Maya V.Tatel
ProcessPiping Designer
Profile
Has wide exposure inDetailedDesignandEngineeringinlarge
Refinery, Petrochemicals,Oil&GasandConstructionof various
Plants. Has beeninvolvedwithdetaileddesign,FEED(FrontEnd
EngineeringDesign) andengineeringof reputedconsultant and
construction suchas CH2M Hill Canada LimitedatAbuDhabi UAE,
AmanaPipelinesLLCDubai UAE, ChiyodaCorporationInc.
(Philippines,Singaporeand YokohamaJapan),.Hasstrong
knowledge inASME&API,PipingInternational Codes,PDS,
Primavera3, microstation,NavisWorks, SPR,2DCad Piping
DetailedEngineeringDesign,andCDMS.
Level of Experience
12+Years’ experienceinthe fieldof Refinery, Petrochem,Oil&Gas
and Constructionof variousPlants.
Fieldsof Experience
Experience inpipingDetailedEngineering,QualityControl and
Construction of variousLNGplant,refinery,Petrochem, Oil&Gas,
FEED (FrontEnd EngineeringDesign).Workingondifferent
weatherconditions(tropical,cold,hotandharshwinter).
Employment/CareerHistory
CH2M Hill (Abu Dhabi)
Early Power Plant Rumaila Oil Field (FEED Project)
China Petroleum Engineering & Construction Corp.
ProcessPiping DesignProfessional 1
Project Location: Rumaila Iraq
June2015 – 23 March 2016
 Responsible for the preparation and development of layouts
(General Arrangement Layout, Plot Plan) including applicable
pipe supports and material selection for auxiliary piping
according to P&ID, project standards and specs.
 Responsible forthe preparation anddevelopmentof drawings
for pipeline works.
 Coordinates with other disciplines on design interface
throughout the progress of the project.
 2D Cad and PDS operator
 Preparation and development of standards pipe support &
standard piping connection.
 Utilized 3D plant viewing software in daily piping design
check-ups
Email Address:
mvergara_8@yahoo.com.ph
Mobile Number: 0529945469
Nationality: Filipino
Citizenship: Filipino
Visa: Husband Visa
Date of Birth
01.05.1980
Education
BS ME
Bachelor of Science in
Mechanical Engineering 2003
Membership
Philippine Society of Mechanical
Engineers (Manila Chapter)
2003 to present
Languages Spoken
Tagalog /English
Computer Skills
Auto Cad 2013
Microstation V8
Plant Design System
Smart Plant Review
Primavera 3
Word
Excel
Power Point
Chiyoda Document Management
System
Navis Works
Name(Maya V. Tatel)
2
 Utilized PDS in inputting initial manual piping designs layout
into electronic design system
 Checking and verification of pre-isometric drawings if design
are met prior to approval for final isometric production
 Responsible forcontrollingqualityandBOM(bill of materials),
and coordinating with the clients and other engineering
discipline.
 Responsible forexpeditingthe engineeringscheduleand work
hours.
CH2M Hill (Abu Dhabi)
FEED Projects (ChemaWeyaat)
Abu Dhabi National Chemicals Company PJSC
ProcessPiping DesignProfessional 1
Project Location: Abu Dhabi
Oct 28. 2013 – March. 2015
 Preparation and development of layouts (General
Arrangement Layout, Plot Plan) including applicable pipe
supportsandmaterial selection for auxiliary piping according
to P&ID, project standards and specs.
 Coordinates with other disciplines on design interface
throughout the progress of the project.
 2D Cad and PDS operator
 Initiate quality checking of drawings prior to submissions,
standards and specification as per Client.
 Preparation and development of standards pipe support.
 Utilized 3D plant viewing software in daily piping design
check-ups
 Utilized PDS in inputting initial manual piping designs layout
intoelectronicdesignsystemandpipinggeneral arrangement
drawing production
 Checkingandverificationof pre-isometric drawings if designs
are meet prior to approval for final isometric production.
 Responsible forcontrollingqualityandBOM(bill of materials),
and coordinating with the clients and other engineering
discipline.
 Responsible forexpeditingthe engineeringscheduleand work
hours.
Name(Maya V. Tatel)
3
Amana Pipelines LLC (Dubai)
Aviation Projects
Dubai World Central
Al Maktoum International Airport,
Abu Dhabi Airport,
Oman Airport
PipingDesigner
Project Location: Dubai, Abu Dhabi and Oman
Jun. 2012 – Sept. 2013
 Preparation and development of piping layouts including
applicable pipe supports and material selection for auxiliary
piping according to P&ID, project standards and specs.
 Responsible forthe preparation anddevelopmentof drawings
for pipeline works.
 Update and encode control list of documents for issuance
 Coordinates with other disciplines on design interface
throughout the progress of the project.
 2D Cad Operator
 Initiate quality checking of Isometric drawings prior to
submissions, standards and specification as per Client.
Chiyoda Corporation (Philippines)
TMP Project
PipingDesignEngineer
Area Leader
Project Location: Sarawak Malaysia
Feb. 2011 – Feb. 2012
 Lead the execution of piping design/modeling in accordance
with drawings, standards and project specification.
 Initiate quality checking of Pre-Iso, Final and IFC of Isometric
drawings prior to submissions to Yokohama thru SPR, Navis
Works,standards and specification as per Client required the
supports to be added in ISO. Dwgs.
 Provide Isometric sketches to assist PDS designers on piping
3D modelingandassure mymembers of awareness on piping
standards, Project specs, and PCD engineering memo.
 Update and encode control list of documents for issuance
 Operate PDS modeling when required.
 Coordinates with other disciplines on design interface
throughout the progress of the project.
Name(Maya V. Tatel)
4
Chiyoda Corporation (Philippines/Japan)
HSFCC Project
AKG-2 Project
PipingDesignEngineer
Project Location: Japan
Sep. 2009 – Jan. 2011
 Preparation and development of piping layouts including
applicable pipe supports and material selection for auxiliary
piping according to P&ID, project standards and specs.
 Checkingandverificationof pre-isometric drawings if designs
are meet prior to approval for final isometric production and
issuance for construction.
 Preparation and development of special pipe support layout
when use of standards pipe support are not suitable on the
desired location.
 Checkingof initial special pipe support CAD drawings to make
sure that the necessary information are indicated on the
drawing prior to submission to Pipe support group for load
calculation and approval.
 Checkingof pipinggeneral arrangementdrawingspriortofinal
issuance at site.
 Supervision and monitoring 2D CAD activities.
 Utilized PDS in inputting initial manual piping designs layout
into electronic design system and in isometric and piping
general arrangement drawing production.
 Utilized 3D plant viewing software in daily piping design
check-ups.
 Coordinates with other disciplines.
 Document controller.
Chiyoda Corporation (Singapore)
Shell Project (As Built)
PipingDesigner
Project Location: Singapore
Nov. 2008 – Jul. 2009
 Preparation and development of piping layouts including
applicable pipe supports and material selection for auxiliary
piping according to P&ID, project standards and specs.
Name(Maya V. Tatel)
5
 Checkingandverificationof pre-isometric drawings if designs
are meet prior to approval for final isometric production and
issuance for construction.
 Preparation and development of special pipe support layout
when use of standards pipe support are not suitable on the
desired location.
 Checkingof initial special pipe support CAD drawings to make
sure that the necessary information are indicated on the
drawing prior to submission to Pipe support group for load
calculation and approval.
 Checkingof pipinggeneral arrangementdrawingspriortofinal
issuance at site.
 Utilized PDS in inputting initial manual piping designs layout
into electronic design system and in isometric and piping
general arrangement drawing production.
 Coordinates with other disciplines.
Chiyoda Corporation (Japan)
RasGas Expansion Project
PipingDesigner
Project Location: RasLaffan Qatar
Feb. 2005 – Oct. 2008
 Preparation and development of piping layouts including
applicable pipe supports and material selection for auxiliary
piping according to P&ID, project standards and specs.
 Checkingandverificationof pre-isometric drawings if designs
are meet prior to approval for final isometric production and
issuance for construction.
 Preparation and development of special pipe support layout
when use of standards pipe support are not suitable on the
desired location.
 Checkingof initial special pipe support CAD drawings to make
sure that the necessary information are indicated on the
drawing prior to submission to Pipe support group for load
calculation and approval.
 Checkingof pipinggeneral arrangementdrawingspriortofinal
issuance at site.
 Supervision and monitoring 2D CAD activities.
Name(Maya V. Tatel)
6
 Utilized PDS in inputting initial manual piping designs layout
into electronic design system and in isometric and piping
general arrangement drawing production.
 Utilized 3D plant viewing software in daily piping design
check-ups.
 Coordinates with other disciplines.
Chiyoda Corporation (Philippines)
SEG LNG Project
Junior PipingDesigner
Project Location: Sakhalin Island,Russian Federation
Oct. 2004 – Feb. 2005
 Preparation and development of piping layouts including
applicable pipe supports and material selection for auxiliary
piping according to P&ID, project standards and specs.
 Checking and verification of pre-isometric drawings.
 Preparation and development of special pipe support layout
when use of standards pipe support are not suitable on the
desired location.
 Checkingof pipinggeneral arrangementdrawingspriortofinal
issuance at site.
 PDS and 2D Operator.
 Document controller.
 Coordinates with other disciplines.
Training and Information
1. Auto Shop (QC Training) - Philippines
2. 2D Cad Training - Philippines
3. Microstation V6 Training - Philippines
4. PDS Training - Philippines
5. Primavera 3 Training – Yokohama Japan
6. Navis Works - Philippines
7. Piping International Codes - Philippines
8. ASME & API - Philippines
9. Piping Detailed Engineering Design - Philippines

MVTatel

  • 1.
    1 Maya V.Tatel ProcessPiping Designer Profile Haswide exposure inDetailedDesignandEngineeringinlarge Refinery, Petrochemicals,Oil&GasandConstructionof various Plants. Has beeninvolvedwithdetaileddesign,FEED(FrontEnd EngineeringDesign) andengineeringof reputedconsultant and construction suchas CH2M Hill Canada LimitedatAbuDhabi UAE, AmanaPipelinesLLCDubai UAE, ChiyodaCorporationInc. (Philippines,Singaporeand YokohamaJapan),.Hasstrong knowledge inASME&API,PipingInternational Codes,PDS, Primavera3, microstation,NavisWorks, SPR,2DCad Piping DetailedEngineeringDesign,andCDMS. Level of Experience 12+Years’ experienceinthe fieldof Refinery, Petrochem,Oil&Gas and Constructionof variousPlants. Fieldsof Experience Experience inpipingDetailedEngineering,QualityControl and Construction of variousLNGplant,refinery,Petrochem, Oil&Gas, FEED (FrontEnd EngineeringDesign).Workingondifferent weatherconditions(tropical,cold,hotandharshwinter). Employment/CareerHistory CH2M Hill (Abu Dhabi) Early Power Plant Rumaila Oil Field (FEED Project) China Petroleum Engineering & Construction Corp. ProcessPiping DesignProfessional 1 Project Location: Rumaila Iraq June2015 – 23 March 2016  Responsible for the preparation and development of layouts (General Arrangement Layout, Plot Plan) including applicable pipe supports and material selection for auxiliary piping according to P&ID, project standards and specs.  Responsible forthe preparation anddevelopmentof drawings for pipeline works.  Coordinates with other disciplines on design interface throughout the progress of the project.  2D Cad and PDS operator  Preparation and development of standards pipe support & standard piping connection.  Utilized 3D plant viewing software in daily piping design check-ups Email Address: mvergara_8@yahoo.com.ph Mobile Number: 0529945469 Nationality: Filipino Citizenship: Filipino Visa: Husband Visa Date of Birth 01.05.1980 Education BS ME Bachelor of Science in Mechanical Engineering 2003 Membership Philippine Society of Mechanical Engineers (Manila Chapter) 2003 to present Languages Spoken Tagalog /English Computer Skills Auto Cad 2013 Microstation V8 Plant Design System Smart Plant Review Primavera 3 Word Excel Power Point Chiyoda Document Management System Navis Works
  • 2.
    Name(Maya V. Tatel) 2 Utilized PDS in inputting initial manual piping designs layout into electronic design system  Checking and verification of pre-isometric drawings if design are met prior to approval for final isometric production  Responsible forcontrollingqualityandBOM(bill of materials), and coordinating with the clients and other engineering discipline.  Responsible forexpeditingthe engineeringscheduleand work hours. CH2M Hill (Abu Dhabi) FEED Projects (ChemaWeyaat) Abu Dhabi National Chemicals Company PJSC ProcessPiping DesignProfessional 1 Project Location: Abu Dhabi Oct 28. 2013 – March. 2015  Preparation and development of layouts (General Arrangement Layout, Plot Plan) including applicable pipe supportsandmaterial selection for auxiliary piping according to P&ID, project standards and specs.  Coordinates with other disciplines on design interface throughout the progress of the project.  2D Cad and PDS operator  Initiate quality checking of drawings prior to submissions, standards and specification as per Client.  Preparation and development of standards pipe support.  Utilized 3D plant viewing software in daily piping design check-ups  Utilized PDS in inputting initial manual piping designs layout intoelectronicdesignsystemandpipinggeneral arrangement drawing production  Checkingandverificationof pre-isometric drawings if designs are meet prior to approval for final isometric production.  Responsible forcontrollingqualityandBOM(bill of materials), and coordinating with the clients and other engineering discipline.  Responsible forexpeditingthe engineeringscheduleand work hours.
  • 3.
    Name(Maya V. Tatel) 3 AmanaPipelines LLC (Dubai) Aviation Projects Dubai World Central Al Maktoum International Airport, Abu Dhabi Airport, Oman Airport PipingDesigner Project Location: Dubai, Abu Dhabi and Oman Jun. 2012 – Sept. 2013  Preparation and development of piping layouts including applicable pipe supports and material selection for auxiliary piping according to P&ID, project standards and specs.  Responsible forthe preparation anddevelopmentof drawings for pipeline works.  Update and encode control list of documents for issuance  Coordinates with other disciplines on design interface throughout the progress of the project.  2D Cad Operator  Initiate quality checking of Isometric drawings prior to submissions, standards and specification as per Client. Chiyoda Corporation (Philippines) TMP Project PipingDesignEngineer Area Leader Project Location: Sarawak Malaysia Feb. 2011 – Feb. 2012  Lead the execution of piping design/modeling in accordance with drawings, standards and project specification.  Initiate quality checking of Pre-Iso, Final and IFC of Isometric drawings prior to submissions to Yokohama thru SPR, Navis Works,standards and specification as per Client required the supports to be added in ISO. Dwgs.  Provide Isometric sketches to assist PDS designers on piping 3D modelingandassure mymembers of awareness on piping standards, Project specs, and PCD engineering memo.  Update and encode control list of documents for issuance  Operate PDS modeling when required.  Coordinates with other disciplines on design interface throughout the progress of the project.
  • 4.
    Name(Maya V. Tatel) 4 ChiyodaCorporation (Philippines/Japan) HSFCC Project AKG-2 Project PipingDesignEngineer Project Location: Japan Sep. 2009 – Jan. 2011  Preparation and development of piping layouts including applicable pipe supports and material selection for auxiliary piping according to P&ID, project standards and specs.  Checkingandverificationof pre-isometric drawings if designs are meet prior to approval for final isometric production and issuance for construction.  Preparation and development of special pipe support layout when use of standards pipe support are not suitable on the desired location.  Checkingof initial special pipe support CAD drawings to make sure that the necessary information are indicated on the drawing prior to submission to Pipe support group for load calculation and approval.  Checkingof pipinggeneral arrangementdrawingspriortofinal issuance at site.  Supervision and monitoring 2D CAD activities.  Utilized PDS in inputting initial manual piping designs layout into electronic design system and in isometric and piping general arrangement drawing production.  Utilized 3D plant viewing software in daily piping design check-ups.  Coordinates with other disciplines.  Document controller. Chiyoda Corporation (Singapore) Shell Project (As Built) PipingDesigner Project Location: Singapore Nov. 2008 – Jul. 2009  Preparation and development of piping layouts including applicable pipe supports and material selection for auxiliary piping according to P&ID, project standards and specs.
  • 5.
    Name(Maya V. Tatel) 5 Checkingandverificationof pre-isometric drawings if designs are meet prior to approval for final isometric production and issuance for construction.  Preparation and development of special pipe support layout when use of standards pipe support are not suitable on the desired location.  Checkingof initial special pipe support CAD drawings to make sure that the necessary information are indicated on the drawing prior to submission to Pipe support group for load calculation and approval.  Checkingof pipinggeneral arrangementdrawingspriortofinal issuance at site.  Utilized PDS in inputting initial manual piping designs layout into electronic design system and in isometric and piping general arrangement drawing production.  Coordinates with other disciplines. Chiyoda Corporation (Japan) RasGas Expansion Project PipingDesigner Project Location: RasLaffan Qatar Feb. 2005 – Oct. 2008  Preparation and development of piping layouts including applicable pipe supports and material selection for auxiliary piping according to P&ID, project standards and specs.  Checkingandverificationof pre-isometric drawings if designs are meet prior to approval for final isometric production and issuance for construction.  Preparation and development of special pipe support layout when use of standards pipe support are not suitable on the desired location.  Checkingof initial special pipe support CAD drawings to make sure that the necessary information are indicated on the drawing prior to submission to Pipe support group for load calculation and approval.  Checkingof pipinggeneral arrangementdrawingspriortofinal issuance at site.  Supervision and monitoring 2D CAD activities.
  • 6.
    Name(Maya V. Tatel) 6 Utilized PDS in inputting initial manual piping designs layout into electronic design system and in isometric and piping general arrangement drawing production.  Utilized 3D plant viewing software in daily piping design check-ups.  Coordinates with other disciplines. Chiyoda Corporation (Philippines) SEG LNG Project Junior PipingDesigner Project Location: Sakhalin Island,Russian Federation Oct. 2004 – Feb. 2005  Preparation and development of piping layouts including applicable pipe supports and material selection for auxiliary piping according to P&ID, project standards and specs.  Checking and verification of pre-isometric drawings.  Preparation and development of special pipe support layout when use of standards pipe support are not suitable on the desired location.  Checkingof pipinggeneral arrangementdrawingspriortofinal issuance at site.  PDS and 2D Operator.  Document controller.  Coordinates with other disciplines. Training and Information 1. Auto Shop (QC Training) - Philippines 2. 2D Cad Training - Philippines 3. Microstation V6 Training - Philippines 4. PDS Training - Philippines 5. Primavera 3 Training – Yokohama Japan 6. Navis Works - Philippines 7. Piping International Codes - Philippines 8. ASME & API - Philippines 9. Piping Detailed Engineering Design - Philippines