Amitabha Chattopadhyay
Construction Manager
Currentprojects
 15 MMPTA IOCL Paradip refinery , India Oil Corporation , Paradip, Odisha
Core skills
 Excellent knowledge of Large LNG Tanks (11 nos) with respect to
multidiscipline activities related to the project for Rasgas, Qatar Gas
&Petronet (I st& I Ind phase) including expansion.
 Strong coordination and supervisory skills, particularly in complex project
and/or technical structures.
 Knowledge of all phases of construction operations relating to
engineering, construction and field activities.
Professional summary
Graduate in Civil Engineering having 24 years of experience in the field of construction Management,
Project Management, Engineering & project coordination including but not limited to the pre-commissioning
of large grass root LNG with Re-gasification, LPG, Petrochemicals (Ethylene- Naphtha cracker), Textiles,
Plant Buildings, Automobile and Power plant in India, Qatar and Singapore with client as IOCL, Exxon
Mobil, RAS-Gas, Qatar Gas, ONGC , Petronet LNG & PETRONAS-IOCL LPG in the role of increasing
responsibility.
 Achieved appreciation of excellence from ONGC ,Dahej,India
Professional qualifications/registration(s)
OHSAS 18001:2007 & Lead Auditor ISO 9001:2008
Education
Bachelor Degree in Engineering (Civil ) from Institution of Engineers(India)
Memberships/affiliations
Associate Member of Institution of Engineers
Languages
English,Hindi & Bengali
Employmenthistory
Foster Wheeler India Pvt Ltd., Senior Principal Engineer,Civil &Structural, (2009 – Present)
Ishikawajima-Harima Heavy Industries Corporation (I.H.I), Japan. Construction Superintendent,(2001 –
2008)
Toyo Engineering India Ltd., Civil Engineer (2000 – 2001)
Haldia Petrochemical Ltd., Civil Engineer(1997 – 2000)
Gherzi Eastern Ltd ,Civil Engineer (1995 – 1997)
Simplex Concrete Piles India Ltd, Assistant Engineer (1990 – 1995)
 Resident Construction Manager role performed successfully till handing over to client for ONGC
Petro addition Limited (OPAL) at Dahej, India.
 Having excellent knowledge of large LNG tanks (11 nos) with respect to Civil,structural and
mechanical activities related to the project for Rasgas, Qatar Gas &Petronet (I st& I Ind phase)
including expansion.
 Executing of underground tunnelling job within 52 existing underground services including
hydrogen line successfully and safely for Singapore parallel train.
 Achieved the appreciation from Exxon Mobil,Singapore parallel train project in 2009
Representative projects
Deputy Construction manager, IOCL Paradip Refinery
Petrochemical /Foster Wheeler India Pvt Ltd., Paradip Refinery Project, Paradip ,India
Having a track record as successful completion of overall construction management from construction
phase till system handover.
Petrochemical Facility / Foster Wheeler India Pvt Ltd, ONGC-FETC Project,Dahej,India
Resident Construction manager.
Leading a team of 10 packages as LSTK contracts for Demountable Flare blow down, Demin plant, cooling
towers, ETP, & road bridge over Santa creek, plant buildings, Storm water outfall discharge to the sea ,
secured land fill for the most hazardous substances for disposal and as an Engineering In-charge for piping
contract and OWS,CRWS line.
Responsible to manage INR 1265 cores
 Compliance to the HSE requirements through reviewing the reports and administratively
implemented by job safety analysis, toolbox, Management meetings & safety walk around,
near miss reporting and review of accident/ incident reports .
 Direct coordination with clients for areas of responsibility,
 Strong coordination and supervisory skills, particularly in complex project and/or
technical structures.
 Knowledge of all phases of construction operations relating to engineering,
construction and field activities.
 Direct involvement in quality assurance, ITP and review of quality deficiency and resolving the
problems.
 Assigned the roles and responsibility to the team members for daily basis supervisions and
review their reports and corrective actions advices.
 Direct coordination with H.O.related to Engineering, Construction, Contract& change orders to
take final decision to go ahead the site works.
 Assigned with authority a role to make suitable correspondences and review of all other
contractual correspondences
 Review of schedule and resources to expedite the job assigned.
 Final review of job procedures, QAP,ITP,change order,
 Decisive action to sort out the site issues.
 Attending to monthly/weekly review meeting with client, contractors.
 Analysing major scope of work at site as per contract, inter-discipline coordination, interfacing
issues between EPC contractors.
 Review of Contractor’s time extension request and recommendation to IOCL.
 Appraising of project/construction status to client back to HQ
 Monitoring and Supervision of construction activities at site and ensuring construction
activities are being carried out as per approved drawings, documents and work procedures,
system hook up and commissioning.
 Participation in technical issues to sort out.
 Worked as Engineer-in-charge for conventional packages contract.
 Participation in brain storming discussion to find out the way to improve the progress at site.
Final bill certification and project close out
.LNG Facility / Ishikawajima-Harima Heavy Industries Corporation (I.H.I), Japan.
Petronet LNG Expansion Project(148000 M3
X 4 nos), Dahej, India
Qatar Gas II LNG Tanks Project (140000 M3
X 5 nos),Qatar
Ras-Gas LNG tanks, (2nos), Qatar
 Worked asan in-charge of all civil and structural activities and with respect to the mechanical job
as plate fabrication, erection, bending etc .for tank having inner concrete wall dia 81 m and 40 M
of height as a coordinator.
 Supervised the piling works, special post-tension cryogenic concrete wall, heavy concrete
foundation and dome roof.
LPG Facility / Toyo Engineering India Ltd. Indian Oil Petronas (LPG storage,loading and unloading terminal),
 Worked with Toyo engineering India ltd for the construction of LPG process plant supervising
LPG tanks, piling work, LPG bullet (mounded) steel structure, pipe racks, equipment
foundations and concerned plant service buildings
 Worked with Toyo Engineering corporation ,Japan and Toyo Engineering India ltd. wherein I
was looking after execution of construction supervision for precast driven piles, load tests,
Overall responsible for coordination, liaising and project management at site in accordance with terms and
condition of contract.Responsible to certify the completion of work. Scrutinize the contractor’s records,
approval for execution and HSE plan. To examine the waiver/change over items.To certify the close out
report for infrastructure development project. In addition to that I am direct involved with Site inspection and
construction of civil and structural job for buildings, open sheds roads, drainage ,outfall structure to
river/Sea and huge earthwork for infrastructure development project. Resolve contractor’s raised queries
with technical support group. Responsible for witness the tests also as required.
Responsible to manage INR 941cores
 Managing a team of engineer/supervisors, supporting staffs and site office, overall
responsible for quality and HSE.
 Appraising of project/construction status to client back to HQ.
 Planning, Progress Monitoring/ Supervision of construction activities of Contractors at site
 Preparation and submission of progress reports to client.
 Review and approval of construction procedures and methodology.
 Ensuring all site construction activities being carried out as per agreed schedule and meeting
the governing standards.
 Review of contractor’s resources and Schedules.
 Progress measurement, scrutinise, surveillance on all project related activities and work
certification of bills for payment.
 Carrying out quality and safety audit.
Petrochemical / Foster Wheeler India Pvt Ltd. Singapore Parallel Train
 Direct supervision as daily basis including engineering coordination
 Construction of pipe tunnel crossing the main city road in Singapore refining project. Related
to civil and steel structure for pipe racks, vessels, stair/ladders. Review and check relevant
documents along with drawings. Directinvolved as field engineering as well as supervision as
a team leader of 4 local site Engineers.
 Expediting the tunnelling across the main road wherein 52 underground services including
hydrogen and oxygen line wereexisting and declared as most high risk zone.
heavy equipment foundations like tall towers, flare stacks, fractionators, exchangers, cold
box, vessels, compressors foundation, heaters, pipe racks cable trench and plant buildings
and roads. Apart from this I was assigned as a chief of painting and thermal insulation work.
Project type/company
Paradip Refinery Project, India Oil Corporatio,Delhi India
ONGC-FETC Project,Dahej,India ,ONGC India.
Singapore Parallel Train., Exxon Mobil, Singapore
Petronet LNG Expansion Project(148000 M3
X 4 nos), Dahej, India,
Qatar Gas II LNG Tanks Project (140000 M3
X 5 nos),Qatar, QATAR Gas
Ras-Gas LNG tanks (2nos), Qatar, QATAR Gas
Publications and presentations
Nil.
Amitabha Chattopadhyay latest

More Related Content

What's hot

Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015PRADIP SAHA,CEng MIGEM
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designermilaya_25 mani
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliZain Ali Syed
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.Arindam Guha
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS
 

What's hot (20)

Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
KallalArunCV_TCS
KallalArunCV_TCSKallalArunCV_TCS
KallalArunCV_TCS
 
CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
Eugene Jose
Eugene JoseEugene Jose
Eugene Jose
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Gangopadhaya Shekhar CV
Gangopadhaya Shekhar CVGangopadhaya Shekhar CV
Gangopadhaya Shekhar CV
 
Rakesh
RakeshRakesh
Rakesh
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
aditi
aditiaditi
aditi
 
balaji cv
balaji cvbalaji cv
balaji cv
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain Ali
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 

Viewers also liked

Curriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandCurriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandSverre Viland
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical EngineerVishnu Mohan
 
PATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTSPATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTSpathik mitra
 
Degree_Certificate (1).PDF
Degree_Certificate (1).PDFDegree_Certificate (1).PDF
Degree_Certificate (1).PDFNilesh Desai
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M
 
Rajasekaran CV-updated
Rajasekaran CV-updatedRajasekaran CV-updated
Rajasekaran CV-updatedRaja Sekhar
 
Resume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerResume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerRaees j
 
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Mohammad Arfin Alam
 
Pradip_Mahadik_Resume_16.04.2016
Pradip_Mahadik_Resume_16.04.2016Pradip_Mahadik_Resume_16.04.2016
Pradip_Mahadik_Resume_16.04.2016Pradip Mahadik
 

Viewers also liked (17)

Pankaj Pande
Pankaj PandePankaj Pande
Pankaj Pande
 
Curriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandCurriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. Viland
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical Engineer
 
PATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTSPATHIK MITRA-PROJECTS
PATHIK MITRA-PROJECTS
 
updated resume
updated resumeupdated resume
updated resume
 
Degree_Certificate (1).PDF
Degree_Certificate (1).PDFDegree_Certificate (1).PDF
Degree_Certificate (1).PDF
 
Recruitment of secon
Recruitment of seconRecruitment of secon
Recruitment of secon
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016
 
Rajasekaran CV-updated
Rajasekaran CV-updatedRajasekaran CV-updated
Rajasekaran CV-updated
 
Resume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerResume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project Enginer
 
Project Controller
Project ControllerProject Controller
Project Controller
 
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
 
GIRISH CV
GIRISH CVGIRISH CV
GIRISH CV
 
Mechanical Engg_CV
Mechanical Engg_CVMechanical Engg_CV
Mechanical Engg_CV
 
Pradip_Mahadik_Resume_16.04.2016
Pradip_Mahadik_Resume_16.04.2016Pradip_Mahadik_Resume_16.04.2016
Pradip_Mahadik_Resume_16.04.2016
 
Mohd Muttalib CV.pdf
Mohd Muttalib CV.pdfMohd Muttalib CV.pdf
Mohd Muttalib CV.pdf
 
Ibrahim dilawer syed cv
Ibrahim dilawer syed  cvIbrahim dilawer syed  cv
Ibrahim dilawer syed cv
 

Similar to Amitabha Chattopadhyay latest

A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015Suresha Rao
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkatesh Rajendran
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep Pandey
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLranganathan shankar
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-NewManish Sabane
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016sanjeev kadam
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 
Curriculam vitae deepak
Curriculam vitae deepakCurriculam vitae deepak
Curriculam vitae deepakDeepak Khurana
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resumeAbhinav Rawat
 

Similar to Amitabha Chattopadhyay latest (20)

A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
updated CV
updated CVupdated CV
updated CV
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
CV
CVCV
CV
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
abhinav rawat
abhinav rawatabhinav rawat
abhinav rawat
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Curriculam vitae deepak
Curriculam vitae deepakCurriculam vitae deepak
Curriculam vitae deepak
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 

Amitabha Chattopadhyay latest

  • 1. Amitabha Chattopadhyay Construction Manager Currentprojects  15 MMPTA IOCL Paradip refinery , India Oil Corporation , Paradip, Odisha Core skills  Excellent knowledge of Large LNG Tanks (11 nos) with respect to multidiscipline activities related to the project for Rasgas, Qatar Gas &Petronet (I st& I Ind phase) including expansion.  Strong coordination and supervisory skills, particularly in complex project and/or technical structures.  Knowledge of all phases of construction operations relating to engineering, construction and field activities. Professional summary Graduate in Civil Engineering having 24 years of experience in the field of construction Management, Project Management, Engineering & project coordination including but not limited to the pre-commissioning of large grass root LNG with Re-gasification, LPG, Petrochemicals (Ethylene- Naphtha cracker), Textiles, Plant Buildings, Automobile and Power plant in India, Qatar and Singapore with client as IOCL, Exxon Mobil, RAS-Gas, Qatar Gas, ONGC , Petronet LNG & PETRONAS-IOCL LPG in the role of increasing responsibility.  Achieved appreciation of excellence from ONGC ,Dahej,India Professional qualifications/registration(s) OHSAS 18001:2007 & Lead Auditor ISO 9001:2008 Education Bachelor Degree in Engineering (Civil ) from Institution of Engineers(India) Memberships/affiliations Associate Member of Institution of Engineers Languages English,Hindi & Bengali Employmenthistory Foster Wheeler India Pvt Ltd., Senior Principal Engineer,Civil &Structural, (2009 – Present) Ishikawajima-Harima Heavy Industries Corporation (I.H.I), Japan. Construction Superintendent,(2001 – 2008) Toyo Engineering India Ltd., Civil Engineer (2000 – 2001) Haldia Petrochemical Ltd., Civil Engineer(1997 – 2000) Gherzi Eastern Ltd ,Civil Engineer (1995 – 1997) Simplex Concrete Piles India Ltd, Assistant Engineer (1990 – 1995)  Resident Construction Manager role performed successfully till handing over to client for ONGC Petro addition Limited (OPAL) at Dahej, India.  Having excellent knowledge of large LNG tanks (11 nos) with respect to Civil,structural and mechanical activities related to the project for Rasgas, Qatar Gas &Petronet (I st& I Ind phase) including expansion.  Executing of underground tunnelling job within 52 existing underground services including hydrogen line successfully and safely for Singapore parallel train.  Achieved the appreciation from Exxon Mobil,Singapore parallel train project in 2009
  • 2. Representative projects Deputy Construction manager, IOCL Paradip Refinery Petrochemical /Foster Wheeler India Pvt Ltd., Paradip Refinery Project, Paradip ,India Having a track record as successful completion of overall construction management from construction phase till system handover. Petrochemical Facility / Foster Wheeler India Pvt Ltd, ONGC-FETC Project,Dahej,India Resident Construction manager. Leading a team of 10 packages as LSTK contracts for Demountable Flare blow down, Demin plant, cooling towers, ETP, & road bridge over Santa creek, plant buildings, Storm water outfall discharge to the sea , secured land fill for the most hazardous substances for disposal and as an Engineering In-charge for piping contract and OWS,CRWS line. Responsible to manage INR 1265 cores  Compliance to the HSE requirements through reviewing the reports and administratively implemented by job safety analysis, toolbox, Management meetings & safety walk around, near miss reporting and review of accident/ incident reports .  Direct coordination with clients for areas of responsibility,  Strong coordination and supervisory skills, particularly in complex project and/or technical structures.  Knowledge of all phases of construction operations relating to engineering, construction and field activities.  Direct involvement in quality assurance, ITP and review of quality deficiency and resolving the problems.  Assigned the roles and responsibility to the team members for daily basis supervisions and review their reports and corrective actions advices.  Direct coordination with H.O.related to Engineering, Construction, Contract& change orders to take final decision to go ahead the site works.  Assigned with authority a role to make suitable correspondences and review of all other contractual correspondences  Review of schedule and resources to expedite the job assigned.  Final review of job procedures, QAP,ITP,change order,  Decisive action to sort out the site issues.  Attending to monthly/weekly review meeting with client, contractors.  Analysing major scope of work at site as per contract, inter-discipline coordination, interfacing issues between EPC contractors.  Review of Contractor’s time extension request and recommendation to IOCL.  Appraising of project/construction status to client back to HQ  Monitoring and Supervision of construction activities at site and ensuring construction activities are being carried out as per approved drawings, documents and work procedures, system hook up and commissioning.  Participation in technical issues to sort out.  Worked as Engineer-in-charge for conventional packages contract.  Participation in brain storming discussion to find out the way to improve the progress at site.
  • 3. Final bill certification and project close out .LNG Facility / Ishikawajima-Harima Heavy Industries Corporation (I.H.I), Japan. Petronet LNG Expansion Project(148000 M3 X 4 nos), Dahej, India Qatar Gas II LNG Tanks Project (140000 M3 X 5 nos),Qatar Ras-Gas LNG tanks, (2nos), Qatar  Worked asan in-charge of all civil and structural activities and with respect to the mechanical job as plate fabrication, erection, bending etc .for tank having inner concrete wall dia 81 m and 40 M of height as a coordinator.  Supervised the piling works, special post-tension cryogenic concrete wall, heavy concrete foundation and dome roof. LPG Facility / Toyo Engineering India Ltd. Indian Oil Petronas (LPG storage,loading and unloading terminal),  Worked with Toyo engineering India ltd for the construction of LPG process plant supervising LPG tanks, piling work, LPG bullet (mounded) steel structure, pipe racks, equipment foundations and concerned plant service buildings  Worked with Toyo Engineering corporation ,Japan and Toyo Engineering India ltd. wherein I was looking after execution of construction supervision for precast driven piles, load tests, Overall responsible for coordination, liaising and project management at site in accordance with terms and condition of contract.Responsible to certify the completion of work. Scrutinize the contractor’s records, approval for execution and HSE plan. To examine the waiver/change over items.To certify the close out report for infrastructure development project. In addition to that I am direct involved with Site inspection and construction of civil and structural job for buildings, open sheds roads, drainage ,outfall structure to river/Sea and huge earthwork for infrastructure development project. Resolve contractor’s raised queries with technical support group. Responsible for witness the tests also as required. Responsible to manage INR 941cores  Managing a team of engineer/supervisors, supporting staffs and site office, overall responsible for quality and HSE.  Appraising of project/construction status to client back to HQ.  Planning, Progress Monitoring/ Supervision of construction activities of Contractors at site  Preparation and submission of progress reports to client.  Review and approval of construction procedures and methodology.  Ensuring all site construction activities being carried out as per agreed schedule and meeting the governing standards.  Review of contractor’s resources and Schedules.  Progress measurement, scrutinise, surveillance on all project related activities and work certification of bills for payment.  Carrying out quality and safety audit. Petrochemical / Foster Wheeler India Pvt Ltd. Singapore Parallel Train  Direct supervision as daily basis including engineering coordination  Construction of pipe tunnel crossing the main city road in Singapore refining project. Related to civil and steel structure for pipe racks, vessels, stair/ladders. Review and check relevant documents along with drawings. Directinvolved as field engineering as well as supervision as a team leader of 4 local site Engineers.  Expediting the tunnelling across the main road wherein 52 underground services including hydrogen and oxygen line wereexisting and declared as most high risk zone.
  • 4. heavy equipment foundations like tall towers, flare stacks, fractionators, exchangers, cold box, vessels, compressors foundation, heaters, pipe racks cable trench and plant buildings and roads. Apart from this I was assigned as a chief of painting and thermal insulation work. Project type/company Paradip Refinery Project, India Oil Corporatio,Delhi India ONGC-FETC Project,Dahej,India ,ONGC India. Singapore Parallel Train., Exxon Mobil, Singapore Petronet LNG Expansion Project(148000 M3 X 4 nos), Dahej, India, Qatar Gas II LNG Tanks Project (140000 M3 X 5 nos),Qatar, QATAR Gas Ras-Gas LNG tanks (2nos), Qatar, QATAR Gas Publications and presentations Nil.