
work Steel structure, Piping, M&E and Instrument. Test and commissioning to
close out Punch List and Erection.
Contact Award : August 2011- Load out& Sail away October 2012
Responsibilities :
Lead Module close out Punch list for Structure Fabrication and ship loose preparation
material handling on shipment. Outsource fabrication for miscellaneous structure work and
plan schedule for load out. Expeditor for outstanding work and completion with co work to
Consult and close out report.
ACHIEVEMENTS & RESULTS
Completion work and maintain to schedule with zero punch list accordance to Project requirements
with discipline and Specification. And recognize with Safety policy and procedure by work without
accident 1,000,000 hrs. Successfully implemented with Productivity and Efficiency target.
5. Resume of Proposed Personnel
Date: 2011 – Sep 2011
Employer :
Italian-Thai Development Co,.LTD.
Position :
Track Works Welding DEPOT Engineer.
Project Brief : Project Name : Track Rehabilitation Phase 5 Project.
Project Owner : State Railway of Thailand. ( SRT )
Location of Project : Kaengkoi – Bua Yai , RailWay Thailand
Brief of Project : Construction Railway by Renewals material Track rail , Turn Out ,
Sleeper and Steel Bridge on rail way and civil Work sub-ballast , Drainage Utility.
Distance 308 km.
Value of the Project : 8,000 MB.
Responsibilities : Preparation of Technical Proposal and Tender Document Submittal to project
owner; Preparation Shop Drawing and Combine Drawing Co – ordinate with
colleague team; Search and Purchasing, Procurement execution for Track Work
material; Management and execution in accordance with agreed budget and
Project Schedule Progress; TPM and maintenance for Flash Butt machine ;
Progress report and monitoring; Test and Commissioning Track Welding Joint
with Standard SRT.
Date: 2009-2011
Position : Field Pipe Line Engineer.
Project Brief : Project Name : Utility Work of Kubon Road Project in Bangkok.
Project Owner : METROPOLITANT WATERWORKS AUTHORITY, CAT
TELECOM PLC,
Location of Project : Bangkok, Thailand
Type of Project : Installation and Welding Steel Water Pipe Diameter. 1000 mm.
By Pipe length 4500 m. with accessories valve and fitting competition
accordance to Standard of Project owner. Pressure Test and commission to Client.
Brief of Project : Construction the Road includes Drainage System and Utility
Diversion System. Welding Steel Water pipe and Installation Water Plumbing System.
Value of the Project : 130 MB.
Responsibilities : Preparation of Technical Proposal and Tender Document Submittal to project
owner (MWA) ; Preparation Shop Drawing and Combine Drawing Co –
ordinate with colleague team (Civil , Electrical) ; Search and Purchasing,
Procurement execution for material ; Management and execution in accordance
with agreed budget and Project Schedule Progress ; Control and Supervision in
Engineering construction ; Progress report and monitoring ; Test and
Commissioning Steel Pipe Line with Standard MWA.
Date: 2007-2009
Position : Field Pipe Line Engineer.
Project Brief : Project Name : Utility Work of Phuttamontol 2 Road Project in Bangkok.
Project Owner : METROPOLITANT WATERWORKS AUTHORITY, CAT
TELECOM PLC,
Location of Project : Bangkok, Thailand
6. Resume of Proposed Personnel
Type of Project : Installation and Welding Steel Water Pipe Diameter. 1000 mm.
By Pipe length 10,000 m. with accessories valve and fitting competition
accordance to Standard of Project owner. Pressure Test and commission to Client.
Brief of Project : Construction the Road includes Drainage System and Utility
Diversion System. Welding Steel Water pipe and Installation Water Plumbing System.
Value of the Project : 220 MB.
Responsibilities : Preparation of Technical Proposal and Tender Document Submittal to project
owner (MWA) ; Preparation Shop Drawing and Combine Drawing Co –
ordinate with colleague team (Civil , Electrical) ; Search and Purchasing,
Procurement execution for material ; Management and execution in accordance
with agreed budget and Project Schedule Progress ; Control and Supervision in
Engineering construction ; Progress report and monitoring ; Test and
Commissioning Steel Pipe Line with Standard MWA.
Date: 2006-2006
Position : Mechanical Engineer.
Project Brief : Project Name : Osotspa Parking Building.
Project Owner : Osotspa Company.
Location of Project : Bangkok, Thailand
Type of Project : Construction Parking Building.
Value of Project : 55 MB.
Responsibilities : Construction Parking Building includes M&E Building System. (Plumbing, Fire Protection
And Electrical System). Architectural Interior.
Date: 2006-2006
Position : Track Works Engineer.
Project Brief : Project Name : Italian Thai - Bombadier Joint Venture .
Project Owner : State Railway of Thailand (SRT)
Location of Project : Bangkok, Thailand
Type of Project : Track Works.
Brief of Project : Reinstallation Railway Track and Signal system.
Value of Project : 45 MB.
Responsibilities : Installation the Bombardier’s Point Machine Signaling System ; Installation Motor Gear for
Track Turn Out ; Test and Commissioning Track Turn Out with Standard of SRT.
Date: 2004-2005
Position : Mechanical Engineer.
Project Brief : Project Name : Plant Mechanical and Maintenance Department
Location of Project : Bangkok, Thailand
Type of Project : Maintenance Section.
Brief of Project : Maintenance and TPM for Construction Machine ; PM for
Locomotive and Bogie Train.
7. Resume of Proposed Personnel
3. Education & Qualifications :
Year of Graduation University / College Degree Type Major
2002 Kasetsart University Bachelor Degree Mechanical Engineer
4. Training Experience / Professionals Qualification.
Attended course in the following :
Professionals Qualification: Professional Mechanical Engineer License No. ภก.25845
5. Computer Skills :
Office Program Microsoft office ; Microsoft Project
Engineering Design AutoCAD 2D ; ProEngineer