Operation of steam turbine is a complex process. Before starting the rolling of a
turbine, auxiliary systems, are to be properly put in service. Special care is required
to be taken for starting of Turbine.
Normally for start up of a turbine some sequence of operation is
followed. We will discuss the operation of different systems as per sequence.
NOTE-:
Don’t do any field activities without informing to control room
Energy | Environment | Chemical www.thermaxglobal.com
Block diagram
Open all
drains
Steam
line
charge
cooling
water
operation
Condensa
te steam
operation
Oil
System
Barring
gear
operation
Vacuum
build-up
Gland
steam
charge
Rolling of
turbine
Synchroni
zation
clearance
Close all
drains
cooling water operation
Energy | Environment | Chemical www.thermaxglobal.com
Energy | Environment | Chemical www.thermaxglobal.com
Operation of steam line charge.
1. First of all drains are should be in open condition before start the steam line charging.
2. Open the warm up went to charge the Turbine inlet steam line as per OEM suggested
parameters.
3. Give clearance to control room for open the MSSV Bypass .
4. Throttle the steam line drain after removing of condensate.
5. After steam line in operation close the main drain and traps to be taken in line.
Energy | Environment | Chemical www.thermaxglobal.com
Before Steam Charging
Following Drains should be in open condition.
1. Main steam line drain.
2. Warm-up vent open.
3. Throttle valve drain.
4. ESV drain.
5. Casing drain.
6. Wheel case drain.
7. Extraction line drain.
8. PRDS line drain.
Energy | Environment | Chemical www.thermaxglobal.com
Casing drain ESV Drain
Energy | Environment | Chemical www.thermaxglobal.com
QCNRV before & after drain Wheel chamber drain
Energy | Environment | Chemical www.thermaxglobal.com
Throttle valve drain. Main steam line drain.
Energy | Environment | Chemical www.thermaxglobal.com
Operation of cooling water system
To circulate cooling water in the condenser, cooling water pumps are to be started.
Following steps are followed to circulate cooling water in the condenser.
1. Ensure level of the cooling tower basin is normal.
2. Keep suction valve of the pump in open condition and discharge valve in closed
condition.
3 Ensure inlet and outlet cooling water valves of condenser and hot water distributor
valves of cooling tower are in open condition.
4. Do the priming & Start the pump. If there is variable speed drive then start the pump
at lower speed and gradually increase the speed.
5. Open the discharge valve.
6. Observe cooling water is falling on the cooling tower.
7. Increase speed or Start other pump to get required amount of cooling water flow at
the condenser. –
8.Observe all the cooling water pumps are sharing load.
Energy | Environment | Chemical www.thermaxglobal.com
Inlet and outlet cooling water valves
of condenser
level of the cooling tower basin
Energy | Environment | Chemical www.thermaxglobal.com
Condensate steam operation
1.Ensure condenser hot well level is adequate. Otherwise maintain the hot well with
make up DM water.
2. Open suction of the pump. Start the pump. Open discharge valve and Ensure
Differential pressure of the strainer is normal.
3. Open condensate inlet and outlet valves of GVC, ejector condenser.
Energy | Environment | Chemical www.thermaxglobal.com
Condensate extraction pump
Energy | Environment | Chemical www.thermaxglobal.com
Operation of oil system
1. Ensure the all work permit is closed.
2. Ensure Proper supply is available
3. Ensure emergency push button is release from field.
4. Ensure Main oil tank level is normal.
5. Valves provided at oil line at oil filter and oil cooler are in open condition.
6. Cooling water outlet valve of oil cooler is in close condition .
7. Start oil pump.
8. Check oil filter differential pressure. If it is high, change the filter cartridge or change the
filter.
9. Maintain oil temperature by adjusting cooling water outlet valve of oil cooler.
10. Keep the standby oil pump and Emergency oil pump in Auto mode.
11. Ensure overhead tank is full.
Energy | Environment | Chemical www.thermaxglobal.com
Oil system
Energy | Environment | Chemical www.thermaxglobal.com
Overhead tank overflow indication EOP mode selection
Energy | Environment | Chemical www.thermaxglobal.com
Operation of barring gear
Before rolling, turbine is required to be kept on barring operation at least 8
hours before. To put the turbine on barring operation.
1. Ensure lube oil system(AOP PUMP) is in service and oil is circulating at
all the bearings and oil pressure is at desired level.i.e.1.8-2kg/cm2.
2. Ensure emergency release button from local.
3. Start barring gear motor.
4. Observe rotor is rotating at barring speed without increase in bearing
vibration and temperature and there is no abnormal sound.
NOTE-:
when DC supply failed then Put BGM in manual mode and local
emergency push button of BGM should be pushed.
Energy | Environment | Chemical www.thermaxglobal.com
Vacuum build up
Ejector/
hogger
Vacuum
pump
Energy | Environment | Chemical www.thermaxglobal.com
Vacuum build up
1.Ensure auxiliary steam at desired pressure and temperature is available.
2. Ensure the vacuum break valve of the condenser is closed.
3. Ensure cooling water is circulating in the condenser and turbine gland is charged
fully.
4. Open steam valve of the hogger.
5. Observe steam is vented to atmosphere.
6. Open hogger air valve.
7. Observe vacuum inside condenser is increasing slowly
8. After normalization of plant take ejector in line.
Energy | Environment | Chemical www.thermaxglobal.com
Ejector & Hogger system
Steam valve Air valve
Energy | Environment | Chemical www.thermaxglobal.com
vacuum pump
Energy | Environment | Chemical www.thermaxglobal.com
Operation of gland steam charging
1.ensure auxiliary steam is available from PRDS at desired pressure and
temperature i.e. 10 kg /cm2 & 250 deg.c
2. Ensure GVC is in running condition.
3.Open gland steam header and gland drains.
4.Open HP side valve slowly. (1)
5.Open LP side valve slowly.(2)
1 2
Energy | Environment | Chemical www.thermaxglobal.com
Rolling of turbine
1. Ensure lube oil and control oil is available, cooling water is flowing in
condenser, turbine is on barring, gland is properly charged and vacuum is
available.
2. Steam pressure and temperature are within limit.
3. All the turbine tripping interlocks are healthy.
4. .Ensure ESV is in closed position .
5. Acknowledge the Alarm on DCS as well TCP
6. Alarm rest on DCS as well TCP
7. Turbine Trip reset
8. LP reset. On DCS if not reset do on field.
9. SOV reset from panel.
10. ESV open command.
11. Woodward 505 press “RESET” button.
12. Woodward 505 press “RUN” button.
13. observe bearing temperature, lube oil pressure at bearings, bearing
vibration, any abnormal sound during start-up.
Energy | Environment | Chemical www.thermaxglobal.com
14. Ensure barring device is disengaged.
15.Maintain lube oil temperature by adjusting cooling water at oil cooler.
16. At critical speed zone the speed to be raised faster and bearing vibrations should
be within limit.
17. Once turbine reaches full speed check all the parameters.
18.if the main oil pump is mechanically coupled with turbine rotor then stop AOP and
check oil pressure.
19. Give clearance to electrical dept. for synchronization.
20. After taking load on TG close the warm up went & all drains of turbine
Energy | Environment | Chemical www.thermaxglobal.com
Turbine Alarm Rest page
Energy | Environment | Chemical www.thermaxglobal.com
LP Reset
Energy | Environment | Chemical www.thermaxglobal.com
SOV Reset ESV Open command
Energy | Environment | Chemical www.thermaxglobal.com
Woodward 505
Energy | Environment | Chemical www.thermaxglobal.com
Thank you ……

More Related Content

What's hot

Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overviewGaurav Kaushik
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations Ashish Kumar Jain
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergenciesManohar Tatwawadi
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING Nitin Patel
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownAshvani Shukla
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSManohar Tatwawadi
 
660 mw turbo governing & protection system
660 mw turbo  governing & protection system660 mw turbo  governing & protection system
660 mw turbo governing & protection systemAshvani Shukla
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGSURAJ KUMAR
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)Billa ParameswaraRao
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
condensate system
condensate systemcondensate system
condensate systemvikrantdesh
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedureAshvani Shukla
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protectionanujkumarsingh79
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
Steam Turbine and Condenser
Steam Turbine and CondenserSteam Turbine and Condenser
Steam Turbine and CondenserMulugeta Wotango
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Manohar Tatwawadi
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTahoor Alam Khan
 

What's hot (20)

Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overview
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergencies
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
 
660 mw turbo governing & protection system
660 mw turbo  governing & protection system660 mw turbo  governing & protection system
660 mw turbo governing & protection system
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
boiler turbine emergency
boiler turbine emergencyboiler turbine emergency
boiler turbine emergency
 
condensate system
condensate systemcondensate system
condensate system
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedure
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Steam Turbine and Condenser
Steam Turbine and CondenserSteam Turbine and Condenser
Steam Turbine and Condenser
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & Working
 

Similar to Final Turbine rolling ppt Akshay.pptx

Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfMadan Karki
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-systemMowaten Masry
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptxssuser0cdaa1
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.pptssuser9e9be71
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answersmark robertson
 
Hrsg startup proceudre
Hrsg startup proceudreHrsg startup proceudre
Hrsg startup proceudrekamaraprasad
 
compressor Operation pdf.pdf
compressor Operation pdf.pdfcompressor Operation pdf.pdf
compressor Operation pdf.pdfyusuf699644
 
Compressor operation.pdf
Compressor operation.pdfCompressor operation.pdf
Compressor operation.pdfMBouderbala
 
hydroelectric power plant_overview.ppt
hydroelectric power plant_overview.ppthydroelectric power plant_overview.ppt
hydroelectric power plant_overview.pptAnonymousYoutuber2
 
Sabardairy Training Report
Sabardairy Training ReportSabardairy Training Report
Sabardairy Training ReportNiravDesai66
 
A guide for firetube boiler testes
A guide for firetube boiler   testesA guide for firetube boiler   testes
A guide for firetube boiler testesederpitapeva
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Manohar Tatwawadi
 
Condensate Return Solutions.ppt
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.pptssuser8006c7
 
B737 NG Air Systems
B737 NG Air SystemsB737 NG Air Systems
B737 NG Air Systemstheoryce
 
Main air compressors PPT.pptx
Main air compressors PPT.pptxMain air compressors PPT.pptx
Main air compressors PPT.pptxdeepu501949
 
Archive for the ‘refrigerator commissioning’ tag
Archive for the ‘refrigerator commissioning’ tagArchive for the ‘refrigerator commissioning’ tag
Archive for the ‘refrigerator commissioning’ tagMuhammad Awais
 

Similar to Final Turbine rolling ppt Akshay.pptx (20)

Turbine operation.pptx
Turbine operation.pptxTurbine operation.pptx
Turbine operation.pptx
 
Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdf
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptx
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answers
 
Curso refrigeración comercial y domestica
Curso refrigeración comercial y domesticaCurso refrigeración comercial y domestica
Curso refrigeración comercial y domestica
 
Plant Air & Inst Air.ppt
Plant Air & Inst Air.pptPlant Air & Inst Air.ppt
Plant Air & Inst Air.ppt
 
Hrsg startup proceudre
Hrsg startup proceudreHrsg startup proceudre
Hrsg startup proceudre
 
compressor Operation pdf.pdf
compressor Operation pdf.pdfcompressor Operation pdf.pdf
compressor Operation pdf.pdf
 
Compressor operation.pdf
Compressor operation.pdfCompressor operation.pdf
Compressor operation.pdf
 
hydroelectric power plant_overview.ppt
hydroelectric power plant_overview.ppthydroelectric power plant_overview.ppt
hydroelectric power plant_overview.ppt
 
Sabardairy Training Report
Sabardairy Training ReportSabardairy Training Report
Sabardairy Training Report
 
A guide for firetube boiler testes
A guide for firetube boiler   testesA guide for firetube boiler   testes
A guide for firetube boiler testes
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
 
Condensate Return Solutions.ppt
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.ppt
 
B737 NG Air Systems
B737 NG Air SystemsB737 NG Air Systems
B737 NG Air Systems
 
Main air compressors PPT.pptx
Main air compressors PPT.pptxMain air compressors PPT.pptx
Main air compressors PPT.pptx
 
Gas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdfGas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdf
 
Archive for the ‘refrigerator commissioning’ tag
Archive for the ‘refrigerator commissioning’ tagArchive for the ‘refrigerator commissioning’ tag
Archive for the ‘refrigerator commissioning’ tag
 

Recently uploaded

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Recently uploaded (20)

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 

Final Turbine rolling ppt Akshay.pptx

  • 1. Energy | Environment | Chemical www.thermaxglobal.com Presented by –: Mr. Akshay kunakekar shift- incharge
  • 2. Energy | Environment | Chemical www.thermaxglobal.com Introduction Operation of steam turbine is a complex process. Before starting the rolling of a turbine, auxiliary systems, are to be properly put in service. Special care is required to be taken for starting of Turbine. Normally for start up of a turbine some sequence of operation is followed. We will discuss the operation of different systems as per sequence. NOTE-: Don’t do any field activities without informing to control room
  • 3. Energy | Environment | Chemical www.thermaxglobal.com Block diagram Open all drains Steam line charge cooling water operation Condensa te steam operation Oil System Barring gear operation Vacuum build-up Gland steam charge Rolling of turbine Synchroni zation clearance Close all drains cooling water operation
  • 4. Energy | Environment | Chemical www.thermaxglobal.com
  • 5. Energy | Environment | Chemical www.thermaxglobal.com Operation of steam line charge. 1. First of all drains are should be in open condition before start the steam line charging. 2. Open the warm up went to charge the Turbine inlet steam line as per OEM suggested parameters. 3. Give clearance to control room for open the MSSV Bypass . 4. Throttle the steam line drain after removing of condensate. 5. After steam line in operation close the main drain and traps to be taken in line.
  • 6. Energy | Environment | Chemical www.thermaxglobal.com Before Steam Charging Following Drains should be in open condition. 1. Main steam line drain. 2. Warm-up vent open. 3. Throttle valve drain. 4. ESV drain. 5. Casing drain. 6. Wheel case drain. 7. Extraction line drain. 8. PRDS line drain.
  • 7. Energy | Environment | Chemical www.thermaxglobal.com Casing drain ESV Drain
  • 8. Energy | Environment | Chemical www.thermaxglobal.com QCNRV before & after drain Wheel chamber drain
  • 9. Energy | Environment | Chemical www.thermaxglobal.com Throttle valve drain. Main steam line drain.
  • 10. Energy | Environment | Chemical www.thermaxglobal.com Operation of cooling water system To circulate cooling water in the condenser, cooling water pumps are to be started. Following steps are followed to circulate cooling water in the condenser. 1. Ensure level of the cooling tower basin is normal. 2. Keep suction valve of the pump in open condition and discharge valve in closed condition. 3 Ensure inlet and outlet cooling water valves of condenser and hot water distributor valves of cooling tower are in open condition. 4. Do the priming & Start the pump. If there is variable speed drive then start the pump at lower speed and gradually increase the speed. 5. Open the discharge valve. 6. Observe cooling water is falling on the cooling tower. 7. Increase speed or Start other pump to get required amount of cooling water flow at the condenser. – 8.Observe all the cooling water pumps are sharing load.
  • 11. Energy | Environment | Chemical www.thermaxglobal.com Inlet and outlet cooling water valves of condenser level of the cooling tower basin
  • 12. Energy | Environment | Chemical www.thermaxglobal.com Condensate steam operation 1.Ensure condenser hot well level is adequate. Otherwise maintain the hot well with make up DM water. 2. Open suction of the pump. Start the pump. Open discharge valve and Ensure Differential pressure of the strainer is normal. 3. Open condensate inlet and outlet valves of GVC, ejector condenser.
  • 13. Energy | Environment | Chemical www.thermaxglobal.com Condensate extraction pump
  • 14. Energy | Environment | Chemical www.thermaxglobal.com Operation of oil system 1. Ensure the all work permit is closed. 2. Ensure Proper supply is available 3. Ensure emergency push button is release from field. 4. Ensure Main oil tank level is normal. 5. Valves provided at oil line at oil filter and oil cooler are in open condition. 6. Cooling water outlet valve of oil cooler is in close condition . 7. Start oil pump. 8. Check oil filter differential pressure. If it is high, change the filter cartridge or change the filter. 9. Maintain oil temperature by adjusting cooling water outlet valve of oil cooler. 10. Keep the standby oil pump and Emergency oil pump in Auto mode. 11. Ensure overhead tank is full.
  • 15. Energy | Environment | Chemical www.thermaxglobal.com Oil system
  • 16. Energy | Environment | Chemical www.thermaxglobal.com Overhead tank overflow indication EOP mode selection
  • 17. Energy | Environment | Chemical www.thermaxglobal.com Operation of barring gear Before rolling, turbine is required to be kept on barring operation at least 8 hours before. To put the turbine on barring operation. 1. Ensure lube oil system(AOP PUMP) is in service and oil is circulating at all the bearings and oil pressure is at desired level.i.e.1.8-2kg/cm2. 2. Ensure emergency release button from local. 3. Start barring gear motor. 4. Observe rotor is rotating at barring speed without increase in bearing vibration and temperature and there is no abnormal sound. NOTE-: when DC supply failed then Put BGM in manual mode and local emergency push button of BGM should be pushed.
  • 18. Energy | Environment | Chemical www.thermaxglobal.com Vacuum build up Ejector/ hogger Vacuum pump
  • 19. Energy | Environment | Chemical www.thermaxglobal.com Vacuum build up 1.Ensure auxiliary steam at desired pressure and temperature is available. 2. Ensure the vacuum break valve of the condenser is closed. 3. Ensure cooling water is circulating in the condenser and turbine gland is charged fully. 4. Open steam valve of the hogger. 5. Observe steam is vented to atmosphere. 6. Open hogger air valve. 7. Observe vacuum inside condenser is increasing slowly 8. After normalization of plant take ejector in line.
  • 20. Energy | Environment | Chemical www.thermaxglobal.com Ejector & Hogger system Steam valve Air valve
  • 21. Energy | Environment | Chemical www.thermaxglobal.com vacuum pump
  • 22. Energy | Environment | Chemical www.thermaxglobal.com Operation of gland steam charging 1.ensure auxiliary steam is available from PRDS at desired pressure and temperature i.e. 10 kg /cm2 & 250 deg.c 2. Ensure GVC is in running condition. 3.Open gland steam header and gland drains. 4.Open HP side valve slowly. (1) 5.Open LP side valve slowly.(2) 1 2
  • 23. Energy | Environment | Chemical www.thermaxglobal.com Rolling of turbine 1. Ensure lube oil and control oil is available, cooling water is flowing in condenser, turbine is on barring, gland is properly charged and vacuum is available. 2. Steam pressure and temperature are within limit. 3. All the turbine tripping interlocks are healthy. 4. .Ensure ESV is in closed position . 5. Acknowledge the Alarm on DCS as well TCP 6. Alarm rest on DCS as well TCP 7. Turbine Trip reset 8. LP reset. On DCS if not reset do on field. 9. SOV reset from panel. 10. ESV open command. 11. Woodward 505 press “RESET” button. 12. Woodward 505 press “RUN” button. 13. observe bearing temperature, lube oil pressure at bearings, bearing vibration, any abnormal sound during start-up.
  • 24. Energy | Environment | Chemical www.thermaxglobal.com 14. Ensure barring device is disengaged. 15.Maintain lube oil temperature by adjusting cooling water at oil cooler. 16. At critical speed zone the speed to be raised faster and bearing vibrations should be within limit. 17. Once turbine reaches full speed check all the parameters. 18.if the main oil pump is mechanically coupled with turbine rotor then stop AOP and check oil pressure. 19. Give clearance to electrical dept. for synchronization. 20. After taking load on TG close the warm up went & all drains of turbine
  • 25. Energy | Environment | Chemical www.thermaxglobal.com Turbine Alarm Rest page
  • 26. Energy | Environment | Chemical www.thermaxglobal.com LP Reset
  • 27. Energy | Environment | Chemical www.thermaxglobal.com SOV Reset ESV Open command
  • 28. Energy | Environment | Chemical www.thermaxglobal.com Woodward 505
  • 29. Energy | Environment | Chemical www.thermaxglobal.com Thank you ……