1. The document provides instructions for synchronizing a thermal power plant generator to the grid. Key steps include checking that isolators and instruments are ready, testing excitation equipment, matching the generator's voltage and frequency to the grid using the automatic voltage regulator and speeder gear, and closing the generator breaker when the synchroscope needle indicates the proper phase to connect safely.