Off Shore - Super Complex Layout
Topsides Layout & Design
MOC _ Management Of Change
OFFSHORE Installations
Construction Management
Commissioning Mangement
FPSO - Layout / Design
Hook –Up Methodology
Turnover Management
CMT (Completions Management Tool)
Fabrication / Welding
Client Specifications- BP-Total –Shell-
ADMA
Design Optimization
Group Management
Group Training & Development
Man power Recruitment
EDMS Management
HSE Awareness & Promotion
QA/QC Management
PDS/PDMS 3D Management
Performance Appraisals
Cost Reduction Techniques
VE – Value Engineering
SUMMARY
40 Years experienced Piping/Pipelines Engineer/Managerwith excellent communication andmanagement skills,
Delivers results through personalcontribution andteam, uses personalpower to motivate, guide andinfluence others.
Demonstrates willingness andability to focus on the delivery of results andrespondaccordingly to needs in order to
provide the best quality service to our customers. Develops others to achieve individual andorganizationalpotential,
managing self andimmediate teamto delive r results.
Nationality : British Passport No : 761 282 142
Birth date: : 08/05/1955 Salary Current: : £ 180 k ( pa net) – (280k USD)
22k p/month
Salary Required: : Same OR more
Email: ttpearce2003@yahoo.com.au
terenceanthonypearce@gmail.com
Language : English / French Tel No. +971 50 661 4731 mobile
+ 971 2 677 9310
Availability : Immediate Education: HND – MechanicalEngineering
2. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 2
Rev 5 (18-Feb-08)
Plan, Schedule, Resource, Cost&manage project Engineering deliverables. Direct effort to acquire andretain resources
thru out, Working for either the client on the PMT Team or the EPCM Contractor Handling Multi Nationality Task
forces andWorkshare Procedures. Provide key managerial and administrative support for Piping Department and
assist in activities related to manpower resources, organization development
Ensure compliance with all laws, Safety, internationalregulations and client requirements applicable to the assigned
location, andcontractSet standards goals, andformulates, produce andimplement company policies and procedures.
Demonstrates willingness and ability to focus on the delivery of results and respond according to needs in order to
provide the best quality service to our customers
Management of Piping department, From Concept, FEED, to Detaildesign, Layout, andconstruction to finalTurnover
activities. Provide leadershipandboost morale in the Piping Team members (dire ct reports). Identify strengths and
weaknesses of Piping members, Take measures for maintaining quality of engineering, completion of projects within
the budgetedman-hours andcost, adhering to projectschedule Liaison andinterface with EPCM contractors. Attend
all Risk Assessment Reviews &Analysis Including HAZOP, HAZID, andALARP.
Predominantly engagedin the Oil & Gas/Petrochemical-PowerGeneration, andOff Shore Industry, 10 yrs. Experience
in Top Sides Layout &design, 25 years in construction, Engagedin multi-Billion dollar green andbrown field works
thru out, Africa, Namibia, Zimbabwe, South East Asia Uzbekistan, Yemen, Egypt, Korea, Japan, The Middle East, India,
China, Singapore, Malaysia, Norway, Germany, France, Belgium, Czech Republic, Thailand& Australia.
Projects Include: Umm LuluSupa Complex, FPSO, LNG, CTL, SRU, Petrochemical, Hydro - Cracker, Marine, Offshore,
Phosphate Plants, Gas Injection, De-Gassing Stations, Gas-Pipelines, Oil& Gas Gathering Systems.
Offshore Installations in compliance with DNV-OS-B101 Materials,DNV-OS-C401 Fabrication &Testing Requirements,
NV-OS-D101 Marine Systems. DNV-OSS-101 Rules for Classification of Offshore Drilling andSupport Units
DNV OSS-102 Rules for Classification of Floating Production, Storage andLoading Units
DNV-OSS-103 Rules for Classification of LNG/LPG Floating Production andStorage Units or Installations,
DNV-OSS-202 Verification for Compliance with UK Shelf Regulations (North Sea)
DNV-OS-A101 Safety Principles andArrangements,DNV-OS-F101 Submarine Pipeline Systems.
DNV-RP-D101 StructuralAnalysis of Piping Systems
DNV-RP-D102 Failure Mode andEffect Analysis (FMEA) of Redundant Systems
WORK HISTORY:
2013-2015 – Lead Piping Engineer ADMA/NPCC – CLIENT - Amec International – Abu Dhabi (6 +bill)
IPMT Team Umm Lulu Project - Off Shore - Supa Complex.
• Off Shore Complex - Comprising of: Accommodation Platform(ULAP).
• Utilities Platform (ULUTP).
• Separation Platform (ULSP).
3. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 3
Rev 5 (18-Feb-08)
• Riser Platform (ULRP Topside only).
• Gas Treatment Platform (ULGTP).
• WaterDisposalPlatform (ULWDP).
• Bridge Support S 1.to 4
• Flare Platforms 1 (ULFL 1).& 2
Responsibilities:
EPCM – Technip / NPCC Teams – Supervision , Guidence, Mentor, Control.
Full Field development of offshore facilities. Allplatforms
Ensure ALL EPC deliverables are in compliance to client specs
Ensure constructability/install ability of designs andprocedures.
Initiating Concept ideas, IntoFEEDandDetaileddesign.
Lay out Optimization implementation andchecking
Verify WallThickness Calcs
Approve Project Piping Specifications
Launcher / Receiver Layout
CheckCTR,s Man hours
ReviewMTO andlong leaditems
Flare System Layout - Knockout drum
Close out engineering technicaldocumentation
Reviewandapprove allcontractors documentation
Close out allFeeddocs to proceedwith detaildesign
Perform 3DPDS client modelreviews
2013 - Piping Design Manager SBM Offshore , KL Malaysia
4. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 4
Rev 5 (18-Feb-08)
Design andconstruct FPSO,s From concept to completion
Responsibilities:
Managing The Piping Design Team approx. 95 personnel,
Establish performance criteria, agree performance objectives with Piping Team anddevelop
competency of Teammembers. Set performance benchmarks, KPIs andconduct regular performance
appraisals, mentor andguide piping team.
Conduct regular technicalinterviews for potentialnewhires.
Establish goals and objectives for engineering operations andmake operationaldecisions
Identify strengths andweaknesses of Piping Team members andrecommendtraining and
development intervention, planning andcareer opportunities
Understandclients'needs; independently evaluate, organize andprioritize work for self andothers
Facilitate andco-ordinate manpower recruitment process in collaboration with HR.
Organize internalquality audits/peerreviews for monitoring quality andensure timely close-out of
actions.
Provide advice andguidance to engineers anddesigners on important technicalissues as wellas on
managerialmatters.
Provides necessaryguidance on manpower planning andtakes responsibility for recruitment and
performance management of his/herteam.
2012 Lead Piping Engineer - PMT Client - Q8 - Refinery Project Holland – (1Bill USD)
Green & Brownfield’s Works RE-investment into existing facilities,
New Hydrocracker and facilities.
Responsibilities:
Team of 50 personel
5. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 5
Rev 5 (18-Feb-08)
Ensure ALL deliverables are in compliance to ShellDEP,s
Ensure constructability/installability of designs andprocedures.
Initiating Concept ideas, IntoFEEDandDetaileddesign.
Verify WallThickness Calcs
Approve Project Piping Specifications
Launcher / Receiver Layout
CheckCTR,s Man hours
ReviewMTO andlong leaditems
Flare System Layout - Knockout drum
Close out engineering technicaldocumentation
Reviewandapprove allcontractors documentation
Close out allFeeddocs to proceedwith detaildesign
Perform 3DPDS client modelreviews
2011-12 Department Technical Authority - WorleyParsons, London Office
Rumaila Project – Iraq. – (8 Bill USD)
Green &Brownfield’s Works RE-investment into existing facilities, ie: flow/trunk lines, gathering systems,
Cluster pump stations, Degassing stations, design andbuild New De -Gassing facilities, andpumping stations.
Responsibilities:
Ensure BP ETP,s & Standards are adheredto.
Act as Focalpoint for client , EPCM for all project interfaces, delegating where appropriate
Ensure allQA/QC BP practices are followed
Overseeanddirect key areas of discipline engineering, including design codes, legislative requirements and
current goodengineering practice.
Optimise OilGathering SystemLayouts
Sign and issue technicaldocumentation as approver, accepting personalresponsibility for its adequacy
6. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 6
Rev 5 (18-Feb-08)
Waterinjection fieldlayout
WTcalculations
Interface with discipline leads and/ or groupleads to ensure deliverable schedule is being met andbudget is
on track.
Ensure constructability/installability of designs andprocedures.
Initiating Concept ideas, IntoFEEDandDetaileddesign.
Ensuring all QA/QC procedures are appliedandworkedto.
De Gassing Station facilities design
Cluster pumping station design - layout
Wellpad- Trunk & Flow line design
Verify WallThickness Calcs
Approve Project Piping Specifications
Launcher / Receiver Layout
CheckCTR,s Man hours
ReviewMTO andlong leaditems
Flare System Layout - Knockout drum
Monitoring the TechnicalAssurance of the Engineering andDesign services anddeliverables inclStress
Group Management (Caesar II)
Design of Onshore production facilities (wellsites, flowlines, gathering lines, metering stations, centralfield
manifolds etc.)
Reviewedandapprovedas necessary Site prepared Contractor’s engineering requisitions, documents and
drawings.
Participated in overall Project design, risk and construction reviews.
AttendSite Surveys, Fieldtrips. Checkconstruction As Built to EPC design documents
Contribute to CLIENT's continuous improvement in HSE performance by ensuring safety andenvironmental
standards are followed within the workplace by providing ongoing training to all staff and ensuring the
appropriate controlmechanisms, procedures andprocesses are followed in accordance with the Operational
Excellence System.
7. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 7
Rev 5 (18-Feb-08)
2010 –2011 Lead Mech-Piping Engineer, TG Engineering - OMV, Sana’a Yemen,
Block S_2 Well Development. Field Gathering Systems. Approx. – 56 wells – ( 1 Bill USD)
Responsibilities:
Team of 20 engineers
Optimise Gathering System Layouts
Control, supervise Mech-Piping group
Responsible for allMech/Piping Discipline.
Development of discipline engineering specifications.
Responsible for allProject QAImplementation
ReviewMTO andlong leaditems
Monitoring the TechnicalAssurance of the Engineering andDesign services anddeliverables inclStress Group
Management (Caesar II)
Design of Onshore production facilities (wellsites, flowlines, gathering lines, metering stations, centralfield
manifolds etc.)
Providedengineering support at Site including review/ approvalof Material Approval Requests Provided Piping
engineering support as team member of the Project Management Consultant (PMC) during the detaileddesign and
construction phases of the project.
2009- 200 Lead Piping Engineer, PMC Team ILF CONSULTING ENGINEERS, ( 1.5 Bill )
UZBEKISTAN ASIA TRANS GAS.-- China Petroleum Engineering Construction Company.
ASIA TRANSGAS PIPELINEPROJECT & GAS COMPRESSION STATIONS:
8. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 8
Rev 5 (18-Feb-08)
Responsibilities:
Working to GOST17380-2001,SNIP,ROK, ISO 3419-81, Russian Industrystandards.BNAR.Building Norms and
Regulations,II-45-75
Liaise andcoordination with Chinese Design Institute, CPECC, CPPE, for FEED and Detaildesign documents.
Audit Caesar 2 Stress Analysis’s Review. Project requirements.Provided piping engineering support as team
member of the Project Management Consultant (PMC) during the detailed design and construction pha ses of the
Asia Trans Gas Pip Line project.
Reviewed Piping deliverables and methods for compliance with safety, environmental and engineering
requirements.
Providedengineering support at Site including review/ approvalof Material Approval Requests Pro vided Piping
engineering support as team member of the Project Management Consultant (PMC) during the detaileddesign and
construction phases of the project.
Reviewed and approved as necessary Site prepared Contractor’s engineering requisitions, documents and
drawings.
Participated in overall Project design, risk and construction reviews.
Audit of “As-Built” Piping documents to ensure all comments made during the construction have been
incorporated.
AttendSite Surveys, Fieldtrips. Checkconstruction As Built to EPC design documents
Close out engineering technicaldocumentation
Provide discipline engineering services as part of a team providing engineering, design services to support
Existing Field Facilities Program. This includes responsibility for work on a wide variety of facilities including:
• Coordination andreviewof off-site discipline engineering work performedby engineering service contractors.
• Specification andsupervision of site survey work.
• Production of discipline engineering of new(andmodifications to existing) Oil& Gas production facilities, and
production of “Approvedfor Construction” workpackages under the guidance of LeadDiscipline Engineers andDiscipline
Designers.
• Specification andorder documentation for purchasing materials andequipment. Can include coordination
activities with vendors/suppliers. For MechanicalDiscipline this will include piping bulks, static / rotating equipment and
packagedunits.
9. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 9
Rev 5 (18-Feb-08)
2008-2009 Department Manager Piping / Pipelines , WorleyParsons, Egypt Cairo Office
Multi Projects-Ramadan-6 –(4 Offshore Platforms)/ North Shadwan / Akik Eng / ELNG – WHRU / Petro
Alam / ( 2 Bill USD)
Responsibilities:
Department of 70 personnel
PDS Training of locals
PDS Project Set Up
Prepare CTR,s
Prepare SOW
Prepare alltraining material
Prepare andissue design office procedures
Man hr estimates
Interviewcandidates
Chair weekly meeting
Peer appraisals review
Perform Design office audits
Overseedevelopment, communication,
implementation andmaintenance of
Engineering group
Top Sides Layout &Design
Act as Focalpoint for client on project
interfaces, delegating where appropriate
Establish goals andobjectives for engineering
operations andmake operationaldecisions
Understandclients'needs; independently
evaluate, organise andprioritise workfor self
andothers
Responsible for allMech/Piping Discipline.
Development of discipline engineering
specifications.
FPSO Top Sides FocalPoint for Piping
engineering with other companies and
industry bodies
Responsible for allProject QA
Implementation
ReviewMTO andlong leaditems
Identify any deviation from the Project Basis
of Requirements andreporting these to the
Engineering-Project Manager.
PDS 3D Model layout supervision andreview
of all modules on FPSO including interfaces.
ReviewLay out
Modelreviewset up
Responsible for development of Engineering
Management Systems andProcesses for the
office in line with corporate requirements
10. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 10
Rev 5 (18-Feb-08)
Co-ordinate andimplement allPDS 3D
Works
Monitoring the TechnicalAssurance of the
Engineering andDesign services and
deliverables inclStress GroupManagement
(Caesar II)
Assist with identification and preparation of
training and career development
requirements of staff
2007- 2008 Lead Piping Engineer, PMT WorleyParsons, Saudi Arabia. ( 5 Bill USD)
Maaden Phosphate Project Al-Khobar-Grass Roots Chemicalproduction facilities;
Sulphuric, Phosphoric Acid Plant, Ammonia Plant. DAP (di–ammonium phosphate) Plant.
Responsibilities:
Co-ordinate andcontrolallpiping activities.
Assess scope of work, priorities, andman hours,
Reviewpiping specifications
Review, approve Sub Contractor plot plans, lay outs.
Prepare hydro testprocedure
Close out engineering technicaldocumentation
Reviewandapprove allcontractors documentation
Close out allFeeddocs to proceedwith detaildesign
Perform 3DPDS client modelreviews
Piping specifications review
FRP Vendor expediting
Instruct contractorof project responsibilities
Represent the discipline on the project for client resolve technicalquestions as requiredto coordinate work.
Answer all incoming TQ, s, RFI, s, NCR, s, on be half of client.
Controlandmonitor progress of piping installation, through construction phase to completion.
Answer all technicalmemorandums from contractor
11. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 11
Rev 5 (18-Feb-08)
2007-2006 Lead Piping Engineer , EPCM Fluor Daniel, Holland ( 3 Bill USD)
Multi Projects Group.- Hurcules & Miro site trips
Responsibilities:
Co-ordinate andcontrolpiping activities. For multiprojects
Prepare andUpdate Man Hr estimates
Write upScope of works
Write upScope of facilities
Prepare PAM.
Prepare Isometric schedule
Prepare Piping design job book
Ensure the efficient usage of resource’s
Site visits to prepare FEEDDocuments
Controlmaterials group
ControlStress group
Set upWorkshare procedures
Chair andpresent clientmodelreviewmeetings
Attendinternalmeetings. Liaise with client/leadengineers daily, controlof personnelandduties.
WorkShare Co-ordination.
Supervise andprovide technicalknowledge to checkers, designers ,drafters. andarea leads
Provide technicaldirection andassign workto subordinate engineers, designers, drafters, andothers who assist in
performing specific assignments.
Ensure allwork is performedandcheckedeffectively, records kept before issue.
Control, monitor andprogress the piping design group.
Prepare isometriccontrolsheet. isometricflow procedure
Monitor andcontrolCheckerdaily progress andperformance.
12. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 12
Rev 5 (18-Feb-08)
Plan andproduce allpiping deliverables according to schedule
Ensure sufficient recourses available utilizing locallabour
Piping group Approx 70 personnelunder my control
2005 –-
2006
Lead Piping Engineer, ( EPCM ) Foster Wheeler Energy Limited, Saudi Arabia & India
SHARQ 3RD Expansion Ethylene Plant Site based- ( 6 Bill USD)
Responsibilities:
Co-ordinate andcontrolallpiping activities.
Prepare andUpdate MPPschedule
Prioritise deliverables according to schedule
Prepare Isometric schedule
Assess scope of work, priorities, andman hours,
Ensure the efficient usage of resource’s
Maintain isometric control, andissue AFC Documents
Attendinternalmeetings. Liaise with client/leadengineers daily, controlof personnelandduties.
Controlandreply to all incoming transmittals
up date iso register, monitor checking activities,
Supervise andprovide technicalknowledge to checkers, designers anddrafters. andarea leads
Provide technicaldirection andassign workto subordinate engineers, designers, drafters, andothers who assist in
performing specific assignments.
Ensure allwork is performedandcheckedeffectively, records kept before issue.
Control, monitor andprogress the piping design group.
Prepare isometriccontrolsheet. isometricflow procedure
Monitor andcontrolCheckerdaily progress andperformance.
Plan andproduce allpiping deliverables according to schedule
Ensure sufficient recourses available utilizing locallabor
Piping group Approx 70 personnelunder my control
13. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 13
Rev 5 (18-Feb-08)
Controlandmonitor progress of piping installation, through construction phase to completion.
Answer all technicalmemorandums from contractor
Co-ordinate /Oversee allpiping construction workto meet objectives of the project,
Represent the discipline on the project andwith the client resolve technicalquestions as requiredto coordinate
work.
Reviewandapprove allcontractors documentation
Prepare AS BUILT isometrics
Prepare compile AllTest Packs, andwork packs
2004-
2005
Lead Piping Engineer - Commissioning (PMT ) Qatar Petroleum, Qatar – Site & Office.
Ethylene Expansion Project - LNG Plant Site ( 5 Bill USD)
Responsibilities:
Co-ordinate /Oversee allpiping technicalandconstruction obligations are met by contractor. andworkmeets with
objectives andschedules of the project,
Oversea AllCommissioning activities
Instruct contractorof project responsibilities
Close out engineering technicaldocumentation
Represent the discipline on the project for client resolve technicalquestions as requiredto coordinate work.
Answer all incoming TQ, s, RFI, s, NCR, s, on be half of client.
Controlandmonitor progress of piping installation, through construction phase to completion.
Answer all technicalmemorandums from contractor
Reviewandapprove allcontractors documentation
Close out allFeeddocs to proceedwith detaildesign
14. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 14
Rev 5 (18-Feb-08)
2002-
2004
Lead Piping Engineer – Commissioning , (EPCM ) United KG Australia – Site &
Office.
Caltex Clean Fuels Expansion Project - Site ( 4 Bill USD)
RESPONSIBILITIES:
Team of 60+ personnel
Co-ordinate /Oversee allpiping construction workto meet objectives of the project,
Represent the discipline on the project andwith the client resolve technicalquestions as requiredto coordinate
work.
Responsible for All Pre – Commissioning activities
Answer all incoming TQ, s, RFI, s, NCR, s, on be half of PC contractor UKG.
Over see, andmanage allwelding QA/QC.NDE
Set upAll welding documentation, andweldmaps.
Controlandmonitor all FW data .
Controlandmonitor progress of piping installation, through construction phase to completion.
Prepare AS BUILT isometrics
Monitor andcontroldaily progress andperformance of punching activities.
Comply with all the requirements of OSHAact. Ensure steps are taken to meet applicable codes, standards. and
specifications.
Checkallhand over docs to client.
Prepare compile AllTest Packs, andwork packs ,
Ensure alldata is correct andenteredin to test packs,
Prepare All relevant procedures
Prepare andcontrolallHydro test activities
Ensure alldocumentation sign off by UKG/client.
Provide Technicaldirection andguidance to supervisors andengineers assign work to subordinate engineers,
Controlandsupervise All Punch List activities, By field engineers.
15. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 15
Rev 5 (18-Feb-08)
2001-
2002
Lead Piping Engineer, (EPCM) Worley International, Thailand Bangkok Office.
Multi- Projects FPSO - OFF SHORE PLAT FORMS,Brownfields mods,hook ups.
Responsibilities:
Co-ordinate allcheckeractivities.
Access scope of work, priorities, man hours,
Maintain isometric control,
Attendinternalmeetings. Liaise with client/leadarea eng daily, controlof personnelandduties.
up date iso register, monitor checking activities,
Supervise andprovide technicalknowledge to checkers, designers a nddrafters.
Provide technicaldirection andassign workto subordinate engineers, designers, drafters, andothers who assist in
performing specific assignments.
Ensure allwork is checkedeffectively andrecords kept before issue.
Control, monitor andprogress the piping design checking group.
Prepare isometriccontrolsheet. isometricflow procedure
Monitor andcontrolCheckerdaily progress andperformance.
Report to senior management on checking groupperformance andprogress.
Ensure effective operation, communication andco-operation between leads, Designers andgroup.
Worley International, Kuala Lumpar Office
Supervise andprovide technicalknowledge to checkers, designers anddrafters.
Optimize piping layout
Reviewall area studies
Issue optimizedpipe routing to stress
Prepare isometriccontrolsheet. isometricflow procedure
Monitor andcontrolCheckerdaily progress andperformance.
Ensure allwork is checkedeffectively andrecords kept before issue.
16. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 16
Rev 5 (18-Feb-08)
Provide technicaldirection andassign workto subordinate engineers, designers, drafters, andothers who assist in
performing specific assignments.
2000-2001 Lead Piping Engineer (PMT) Bechtel, China . ( 7 Bill USD)
Nanhai Petrochemical Project - Site
Responsibilities:
Co-ordinate /Oversee allPDS, andpiping design work to meet objectives of the project,
Represent the discipline on the project andwith the client to resolve technicalquestions andas requiredto
coordinate work.
Answer all incoming TQ, s, RFI, s, NCR, s, on be half of PMC (Shell) refer allShellDEP, s SP, s etc,
Training of locals, attendContractor, client meetings.
Organise andmanage the technicalworkloadof the piping department.
Supervise andprovide technicaldirection to engineers, designers anddrafters. Andothers who assist in
performing specific assignments.
Control, monitor andprogress the piping design deliverables including Equipment layouts, piping general
arrangements, piping isometrics’, andsupports.
Reviewdocuments against contract scope; advise on resources requiredfor workload.
Apply goodinterpersonalskills between EPC andPMC interfaces.
Prepare technicalscope of MR, data sheets, drgs, andstandards.
Perform work using BechtelStandardApplication Programs (BSAPs) EDMS, CMT, andappropriate 2-Dand3-D
computer aideddesign andPDS (CAD) tools.
Demonstrate due diligence in managing hazards associatedwith design.
Comply with all the requirements of OSHAact. Ensure steps are taken to meet applicable codes, standards. and
specifications.
Preparation of checking, fabrication, andtesting procedures.
Ensure allwork is checkedeffectively andrecords kept before issue.
17. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 17
Rev 5 (18-Feb-08)
1999-2000 Field Piping Engineer, (EPCM) KJV Australia – Site
Wood side Project- LNG Train ( 5 Bill USD)
Responsibilities:
Co-ordinate allsite workactivities,
site measure,
Compile site sketches
Mark up isometrics, andP&ID.
PDS design- review(Smart plant) training of locals,
Punch line activities.
Compile test packs
Supervise andprovide technicaldirection to engineers, designers anddrafters.
Reviewdocuments against contract scope; advise on resources requiredfor workload
Comply with all the requirements of OSHAact. Ensure steps are taken to meet applicable codes, standards. and
specifications.
Comply with all safety rules on site
The naturalgas fedinto the LNG plant will be treatedto remove water, hydrogen sulfide, dioxide, ethane,
propane, butane andsome heavier alkanes.
1997-99 Lead Piping Engineer, (EPCM) Technip Paris/ Abu Dhabi
Saroosh - Naroosh Project 7 Offshore Platforms, brown fields, hook ups.
Responsibilities:
Co-ordinate /Oversee all PDS, and piping design work to meet objectives of the project,SPP-1
Organize andmanage the technicalworkloadof the piping department for topsides
18. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 18
Rev 5 (18-Feb-08)
Control, monitor andprogress the piping design deliverables including Equipment layouts, piping general
arrangements, piping isometrics, andsupports.
Equipment vendor co-coordinator.
Topsides equipment lay out and detailed piping design.
Control, monitor Backdraughting squad(20 off )
Supervise and provide technicaldirection to checkers, , designers anddrafters.
Attends internalmeetings. Liaise with client/leadarea eng daily, controlof personnelandduties.
Monitor andcontrolall vendor documentation
Distribute all vendor docs to leads
Ensure allwork is checkedeffectively andrecords kept before issue.
Layout of CPP and well heads with all cluster assemblies.
Preparation of plot plans.
Plant Layout and detailed piping.
Piping studies, general arrangements
Preparation of stress sketches.
Extraction of isometrics.
Checking of layouts.
96-97 Lead Piping Checker, (EPCM) MGJV Australia – Office
MGJV Magnesium Project
Responsibilities:
Co-ordinate allP.D.S. Checkeractivities.15 off
Access scope of work, priorities, man hours,
Maintain isometric checking control,
Attendinternalmeetings. Liaise with client/leadarea eng daily, controlof personnelandduties.
19. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 19
Rev 5 (18-Feb-08)
up date iso register, monitor checking activities,
Supervise andprovide technicalknowledge to checkers, designers anddrafters.
Provide technicaldirection andassign workto subordinate engineers, designers, drafters, andothers who assist in
performing specific assignments.
Ensure allwork is checkedeffectively andrecords kept before issue.
Control, monitor andprogress the piping design checking group.
Prepare isometriccontrolsheet. isometricflow procedure
Monitor andcontrolCheckerdaily progress andperformance.
Report to senior management on checking groupperformance andprogress.
Ensure effective operation, communication andco-operation between leads, Designers andgroup.
DATE 999POSITION COMP ANY
94-95 Senior Piping Engineer (PDS) Aker Off-shore, Norway
93-94 Senior Piping Engineer (PDS) MWKellogs, UK
93-92 Senior Piping Engineer (PDS) Stone & Webster, UK
91-92 Senior Piping Engineer (PDS) Foster Wheeler , UK
88-90 Design Office Manager PromatechEngineering SA
20. Terence A Pearce
LeadPiping Engineer / Manager
317/4 M.Nongdon
Saraburi
18190
Thailand
Tel-66 363 97285
ttpearce2003@yahoo.com.au
tt
tttttt
Terence.pearce@yahoo.com.au
ttpearce2003@yahoo.com.au
Resume2015
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 20
Rev 5 (18-Feb-08)
86-87 Senior Piping Designer Foster Wheeler , SA
83-85 Senior Piping Designer Uhde , South Africa
79-82 Senior Piping Designer/ Checker Sasol-Secunda , South Africa
77-79 Piping Design & Fabrication National Chemicals SA
71-76 Piping Design & Welding Apprentice Weldtite Engineering UK
Reference Details:
Yellow highlight are contactablenow.
Name Company Tele Position
brandley.symons@gmail.com Chiyoda Engineering Manager
Guy_Maloney@fwuk.fwc.com
guy.maloney@hotmail.com
FW 966-554-010-014 Construction Manager
jknowlesinspace@yahoo.com.au WP Systems Manager
Gwyn_thomas@hotmail.com FW 966-503-308-379 QA/QC Manager
Tony.ranson@uk.bp.com WP 07769640243 QA Manager
lestergaunt@hotmail.com JGCV QA
briangreavesuk@yahoo.co.uk Bechtel LeadEngineer
Passport: