9/14/2020 Manohar Tatwawadi 2
Thermal Power Cycle Schemetic
S
T
A
C
K
DRUM
FURNACE
SH
RH
ECON
A
P
H
A
P
H
PA FANS FD FANS
ID FANS
HOT PA
HEADER
COLD PA
HEADER
BUNKER,
RCF & CM
ESP
ESP
HP
HEATERS
LP
HEATERS,
EJECTOR,
GS
COOLER
CON
HP IP
LP
GEN
DEAIRATOR
FEED TANK
Boiler Feed Pumps
CEP
210 MW
P-130, T- 540
P-28, T- 320
P-24, T- 535
P-1.32, T- 180
P-0.0889, T- 43
P-0.0889, T- 43
P-22, T- 43
CW in,
T- 30
CW out,
T- 41
T- 156T- 167
P-150 T- 173
T- 255
T- 340
P-145
T- 340
9/14/2020 Manohar Tatwawadi 3
B
o
i
l
e
r
s
9/14/2020 Manohar Tatwawadi 4
Turbines
9/14/2020 Manohar Tatwawadi 5
Efficiency = Output / Input
Input - Losses
Input
Efficiency
Efficiency
100 - Losses
100
9/14/2020 Manohar Tatwawadi 6
Losses in Boiler & Efficiency
(As per Designer
Heat Supplied to
Turbine (Output)
Heat Lost
in hot flue
gasses = 6%
Other Losses
1 Moisture in Fuel 1.2%.
2 Moisture in Air 0.1%
3 Hydrogen in Fuel 5.00%
4 Radiation Loss 0.2%.
Heat Lost in Unburnt in Fly
and Bottom Ash = 0.4%
Total Heat
Input = 100%
Boiler Efficiency = 86.5%
Excess Air
Loss = 0.75%
9/14/2020 Manohar Tatwawadi 7
HP Turbine Efficiency
Inlet Steam
130kg/sq.cm
5350C
Outlet Steam
30kg/sq.cm.
2800C
HP Turbine Efficiency
= 81.11%
9/14/2020 Manohar Tatwawadi 8
IP Turbine Efficiency
Inlet Steam
27kg/sq.cm.
5350C
Outlet Steam
1.2kg/sq.cm.
2000C
IP Turbine Efficiency
= 89.83%
9/14/2020 Manohar Tatwawadi 9
LP Turbine Efficiency
Inlet Steam from IPT
0.09 kg/sq.cm. abs 470C
Outlet Steam to condenser
1.2kg/sq.cm.
2000C
LP Turbine Efficiency
= 85%
9/14/2020 Manohar Tatwawadi 10
Turbine Efficiencies
(Design Efficiencies)
9/14/2020 Manohar Tatwawadi 11
Turbine Losses
9/14/2020 Manohar Tatwawadi 12
Turbine Losses contd…
9/14/2020 Manohar Tatwawadi 13
9/14/2020 Manohar Tatwawadi 14
1. Copper Losses (I2R)
2. Iron Losses
3. Other Losses
All the above losses account to 2%
Hence the Generator Efficiency = 98%
9/14/2020 Manohar Tatwawadi 15
Steam Cycle Efficiency
Water
Steam
Turbine
Heat Energy
Energy Converted to
Electrical Energy = 40%
100%
Cycle Efficiency = 40%
Heat Taken
away in
Condenser
= 60%
9/14/2020 Manohar Tatwawadi 16
9/14/2020 Manohar Tatwawadi 17
9/14/2020 Manohar Tatwawadi 18
9/14/2020 Manohar Tatwawadi 19
9/14/2020 Manohar Tatwawadi 20
9/14/2020 Manohar Tatwawadi 21
9/14/2020 Manohar Tatwawadi 22
S
T
A
C
K
DRUM
FURNACE
SH
RH
ECON
A
P
H
A
P
H
PA FANS FD FANS
ID FANS
HOT PA
HEADER
COLD PA
HEADER
BUNKER,
RCF & CM
ESP
ESP
HP
HEATERS
LP
HEATERS,
EJECTOR,
GS
COOLER
CONDE
NSER
HP IP
LP
GEN
DEAIRATOR
FEED TANK
Boiler Feed Pumps
CEP
HOT PRIMARY AIR
HOT SECONDARY AIR
Stn. Aux-
51 Kcal
-
Heat Rejected
962 Kcal
Total Turbine
Losses includes
Heat Rejected - 1185
Kcal
Energy Input
to Turbine
2065 Kcal
Stack Loss
122 Kcal
Total Boiler Losses -
331 Kcal
Total Boiler Input -
2396 Kcal
Design Turbine Heat Rate - GTHR - 2065 Kcal/Kwh
and Gross Unit Heat Rate- GUHR - 2396 Kcal/Kwh
* Any amount of energy or heat/Coal/Water going out of cycle is increasing the heat rate.
9/14/2020 Manohar Tatwawadi 23
9/14/2020 Manohar Tatwawadi 24
9/14/2020 Manohar Tatwawadi 25
9/14/2020 Manohar Tatwawadi 26
9/14/2020 Manohar Tatwawadi 27
9/14/2020 Manohar Tatwawadi 28
9/14/2020 Manohar Tatwawadi 29

More Related Content

What's hot

Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rateManohar Tatwawadi
 
Auxiliary power consumption reduction
Auxiliary power consumption reductionAuxiliary power consumption reduction
Auxiliary power consumption reductionAmit jangra
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculationSHIVAJI CHOUDHURY
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boilerAshvani Shukla
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownNitin Mahalle
 
A technical overview of thermal power plant
A technical overview of thermal power plantA technical overview of thermal power plant
A technical overview of thermal power plantMirdul Amin Sarkar
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat BalanceManohar Tatwawadi
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~ihaxxo24
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantWater steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantHareesh VS
 
Feed water and condensate heaters
Feed water and condensate heatersFeed water and condensate heaters
Feed water and condensate heatersManohar Tatwawadi
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPSManohar Tatwawadi
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protectionanujkumarsingh79
 
Power plant performance_efficiency
Power plant performance_efficiencyPower plant performance_efficiency
Power plant performance_efficiencyKeyur Patel
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operationNitin Patel
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heaterSHIVAJI CHOUDHURY
 

What's hot (20)

Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
Auxiliary power consumption reduction
Auxiliary power consumption reductionAuxiliary power consumption reduction
Auxiliary power consumption reduction
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculation
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
A technical overview of thermal power plant
A technical overview of thermal power plantA technical overview of thermal power plant
A technical overview of thermal power plant
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantWater steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
 
Feed water and condensate heaters
Feed water and condensate heatersFeed water and condensate heaters
Feed water and condensate heaters
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
 
Heat rate formula
Heat rate formulaHeat rate formula
Heat rate formula
 
Power plant performance_efficiency
Power plant performance_efficiencyPower plant performance_efficiency
Power plant performance_efficiency
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 

Similar to THERMAL POWER PLANT EFFICIENCY AND HEAT RATE

Update Data of APR2014 in SPICEPARK
Update Data of APR2014 in SPICEPARK Update Data of APR2014 in SPICEPARK
Update Data of APR2014 in SPICEPARK Tsuyoshi Horigome
 
Update Data of SEP2014 in SPICEPARK
Update Data of SEP2014 in SPICEPARKUpdate Data of SEP2014 in SPICEPARK
Update Data of SEP2014 in SPICEPARKTsuyoshi Horigome
 
Update Data of AUG2014 in SPICEPARK
Update Data of AUG2014 in SPICEPARKUpdate Data of AUG2014 in SPICEPARK
Update Data of AUG2014 in SPICEPARKTsuyoshi Horigome
 
Update Data MAY2015 (22 Models) in SPICE PARK
Update Data MAY2015 (22 Models) in SPICE PARKUpdate Data MAY2015 (22 Models) in SPICE PARK
Update Data MAY2015 (22 Models) in SPICE PARKTsuyoshi Horigome
 
Spice park May2015 22pcs (update)
Spice park May2015 22pcs (update)Spice park May2015 22pcs (update)
Spice park May2015 22pcs (update)Tsuyoshi Horigome
 
Update 32 models(Solar Cell) in SPICE PARK(OCT2023)
Update 32 models(Solar Cell) in SPICE PARK(OCT2023)Update 32 models(Solar Cell) in SPICE PARK(OCT2023)
Update 32 models(Solar Cell) in SPICE PARK(OCT2023)Tsuyoshi Horigome
 
2014年11月度のアップデート(スパイス・パーク)
2014年11月度のアップデート(スパイス・パーク)2014年11月度のアップデート(スパイス・パーク)
2014年11月度のアップデート(スパイス・パーク)Tsuyoshi Horigome
 
Update 41 models(Solar Cell) in SPICE PARK(NOV2023)
Update 41 models(Solar Cell) in SPICE PARK(NOV2023)Update 41 models(Solar Cell) in SPICE PARK(NOV2023)
Update 41 models(Solar Cell) in SPICE PARK(NOV2023)Tsuyoshi Horigome
 
Update 10 models in SPICE PARK(MAR2019)
Update 10 models in SPICE PARK(MAR2019) Update 10 models in SPICE PARK(MAR2019)
Update 10 models in SPICE PARK(MAR2019) Tsuyoshi Horigome
 
Spice park Update of OCT2015
Spice park Update of OCT2015Spice park Update of OCT2015
Spice park Update of OCT2015Tsuyoshi Horigome
 
Spice park Update of SEP2015
Spice park Update of SEP2015Spice park Update of SEP2015
Spice park Update of SEP2015Tsuyoshi Horigome
 
Update 38 models(Solar Cell) in SPICE PARK(JUL2023)
Update 38 models(Solar Cell) in SPICE PARK(JUL2023) Update 38 models(Solar Cell) in SPICE PARK(JUL2023)
Update 38 models(Solar Cell) in SPICE PARK(JUL2023) Tsuyoshi Horigome
 
Update 42 models(Solar Cell) in SPICE PARK(APR2023)
Update 42 models(Solar Cell) in SPICE PARK(APR2023)Update 42 models(Solar Cell) in SPICE PARK(APR2023)
Update 42 models(Solar Cell) in SPICE PARK(APR2023)Tsuyoshi Horigome
 
Update 12 models in SPICE PARK(APR2019)
Update 12 models in SPICE PARK(APR2019) Update 12 models in SPICE PARK(APR2019)
Update 12 models in SPICE PARK(APR2019) Tsuyoshi Horigome
 
SPICE PARK Update of SEP2015
SPICE PARK  Update of SEP2015SPICE PARK  Update of SEP2015
SPICE PARK Update of SEP2015Tsuyoshi Horigome
 
Update 21 models in SPICE PARK(MAY2019)
Update 21 models in SPICE PARK(MAY2019)Update 21 models in SPICE PARK(MAY2019)
Update 21 models in SPICE PARK(MAY2019)Tsuyoshi Horigome
 
Update 21 models in SPICE PARK(JUN2019)
Update 21 models in SPICE PARK(JUN2019) Update 21 models in SPICE PARK(JUN2019)
Update 21 models in SPICE PARK(JUN2019) Tsuyoshi Horigome
 
Update 29 models(Solar cell) in SPICE PARK(FEB2024)
Update 29 models(Solar cell) in SPICE PARK(FEB2024)Update 29 models(Solar cell) in SPICE PARK(FEB2024)
Update 29 models(Solar cell) in SPICE PARK(FEB2024)Tsuyoshi Horigome
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTManohar Tatwawadi
 
Update 33 models(Solar Cell) in SPICE PARK(JUN2022)
Update 33 models(Solar Cell) in SPICE PARK(JUN2022)Update 33 models(Solar Cell) in SPICE PARK(JUN2022)
Update 33 models(Solar Cell) in SPICE PARK(JUN2022)Tsuyoshi Horigome
 

Similar to THERMAL POWER PLANT EFFICIENCY AND HEAT RATE (20)

Update Data of APR2014 in SPICEPARK
Update Data of APR2014 in SPICEPARK Update Data of APR2014 in SPICEPARK
Update Data of APR2014 in SPICEPARK
 
Update Data of SEP2014 in SPICEPARK
Update Data of SEP2014 in SPICEPARKUpdate Data of SEP2014 in SPICEPARK
Update Data of SEP2014 in SPICEPARK
 
Update Data of AUG2014 in SPICEPARK
Update Data of AUG2014 in SPICEPARKUpdate Data of AUG2014 in SPICEPARK
Update Data of AUG2014 in SPICEPARK
 
Update Data MAY2015 (22 Models) in SPICE PARK
Update Data MAY2015 (22 Models) in SPICE PARKUpdate Data MAY2015 (22 Models) in SPICE PARK
Update Data MAY2015 (22 Models) in SPICE PARK
 
Spice park May2015 22pcs (update)
Spice park May2015 22pcs (update)Spice park May2015 22pcs (update)
Spice park May2015 22pcs (update)
 
Update 32 models(Solar Cell) in SPICE PARK(OCT2023)
Update 32 models(Solar Cell) in SPICE PARK(OCT2023)Update 32 models(Solar Cell) in SPICE PARK(OCT2023)
Update 32 models(Solar Cell) in SPICE PARK(OCT2023)
 
2014年11月度のアップデート(スパイス・パーク)
2014年11月度のアップデート(スパイス・パーク)2014年11月度のアップデート(スパイス・パーク)
2014年11月度のアップデート(スパイス・パーク)
 
Update 41 models(Solar Cell) in SPICE PARK(NOV2023)
Update 41 models(Solar Cell) in SPICE PARK(NOV2023)Update 41 models(Solar Cell) in SPICE PARK(NOV2023)
Update 41 models(Solar Cell) in SPICE PARK(NOV2023)
 
Update 10 models in SPICE PARK(MAR2019)
Update 10 models in SPICE PARK(MAR2019) Update 10 models in SPICE PARK(MAR2019)
Update 10 models in SPICE PARK(MAR2019)
 
Spice park Update of OCT2015
Spice park Update of OCT2015Spice park Update of OCT2015
Spice park Update of OCT2015
 
Spice park Update of SEP2015
Spice park Update of SEP2015Spice park Update of SEP2015
Spice park Update of SEP2015
 
Update 38 models(Solar Cell) in SPICE PARK(JUL2023)
Update 38 models(Solar Cell) in SPICE PARK(JUL2023) Update 38 models(Solar Cell) in SPICE PARK(JUL2023)
Update 38 models(Solar Cell) in SPICE PARK(JUL2023)
 
Update 42 models(Solar Cell) in SPICE PARK(APR2023)
Update 42 models(Solar Cell) in SPICE PARK(APR2023)Update 42 models(Solar Cell) in SPICE PARK(APR2023)
Update 42 models(Solar Cell) in SPICE PARK(APR2023)
 
Update 12 models in SPICE PARK(APR2019)
Update 12 models in SPICE PARK(APR2019) Update 12 models in SPICE PARK(APR2019)
Update 12 models in SPICE PARK(APR2019)
 
SPICE PARK Update of SEP2015
SPICE PARK  Update of SEP2015SPICE PARK  Update of SEP2015
SPICE PARK Update of SEP2015
 
Update 21 models in SPICE PARK(MAY2019)
Update 21 models in SPICE PARK(MAY2019)Update 21 models in SPICE PARK(MAY2019)
Update 21 models in SPICE PARK(MAY2019)
 
Update 21 models in SPICE PARK(JUN2019)
Update 21 models in SPICE PARK(JUN2019) Update 21 models in SPICE PARK(JUN2019)
Update 21 models in SPICE PARK(JUN2019)
 
Update 29 models(Solar cell) in SPICE PARK(FEB2024)
Update 29 models(Solar cell) in SPICE PARK(FEB2024)Update 29 models(Solar cell) in SPICE PARK(FEB2024)
Update 29 models(Solar cell) in SPICE PARK(FEB2024)
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
 
Update 33 models(Solar Cell) in SPICE PARK(JUN2022)
Update 33 models(Solar Cell) in SPICE PARK(JUN2022)Update 33 models(Solar Cell) in SPICE PARK(JUN2022)
Update 33 models(Solar Cell) in SPICE PARK(JUN2022)
 

More from Manohar Tatwawadi

Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Manohar Tatwawadi
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practicesManohar Tatwawadi
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyManohar Tatwawadi
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESManohar Tatwawadi
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Manohar Tatwawadi
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plantsManohar Tatwawadi
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stationsManohar Tatwawadi
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSManohar Tatwawadi
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsManohar Tatwawadi
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...Manohar Tatwawadi
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion EquationsManohar Tatwawadi
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stationsManohar Tatwawadi
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
 
Boiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsBoiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsManohar Tatwawadi
 

More from Manohar Tatwawadi (20)

Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plants
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stations
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPS
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power Stations
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion Equations
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stations
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 
Swot Analysis
Swot AnalysisSwot Analysis
Swot Analysis
 
Boiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsBoiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power Stations
 

Recently uploaded

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 

Recently uploaded (20)

young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

THERMAL POWER PLANT EFFICIENCY AND HEAT RATE