210 MW LMW Turbine Cycle
Heat Rate Calculations
Heaters, Condensers Designs
Heat Balance, Features
Turbine Heat Rate
3/2/2021 1
Manohar Tatwawadi
3/2/2021 Manohar Tatwawadi 2
210 MW LMW Turbine
3/2/2021 Manohar Tatwawadi 3
HPT Glands
HPT
AS
39
To GC 1 Steam from
Deaerator/PRDS
AS55
OR
AS57
To LPH 4
thru ES12
To HPH 6
Sealing Chambers
Sealing Chambers
1 2 3 4 5
4 3 2 1
To GC 2
3/2/2021 Manohar Tatwawadi 4
IPT Glands
To GC 1
4 3 2 1
Steam from
Deaerator/PRDS
To GC 2
AS
40
AS55
OR
AS57
Sealing Chambers
Sealing Chambers
1 2 3
IPT
To LP4
3/2/2021 Manohar Tatwawadi 5
GLANDS
SHAFT
3/2/2021 Manohar Tatwawadi 6
LPT Glands
To GC 1
Steam from
Deaerator/PRDS
AS55
OR
AS57
1 2
2 1
Sealing
Chambers
Sealing Chambers
LPT
3/2/2021 Manohar Tatwawadi 7
Ejector
P- 4.5, T - 155
F - 1500, E-659.83
Steam from Deaerator
Condensate
to G.C.1
T - 47.27
F - 1500
T - 45.07
F - 480106
T - 43.16
F - 480106
Condensate
from CEP
Discharge
Drain to Flash
Chamber
Output Heat taken by condensate
Input heat given by steam
480106(45.07-43.16)*100
1500 (659.83-47.27)
= = 99.8 %
3/2/2021 Manohar Tatwawadi 8
GLAND STEAM CONDENSER GC1
T - 100
F - 1660
Drain to Cond
Flash Tank
T - 45.07
F - 480106
Condensate
from Ejector
P- 4.5, T - 155
F - 400, E-659.83
Steam from Deaerator
Condensate
to LPH 1
T - 47.18
F - 480106
Ejector
GLAND STEAM
COOLER (GC1)
Gland Steam
Condenser Effy.
480106(47.18-45.07)*100
1260(728.20-100)+400(659.83-100)
= = 99.7%
Steam Air
Mixture from
glands
P- 0.97, T - 280
F - 1260, E-728.20
3/2/2021 Manohar Tatwawadi 9
LOW PRESSURE HEATER NO 1
Condensate
to GC 2
T - 61.05
F - 480106
T - 47.18
F - 480106
Condensate
from GC 1
T - 65.93
F - 11989
Drain to flash
chamber in Cond.
(hd1)
P- 0.89, T - 85
F - 11989, E-622.05
Steam from
Extraction e1
from LPT
Effy of LPH No 1
480106(61.05-47.18)*100
11989(622.05-65.93)
= = 99.8%
LPH 1
3/2/2021 Manohar Tatwawadi 10
GLAND STEAM CONDENSER NO 2
Condensate
to LPH 2
T - 68.10
F - 480106
T - 61.5
F - 480106
Condensate
from LPH 1
T - 72.94
F - 4949
Drain to flash
chamber on Cond.
(gd2)
P- 0.50, T - 325
F - 4949, E-756.90
Steam from HP
& IP Glands g2
Effy of Gland
Steam
Condenser GC 2
0.8*480106(68.10-61.05)*100
4949(756.80-72.94)
= =80% (20% of
condensate is
bypassed)
80%
20%
Flow through GC2
GC 2
3/2/2021 Manohar Tatwawadi 11
LOW PRESSURE HEATER NO 2
Condensate
to LPH 3
T - 101.52
F - 555281
T - 68.10
F - 480106
Condensate
from GC 2
T - 105.78
F - 75175
Drain to
Condensate line
(hd2)
P- 1.369, T - 183
F - 25369, E-678.41
Steam from IPT
out e2
Effy of LPH 2
480106(100.86-68.10)*100
25369(678.41-105.78)+49806(130.26-105.78)
= = 99.8%
LPH 2
Drip Pump
Drain from
LPH3 (hd3)
T - 130.26
F - 49806
T-100.86, F-480106
3/2/2021 Manohar Tatwawadi 12
LOW PRESSURE HEATER NO 3
Condensate
to LPH 4
T - 125.27
F - 555281
T - 101.52
F - 555281
Condensate
from LPH2 &
Drip Pump
T - 130.26
F - 49806
Drain to LPH 2 (hd3)
P- 2.974, T - 264
F - 21033, E-715.68
Steam from IPT
Extr (e3)
Effy of LPH 3
555281(125.27-101.52)*100
21033(715.68-130.26)+28773(161.73-130.26)
= = 99.8%
LPH 3
Drain from
LPH4 (hd4)
T - 161.73
F - 28773
3/2/2021 Manohar Tatwawadi 13
LOW PRESSURE HEATER NO 4
Condensate
to Deairator
T - 156.52
F - 555281
T - 125.27
F - 555281
Condensate
from LPH3
T - 161.73
F - 28773
Drain to LPH 3 (hd4)
P- 6.911, T - 364
F - 23838, E-762.69
Steam from IPT
Extr (e4)
Effy of LPH 4
555281(156.52-125.27)*100
23838(762.69-161.73)+4395(782.31-161.73)
= = 99.7%
LPH 4
Leak off
steam HP
& IP (g3)
P-6.9, T - 161.73
F - 4935, E-782.31
3/2/2021 Manohar Tatwawadi 14
DEAERATOR - FEED TANK
Deaerator
pegging steam
From PRDS or
Extr.6(ed)
Drain from HPH
5/6 (hd5 or hd6)
Spindle leak off
from ESV/IV
Steam supply to
glands (d1)
Steam supply to
Ejectors (main
& GC1) d2+d4
Condensate
from LPH4
P-7.5, T - 479
F - 2300, E-820.28
P-1.03, T - 141
F - 2930, E-659.83
P-4.5, T - 155
F - 1900, E-659.83
T - 181.51
F - 93256
E - 802.51
F - 5984
T - 156.52
F - 555281
Feed water
to HPH5
T - 173.12
F - 652000
(555281(166.71-156.52)+4830(820.28-659.83))*100
2300(820.28-166.71)+93256(181.51-166.71)+5984(802.92-166.71)
Deaerator Effy = = 96.8%
T - 166.71
F - 652000
BFP
FEED TANK
3/2/2021 Manohar Tatwawadi 15
Deaerator Working
Note:-
1. Below 150 MW, Deaerator heating steam is tapped from HPT
at HPT exhaust.(Extraction 6)
2. Above 150 MW, Heating steam supplied from Extraction No 5
from IPT.
3. Above 150 MW, Aux Steam Supply to Main Ejector, Gland
Steam Ejector and sealing steam of Turbine Glands is changed
over from Aux PRDS to Deaerator.
4 Gland leakage Steam from ESV & IV, Drains of Heater No 5
and 6 are also fed to the deaerator.
5. Pegging steam supply is initially from PRDS and changed
over to Extraction 6 at about 100 MW Load.
3/2/2021 Manohar Tatwawadi 16
Boiler Feed Pump
The total quantity of feed water supplied from feed water tank
to boiler feed water pump is equal to the main steam flow to
the HP Turbine
Heat Added by Boiler feed pump due to mechanical churning
of water is also taken into consideration and equals to:-
T=166.71
T=173.12
Flow= 652000
= 652000(173.12-166.71) = 4179320 Kcal.
BFP
3/2/2021 Manohar Tatwawadi 17
Feed Water
to HPH 6
T - 189.69
F - 652000
T - 173.12
F - 652000
Feed water
from BFP
Discharge
T - 181.51
F - 93256
Drain to Deaeator (hd5)
P- 12.96, T - 444
F - 16640, E-802.92
Steam from IPT
Extr (e5)
Effy of HPH 5
652000(189.69-173.12)*100
16640(802.92-181.51)+76616(198.05-181.51)
= = 93.7%
HPH 5
Drain from
HPH6 (hd6)
T - 198
F - 76616, E-198
HIGH PRESSURE HEATER NO 5
3/2/2021 Manohar Tatwawadi 18
Feed Water
to HPH 7
T – 228.80
F - 652000
T – 189.69
F - 652000
Feed water
from HPH 5
T - 198.01
F - 76616
Drain to HPH 5 (hd6)
P- 28.07, T - 327
F - 40391, E-732.99
Steam from
HPT Exh. (e6)
Effy of HPH 6
652000(228.80-189.69)*100
40391(732.99-198.05)+31844(238.65-198.05)+4381(806.50-198.05)
= = 99.7%
HPH 6
Drain from
HPH7 (hd7)
T - 238
F - 31844, E-238.65
HIGH PRESSURE HEATER NO 6
Spindle
Leakage from
HPT (g5)
P- 28.07, T - 464
F - 4381, E-806.50
3/2/2021 Manohar Tatwawadi 19
HIGH PRESSURE HEATER NO 7
Feed Water to
Economiser T – 253.94
F - 652000
T – 228.80
F - 652000
Feed water
from HPH 6
T – 238.65
F - 31844
Drain to HPH 6 (hd7)
P- 42.18, T - 381
F - 31844, E-755.97
Ext. Steam
from HPT (e7)
Effy of HPH 7
652000(253.94-228.80)*100
31844(755.97-238.65)
= = 99.5%
HPH 7
3/2/2021 Manohar Tatwawadi 20
H.P.Turbine
MS Inlet P-130, T=535,
F=652000, E= 819.94
C Rh P 28.07 / T 327
F=566369 E=732.99
E6 P 28.07/ T 327
F- 40391 E-732.99
E7 P 42.18 / T 381
F-31844 E-755.97
• Total 12 Stages
• Extraction E7
after 6th Stage
3/2/2021 Manohar Tatwawadi 21
I P Turbine
H Rh P 24.69 / T 535
F- 566369 E- 845.83
P-1.369 / T- 183
F- 470857 E-678.41
E5 P 12.96/ T 444
F- 16640 E-802.92
E4 P 6.911/ T 364
F- 23838 E-762.69
E3 P 2.974/ T 264
F- 21033 E-756.79
E2 P 1.369/ T 183
F- 25369 E-678.41
• Total 11 Stages
• E5 after 3rd Stage
• E4 after 6th Stage
• E3 after 9th Stage
• E2 at 11th stage
3/2/2021 Manohar Tatwawadi 22
L P Turbine
Steam from LPT
P-0.0889, F-2*230004,
T= 430C, E- 589.18
P 1.369 / T 183
F-470857 E-678.41
E1 P 0.8895/ T 45
F-11989 E-622.05
• Total 4+4 = 8 Stages
• E1 after 3rd stage both sides
3/2/2021 Manohar Tatwawadi 23
Condenser
Cooling
Water out
to Cooling
Towers
Cooling
Water from
CW Pumps
T – 30
F – 270000 m3
CEP
CEP Disc.
To
Ejector
P- 22, T – 43
F–480106, E-43.1
Drains to cond
Flash Tank.
gd1- 1660
gd2- 4949
hd1- 11989
ejd – 1500
Total = 20098
Steam from LPT
P-0.0889, F-2*230004,
T= 430C, E- 589.18
Steam to circ. water Ratio
=270000*1000/460008
=586Kg/kg steam.
T. T. D.. =110C Effy = 80%
Make up stopped
T – 410C
F – 270000 m3
3/2/2021 Manohar Tatwawadi 24
Condensers
Two Condensers connected in Parallel
Total condensate from Hotwell is extracted by Condensate
Extraction Pump and passes through the regenerative feed
cycle before entering the Economiser in the Boiler.
Heat Lost in Condensers
= (Enthalpy of Steam at LPT Exhaust-Enthalpy of
Hotwell water) * Qty of steam at LPT Exhaust
= 460008 ( 589.18 – 43.16) = 251173568 Kcal
OR 1185.32kcal/kwh
3/2/2021 Manohar Tatwawadi 25
UNIT HEAT RATE
860 KCAL
20 KCAL
1185 KCAL
2065 KCAL
331 KCAL
2396 KCAL
TURBINE HEAT RATE = 2065 KCAL/KWH
UNIT HEAT RATE = 2396 KCAL/KWH
3/2/2021 Manohar Tatwawadi 26
Heat given to Turbine Cylinders
HP Turbine Flow Enthalpy Heat kcal
Input Steam 652000 819.94 534600880
Output Steam 566369 732.99 415142813
Heat given to HP Turbine 119458067
IP Turbine Flow Enthalpy Heat kcal
Input Steam 566369 845.83 479051891
Output Steam 470857 678.41 319434097
Heat given to IP Turbine 159617794
LP Turbine Flow Enthalpy Heat kcal
Input Steam 470857 678.41 319434097
Output Steam 460008 589.18 271027514
Heat given to LP Turbine 48406583
Total Heat given to HP,IP & LP Cylinders 327482444 Kcal
3/2/2021 Manohar Tatwawadi 27
Turbine Cycle Heat Rate
Heat Rate =
Total Heat Supplied to Turbine in Kcal
Total Geneation in Kwh
Q1(I1-IWE) + Q(I3-I4)
W
Q1= Live steam flow 652000kg/hr
I1 – Enthalpy of Live Steam 819.94 Kcal/Kg
IWE – Enthalpy of Feed water at HP7 outlet 253.94 Kcal/kg
QR – Reheat Steam Flow 566369 Kg/hr
I3 – Enthalpy of Reheat Steam 845.83 Kcal/kg
I4 – Enthalpy of Cold Reheat Steam 732.99 Kcal/kg
W – Total power Developed at gen out in Kwh 211902kwh.
3/2/2021 Manohar Tatwawadi 28
Heat Rate Calculations
Turbine Cycle Heat Rate
Heat Rate =
652000(819.94-253.94)+566369(845.83-732.99)
211902
Heat Rate = 2043.11 Kcal/Kwh at 210 MW
2068 Kcal/kwh at 176 MW
2070 Kcal/Kwh at 150 MW
2156 Kcal/kwh at 100 MW
Heat Rate =
652000(566)+566369(112.84) 369032000+63909077.96
211902 211902
Heat Rate =
432941077.96
211902
= 2043.11 Kcal/Kwh
=
3/2/2021 Manohar Tatwawadi 29
Extractions Quantity & Heat
Tapped
Symbol Details Pressure Temp Flow kg/hr Enthalpy Total Heat
e1 LPH 1 0.8895 45 11989 622.05 7457757.45
e2 LPH2 1.369 183 25369 678.41 17210583.3
e3 LPH3 2.974 264 21033 715.68 15052897.4
e4 LPH4 6.911 364 23838 762.69 18181004.2
ed Deaerator 12.96 449 5984 802.92 4804673.28
e5 HPH5 12.96 444 16640 802.92 13360588.8
e6 HPH6 28.07 327 40391 732.99 29606199.1
e7 HPH7 42.18 381 31844 755.97 24073108.7
Total 177088 129746812
Quantity of Extraction flow = 177088 kg/hr
Percentage of Extraction =177088/650000 = 27.16%
Percent heat tapped = 129746812/327482444 = 39.61%
3/2/2021 Manohar Tatwawadi 30
Heat regained by Feed water
Upto LPH 2 480106 (100.86-43.16) = 27702116
After LPH 3 555281 (156.52-100.86)= 30906940
After Deaerator 555281 (166.71-156.52)= 5658313
In BFP 652000 (173.12-166.71)= 4179320
After HPH 7 652000 (253.94-173.12)= 52694640
Total Heat gained by Feed water =121141330
Heat Lost in Feedwater regenerative heating cycle
= Heat in Extractions – Heat gained by FW
=129746812-121141330 = 8605482 kcal
Efficiency of regenerative feed heating system
= 121141330*100 / 129746812 = 93.36%
3/2/2021 Manohar Tatwawadi 31
Material/Energy Balance
Statements
Material Balance is the statement on the
conversion of Mass for a chosen time interval
Energy Balance is the statement of Energy during
the Process for a chosen time interval
3/2/2021 Manohar Tatwawadi 32
Basic Principle
Material input = Material output + Material lost
Energy output = Energy Input – Energy Lost
PROCESS
WORKPLACE
PROCESS INPUT PROCESS OUTPUT
WORKPLACE
INPUT
WORKPLACE
OUTPUT
LOSSES
3/2/2021 Manohar Tatwawadi 33
PLANT WORKPLACES
Coal Handling Plants > River water Pumps
Boilers > Oil Unloading Plants
Turbines > High Voltage Boards
Generators > Low Voltage Boards
Ash Handling Plants > Ash Slurry Pumps
Oil Handling Plants > ETC
Water Treatment Plants
Plant Control Rooms
3/2/2021 Manohar Tatwawadi 34
Plant Heat Rate
PLANT
WORKPLACES /
SECTIONS /
PROCESSES
F
U
E
L
ELECTRICITY
PLANT HEAT RATE =
FUEL QTY X HEAT VALUE
UNITS GENERATED
PLANT HEAT RATE = KCAL / KWH
LOSSES
3/2/2021 Manohar Tatwawadi 35
Questions / Answers
1. The designed THR for a BHEL 210 MW LMW Turbine is
a) 2063 b) 2500 c) 1900 Kcal/Kwh
2. Steam at 470C comes out from the LPT and enters the
condenser. True / False
3. Heat rejected in the condenser is more than the mechanical
output of the turbine. True / False
4. The quantity of Steam trapped for Extraction is
a) 20.26% b) 10.15% c) 27.16% of the total steam.
5. Total amount of the heat tapped for the Feed Heating in
Heaters is a) 30.25% b) 25.36% c) 39.16% of the
total heat supplied by the boiler.
3/2/2021 Manohar Tatwawadi 36
Questions / Answers
6. Steam in the condenser flows through the tubes and
cooling water flows over the tubes.. True / False
7. Condenser tube leakage can be detected by
a) online O2 Aanlyser b) online sodium analyser.
9. What is the effect of increase in heat load of the condenser ?
11. How the heat Transfer in the condenser will be affected
with reference to water chemistry.
8. The Economiser Inlet Feed water Temp determines the
efficiency of the feed heating system. True / False
10. What is the effect of air ingress in the condenser ?
3/2/2021 Manohar Tatwawadi 37
Questions / Answers
12. Feed heaters improve the boiler Efficiency………….
True / False
13. Bypassing of HP Heaters will increase the Generator MW
…….Discuss..
14. The decrease in the Feedwater / Condensate at the outlet of
the heater may be due to
a) Feed/Condensate Bypass valve of the heater passing.
b) Extraction Steam Valve not full open.
c) Both of these
d) None of these
15. Gland Steam cooler No 1 is under vacuum…
True / False.
3/2/2021 Manohar Tatwawadi 38
Thanks
Questions
Please
3/2/2021 Manohar Tatwawadi 39

More Related Content

What's hot

TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE Manohar Tatwawadi
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boilerAshvani Shukla
 
Feed water and condensate heaters
Feed water and condensate heatersFeed water and condensate heaters
Feed water and condensate heatersManohar Tatwawadi
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATEManohar Tatwawadi
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculationSHIVAJI CHOUDHURY
 
Steam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticSteam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticPichai Chaibamrung
 
Power plant performance_efficiency
Power plant performance_efficiencyPower plant performance_efficiency
Power plant performance_efficiencyKeyur Patel
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heaterSHIVAJI CHOUDHURY
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW Manohar Tatwawadi
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheaterHOANG VAN DUC
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineRAVI PAL SINGH
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plantsSHIVAJI CHOUDHURY
 

What's hot (20)

Heat balance diagram
Heat balance diagramHeat balance diagram
Heat balance diagram
 
TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 
Feed water and condensate heaters
Feed water and condensate heatersFeed water and condensate heaters
Feed water and condensate heaters
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculation
 
Steam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticSteam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnostic
 
Heat rate of coal fired power plant
Heat rate of coal fired power plantHeat rate of coal fired power plant
Heat rate of coal fired power plant
 
Power plant performance_efficiency
Power plant performance_efficiencyPower plant performance_efficiency
Power plant performance_efficiency
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheater
 
Steam turbine losses
Steam turbine  lossesSteam turbine  losses
Steam turbine losses
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 

Similar to 210 mw turbine cycle heat rate

BPSCL Vocational Training report
BPSCL Vocational Training report BPSCL Vocational Training report
BPSCL Vocational Training report Rahul Raj
 
1 palmer international consulting_presentation_artc_singapore_2014 (10)
1 palmer international consulting_presentation_artc_singapore_2014 (10)1 palmer international consulting_presentation_artc_singapore_2014 (10)
1 palmer international consulting_presentation_artc_singapore_2014 (10)pipllp
 
heat engine information detail
heat engine information detailheat engine information detail
heat engine information detailpratik darji
 
UNIT-2_Part3_RANKINE CYCLE.pdf
UNIT-2_Part3_RANKINE CYCLE.pdfUNIT-2_Part3_RANKINE CYCLE.pdf
UNIT-2_Part3_RANKINE CYCLE.pdfYOGESH AHIRE
 
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...Komandur Sunder Raj, P.E.
 
Example Custom Block Digram
Example Custom Block DigramExample Custom Block Digram
Example Custom Block DigramRobert Wood
 
1 - plano electrico 330cl CABANILLAS.pdf
1 - plano electrico 330cl CABANILLAS.pdf1 - plano electrico 330cl CABANILLAS.pdf
1 - plano electrico 330cl CABANILLAS.pdfrobertomontoya25
 
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...Saikat Halder
 
Hellisheidi Power Plant - is there an optimal design?
Hellisheidi Power Plant - is there an optimal design?Hellisheidi Power Plant - is there an optimal design?
Hellisheidi Power Plant - is there an optimal design?Iceland Geothermal
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTManohar Tatwawadi
 
Delayed Coking Unit
Delayed Coking  Unit Delayed Coking  Unit
Delayed Coking Unit RajGarud3
 
Dynamic simulation of Steam and Power System.ppt
Dynamic simulation of Steam and Power System.pptDynamic simulation of Steam and Power System.ppt
Dynamic simulation of Steam and Power System.pptMurty Moguluru
 

Similar to 210 mw turbine cycle heat rate (20)

BPSCL Vocational Training report
BPSCL Vocational Training report BPSCL Vocational Training report
BPSCL Vocational Training report
 
1 palmer international consulting_presentation_artc_singapore_2014 (10)
1 palmer international consulting_presentation_artc_singapore_2014 (10)1 palmer international consulting_presentation_artc_singapore_2014 (10)
1 palmer international consulting_presentation_artc_singapore_2014 (10)
 
Box type Bitzer condensing unit
Box type Bitzer condensing unitBox type Bitzer condensing unit
Box type Bitzer condensing unit
 
heat engine information detail
heat engine information detailheat engine information detail
heat engine information detail
 
Gross turbine cycle_heat_rate_ch-8.2
Gross turbine cycle_heat_rate_ch-8.2Gross turbine cycle_heat_rate_ch-8.2
Gross turbine cycle_heat_rate_ch-8.2
 
UNIT-2_Part3_RANKINE CYCLE.pdf
UNIT-2_Part3_RANKINE CYCLE.pdfUNIT-2_Part3_RANKINE CYCLE.pdf
UNIT-2_Part3_RANKINE CYCLE.pdf
 
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
 
GSU AND GDU
GSU AND GDUGSU AND GDU
GSU AND GDU
 
Example Custom Block Digram
Example Custom Block DigramExample Custom Block Digram
Example Custom Block Digram
 
1 - plano electrico 330cl CABANILLAS.pdf
1 - plano electrico 330cl CABANILLAS.pdf1 - plano electrico 330cl CABANILLAS.pdf
1 - plano electrico 330cl CABANILLAS.pdf
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
 
training report
training reporttraining report
training report
 
Hellisheidi Power Plant - is there an optimal design?
Hellisheidi Power Plant - is there an optimal design?Hellisheidi Power Plant - is there an optimal design?
Hellisheidi Power Plant - is there an optimal design?
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
 
hard bind arj
hard bind arjhard bind arj
hard bind arj
 
Delayed Coking Unit
Delayed Coking  Unit Delayed Coking  Unit
Delayed Coking Unit
 
Dynamic simulation of Steam and Power System.ppt
Dynamic simulation of Steam and Power System.pptDynamic simulation of Steam and Power System.ppt
Dynamic simulation of Steam and Power System.ppt
 

More from Manohar Tatwawadi

Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Manohar Tatwawadi
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practicesManohar Tatwawadi
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyManohar Tatwawadi
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESManohar Tatwawadi
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Manohar Tatwawadi
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plantsManohar Tatwawadi
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stationsManohar Tatwawadi
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSManohar Tatwawadi
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsManohar Tatwawadi
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...Manohar Tatwawadi
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion EquationsManohar Tatwawadi
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stationsManohar Tatwawadi
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
 
Boiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsBoiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsManohar Tatwawadi
 
SCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionSCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionManohar Tatwawadi
 

More from Manohar Tatwawadi (20)

Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plants
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stations
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPS
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power Stations
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion Equations
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stations
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 
Swot Analysis
Swot AnalysisSwot Analysis
Swot Analysis
 
Boiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsBoiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power Stations
 
SCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionSCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisition
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

210 mw turbine cycle heat rate

  • 1. 210 MW LMW Turbine Cycle Heat Rate Calculations Heaters, Condensers Designs Heat Balance, Features Turbine Heat Rate 3/2/2021 1 Manohar Tatwawadi
  • 2. 3/2/2021 Manohar Tatwawadi 2 210 MW LMW Turbine
  • 3. 3/2/2021 Manohar Tatwawadi 3 HPT Glands HPT AS 39 To GC 1 Steam from Deaerator/PRDS AS55 OR AS57 To LPH 4 thru ES12 To HPH 6 Sealing Chambers Sealing Chambers 1 2 3 4 5 4 3 2 1 To GC 2
  • 4. 3/2/2021 Manohar Tatwawadi 4 IPT Glands To GC 1 4 3 2 1 Steam from Deaerator/PRDS To GC 2 AS 40 AS55 OR AS57 Sealing Chambers Sealing Chambers 1 2 3 IPT To LP4
  • 5. 3/2/2021 Manohar Tatwawadi 5 GLANDS SHAFT
  • 6. 3/2/2021 Manohar Tatwawadi 6 LPT Glands To GC 1 Steam from Deaerator/PRDS AS55 OR AS57 1 2 2 1 Sealing Chambers Sealing Chambers LPT
  • 7. 3/2/2021 Manohar Tatwawadi 7 Ejector P- 4.5, T - 155 F - 1500, E-659.83 Steam from Deaerator Condensate to G.C.1 T - 47.27 F - 1500 T - 45.07 F - 480106 T - 43.16 F - 480106 Condensate from CEP Discharge Drain to Flash Chamber Output Heat taken by condensate Input heat given by steam 480106(45.07-43.16)*100 1500 (659.83-47.27) = = 99.8 %
  • 8. 3/2/2021 Manohar Tatwawadi 8 GLAND STEAM CONDENSER GC1 T - 100 F - 1660 Drain to Cond Flash Tank T - 45.07 F - 480106 Condensate from Ejector P- 4.5, T - 155 F - 400, E-659.83 Steam from Deaerator Condensate to LPH 1 T - 47.18 F - 480106 Ejector GLAND STEAM COOLER (GC1) Gland Steam Condenser Effy. 480106(47.18-45.07)*100 1260(728.20-100)+400(659.83-100) = = 99.7% Steam Air Mixture from glands P- 0.97, T - 280 F - 1260, E-728.20
  • 9. 3/2/2021 Manohar Tatwawadi 9 LOW PRESSURE HEATER NO 1 Condensate to GC 2 T - 61.05 F - 480106 T - 47.18 F - 480106 Condensate from GC 1 T - 65.93 F - 11989 Drain to flash chamber in Cond. (hd1) P- 0.89, T - 85 F - 11989, E-622.05 Steam from Extraction e1 from LPT Effy of LPH No 1 480106(61.05-47.18)*100 11989(622.05-65.93) = = 99.8% LPH 1
  • 10. 3/2/2021 Manohar Tatwawadi 10 GLAND STEAM CONDENSER NO 2 Condensate to LPH 2 T - 68.10 F - 480106 T - 61.5 F - 480106 Condensate from LPH 1 T - 72.94 F - 4949 Drain to flash chamber on Cond. (gd2) P- 0.50, T - 325 F - 4949, E-756.90 Steam from HP & IP Glands g2 Effy of Gland Steam Condenser GC 2 0.8*480106(68.10-61.05)*100 4949(756.80-72.94) = =80% (20% of condensate is bypassed) 80% 20% Flow through GC2 GC 2
  • 11. 3/2/2021 Manohar Tatwawadi 11 LOW PRESSURE HEATER NO 2 Condensate to LPH 3 T - 101.52 F - 555281 T - 68.10 F - 480106 Condensate from GC 2 T - 105.78 F - 75175 Drain to Condensate line (hd2) P- 1.369, T - 183 F - 25369, E-678.41 Steam from IPT out e2 Effy of LPH 2 480106(100.86-68.10)*100 25369(678.41-105.78)+49806(130.26-105.78) = = 99.8% LPH 2 Drip Pump Drain from LPH3 (hd3) T - 130.26 F - 49806 T-100.86, F-480106
  • 12. 3/2/2021 Manohar Tatwawadi 12 LOW PRESSURE HEATER NO 3 Condensate to LPH 4 T - 125.27 F - 555281 T - 101.52 F - 555281 Condensate from LPH2 & Drip Pump T - 130.26 F - 49806 Drain to LPH 2 (hd3) P- 2.974, T - 264 F - 21033, E-715.68 Steam from IPT Extr (e3) Effy of LPH 3 555281(125.27-101.52)*100 21033(715.68-130.26)+28773(161.73-130.26) = = 99.8% LPH 3 Drain from LPH4 (hd4) T - 161.73 F - 28773
  • 13. 3/2/2021 Manohar Tatwawadi 13 LOW PRESSURE HEATER NO 4 Condensate to Deairator T - 156.52 F - 555281 T - 125.27 F - 555281 Condensate from LPH3 T - 161.73 F - 28773 Drain to LPH 3 (hd4) P- 6.911, T - 364 F - 23838, E-762.69 Steam from IPT Extr (e4) Effy of LPH 4 555281(156.52-125.27)*100 23838(762.69-161.73)+4395(782.31-161.73) = = 99.7% LPH 4 Leak off steam HP & IP (g3) P-6.9, T - 161.73 F - 4935, E-782.31
  • 14. 3/2/2021 Manohar Tatwawadi 14 DEAERATOR - FEED TANK Deaerator pegging steam From PRDS or Extr.6(ed) Drain from HPH 5/6 (hd5 or hd6) Spindle leak off from ESV/IV Steam supply to glands (d1) Steam supply to Ejectors (main & GC1) d2+d4 Condensate from LPH4 P-7.5, T - 479 F - 2300, E-820.28 P-1.03, T - 141 F - 2930, E-659.83 P-4.5, T - 155 F - 1900, E-659.83 T - 181.51 F - 93256 E - 802.51 F - 5984 T - 156.52 F - 555281 Feed water to HPH5 T - 173.12 F - 652000 (555281(166.71-156.52)+4830(820.28-659.83))*100 2300(820.28-166.71)+93256(181.51-166.71)+5984(802.92-166.71) Deaerator Effy = = 96.8% T - 166.71 F - 652000 BFP FEED TANK
  • 15. 3/2/2021 Manohar Tatwawadi 15 Deaerator Working Note:- 1. Below 150 MW, Deaerator heating steam is tapped from HPT at HPT exhaust.(Extraction 6) 2. Above 150 MW, Heating steam supplied from Extraction No 5 from IPT. 3. Above 150 MW, Aux Steam Supply to Main Ejector, Gland Steam Ejector and sealing steam of Turbine Glands is changed over from Aux PRDS to Deaerator. 4 Gland leakage Steam from ESV & IV, Drains of Heater No 5 and 6 are also fed to the deaerator. 5. Pegging steam supply is initially from PRDS and changed over to Extraction 6 at about 100 MW Load.
  • 16. 3/2/2021 Manohar Tatwawadi 16 Boiler Feed Pump The total quantity of feed water supplied from feed water tank to boiler feed water pump is equal to the main steam flow to the HP Turbine Heat Added by Boiler feed pump due to mechanical churning of water is also taken into consideration and equals to:- T=166.71 T=173.12 Flow= 652000 = 652000(173.12-166.71) = 4179320 Kcal. BFP
  • 17. 3/2/2021 Manohar Tatwawadi 17 Feed Water to HPH 6 T - 189.69 F - 652000 T - 173.12 F - 652000 Feed water from BFP Discharge T - 181.51 F - 93256 Drain to Deaeator (hd5) P- 12.96, T - 444 F - 16640, E-802.92 Steam from IPT Extr (e5) Effy of HPH 5 652000(189.69-173.12)*100 16640(802.92-181.51)+76616(198.05-181.51) = = 93.7% HPH 5 Drain from HPH6 (hd6) T - 198 F - 76616, E-198 HIGH PRESSURE HEATER NO 5
  • 18. 3/2/2021 Manohar Tatwawadi 18 Feed Water to HPH 7 T – 228.80 F - 652000 T – 189.69 F - 652000 Feed water from HPH 5 T - 198.01 F - 76616 Drain to HPH 5 (hd6) P- 28.07, T - 327 F - 40391, E-732.99 Steam from HPT Exh. (e6) Effy of HPH 6 652000(228.80-189.69)*100 40391(732.99-198.05)+31844(238.65-198.05)+4381(806.50-198.05) = = 99.7% HPH 6 Drain from HPH7 (hd7) T - 238 F - 31844, E-238.65 HIGH PRESSURE HEATER NO 6 Spindle Leakage from HPT (g5) P- 28.07, T - 464 F - 4381, E-806.50
  • 19. 3/2/2021 Manohar Tatwawadi 19 HIGH PRESSURE HEATER NO 7 Feed Water to Economiser T – 253.94 F - 652000 T – 228.80 F - 652000 Feed water from HPH 6 T – 238.65 F - 31844 Drain to HPH 6 (hd7) P- 42.18, T - 381 F - 31844, E-755.97 Ext. Steam from HPT (e7) Effy of HPH 7 652000(253.94-228.80)*100 31844(755.97-238.65) = = 99.5% HPH 7
  • 20. 3/2/2021 Manohar Tatwawadi 20 H.P.Turbine MS Inlet P-130, T=535, F=652000, E= 819.94 C Rh P 28.07 / T 327 F=566369 E=732.99 E6 P 28.07/ T 327 F- 40391 E-732.99 E7 P 42.18 / T 381 F-31844 E-755.97 • Total 12 Stages • Extraction E7 after 6th Stage
  • 21. 3/2/2021 Manohar Tatwawadi 21 I P Turbine H Rh P 24.69 / T 535 F- 566369 E- 845.83 P-1.369 / T- 183 F- 470857 E-678.41 E5 P 12.96/ T 444 F- 16640 E-802.92 E4 P 6.911/ T 364 F- 23838 E-762.69 E3 P 2.974/ T 264 F- 21033 E-756.79 E2 P 1.369/ T 183 F- 25369 E-678.41 • Total 11 Stages • E5 after 3rd Stage • E4 after 6th Stage • E3 after 9th Stage • E2 at 11th stage
  • 22. 3/2/2021 Manohar Tatwawadi 22 L P Turbine Steam from LPT P-0.0889, F-2*230004, T= 430C, E- 589.18 P 1.369 / T 183 F-470857 E-678.41 E1 P 0.8895/ T 45 F-11989 E-622.05 • Total 4+4 = 8 Stages • E1 after 3rd stage both sides
  • 23. 3/2/2021 Manohar Tatwawadi 23 Condenser Cooling Water out to Cooling Towers Cooling Water from CW Pumps T – 30 F – 270000 m3 CEP CEP Disc. To Ejector P- 22, T – 43 F–480106, E-43.1 Drains to cond Flash Tank. gd1- 1660 gd2- 4949 hd1- 11989 ejd – 1500 Total = 20098 Steam from LPT P-0.0889, F-2*230004, T= 430C, E- 589.18 Steam to circ. water Ratio =270000*1000/460008 =586Kg/kg steam. T. T. D.. =110C Effy = 80% Make up stopped T – 410C F – 270000 m3
  • 24. 3/2/2021 Manohar Tatwawadi 24 Condensers Two Condensers connected in Parallel Total condensate from Hotwell is extracted by Condensate Extraction Pump and passes through the regenerative feed cycle before entering the Economiser in the Boiler. Heat Lost in Condensers = (Enthalpy of Steam at LPT Exhaust-Enthalpy of Hotwell water) * Qty of steam at LPT Exhaust = 460008 ( 589.18 – 43.16) = 251173568 Kcal OR 1185.32kcal/kwh
  • 25. 3/2/2021 Manohar Tatwawadi 25 UNIT HEAT RATE 860 KCAL 20 KCAL 1185 KCAL 2065 KCAL 331 KCAL 2396 KCAL TURBINE HEAT RATE = 2065 KCAL/KWH UNIT HEAT RATE = 2396 KCAL/KWH
  • 26. 3/2/2021 Manohar Tatwawadi 26 Heat given to Turbine Cylinders HP Turbine Flow Enthalpy Heat kcal Input Steam 652000 819.94 534600880 Output Steam 566369 732.99 415142813 Heat given to HP Turbine 119458067 IP Turbine Flow Enthalpy Heat kcal Input Steam 566369 845.83 479051891 Output Steam 470857 678.41 319434097 Heat given to IP Turbine 159617794 LP Turbine Flow Enthalpy Heat kcal Input Steam 470857 678.41 319434097 Output Steam 460008 589.18 271027514 Heat given to LP Turbine 48406583 Total Heat given to HP,IP & LP Cylinders 327482444 Kcal
  • 27. 3/2/2021 Manohar Tatwawadi 27 Turbine Cycle Heat Rate Heat Rate = Total Heat Supplied to Turbine in Kcal Total Geneation in Kwh Q1(I1-IWE) + Q(I3-I4) W Q1= Live steam flow 652000kg/hr I1 – Enthalpy of Live Steam 819.94 Kcal/Kg IWE – Enthalpy of Feed water at HP7 outlet 253.94 Kcal/kg QR – Reheat Steam Flow 566369 Kg/hr I3 – Enthalpy of Reheat Steam 845.83 Kcal/kg I4 – Enthalpy of Cold Reheat Steam 732.99 Kcal/kg W – Total power Developed at gen out in Kwh 211902kwh.
  • 28. 3/2/2021 Manohar Tatwawadi 28 Heat Rate Calculations Turbine Cycle Heat Rate Heat Rate = 652000(819.94-253.94)+566369(845.83-732.99) 211902 Heat Rate = 2043.11 Kcal/Kwh at 210 MW 2068 Kcal/kwh at 176 MW 2070 Kcal/Kwh at 150 MW 2156 Kcal/kwh at 100 MW Heat Rate = 652000(566)+566369(112.84) 369032000+63909077.96 211902 211902 Heat Rate = 432941077.96 211902 = 2043.11 Kcal/Kwh =
  • 29. 3/2/2021 Manohar Tatwawadi 29 Extractions Quantity & Heat Tapped Symbol Details Pressure Temp Flow kg/hr Enthalpy Total Heat e1 LPH 1 0.8895 45 11989 622.05 7457757.45 e2 LPH2 1.369 183 25369 678.41 17210583.3 e3 LPH3 2.974 264 21033 715.68 15052897.4 e4 LPH4 6.911 364 23838 762.69 18181004.2 ed Deaerator 12.96 449 5984 802.92 4804673.28 e5 HPH5 12.96 444 16640 802.92 13360588.8 e6 HPH6 28.07 327 40391 732.99 29606199.1 e7 HPH7 42.18 381 31844 755.97 24073108.7 Total 177088 129746812 Quantity of Extraction flow = 177088 kg/hr Percentage of Extraction =177088/650000 = 27.16% Percent heat tapped = 129746812/327482444 = 39.61%
  • 30. 3/2/2021 Manohar Tatwawadi 30 Heat regained by Feed water Upto LPH 2 480106 (100.86-43.16) = 27702116 After LPH 3 555281 (156.52-100.86)= 30906940 After Deaerator 555281 (166.71-156.52)= 5658313 In BFP 652000 (173.12-166.71)= 4179320 After HPH 7 652000 (253.94-173.12)= 52694640 Total Heat gained by Feed water =121141330 Heat Lost in Feedwater regenerative heating cycle = Heat in Extractions – Heat gained by FW =129746812-121141330 = 8605482 kcal Efficiency of regenerative feed heating system = 121141330*100 / 129746812 = 93.36%
  • 31. 3/2/2021 Manohar Tatwawadi 31 Material/Energy Balance Statements Material Balance is the statement on the conversion of Mass for a chosen time interval Energy Balance is the statement of Energy during the Process for a chosen time interval
  • 32. 3/2/2021 Manohar Tatwawadi 32 Basic Principle Material input = Material output + Material lost Energy output = Energy Input – Energy Lost PROCESS WORKPLACE PROCESS INPUT PROCESS OUTPUT WORKPLACE INPUT WORKPLACE OUTPUT LOSSES
  • 33. 3/2/2021 Manohar Tatwawadi 33 PLANT WORKPLACES Coal Handling Plants > River water Pumps Boilers > Oil Unloading Plants Turbines > High Voltage Boards Generators > Low Voltage Boards Ash Handling Plants > Ash Slurry Pumps Oil Handling Plants > ETC Water Treatment Plants Plant Control Rooms
  • 34. 3/2/2021 Manohar Tatwawadi 34 Plant Heat Rate PLANT WORKPLACES / SECTIONS / PROCESSES F U E L ELECTRICITY PLANT HEAT RATE = FUEL QTY X HEAT VALUE UNITS GENERATED PLANT HEAT RATE = KCAL / KWH LOSSES
  • 35. 3/2/2021 Manohar Tatwawadi 35 Questions / Answers 1. The designed THR for a BHEL 210 MW LMW Turbine is a) 2063 b) 2500 c) 1900 Kcal/Kwh 2. Steam at 470C comes out from the LPT and enters the condenser. True / False 3. Heat rejected in the condenser is more than the mechanical output of the turbine. True / False 4. The quantity of Steam trapped for Extraction is a) 20.26% b) 10.15% c) 27.16% of the total steam. 5. Total amount of the heat tapped for the Feed Heating in Heaters is a) 30.25% b) 25.36% c) 39.16% of the total heat supplied by the boiler.
  • 36. 3/2/2021 Manohar Tatwawadi 36 Questions / Answers 6. Steam in the condenser flows through the tubes and cooling water flows over the tubes.. True / False 7. Condenser tube leakage can be detected by a) online O2 Aanlyser b) online sodium analyser. 9. What is the effect of increase in heat load of the condenser ? 11. How the heat Transfer in the condenser will be affected with reference to water chemistry. 8. The Economiser Inlet Feed water Temp determines the efficiency of the feed heating system. True / False 10. What is the effect of air ingress in the condenser ?
  • 37. 3/2/2021 Manohar Tatwawadi 37 Questions / Answers 12. Feed heaters improve the boiler Efficiency…………. True / False 13. Bypassing of HP Heaters will increase the Generator MW …….Discuss.. 14. The decrease in the Feedwater / Condensate at the outlet of the heater may be due to a) Feed/Condensate Bypass valve of the heater passing. b) Extraction Steam Valve not full open. c) Both of these d) None of these 15. Gland Steam cooler No 1 is under vacuum… True / False.
  • 38. 3/2/2021 Manohar Tatwawadi 38 Thanks Questions Please