Senior Roles
Principal Civil / Structural Engineer
Qualification
Bachelor of Science in Civil Engineer
Philippines Professional Civil Engineer
License No. 0027228
Memberships
Philippines Institute of Civil Engineer
Philippines Government Civil Service
Merits Awards
11th place Civil Engineering Board
Examination
Market Sectors
LNG/LPG
Refinery
Chemicals
Fertilizers’
GTL
Oil & Gas
Olefins
Code Experiences
BS
Euro
ACI
AISC
BAEL
AS
Structural/Civil Engineer
Twenty six (26) years of experience as a civil/structural engineer in various
designs and constructions of civil and structural engineering projects; 19 years in
oil & gas onshore projects and 7 years in building and residential projects.
My main job as a civil/structural engineer is the detailed structural design of
various foundations and civil /structural structures.
Specialized in dynamic analysis of foundation/structures subject to
vibration such as gas/turbine generator & compressor, reciprocating
compressor, pump foundation and etc.
Has extensive knowledge in the MS Office VBA macro language for the advance
application of Excel spreadsheet. With this skill, I developed a powerful concrete
foundation design in a spreadsheet based on the ULS Geotechnical approached.
This spreadsheet has been officially adopted in the foundation design of all KBR
engineering centre office for the Chevron Gorgon project in Australia.
In addition, I developed ‘StaadProTools’ in spreadsheet using the
‘OpenStaad’macro language of StaadPro engineering software. These tools are
the collections of my developed function command of the OpenStaad for a quick
and further processing of the StaadPro output, which is a very useful for the
StaadPro users.
Had experiences as well in the land / sea transportation and lifting/rigging
structural analysis of modular structurers.
Had knowledge in advance structural analysis such as buckling analysis,
pushover analysis and etc.
With my extensive experiences in engineering calculation and VBA skill, I
will be an asset in developing customized and powerful civil/structural
calculations in a spreadsheet.
Overall and based on my various experiences, I am a highly knowledgeable in technical matters of engineering,
which is my greatest strength in my career practiced.
Career Highlights
A. KBR-UK (Formerly MW Kelloggs Limited) Employment
April 2016 – Present, Principal Civil / Structural Engineer
TOAZ Ammonia Project, Togliatti, Samara, Russia
The scope of work for this project is a FEED deliverables for the revamp of the ammonia unit (GIAP 5, 6 &7) and
the new PGRL unit.
The scope of works involved are studies and or preliminary design of foundations and structures (FEED level
structural design) for quantity estimations and support piping department for the development of the plot plan and
PDMS model.
2. Career Highlights Continued
2 of 5
March 2015 – March 2016, Principal Civil / Structural Engineer
Short time or part time assignment on PK Butadiende DBN project, Offshore
NLG Arctic PreFEED project, and full time on EPC Dragon LNG Boil-Off Gas
project .
Boil-Off-Gas project is an expansion project of the Dragon LNG Import
Terminal project in Wales.
My main job in the Dragon project is the detailed design of the table top
compressor foundation and steel structures for the interconnecting pipe rack
and relief valve platform.
Jun 2014–Feb ‘15, Principal Civil / Structural Engineer, EPC
Shah Deniz Stage 2 Project, Sangachal Onhore Terminal,
Azerbaijan
Shah Deniz II is the second stage of the Shah Deniz Full Field Development
as well as the expansion of the South Caucasus Pipeline. It will deliver an
additional 16 bcma of gas and up to 100,000 barrels of condensate, tripling
overall production from the field.
I’m assigned to the detailed design of the vibrating equipment foundations
such as power generator, export gas compressor and flash gas compressor,
static design of various foundations and some steel equipment support
structures.
Feb 2012 – May 2014, Principal Civil / Structural Engineer PRE-
FEED for Gorgon Expansion Project (Train 4) and MRU EPC,
Australia
The Gorgon LNG Project is a 3 x 5 MTPA train grassroots liquefaction complex
situated on Barrow Island, Australia.
I am involved in the detailed design of the piping tie-in structural steel
supports. Studies of the additional level steel supports on the existing pipe
racks and structures. Providing support to piping groups for the study and
development of the project plot plan. Create some reports on the various
studies of the structural primary member’s layout for the modularization of the
new structures.
On the MRU EPC works, assigned in the detailed design and analysis of steel
expansion valve platforms and other pipe supports frames. These platforms
design as a modular structure, therefore structural analysis includes in-place,
land transportation, sea transportation and lifting. Scope of works includes
design of connections.
April ’09 – Jan’12, Principal Civil / Structural Engineer, EPC Gorgon Project, Australia
First assignment in the Civil group:
Responsible for the detailed design of equipment’s subject to dynamic load or vibrations such as MR & PR table
top compressor foundation. This includes static design for various equipment foundations.
Site Experiences
Philippines Saudi Arabia
Plant Locations
Australia
Qatar
Yemen
Vietnam
Wales
Algeria
Nigeria
Saudi Arabia
Thailand
USSR
Azerbaijan
Major Clients
Chevron
BP
NLNG
Shell
PDVSA
Thai Oil
Mobil
NNPC
PetroVietnam
Arabian Industrial
Software Knowledges
Staad Pro
GTStrudl
MathCad
ACAD
RAM connection
MS Excel/Word
VBA programming
MS Visual Basic
Training
Steel Bldg Design to EC3
Conc Design Str. to EC2
Geotechnical Design to EC7
MicroDrainage WinDes
Machinery Fdn Subject to Vibration
Building Design & Construction
Bridge Design & Construction
Computer Program for Structural Design
3. Career Highlights Continued
3 of 5
Developed concrete foundation design in the spreadsheet based on the Geotechnical limit state analysis (ULS)
approached where most of the calculations have been done using VBA. This spreadsheet foundation has been
officially adopted in the project of all engineering centre; UK (London and Leatherhead), Singapore & Indonesia.
Second assignment in the Structural group:
I am assigned for the lifting analysis of all steel ‘Pre Assembled Rack’ module structures in the flare area. This
includes welded/bolted connections design and performed other jobs as required.
May ’08 – March ‘09, Sr. Civil / Structural Engineer, FEED RPLC Deep Conversion Project,
Venezuela
A comprehensive FEED package for a heavy oil upgrade of PDVSA’s refinery at Puerto La Cruz. Working for a
JGC led consortium, Kellogg’s scope of work involved the auxiliary units: sulphur recovery and tail gas treatment,
hydrogen production, amine regeneration, sour water stripping and hydrogen recovery units.
My duties included preliminary design calculations on civil and structural steel structure for material takes off
purposes and estimation. Reviewed and studied technical matters for the preparation of the EPC stage.
Feb ’07- April ’08, Sr. Civil / Structural Engineer, EPC Pearl GTL Project, Qatar
The Pearl GTL project is the world’s largest integrated GTL complex in Ras Laffan Industrial City. It is also the
largest energy project ever launched within the borders of Qatar. It comprises two 70,000 b/d GTL trains and
associated facilities. The plant will produce a range of clean liquid products and fuels, comprising naphtha, GTL
fuel, normal paraffins, kerosene and lubricant base oils.
Responsible for the detailed analysis and design of machineries support foundation subject to vibration such as a
heavy gas-turbine generator, steam-turbine generator, and various pumps. Other jobs included analysis and
design of some access steelwork platform, etc.
Oct. ’06- Jan’ 07, Sr. Civil / Structural Engineer, EPC, Yemen LNG Project, Yemen
The Yemen LNG complex was undertaken by a joint venture of KBR, JGC and Technip. Located some 200 km
from Al-Mukalla, the plant will have two trains with a combined capacity of 6.9 MMTPA.
On this short assignment, I was responsible for checking calculations and supporting colleagues on a major
foundation and structure design.
Mar. ’06 – Sept. ’06 Sr. Civil / Structural Engineer, EPC Dung Quat Refinery Project, Quang
Ngai province, Vietnam
The Project is a joint venture contract between JGC, Technip and Tecnicas Reuindas for EPC of the Dung Quat
Refinery Vietnam. The Kellogg Scope is the Engineering and Procurement of the LCO Unit
Responsible for a various foundation detailed designs both static equipment’s and machineries subject for
vibration, concrete pits and tank foundations. Structural support and access steelwork design. Also responsible for
checking Company joint venture partner submitted drawings.
June ’05 - Feb ’06, Sr. Civil / Structural Engineer, EPC Dragon LNG Import Terminal Project,
Milford, Wales
Responsible for all various foundation and support/access steelwork detailed design both for static equipment’s
and machineries subject to vibration, tank foundation, and concrete tank for combustion vaporiser, retaining wall,
pipe supports, sleepers, etc.
4. Career Highlights Continued
4 of 5
Also responsible for checking Company joint venture submitted drawings and design calculations, and supported
queries from job sites.
Nov.’03 – May ’05, Sr. Civil / Structural Engineer, EPCM for In Amenas Gas Project, Algeria
This project includes a gathering system to collect hydrocarbon fluids and a central processing facility (CPF) which
will separate the gas from the liquids before being sent to product lines for transport.
Responsible for all various foundation detailed design both for static equipment’s and machineries subject for
vibration, tank foundation, concrete tank, pipe supports, sleepers, etc., in acid desert conditions.
Aug.’02 – Oct. ’03, Sr. Civil / Structural Engineer, EPCM, NLNG Plus Expansion Project,
Nigeria
Train 6 was a 4 million tonne/year air cooled LNG train with additional power generation.
Responsible for all various foundation design both for static equipment’s and machineries subject for vibration,
tank foundation, concrete tank, pipe supports, sleepers, etc., in wet equatorial conditions.
B. Other Employments
1991–1999, Sr. Civil / Structural Engineer Chiyoda Corporation, Japan
In charge in various oil, gas and petrochemical projects for the detailed structural design of civil /structural
works such as but not limited to; equipment and machinery foundation, RC stack, tank foundation and
dikes, retaining and hydraulic structures, concrete pit, pipe sleeper and stanchion support, culvert,
earthwork, underground facilities, sewer and drainage.
• 1987-1990, AL - Mulla Engineering & Consulting Office, Saudi Arabia
Civil/Structural Engineer
• 1984-1985, Light Rail Transit Authority, Philippines
Sr. Engineer
• 1983-1984, Gilbert Yu, Willie Yu and Associates, Philippines
Construction Inspector
• 1982-1983, M. V Calderon and Associates, Philippines
Jr. Structural Engineer / Qty. Estimator
5. 5 of 5
Oil & Gas Project Experiences
Year Client Project
Location
Plant Type Project
Scope
Project Role
2016-Present TogliattiAzot Russia Ammonia FEED Principal Civil / Structural Engineer
Feb ’12 – May’14 Chevron Australia Gas liquefaction PRE-FEED/EPC Principal Civil / Structural Engineer
April ’09 – Jan ‘12 Chevron Australia Gas liquefaction EPC Principal Civil / Structural Engineer
May ’08 - March’09 PDVSA Venezuela Refinery FEED Senior Civil / Structural Engineer
Feb ’07 - April ’08 Shell Qatar Gas to Liquid EPC Senior Civil / Structural Engineer
Oct.’06 - Jan’07 YLNG Yemen Gas liquefaction EPC Senior Civil / Structural Engineer
Mar.’06 - Sept.’06 PertroVietnam Vietnam Refinery EPC Senior Civil / Structural Engineer
June ’05 - Feb.’06 Dragon LNG Wales Gas processing EPC Senior Civil / Structural Engineer
Nov.’03 - May’05 BP Algeria Gas liquefaction EPCM Senior Civil / Structural Engineer
Aug.’02 - Oct.’03 NLNG Nigeria Gas liquefaction EPCM Senior Civil / Structural Engineer
Aug.’97 - Mar.’99 Mineral Resources of
Turkmenistan
USSR Gas processing EPC Senior Civil / Structural Engineer
Jan.’96 - Jul.’97 Arabian Industrial
Company
Saudi Arabia Chemical EPC Civil / Structural Engineer
Feb.’95 - Dec.’95 Thai Oil Company Thailand Oil processing EPC Civil / Structural Engineer
Mar.’94 - Jan’95 Thai Oil Company Thailand Oil processing EPC Civil / Structural Engineer
Apr.’91 - Feb.’94 NNPC Nigeria Chemical EPCM Civil / Structural Engineer
Previous Experiences (Other than oil & gas experiences)
Year Responsibilities Project Role
1987–1990 Detailed designs of commercial and residential project in middle east from engineering consultant company. Civil / Structural Engineer
1984–1985 Support foreign consultant in the construction inspection of Philippine Light Rail Transit railway and support on
the billings evaluation from various sub-contractor.
Sr. Engineer
1983–1984 A/E firm construction inspector of various commercial projects. Evaluates billing from contractor. Construction Inspector
1982–1983 Structural design of building frame and materials take-off estimate. Jr. Structural Engineer/ Estimator