A PRESENTATION ON 660MW TURBO-
GENERATOR ,ITS AUXILIARIES
AND ASSOCIATED SYSTEMS
By
Ashvani Shukla
C&I
BGR energy
STEAM TURBINE K-660-247
GENERAL INFORMATION
 TG DECK IS VIS SUPPORTED AND HAS 26 CONCRETE COLUMNS (T1
– T26).
 TG HALL IS CONSTITUTED OF 3 MAINS ROWS OF COLUMNS – A,B ,C
ROW AND TWO BAYS – AB BAY AND BC BAY. THE WIDTH OF AB
BAY IS 36m AND BC BAY IS 12m
 CONDENSER TUBE BANKS (CW PATH) HAS AN INCLINATION OF 40
.
 THERE ARE TWO MAIN EOT CRANES FOR TG HALL.EACH EOT
CRANE IS HAVING A CAPACITY OF 200t FOR MAIN HOIST AND 20t
FOR AUXILIARY HOIST. 35.5m IS THE MAXIMUM VERTCAL DISTANCE
A HOIST CAN TRAVEL.TANDEM OPERATION OF TWO EOT CRANES
ARE ALLOWED.
RATED CONDITIONS
 LOAD : 660MW
 BEFORE HP STOP VALVE
 STEAM PRESSURE : 247KSC
 STEAM TEMPERATURE : 5370
C
 STEAM FLOW : 2023.75T/HR
 AFTER HPC
 STEAM PRESSURE : 48KSC
 STEAM PRESSURE : 298.710
C
 BEFORE IP STOP VALVE
 STEAM PRESSURE : 43.2KSC
 STEAM TEMPERATURE : 5650
C
 STEAM FLOW TO REHEATER : 1681.12T/HR.
 DESIGN CONDENSER PRESSURE : 0.105KSC (abs.)
 COOLING WATER FLOW : 64000M3
/HR
 FINAL FEED WATER TEMP. : 286.350
C
 FREQUENCY RANGE : 47.5 – 51.5 Hz
STEAM TURBINE
 Generator rated speed 3000 rpm
 Generator manufacturer - Electrosila
 No. of bleedings 8
 Length of the turbine 36.362 m
 No. of stages
 HPT 17
 IPT 11x2
 LPT-1 5x2
 LPT-2 5x2
 Total 59
STEAM TURBINE
 Parameters
 Pr. Before HPC SV 247.0 Ksc
 Temp. before HPC SV 537.0 0
C
 Steam flow 2023.75 TPH
 Pr. After HPC 48.0 Ksc
 Temp. after HPC 298.71 0
C
 Pr. Before IP SV 43.2 Ksc
 Temp. before IP SV 565.0 0
C
 Steam flow to reheat 1681.12 TPH
 Design Cond pr. 0.105 Ksc
 CW flow 64000 TPH
 Final FW Temp. 286.35 0
C
STEAM TURBINE
 Turbine Governing system
Mode of Governing Nozzle
Type E/H
Control fluid Firequel-L make
Supresta-USA
Normal Operating Pr. 50 Ksc
Capacity 600 lpm
Fluid pump motor rating 200 KW
Filter material Ultipor
Mesh size 25 µ
STEAM TURBINE
 Lube oil system
 Lube oil Tn-22C Russia Mobil DTE Oil light Teresso
32
In accordance with ISO VG 32
 Absolute viscosity 16.7Centipoise
 Kinematic viscosity -32 Centistokes
 Specific gravity 0.89
 Flash point 180 0
C
 Fire point 240 0
C
 Oil requirement per bearing
 N1 200 lpm
 N2 200 lpm
 N3 450 lpm
 N4 280 lpm
 N5 350 lpm
 N6 350 lpm
 N7 350 lpm
STEAM TURBINE
 Lube oil system
 Total oil system capacity 52000 lit
 Full volume of oil tank 58000 lit
 Material of tank SS
 Normal lube oil pressure 1.2 Ksc
 Oil temp at inlet of bearings
 Normal 55 0
C
 Maximum 59 0
C
 Piping SS
 Seal steam system
 Source of gland sealing system
 During normal operation End glands of HPC & IPC
 During low load operation End glands of HPC & IPC + AS
 Quantity of seal steam required 3.54 TPH
 Seal steam pressure at turbine glands 1.1-1.2 Ksc
 Seal steam temperature at turbine glands 160 0
C
TURBINE SEAL STEAM
•TWO HEADERS OR COLLECTORS ARE
THERE i.e. HOT
COLLECTOR AND COLD COLLECTOR.
•INITIAL SOURCE OF STEAM SUPPLY IS
APRDS (UNIT HT,16KSC,310O
C).
•PRESSURE AND TEMPERATURE OF COLD
HEADER OR COLLERTOR ARE 1.1TO1.15 KSC
ABSOLUTE AND 140TO 180O
C RESPECTIVELY.
•PRESSURE AND TEMPERATURE OF HOT
HEADER OR COLLERTOR ARE 1.1TO1.15 KSC
ABSOLUTE AND RESPECTIVELY.
Turbine Protection
Over speed trip 110-112 %
Low lube oi pressure 0.3 (g) Ksc
Low vacuum trip 0.3 (abs) Ksc
Thrust bearing excessive wear trip
+1.2/-2.0 mm
Pressure relief diaphragm setting 1.2
(abs) Ksc
STEAM TURBINE
STEAM TURBINE
 Materials of construction
 HP Outer casing 15Cr1Mo1V
 HP blade/carrier casings 15Cr1Mo1V
 IP Outer casing 15Cr1Mo1V
 LP inner casing Steel 3
 LP Outer casing Steel 3
 HP Shaft 25Cr1Mo1V
 IP Shaft 25Cr1Mo1V
 LP Shaft 26CrNi3Mo2V
 Moving blades
 HPT first stage blades18Cr11MoNiVNb (1-5)
 HPT other stages 15Cr11MoV (6-17)
 IPT first stage 18Cr11MoNiVNb (1-3)
 IPT other stages 15Cr11MoV (4-11)
 LPT last stage 13Cr11Ni2W2MoV
 LPT other stages 20Cr13 (1-2)
 LPT other stages 15Cr11MoV (3-4)
STEAM TURBINE
 Fixed blades
 HPT first stage 18Cr11MoNiVNb (1-5)
 HPT other stages 15Cr11MoV (6-17)
 IPT first stage 18Cr11MoNiVNb
 IPT other stages 15Cr11MoV
 LPT first stage 12Cr13 (1-4)
 LPT Other stages 08 Cr13 (5)
 Number of stages
 HPT
 Impulse stages 1
 Reaction stages 16
 IPT
 Impulse stages 22
 Reaction stages 0
 LPT
 Impulse stages 20
 Reaction stages 0
 All rows of blades are integrally shrouded
STEAM TURBINE
 No. of HP Stop valves 2
 No. of HP Control valves 4
 Type of control valve unit Block united
 No. of IP Stop valves 2
 No. of IP Control valves 4
 Type of control valves Separate
 No. of Journal bearings for turbine 8
 No. of Journal bearings for Gen 4
 No. of thrust cum journal bearing 1
 Type of thrust bearing Tilting
 Type of journal bearing 6-Fixed & 2-Tilting
pad
 Material of bearing shell Alloy steel
 Type of lining Babbit
STEAM TURBINE
 Turbine model No K-660-247
 Generator model No TBB-660-2T3
 Strainers are installed in the steam chests of the stop valves
 In HPT, having passed the control stage and 8 stages which
generate left jet of steam (from generator towards front bearing)
steam changes its direction 180° and flows between internal and
external cylinders to 8 stages of right jet (towards generator)
 In CRH lines, NRV has a bypass with electric valve and control
valve to enable counter flow mode of HPT with the aim of
warming up of cylinder and high pressure cross over pipes at
turbine start up and cold condition
 HPT has nozzle steam distribution system
 IPT has throttle steam distribution system
 On each upper half (cover) of low pressure cylinder four
membrane type relief valves are installed which are activated
when the absolute pressure in exhaust nozzles rises up to 1.35 –1.4
Ksc absolute
TG SEAL STEAM SYSTEM
TO 2nd
CHAMBER EXHAUST
TO BLED STEAM TO D/A
TO BLED STEAM TO LPH # 4
TO HOT SEAL STEAM HEADER
TO GSC
HPT
HPT SEAL STEAM CONNECTION
1ST
CHAMBER 2ND
CHAMBER
TO COLD SEAL STEAM HEADER
TO GSC
IPT
IPT SEAL STEAM CONNECTION
FROM COLD SEAL STEAM HEADER
TO GSC
LPT
LPT SEAL STEAM CONNECTION
 IN HIGH PRESSURE DRAINAGE EXPANSION TANK A VALVES IN DRAINAGE COLLECTORS FROM EXTRACTION STEAM
PIPES TO HPHs (10MAL20AA110, 10MAL20AA120, 10MAL20AA140) AND IN LOW PRESSURE DRAINAGE EXPANSION
TANK VALVES IN DRAINAGE COLLECTORS FROM EXTRACTION STEAM PIPES TO LPHs(10MAL30AA110,
10MAL30AA120) CLOSE AUTOMATICALLY IF TURBINE LOAD INCREASES OVER 200MW AND AT THE SAME TIME ALL
VALVES ARE OPEN IN THE CORRESPONDING STEAM EXTRACTION FROM THE TURBINE TO HPHs AND LPHs.
 VALVES IN DRAINAGE PIPES OF HPBP AND LPBP (10MAL30AA107, 10MAL30AA108) CLOSE AUTOMATICALLY IF
TURBINE LOAD INCREASES OVER 30MW.
CONTROL FLUID SYSTEM
 FIRE RESISTANT SYNTHETIC HYDRAULIC FLUID FYRQUEL – L MANUFACTURED BY “SUPRESTA” IS USED AS OPERATING
FLUID.ITS SELF IGNITION TEMPERATURE IS ABOUT 740O
C.
 OPERATING PRESSURE IS APPROXIMATELY 50KSC.
 OPERATING TEMPERATURE IS 45-55OC.
 CONTROL OIL SUPPLY UNIT CNSISTS OF A RESERVOIR (10MAX10BB001)OF CAPACITY 7.0m3
,2NOS.OIL
COOLERS(10MAX10AC001,10MAX10AC002),DE-AERATOR,MESH FILTER,FINE FILTER(10MAX18AT001),DUPLEX
FILTER(10MAX14AT001) AND 2 NOS. OF VERTICALLY MOUNTED CENTRIFUGAL
PUMPS(10MAX11AP001,10MAX12AP001) DRIVEN BY AC MOTOR (1W+1S).EACH PUMP IS HAVING A CAPACITY OF
36m3
/h AND DISCHARGE PRESSURE IS 50KSC.
 CONTROL FLUID RESERVOIR IS SEPERATED BY TWO NUMBERS OF TANDEM MESHES OF CELL SIZE 0.25mm INTO TWO
SECTIONS ,DIRTY AND CLEAN. DE- AERATOR IS INSTALLED INSIDE THE RESERVOIR INFRONT OF MESHES AND IT
CONSISTS OF SLOPING PLATE ASSEMBLY.
 CF FINE FILTER FOR REMOVING MECHANICAL IMPURITIES IS INSTALLED IN RESERVOIR. DURING NORMAL OPERATION
CF IS SUPPLIED TO THE FINE FILTER THROUGH AN ORIFICE OF DIAMETER 4mm FROM UNSTABILIZED PRESSURE LINE VIA
VALVE 10MAX18AA501 . AFTER THAT IT IS DISCHARGED IN THE DIRTY CHAMBER OF THE RESERVOIR. WHEN TURBINE IS
STOPPED CF IS SUPPLIED TO THE FINE FILTER WITH THE HELP OF ANOTHER PUMP (CF TRANSFER
PUMP,10MAX19AP001,CAPACITY 4m3
/hr, AND DISCHARGE PRESSURE 25KSC) VIA VALVES 10MAX19AA503
AND10MAX19AA504 FOR FILTERING PURPOSE KEEPING MAIN PUMPS IN OFF CONDITION.
 OIL PURIFICATION IS CONTINUOUS DUE TO FILTERING OF ITS PART VIA CONCURRENTLY MOUNTED WORKING FILTER
CARTRIDGES INSTALLED INSIDE THE FINE FILTER HOUSING.
 FILTER CARTRIDGES DESIGN ALLOWS USAGE OF DIFFERENT FILTERING MATERIAL.
 METAL SEMI-PINCEBECK MESH WITH FILTERING DEGREE OF 70 MICRONS TO FLUSH SYSTEM AFTER
INSTALLATION OR MAINTENANCE.
 FILTER BELTING FABRIC WITH FILTERING DEGREE 30 – 40 MICRONS FOR PRIMARY REFINING DURING
TURBINE OPERATION.
 FILTERING ELEMENTS MANUFACTURED BY ”PALL” WITH FILTERING DEGREE 12 MICRONS FOR
CONTINUOUS OIL FILTERING DURING TURBINE OPERATION.
 OCCURRENCE OF PRESSURE OF 0.1 TO 0.3KSC IN FILTER HOUSING WITHIN 1-3 HOURS SHOWS CORRECT ASSEMBLY
OF FILTER AND ITS PROPER OPERATION.
 IT IS NECESSARY TO SWITCH OFF THE FINE FILTER AND REPLACE FILTERING ELEMENTS IF PRESSURE IN FILTER HOUSING
RISES UPTO 2KSC.WHICH SHOWS CONTAMINATION OF FILTER FABRIC.
 INSIDE FILTER HOUSING THERE IS A RELIEF VALVE BYPASSING FLUID BESIDES FILTER CARTRIDGES WHEN THEY ARE
CONTAMINATED AND PRESSURE RISES UPTO 5KSC.
 AN OIL LEVEL GAUGE WITH ALARM SYSTEM WHISKERS (10MAX10CL001,10MAX 10CL002) IS PROVIDED IN THE CLEAN
SIDE OF THE RESERVOIR.
 NORMAL OPERATING LEVEL IS 700mm FROM THE UPPER COVER (30 GRADUATION OF L.G.) AND THE AMOUNT OF
CF IS 2.5m3
 MAXIMUM ALLOWALABLE UPPER LIMIT (WITH CF PUMPS IN STOPPED CONDITION) IS 150mm FROM THE UPPER COVER
(85 GRADUATION OF L.G.) AND MINIMUM OPERATING LEVEL IS 800mm (20 GRADUATON OF L.G.) FROM THE UPPER
COVER.
 CF PUMP STOPS AUTOMATICALLY INCASE OF RESERVOIR OIL LEVEL LOW-LOW.
 FOR VISUAL OVSERVATION OF OIL LEVEL ,LEVELGLASSES HAVE BEEN PROVIDED IN THE BOTH SIDES (DIRTY AS WELL
AS CLEAN).
 DIFFERENTIAL PRESSURE SWITCH (10MAX10CP001) HAS BEEN PROVIDED TO WARN ABOUT INCREASE IN PRESSURE
DIFFERENCE IN SIDE THE MESH FILTER. ALLOWABLE DIFFERENCE IN MESHES DOESNOT EXCEED 150mm.
 THE STANDBY CF PUMP STARTS WHEN THE RUNNING ONE TRIPS OR SYSTEM PRESSURE DROPS TO 36KSC.
 IT TAKES 2 MINS FOR THE SYSTEM TO GET PRESSURIZED.
 IF SYSTEM PRESSURE DROPS TO 20KSC (10MAX14CP001) AND STOP VALVES START CLOSING ,THE OPEARTING PUMP
WILL STOP AND NO SIGNAL WILL BE GENERATED TO START THE STAND BY PUMP (SENSING OIL LEAKAGE).
 CF PUMP ALSO TRIPS ON FIRE PROTECTION.
 DUPLEX FULL PASSAGE FILTER WITH FILTERING DEGREE 20-25MICRONS IS INSTALLED IN GENERAL PRESSURE
COLLECTOR OF CONTROL SYSTEM.IF PRESSURE DIFFERENCE (10MAX14CP301,10MAX15CP301) ACROSS THE
RUNNING FILTER REACHES 0.8KSC,THE STANDBY FILTER HAS TO BE TAKEN INTO SERVICE.
 2 NOS.OF CF COOLERS (A&B) ARE INSTALLED IN THE CF SUPPLY LINE BEHIND THE DUPLEX FILTER. THESE COOLERS ARE
DOUBLE PASS (BY WATER) SURFACE HEAT EXCHANGERS WITH TUBULAR DESIGN ,WATER STREAM FLOWS INSIDE THE
TUBES AND CONSIST OF 148 TUBES OF SIZE 16X1500mm AND HEAT EXCHANGE AREA 25m2
.CF FLOWS FROM TO
DOWNARD.
 COOLERS ARE DESIGNED FOR A MAXIMUM COOLING WATER PRESSURE OF 10 ± 0.5KSC AND CF PRESSURE OF 68.7 ±
0.5KSC.CF FLOW RATE TO EACH COOLER IS 50m3
/hr AND PRESSURE DROP IS 0.2KSC. CW FLOW RATE TO EACH
COOLER IS 80m3
/hr AND PRESSURE DROP IS 0.194KSC.
 FOR HYDRODYNAMIC FLUSHING OF PIPELINES DURING MAINTENANCE,THERE IS A BYPASS VALVE
(10MAX14AA501)TO THE COOLERS WHICH SHOULD BE CLOSED AND SEALED DURING ROUTINE OPERATION.
 IN THE INPUT AND OUTPUT TO THE COOLERS CF LINE IS PROVIDED WITH TRIPLE-PASS SWITCHING OVER VALVES
WHICH PREVENT FALSE ACTIVATION OF BOTH COOLERS.
 CF TEMPERATURE IS MAINTAINED (48-52O
C)BY COOLING WATER FLOW VARIATION WITH THE HELP OF A FLOW
CONTROL STATION CONSISTING OF A PNEUMATIC CONTROL VALVE (10PGM20AA001) AND A BYPASS MOTORIZED
CONTROL VALVE(10PGM20AA002).IN CASE TEMPERATURE RISES TO 55O
C
(10MAX14CT001,10MAX14CT002),MOTORIZED BYPASS VALVE OPENS TO MAINTAIN THE CF TEMPERATURE. THE
MAXIMUM LIMIT OF CW TEMPERATURE AT COOLER INLET IS 37O
C.IF CW TEMPERATURE IS BELOW 36O
C ONE COOLER
CAN BE PUT OUT OF OPERATION.
 CF SUPPLY TO CONTROL UNITS IS CARRIED OUT BY TWO PRESSURE COLLECTORS OF STABILIZED AND UNSTABILIZED
PRESSURE.
 CF IS SUPPLIED TO UNSTABILIZED PRESSURE COLLECTOR THROUGH AN ORIFICE OF SIZE 22mm. STOP AND CONTROL
VALVE ACTUATORS ARE FED FROM THIS COLLECTOR.
 INTO STABILIZED PRESSURE COLLECTOR WHICH FEEDS OIL TO ALL CONTROL DEVICES,CF IS SUPPLIED FROM THE
SECTION BETWEEN PUMPS AND THE ORIFICE.
 DUE TO THE ARRANGEMENT MENTIONED ABOVE ,THE PRESSURE VARIATION IN UNSTABILIZED PRESSURE COLLEECTOR
CAUSED BY INCREASE IN CF CONSUMPTION WITH OPEN ACTUATORS AFFECTS IN A LESS DEGREE PRESSURE
VARIATION IN STABILIZED PRESSURE COLLECTOR.
 SPRING-WEIGHT ACCUMULATOR (10MAX20BB001) IS CONNECTED TO UNSTABILIZED PRESSURE COLLECTOR TO
PREVENT DECREASE IN FORWARD PRESSURE IN CASE OF LOSS AC SUPPLY TO THE PUMPS FOR 5-7SECS OR DURING
PUMP CHANGE-OVER.
 THE SETTING OF FLUID PRESSURE LEVEL (45KSC) TO BE ENSURED BY THE ACCUMULATOR IS DETERMINED BY A WEIGHT
WHICH IS CONCRETE FILLED IN THE SITE.
 ONE NRV IS INSTALLED IN THE LINE CONNECTING THE ACCUMULATOR TO THE UNSTABILIZED PRESSURE COLLECTOR.
ACCUMULATOR IS FILLED WITH THE CF THROUGH AN ORIFICE OF SIZE 5mm INSTALLED IN THE BYPASS LINE OF THE
NRV.
 TWO EXHAUST FANS (1W+1S) ,10MAX21AN001,10MAX21AN002 (CAPACITY OF 3200m3
/hr AT A HEAD OF 5-20mm OF
WATER COLUMN) ARE ALSO INSTALLED TO REMOVE CF VAPOUR FROM CF RESERVOIR AND SYSTEM.
 THE EXHAUSTER SWITCHES ON AUTOMATICALLY WHEN CF PUMP STARTS AND SWITCHES OFF AUTOMATICALLY WITH
15mins TIME DELAY AFTER THE STOPPING OF CF PUMP AND CF SYSTEM PRESSURE DROPS BELOW 2.0KSC.
 HYDRAULIC TEST OF PIPE LINES CARRIED OUT AT A PRESSURE OF 90KSC.HYDRAULIC TEST SHOULD BE CARRIED OUT
AFTER ASSEMBLING,OVERHAUL AND INSPECTION.
CONTROL FLUID SYSTEM
CONTROL FLUID SYSTEM
 Isolation valves on pump suction & discharge side
 Pump discharge pressure 50 Ksc
 Capacity 41 TPH
 Stabilized pressure header supply oil to servo motors of SV & CV
 Un stabilized pressure header with 22 mm orifice
 Accumulator in unstabilized pressure header
 CF tank capacity 6.9 m3
 Duplex filter
 Control fluid transfer pump to empty the CF tank
 CF Temperature control by control station in the ECW line
COMPONENT OF GOVERNING SYSTEM
1. ELECTRO-HYDRAULIC CONVERTER – SUMMER – 8 NOS.
2. SUMMER – 8NOS.
3. ELECTRO-MECHANICAL CONVERTER – 8NOS.
4. GOVERNING BLOCK
1. CONTROLGEAR(AE001) – 1NO.
2. EMERGENCY GOVERNOR OR OVERSPEED GOVERNOR– 1NO.
3. TRIP SOLENOID (AA213,AA214)-2NOS.
4. TEST ELECTROMAGNETS(AA211,AA212) – 2NOS.
5. ROTATIONAL SPEED DETECTOR -3 NOS.
6. LIMITER OF PRESSURE (AA502) – 1NO.
7. SPEED TRANSDUCER – 1NO.
8. LEVER OF OVER SPEED GOVERNOR (AX201)– 1NO.
9. PILOT VALVE FOR SUPPLY (AX202) – 1NO.
5. ACCUMULATOR – 1NO.
6. OIL SUPPLY AND PURIFIER UNIT
7. SERVOMOTOR OF HPSV – 2NOS.
8. SERVOMOTOR OF HPCV – 4NOS.
9. SERVOMOTOR OF IPSV – 2NOS.
10. SERVOMOTOR OF IPCV – 4NOS.
11. SERVOMOTOR OF CRH NRV – 2NOS.
12. LOCKING PILOT VALVE (AA001,AA002,AB001,AB002)- 4NOS.
13. EX.STOP VALVE SERVOMOTOR OR ESV (10LBQ10AA101)– 1NO.
DIFFERENT TYPES OF OIL
1. HEAD PRESSURE LINE (STABILIZED,50KSC,10MAX15)
2. HEAD PRESSURE LINE ( NON-STABILIZED,50KSC,10MAX15)
3. LINE OF PROTECTION (50KSC,10MAX51)
4. LINE TO COCK THE OVERSPEED GOVERNOR SLIDE VALVE (50KSC)
5. CONTROL OIL LINE TO STOP VALVE SERVOMOTORS (50KSC,10MAX16)
6. CONTROL LNE TO SUMMATORS (35KSC,10MAX17)
TURBINE PROTRCTIONS
1. OUT OF TOLERANCE ROTOR OVERSPEED : ALARM AT 3300RPM AND TRIPPING AT 3360RPM
2. OUT OF TOLERANCE AXIAL DISPLACEMENT OF ROTOR:
 TOWARDS FRONT BEARING BY 0.6mm (-0.6mm) -ALARM.
 TOWARDS FRONT BEARING BY 1.2mm (-1.2mm) - TRIPPING.
 TOWARDS GENERATOR BY 1.4mm (+1.4mm)A- ALARM.
 TOWARDS GENERATOR BY 2.0mm (+2.0mm) - TRIPPING.
1. LUBRICATING OIL PRESSURE DROP: ALARM AT 0.70KSC AND TRIPPING AT 0.30KSC WITH 3SECS TIME DELAY.
2. PRESSURE RISE IN CONDENSER:ALARM AT 0.15KSC abs. AND TRIPPING AT 0.20KSC abs. PROTECTION IS
INTRODUCED AUTOMETICALLY AT UNIT START-UP AFTER PRESSURE DROP IN CONDENSER LOWER THAN 0.15KSC
abs. OR AT TURBINE SPEED INCREASE OVER 1500RPM. PROTECTION IS IN OPERATION UNTIL STOP VALVES ARE
OPEN
3. INCREASE OF BEARING VIBRATION: ALARM SOUNDS AT INCREASE OF VERTICAL OR TRANSVERSE OR AXIAL
COMPONENT OF VIBRATION ON ANY BEARING OF TG SET REACHES 4.5mm/s .TRIPPING OCCURS WITH 2 SECS
TIME DELAY AT INCREASE OF VERTICAL OR TRANSVERSE COMPONENT OF VIBRATION OVER 11.2mm/s ON ANY
TWO BEARINGS OF TG SET.
6. RISE IN STEAM TEMPERATURE AT HPT OUTLET:
7. LIVE STEAM TEMPERATURE BEFORE TURBINE FALLS BELOW 470O
C:
8. LIVE STEAM TEMPERATURE BEFORE TURBINE RISES ABOVE 565O
C:
9. STEAM TEMPERATURE BEFORE IV FALLS BELOW 500O
C:
10. STEAM TEMPERATURE BEFORE IV RISES ABOVE 593O
C:
11. MOT LEVEL LOW-LOW:
12. DRIP LEVEL HIGH-HIGH IN ANY HPH:
13. ANY FAILURE IN TURBNE CONTROL SYSTEM ELECTRONICS:
14. GENETERATOR PROTECTION:
15. FIRE PROTECTION OPERATED:
16. EPB PRESED.
TURBINE LUBE OILSYSTEM
 LUBRICATION OIL SYSTEM IS DESIGNED TO SUPPLY OIL TO TURBINE AND GENERATOR BEARINGS IN ALL TURBINE PLANT
OPERATION MODES AND ALSO TO PROVIDE ROTOR JACKING OIL SYSTEM AND GENERATOR SEAL OIL SYSTEM WITH
OIL.
 LUBRICATION OIL IS ISO VG 32 TYPE WITH FOLLOWING PROPERTIES:
 ABSOLUTE VISCOCITY : 16.7CENTIPOISE
 KINEMATIC VISCOSITY : 32CENTISTOKE
 SPECIFIC GRAVITY : 0.89
 SPECIFIC HEAT : 0.459Kcal/Kg Deg.C
 FLASH POINT : 180O
C
 FIRE POINT : 240O
C
 DEGREE OF CLEANLINESS : 16/13 ISO 4406
 PERMISSIBLE SUSPENDED PARTICLE SIZE : 25 MICRON
 WATER CONTENT : <10PPM
 LUBE OILTANK IS MADE OF STAINLESS STEEL AND HAVING A CAPACITY OF 58m3
. PROVISION IS MADE FOR OIL
TREATMENT INSIDE THE TANK BY PROVIDING TWO ROWS OF FLAT GRIDS WITH MESH DIMENSIONS 0.25mm LOCATED
INSIDE THE TANK WHICH DIVIDES THE TANK INTO DIRTY AND CEAN COMPARTMENTS. THE AIR SEPARATOR
CONSISTING OF TILTED METAL PLATES SET IS INSTALLED TO SEPARATE THE AIR DISSOLVED IN OIL.
 THE OIL TANK HAS ATTACHMENTS FOR OIL DRAINING TO OIL TREATMENT PLANT FOR SLUDGE DRAIN AND TO
EMERGENCY TANK INCASE OF FIRE.
 NORMAL OPERATING LEVEL IS 600mm FROM TANK TOP COVER.ALARM IS AT 500mm AND TURBINE TRIP IS THERE AT
400mm.
 4 NOS OF LUBE OIL PUMPS (SINGLE STAGE CENTRIFUGAL) ARE INSTALLED VERTICALLY ABOVE THE TANK .2 PUMPS
(AUXILLIARY OIL PUMP) ARE ac MOTOR DRIVEN AND 2 PUMPS ARE dc (EMERGENCY OIL PUMP) MOTOR DRIVEN.
 ONE PUMP WITH ac MOTOR IS CONTINUOUS RUNNING AND OTHER IS KEPT STANDBY.
 EACH ac PUMP IS HAVING A DISCHARGE CAPACITY OF 300m3
/hr A DISCHARGE PRESSURE OF 4.3KSC.
 EOP WLL START IN CASE OF LOSS OF AC.EACH EOP IS HAVING A DISCHARGE CAPACITY OF 250m3
/hr AND A
DISCHARGE PRESSURE OF 2 KSC.FOR HIGHIER RELIABILITY EOP DELIVERS OIL DIRECTLY TO THE BEARING BYPASSING
COOLER AND THROTTLE VALVE.
TG LUBE OIL SUPPLY SYSTEM
TG LUBE OIL SYSTEM
TG LUBE OIL SYSTEM
 Turbine oil is ISO VG 32
 KV 20-23 CST at 500
C
 Acidity Number < 0.05 mg KOH/r
 Viscosity index > 90
 Bearings
 HPT Front N1
 HPT Rear N2
 IPT Front (TB) N3
 IPT Rear N4
 LPT-1 Front N5
 LPT-1 Rear N6
 LPT-2 Front N7
 LPT-2 Rear N8
 Generator Front N9
 Generator Rear N10
 Exciter Front N11
 Exciter Rear N12
TG LUBE OIL SYSTEM
• DC Lube oil pump 1 No.
Equipment Capacity (m3
/hr) Head (Ksc)
AC Lube oil pump 300 4.3
DC Lube oil pump 250 2.0
• NRV & Isolation valve in each Lube oil pump
discharge line
• Oil first goes to duplex filter instead of cooler
• Coolers Bypass line with isolating valve
• Hydraulic Pressure control valve maintains the
pressure at the center shaft level at 1.2 Ksc
• PCV Bypass with throttling orifice which provides
lubrication even at fully closed control valve
TG LUBE OIL SYSTEM
 Oil is first delivered to bearing brasses through emergency
tanks located on bearing cap
 Emergency tanks capacity in m3
 N1 0.43
 N2 0.35
 N3 0.75
 N4 0.44
 N5 0.44
 N6 0.44
 N7 0.44
 N8 0.44
 N9 0.5
 N10 0.44
 N11 0.1
 N12 0.1
TG LUBE OIL SYSTEM
 Lube oil temperature control by control station in the ECW inlet
line to Lube oil coolers
 View glasses in the oil return line from each bearing
 MOT Capacity 58 m3
 Duplex filters fineness 25 µm
 Provision is made for oil cleaning by delivering a portion of oil
from the oil pressure pipe to the oil tank through the fine
cleaning filter with fineness of 12-15 µm
 Fresh oil is filled through the above filter only
 Oil recirculation pump to purify the oil
 Electrical oil heater of 152 KW capacity is provided for the
preliminary oil warming in the lubrication oil tank before turbine
start up by running the oil recirculation pump
 Oil draining to Emergency lube oil tank in case of emergency
with MOV
TG LUBE OIL SYSTEM
 Oil trap at the suction of the vapor extractor fans
 Oil trap drain to lubrication oil tank
 Jacking oil pumps suction also given from lube oil discharge header after
coolers & before control valve
TG JACKING OIL AND BARRING GEAR SYSTEM
Barring gear & Jacking oil system
 Automatic barring gear engagement at the rotor stop
and barring gear disengaging at the start-up
 High pressure oil supply for bearing inserts oil jacking
 Barring speed 1.05 rpm
 Motorized barring gear
 Torque transfer from the barring gear motor to the
turbine shaft is carried out via three stage reducer and
free wheel clutch
 Reduction gear first stage shaft end mounts special
handle for hand barring
 Normal source for jacking oil pumps suction is from lube
oil pumps discharge header after coolers
 JOP discharge pressure: 120 Ksc
Barring Gear & Jacking oil system
 Dozing devices at each bearing of the Turbine & Generator which
contain strainer, NRV, orifice & isolation valve
 Bearing jacking oil is supplied via separate lines for oil jacking of
inserts of bearing no: 4-9
 Stand-by bearing insert oil jacking pump is not provided as
the system is designed to realize auxiliary functions at
turbine start-up. If this pump does not start when it is
required then also the turbine can be operated normally
without any bearing damage and disturbance of turbine
operation
 Each bearing insert jacking oil line is equipped with orifice
only
 Both pumps cut in/cut out is 1500/1500
 Barring gear cut in/cut out is 1500/1500
Barring Gear & Jacking oil system
 Bearing Insert Oil Jacking Pump is started automatically, if the rotor neck
displacement becomes more than 0.1 mm relative to the insert of
any of bearings No. 4,…9 provided that the oil pressure to rotor
jacking is higher than 45 kg/cm2 or the turbine rotor rotational speed
is higher than 1500 rpm
 Pump is stopped automatically, with time delay of 30 seconds, if the rotor
neck displacement is less than 0.1 mm relative to the insert of bearings No. 4-9
GENERATOR SEAL OIL SYSTEM
GENERATOR SEAL OIL SYSTEM
 Seal oil pumps suction from MOT
 No Hydrogen side seal oil pump
 Pumps re-circulation line directly to MOT
 Coolers bypass valve
 Magnetic filters 2 No. (1W+1SB)
 NRV in the seal oil line after filters
 DPR
 DPR bypass manual control valve
GENERATOR SEAL OIL SYSTEM
 Damper tanks 2 No.: 1 for TE & 2 for EE, designed for oil supply to
front and back generator shaft seals with drop, specified by the
height of damper tank installation, and also to seal at short-time
interruption in oil supply, at the moment of automatic transfer from
working pump to standby and at generator runback with
generator shaft seal pumps switched off
 View glasses in return oil lines
 Float hydraulic seal functions as SOT
 Hydraulic seal overflows in to return oil header
 No SOST
 Provision of trap upstream of fans
 Fans suction is from return oil header
GENERATOR STATOR WATER COOLING SYSTEM
 Water tank not on the generator
 Ejector to make vacuum over the water tank to prevent air
ingress
 Ejector cooling by auxiliary cooling water
 Air venting of Generator through Gas trap connected from
winding inlet and outlet headers
 Gas trap to determine hydrogen present which will be extracted
from trap cap to gas analyzer
 Coolers bypass valve
 Ion exchanger-1 contains anion & cat ion in H-OH form to
maintain conductivity
 Ion exchanger-2 contains anion & cat ion in Na-OH form to
maintain Ph if it decreases below 8
 Ion exchanger-1 first will be put in to service for reducing
dissolved oxygen below 5.0 µs/cm and then it will be put out of
service. Then Ion exchanger-2 will be put in to service to increase
the Ph value. If conductivity increases above 12.5 µs/cm, Ion
exchanger-2 to be stopped
STATOR WATER COOLING SYSTEM
STATOR WATER COOLING SYSTEM
 Control valves at the inlet of individual Ion exchanger circuits
 DM water flow through ion exchanger is 1.5 to 2.0 m
 No NAOH dozing system
 Ion exchangers separate bypass lines
 Mechanical filter at the inlet of Ion exchanger circuit
 Dissolved oxygen analyzer & Ph analyzer
 Winding inlet valve for flow adjustment
 Winding outlet valve for pressure adjustment
 Normal make up from DM make up line & emergency make
up line from CST
 Filter in the common make up line
 Control station in the common make up line
GENERATOR GAS SUPPLY SYSTEM
GENERATOR GAS SUPPLY SYSTEM
 Two Hydrogen manifolds to connect 16 cylinders each
 Direct acting Pressure regulator installed on cylinder connecting line to Manifold
header to reduce the Hydrogen pressure from 175 Ksc to 10 Ksc
 Total Pressure regulators 32
 Safety valve on each manifold header which operates when the Hydrogen
pressure in the manifold exceeds 10.5 Ksc
 MOV & NRV in each manifold header
 Three CO2 manifolds to connect 17 cylinders each
 Each manifold header contains MOV, NRV & Isolation valve
 MOV with manual bypass valve at the inlet of CO2 heater
 CO2 heater is steam heated
 Steam source is from auxiliary steam system
 Steam parameters: 15 Ksc & 210 0
C
 MOV in the steam inlet line
 Steam exhaust will go to FWSV Dish flash tank
 Manifold header pressure is 175-20 Ksc
 Control station with Pressure regulator provided D/S of heater to maintain a
pressure of 2.0-2.2 Ksc with manual bypass valve
 SV installed D/S of pressure regulator operates if the pr > 5.0 Ksc
 Capacity of one cylinder 50 lit
GENERATOR GAS SUPPLY SYSTEM
 One Hydrogen manifold is in operation under normal
operating conditions
 If the pr decreases below < 10 Ksc, an alarm will come and
operator connects the standby manifold and disconnects the
first manifold
 Two CO2 manifolds are in operation under normal operating
conditions
 If the pr decreases below < 20 Ksc, an alarm will come and
operator connects the standby manifold and disconnects the
first manifold
 Provision is given for emergency removal of hydrogen from
generator itself by providing a line with one manual isolating
valve & 2 No. MOV
FLASH TANKS
 DRAINS FROM THE TURBINE AND STEAM LINES ARE
REMOVED TO TWO HP DRAIN FLASH TANKS - A
(10MAL10BB001) AND B (10MAL20BB001) AND ONE
LP DRAIN FLASH TANK (10MAL30BB001)
 BOTH THE HP FLASH TANKS ARE HAVING A CAPACITY
OF 2.6m3
. LP DRAIN FLASH TANK IS ALSO HAVING A
CAPACITY OF 2.6m3.
CONDENSER
 Design LMZ
 Design CW Flow 64000 m3
/hr
 Vacuum 77 mm Hg (abs) at 33 0
C
89 mm Hg (abs) at 36 0
C
 No. of passes 1
 Total no. of tubes 22.225 (OD)x0.71 (t) - 29920
22.225 (OD)x1.00 (t) - 2080
 Tube material ASTM A-249 TP 304
 Rated TTD 3.40
C
 DT of CW 100
C
CONDENSATE EXTRACTION PUMP
 Design flow rate 238.75 Kg/s
 Discharge pressure 32.15 Ksc
 Shut off head 395 m
 Pump speed 1480 rpm
 Power input 972.3 KW
 No. of stages 6
 Type of first stage impeller double
entry
 Depth 7.43 m
DE-AERATOR
Design Pressure 13 Ksc
No. of trays 896
Spray valves 132
Design temp for D/A 395 0
C
Design temp for FST 250 0
C
DRIP PUMP
 Design flow rate 324.509 TPH
 Discharge pressure 43 ata
 Shut off head 306.7 m
 Pump speed 1486 rpm
 Power input 310.1 KW
 No. of stages 5
 Type of first stage impeller centrifugal, single entry
 Depth 1090 mm
MDBFP
 Pump flow 769.950 TPH
 Suction temp 186.2 0
C
 BP Suction pr. 14.05 ata
 BFP Suction pr. 21.01 ata
 BFP Discharge pr. 335.78 ata
 BFP Discharge temp. 187.9 0
C
 BP Discharge pr. 22.01 ata
 Shut off head 4830 m
 BFP Speed 6275 rpm
 BP Speed 1490 rpm
 Normal R/C flow 220 TPH
 HC Rated O/P Speed 6505 rpm
 Outer casing type barrel
 No. of stages 7
 BFP warm up flow 15 TPH
TDBFP
 Pump flow 1283.14 TPH
 Suction temp 186.2 0C
 BP Suction pr. 14.10 ata
 BFP Suction pr. 28.24 ata
 BFP Discharge pr. 335.83 ata
 BFP Discharge temp. 187.8 0C
 BP Discharge pr. 29.06 ata
 Shut off head 4580m
 BFP Speed 4678 rpm
 BP Speed 2098rpm
 Normal R/C flow 365 TPH
 HC Rated O/P Speed 6505rpm
 Outer casing type barrel
 No. of stages 7
 BFP warm up flow 20 TPH
TDBFP GOVERNING SYSTEM
GOVERNING SYSTEM
 PARTS OF GOVERNING SYSTEM
 Hydraulic Accumulator (HA)
 Remote switch (RS)
 Lubrication system pressure relay (LSPR)
 Trip Gear (TG)
 Stop valve (SV)
 Governor valve 1 (GV1)
 Governor valve 2 (GV2)
 Cut off pilot valve (COPV)
 Electro mechanical converter (EMC)
 Electro mechanical converter position transducer (ECPT)
 Electronic control part (ECP)
 Servo motor (S)
 Governor valves position transducer (GVPT)
TDBFP TURBINE
 Number of stages 9
 Casing Split
 Steam admission Dual
 Steam pressure at inlet 20.82 ata
 Steam temperature at inlet 469 0
C
 Turbine operating speed 4678 rpm
 Steam consumption 61.4 TPH
 Steam pressure at exhaust 0.128 ata
 Turning gear speed 15 rpm
 Type of governing system Electro-Hydraulic
 Over speed type trip Centrifugal + electrical
 JOP Not required
 Lube oil tank capacity 10.97 m3
 Lube oil Same as main turbine
TDBFP CONDENSER
 CW flow 3000 TPH
 Vacuum in the condenser 0.128 Ksc (abs)
 Total no. of tubes 3312
 Tube OD and thickness 22.225x1.06 mm
 No. of water passes 2
 Tube material ASTM A-249 TP321
TDBFP LUBE OIL SYSTEM
TDBFP EXTRACTION SYSTEM
TDBFP CONDENSATE SYSTEM
ACW SYSTEM
ACW SYSTEM
 Suction header is from all the 4 CW inlet lines to
condensers
 MOV at Suction header from CW line
 MOV at SCS inlet
 MOV at PHE inlet & outlet
 Supply to
 Ejector of Stator water cooling system
 TDBFP vacuum pumps (4 No.)
 Main turbine vacuum pumps (1 No. extra)
 MOV at return header to CW line
TURBINE VACUUM SYSTEM
TURBINE HEATING FLANGES SYSTEM
AUXILIARY STEAM SYSTEM
CONDENSATE SUPPLY SYSTEM TO EXT NRVS
EXHAUST HOOD SPRAY
FEED WATER SYSTEM
TDBFP-A FEED WATER SYSTEM
MDBFP FEED WATER SYSTEM
LP DOZING & OXY TREATMENT SYSTEM
HP BYPASS SYSTEM
LP BYPASS SYSTEM
660 mw turbo generator &amp; its auxiliaries

More Related Content

What's hot

Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownNitin Mahalle
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedureAshvani Shukla
 
660 mw turbo governing &amp; protection system
660 mw turbo  governing &amp; protection system660 mw turbo  governing &amp; protection system
660 mw turbo governing &amp; protection systemAshvani Shukla
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineRAVI PAL SINGH
 
condensate system
condensate systemcondensate system
condensate systemvikrantdesh
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)Billa ParameswaraRao
 
AUTOMATIC TURBINE RUNUP SYSTEM
AUTOMATIC TURBINE RUNUP SYSTEMAUTOMATIC TURBINE RUNUP SYSTEM
AUTOMATIC TURBINE RUNUP SYSTEMkumarswamy927
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiencyManohar Tatwawadi
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overviewGaurav Kaushik
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing SystemSalil Vaidya
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPSManohar Tatwawadi
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING Nitin Patel
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection systemSachin Pyasi
 

What's hot (20)

Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedure
 
660 mw turbo governing &amp; protection system
660 mw turbo  governing &amp; protection system660 mw turbo  governing &amp; protection system
660 mw turbo governing &amp; protection system
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
condensate system
condensate systemcondensate system
condensate system
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
AUTOMATIC TURBINE RUNUP SYSTEM
AUTOMATIC TURBINE RUNUP SYSTEMAUTOMATIC TURBINE RUNUP SYSTEM
AUTOMATIC TURBINE RUNUP SYSTEM
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overview
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection system
 

Viewers also liked

Birkosit Sealing Compound contains boiled linseed oils
Birkosit Sealing Compound contains boiled linseed oilsBirkosit Sealing Compound contains boiled linseed oils
Birkosit Sealing Compound contains boiled linseed oilsProject Sales Corp
 
Cenelca Ii Drm Presentation
Cenelca Ii Drm PresentationCenelca Ii Drm Presentation
Cenelca Ii Drm PresentationWilson Contreras
 
Generator protection system by nicholas naing
Generator protection system by nicholas naingGenerator protection system by nicholas naing
Generator protection system by nicholas naingNicholas Naing
 
Maximize Equipment Life with Lubricant Condition Management
Maximize Equipment Life with Lubricant Condition ManagementMaximize Equipment Life with Lubricant Condition Management
Maximize Equipment Life with Lubricant Condition ManagementVibra
 
Apresentationonturbogeneratorandexcitor 1312012333
Apresentationonturbogeneratorandexcitor 1312012333Apresentationonturbogeneratorandexcitor 1312012333
Apresentationonturbogeneratorandexcitor 1312012333k,l polytechnic roorkee
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantRohith Gadu
 
Birkosit Dichtungskitt - Turbine Sealing Compound
Birkosit Dichtungskitt - Turbine Sealing CompoundBirkosit Dichtungskitt - Turbine Sealing Compound
Birkosit Dichtungskitt - Turbine Sealing CompoundProject Sales Corp
 
Control valves for thermal power plants
Control valves for thermal power plantsControl valves for thermal power plants
Control valves for thermal power plantsSHIVAJI CHOUDHURY
 
Transformer oil dehydration importance & process
Transformer oil dehydration importance & processTransformer oil dehydration importance & process
Transformer oil dehydration importance & processTransfo Tech. Engineering
 
Varnish in turbine lube
Varnish in turbine lubeVarnish in turbine lube
Varnish in turbine lubebocah666
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and FillShad Edwards
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plantra m
 
Generator protection gers
Generator protection gersGenerator protection gers
Generator protection gersHabudin Hassan
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,ReportMAHENDRA MEENA
 

Viewers also liked (20)

Steam turbine
Steam turbineSteam turbine
Steam turbine
 
STEAM TURBINE BASIC
STEAM TURBINE BASIC STEAM TURBINE BASIC
STEAM TURBINE BASIC
 
Birkosit Sealing Compound contains boiled linseed oils
Birkosit Sealing Compound contains boiled linseed oilsBirkosit Sealing Compound contains boiled linseed oils
Birkosit Sealing Compound contains boiled linseed oils
 
Cenelca Ii Drm Presentation
Cenelca Ii Drm PresentationCenelca Ii Drm Presentation
Cenelca Ii Drm Presentation
 
Reliability Centered Lubrication
Reliability Centered LubricationReliability Centered Lubrication
Reliability Centered Lubrication
 
Motor lubrication
Motor lubricationMotor lubrication
Motor lubrication
 
Generator protection system by nicholas naing
Generator protection system by nicholas naingGenerator protection system by nicholas naing
Generator protection system by nicholas naing
 
Maximize Equipment Life with Lubricant Condition Management
Maximize Equipment Life with Lubricant Condition ManagementMaximize Equipment Life with Lubricant Condition Management
Maximize Equipment Life with Lubricant Condition Management
 
Apresentationonturbogeneratorandexcitor 1312012333
Apresentationonturbogeneratorandexcitor 1312012333Apresentationonturbogeneratorandexcitor 1312012333
Apresentationonturbogeneratorandexcitor 1312012333
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Birkosit Dichtungskitt - Turbine Sealing Compound
Birkosit Dichtungskitt - Turbine Sealing CompoundBirkosit Dichtungskitt - Turbine Sealing Compound
Birkosit Dichtungskitt - Turbine Sealing Compound
 
Control valves for thermal power plants
Control valves for thermal power plantsControl valves for thermal power plants
Control valves for thermal power plants
 
Transformer oil dehydration importance & process
Transformer oil dehydration importance & processTransformer oil dehydration importance & process
Transformer oil dehydration importance & process
 
Varnish in turbine lube
Varnish in turbine lubeVarnish in turbine lube
Varnish in turbine lube
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and Fill
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
 
Generators
GeneratorsGenerators
Generators
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 
Generator protection gers
Generator protection gersGenerator protection gers
Generator protection gers
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 

Similar to 660 mw turbo generator &amp; its auxiliaries

Turbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptTurbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptNarhari1
 
SUPER CRITICAL BOILER.pdf
SUPER CRITICAL BOILER.pdfSUPER CRITICAL BOILER.pdf
SUPER CRITICAL BOILER.pdfVivaanRavi
 
Super-Critical Boiler.ppt
Super-Critical Boiler.pptSuper-Critical Boiler.ppt
Super-Critical Boiler.pptMarcWorld
 
Mini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliariesMini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliariesjyotishmathi college
 
Attachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportAttachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportCangTo Cheah
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingPRAN-RFL Group
 
BRITISH THOMSON HOUSTON TURBINE
BRITISH THOMSON HOUSTON TURBINE BRITISH THOMSON HOUSTON TURBINE
BRITISH THOMSON HOUSTON TURBINE Sakshi Vashist
 
Basic ccpp overview Power plant
Basic ccpp overview Power plantBasic ccpp overview Power plant
Basic ccpp overview Power plantMARLON RAMIREZ
 
Boi_5_ST-2 Ball and Tube Mill .ppt
Boi_5_ST-2 Ball and Tube Mill  .pptBoi_5_ST-2 Ball and Tube Mill  .ppt
Boi_5_ST-2 Ball and Tube Mill .pptTravelTechnology1
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to BoilersSATYAKAM MOHAPATRA
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~ihaxxo24
 
discription aboit vam and how it can works
discription aboit vam and how it  can worksdiscription aboit vam and how it  can works
discription aboit vam and how it can worksreader46
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticVibropac
 
Sample Question and answer for power plants
Sample Question and answer for power plantsSample Question and answer for power plants
Sample Question and answer for power plantsVikeshgond2
 
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...exergyorc
 
Combined Cycle power Plant IFFCO Aonla
Combined Cycle power Plant IFFCO AonlaCombined Cycle power Plant IFFCO Aonla
Combined Cycle power Plant IFFCO AonlaANUP SRIVASTAV
 

Similar to 660 mw turbo generator &amp; its auxiliaries (20)

Turbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptTurbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.ppt
 
Turbo generator & its auxiliaries
Turbo generator & its auxiliariesTurbo generator & its auxiliaries
Turbo generator & its auxiliaries
 
SUPER CRITICAL BOILER.pdf
SUPER CRITICAL BOILER.pdfSUPER CRITICAL BOILER.pdf
SUPER CRITICAL BOILER.pdf
 
Super-Critical Boiler.ppt
Super-Critical Boiler.pptSuper-Critical Boiler.ppt
Super-Critical Boiler.ppt
 
Steam Condensate Return Stations
Steam Condensate Return StationsSteam Condensate Return Stations
Steam Condensate Return Stations
 
Mini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliariesMini project ppt on working of steam turbine and its auxiliaries
Mini project ppt on working of steam turbine and its auxiliaries
 
Attachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection reportAttachment 1_SLIC CL2 compressor selection report
Attachment 1_SLIC CL2 compressor selection report
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
Energy Centre
Energy CentreEnergy Centre
Energy Centre
 
BRITISH THOMSON HOUSTON TURBINE
BRITISH THOMSON HOUSTON TURBINE BRITISH THOMSON HOUSTON TURBINE
BRITISH THOMSON HOUSTON TURBINE
 
Basic ccpp overview Power plant
Basic ccpp overview Power plantBasic ccpp overview Power plant
Basic ccpp overview Power plant
 
Boi_5_ST-2 Ball and Tube Mill .ppt
Boi_5_ST-2 Ball and Tube Mill  .pptBoi_5_ST-2 Ball and Tube Mill  .ppt
Boi_5_ST-2 Ball and Tube Mill .ppt
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to Boilers
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
discription aboit vam and how it can works
discription aboit vam and how it  can worksdiscription aboit vam and how it  can works
discription aboit vam and how it can works
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração Hermetic
 
Sample Question and answer for power plants
Sample Question and answer for power plantsSample Question and answer for power plants
Sample Question and answer for power plants
 
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
OPTIMIZED CYCLE AND TURBOMACHINERY CONFIGURATION FOR AN INTERCOOLED, RECOMPRE...
 
Combined Cycle power Plant IFFCO Aonla
Combined Cycle power Plant IFFCO AonlaCombined Cycle power Plant IFFCO Aonla
Combined Cycle power Plant IFFCO Aonla
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 

More from Ashvani Shukla

Adc.pptx ashvani 151503
Adc.pptx ashvani 151503Adc.pptx ashvani 151503
Adc.pptx ashvani 151503Ashvani Shukla
 
Pin photodiode.pptx ashvani
Pin photodiode.pptx ashvaniPin photodiode.pptx ashvani
Pin photodiode.pptx ashvaniAshvani Shukla
 
Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Ashvani Shukla
 
Temperature measurement
Temperature measurementTemperature measurement
Temperature measurementAshvani Shukla
 
Pressure measuring devices
Pressure measuring devicesPressure measuring devices
Pressure measuring devicesAshvani Shukla
 
Urea manufacturing process
Urea manufacturing processUrea manufacturing process
Urea manufacturing processAshvani Shukla
 
Amonia manufacturing process
Amonia manufacturing process Amonia manufacturing process
Amonia manufacturing process Ashvani Shukla
 
Paper production process
Paper production processPaper production process
Paper production processAshvani Shukla
 
Steel manufacturing process
Steel manufacturing processSteel manufacturing process
Steel manufacturing processAshvani Shukla
 
Cement manufacturing process new
Cement manufacturing process newCement manufacturing process new
Cement manufacturing process newAshvani Shukla
 
Combined ff and iec applications
Combined ff and iec applications  Combined ff and iec applications
Combined ff and iec applications Ashvani Shukla
 
Device exchange and calibration
Device exchange and calibration Device exchange and calibration
Device exchange and calibration Ashvani Shukla
 
Devices not in abb device library
Devices not in abb device library Devices not in abb device library
Devices not in abb device library Ashvani Shukla
 

More from Ashvani Shukla (20)

Adc.pptx ashvani 151503
Adc.pptx ashvani 151503Adc.pptx ashvani 151503
Adc.pptx ashvani 151503
 
Pin photodiode.pptx ashvani
Pin photodiode.pptx ashvaniPin photodiode.pptx ashvani
Pin photodiode.pptx ashvani
 
Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1
 
Temperature measurement
Temperature measurementTemperature measurement
Temperature measurement
 
Modern coupling
Modern couplingModern coupling
Modern coupling
 
Mechanical coupling
Mechanical couplingMechanical coupling
Mechanical coupling
 
Pressure measuring devices
Pressure measuring devicesPressure measuring devices
Pressure measuring devices
 
Urea manufacturing process
Urea manufacturing processUrea manufacturing process
Urea manufacturing process
 
Amonia manufacturing process
Amonia manufacturing process Amonia manufacturing process
Amonia manufacturing process
 
Control valve
Control valveControl valve
Control valve
 
Paper production process
Paper production processPaper production process
Paper production process
 
Steel manufacturing process
Steel manufacturing processSteel manufacturing process
Steel manufacturing process
 
Cement manufacturing process new
Cement manufacturing process newCement manufacturing process new
Cement manufacturing process new
 
Nuclear reactor
Nuclear reactorNuclear reactor
Nuclear reactor
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Flow measurement
Flow measurementFlow measurement
Flow measurement
 
Orifice plate
Orifice plateOrifice plate
Orifice plate
 
Combined ff and iec applications
Combined ff and iec applications  Combined ff and iec applications
Combined ff and iec applications
 
Device exchange and calibration
Device exchange and calibration Device exchange and calibration
Device exchange and calibration
 
Devices not in abb device library
Devices not in abb device library Devices not in abb device library
Devices not in abb device library
 

Recently uploaded

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 

Recently uploaded (20)

complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 

660 mw turbo generator &amp; its auxiliaries

  • 1. A PRESENTATION ON 660MW TURBO- GENERATOR ,ITS AUXILIARIES AND ASSOCIATED SYSTEMS By Ashvani Shukla C&I BGR energy
  • 3. GENERAL INFORMATION  TG DECK IS VIS SUPPORTED AND HAS 26 CONCRETE COLUMNS (T1 – T26).  TG HALL IS CONSTITUTED OF 3 MAINS ROWS OF COLUMNS – A,B ,C ROW AND TWO BAYS – AB BAY AND BC BAY. THE WIDTH OF AB BAY IS 36m AND BC BAY IS 12m  CONDENSER TUBE BANKS (CW PATH) HAS AN INCLINATION OF 40 .  THERE ARE TWO MAIN EOT CRANES FOR TG HALL.EACH EOT CRANE IS HAVING A CAPACITY OF 200t FOR MAIN HOIST AND 20t FOR AUXILIARY HOIST. 35.5m IS THE MAXIMUM VERTCAL DISTANCE A HOIST CAN TRAVEL.TANDEM OPERATION OF TWO EOT CRANES ARE ALLOWED.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. RATED CONDITIONS  LOAD : 660MW  BEFORE HP STOP VALVE  STEAM PRESSURE : 247KSC  STEAM TEMPERATURE : 5370 C  STEAM FLOW : 2023.75T/HR  AFTER HPC  STEAM PRESSURE : 48KSC  STEAM PRESSURE : 298.710 C  BEFORE IP STOP VALVE  STEAM PRESSURE : 43.2KSC  STEAM TEMPERATURE : 5650 C  STEAM FLOW TO REHEATER : 1681.12T/HR.  DESIGN CONDENSER PRESSURE : 0.105KSC (abs.)  COOLING WATER FLOW : 64000M3 /HR  FINAL FEED WATER TEMP. : 286.350 C  FREQUENCY RANGE : 47.5 – 51.5 Hz
  • 10. STEAM TURBINE  Generator rated speed 3000 rpm  Generator manufacturer - Electrosila  No. of bleedings 8  Length of the turbine 36.362 m  No. of stages  HPT 17  IPT 11x2  LPT-1 5x2  LPT-2 5x2  Total 59
  • 11. STEAM TURBINE  Parameters  Pr. Before HPC SV 247.0 Ksc  Temp. before HPC SV 537.0 0 C  Steam flow 2023.75 TPH  Pr. After HPC 48.0 Ksc  Temp. after HPC 298.71 0 C  Pr. Before IP SV 43.2 Ksc  Temp. before IP SV 565.0 0 C  Steam flow to reheat 1681.12 TPH  Design Cond pr. 0.105 Ksc  CW flow 64000 TPH  Final FW Temp. 286.35 0 C
  • 12. STEAM TURBINE  Turbine Governing system Mode of Governing Nozzle Type E/H Control fluid Firequel-L make Supresta-USA Normal Operating Pr. 50 Ksc Capacity 600 lpm Fluid pump motor rating 200 KW Filter material Ultipor Mesh size 25 µ
  • 13. STEAM TURBINE  Lube oil system  Lube oil Tn-22C Russia Mobil DTE Oil light Teresso 32 In accordance with ISO VG 32  Absolute viscosity 16.7Centipoise  Kinematic viscosity -32 Centistokes  Specific gravity 0.89  Flash point 180 0 C  Fire point 240 0 C  Oil requirement per bearing  N1 200 lpm  N2 200 lpm  N3 450 lpm  N4 280 lpm  N5 350 lpm  N6 350 lpm  N7 350 lpm
  • 14. STEAM TURBINE  Lube oil system  Total oil system capacity 52000 lit  Full volume of oil tank 58000 lit  Material of tank SS  Normal lube oil pressure 1.2 Ksc  Oil temp at inlet of bearings  Normal 55 0 C  Maximum 59 0 C  Piping SS  Seal steam system  Source of gland sealing system  During normal operation End glands of HPC & IPC  During low load operation End glands of HPC & IPC + AS  Quantity of seal steam required 3.54 TPH  Seal steam pressure at turbine glands 1.1-1.2 Ksc  Seal steam temperature at turbine glands 160 0 C
  • 15. TURBINE SEAL STEAM •TWO HEADERS OR COLLECTORS ARE THERE i.e. HOT COLLECTOR AND COLD COLLECTOR. •INITIAL SOURCE OF STEAM SUPPLY IS APRDS (UNIT HT,16KSC,310O C). •PRESSURE AND TEMPERATURE OF COLD HEADER OR COLLERTOR ARE 1.1TO1.15 KSC ABSOLUTE AND 140TO 180O C RESPECTIVELY. •PRESSURE AND TEMPERATURE OF HOT HEADER OR COLLERTOR ARE 1.1TO1.15 KSC ABSOLUTE AND RESPECTIVELY.
  • 16. Turbine Protection Over speed trip 110-112 % Low lube oi pressure 0.3 (g) Ksc Low vacuum trip 0.3 (abs) Ksc Thrust bearing excessive wear trip +1.2/-2.0 mm Pressure relief diaphragm setting 1.2 (abs) Ksc STEAM TURBINE
  • 17. STEAM TURBINE  Materials of construction  HP Outer casing 15Cr1Mo1V  HP blade/carrier casings 15Cr1Mo1V  IP Outer casing 15Cr1Mo1V  LP inner casing Steel 3  LP Outer casing Steel 3  HP Shaft 25Cr1Mo1V  IP Shaft 25Cr1Mo1V  LP Shaft 26CrNi3Mo2V  Moving blades  HPT first stage blades18Cr11MoNiVNb (1-5)  HPT other stages 15Cr11MoV (6-17)  IPT first stage 18Cr11MoNiVNb (1-3)  IPT other stages 15Cr11MoV (4-11)  LPT last stage 13Cr11Ni2W2MoV  LPT other stages 20Cr13 (1-2)  LPT other stages 15Cr11MoV (3-4)
  • 18. STEAM TURBINE  Fixed blades  HPT first stage 18Cr11MoNiVNb (1-5)  HPT other stages 15Cr11MoV (6-17)  IPT first stage 18Cr11MoNiVNb  IPT other stages 15Cr11MoV  LPT first stage 12Cr13 (1-4)  LPT Other stages 08 Cr13 (5)  Number of stages  HPT  Impulse stages 1  Reaction stages 16  IPT  Impulse stages 22  Reaction stages 0  LPT  Impulse stages 20  Reaction stages 0  All rows of blades are integrally shrouded
  • 19. STEAM TURBINE  No. of HP Stop valves 2  No. of HP Control valves 4  Type of control valve unit Block united  No. of IP Stop valves 2  No. of IP Control valves 4  Type of control valves Separate  No. of Journal bearings for turbine 8  No. of Journal bearings for Gen 4  No. of thrust cum journal bearing 1  Type of thrust bearing Tilting  Type of journal bearing 6-Fixed & 2-Tilting pad  Material of bearing shell Alloy steel  Type of lining Babbit
  • 20. STEAM TURBINE  Turbine model No K-660-247  Generator model No TBB-660-2T3  Strainers are installed in the steam chests of the stop valves  In HPT, having passed the control stage and 8 stages which generate left jet of steam (from generator towards front bearing) steam changes its direction 180° and flows between internal and external cylinders to 8 stages of right jet (towards generator)  In CRH lines, NRV has a bypass with electric valve and control valve to enable counter flow mode of HPT with the aim of warming up of cylinder and high pressure cross over pipes at turbine start up and cold condition  HPT has nozzle steam distribution system  IPT has throttle steam distribution system  On each upper half (cover) of low pressure cylinder four membrane type relief valves are installed which are activated when the absolute pressure in exhaust nozzles rises up to 1.35 –1.4 Ksc absolute
  • 21. TG SEAL STEAM SYSTEM
  • 22. TO 2nd CHAMBER EXHAUST TO BLED STEAM TO D/A TO BLED STEAM TO LPH # 4 TO HOT SEAL STEAM HEADER TO GSC HPT HPT SEAL STEAM CONNECTION 1ST CHAMBER 2ND CHAMBER
  • 23. TO COLD SEAL STEAM HEADER TO GSC IPT IPT SEAL STEAM CONNECTION
  • 24. FROM COLD SEAL STEAM HEADER TO GSC LPT LPT SEAL STEAM CONNECTION
  • 25.  IN HIGH PRESSURE DRAINAGE EXPANSION TANK A VALVES IN DRAINAGE COLLECTORS FROM EXTRACTION STEAM PIPES TO HPHs (10MAL20AA110, 10MAL20AA120, 10MAL20AA140) AND IN LOW PRESSURE DRAINAGE EXPANSION TANK VALVES IN DRAINAGE COLLECTORS FROM EXTRACTION STEAM PIPES TO LPHs(10MAL30AA110, 10MAL30AA120) CLOSE AUTOMATICALLY IF TURBINE LOAD INCREASES OVER 200MW AND AT THE SAME TIME ALL VALVES ARE OPEN IN THE CORRESPONDING STEAM EXTRACTION FROM THE TURBINE TO HPHs AND LPHs.  VALVES IN DRAINAGE PIPES OF HPBP AND LPBP (10MAL30AA107, 10MAL30AA108) CLOSE AUTOMATICALLY IF TURBINE LOAD INCREASES OVER 30MW.
  • 26. CONTROL FLUID SYSTEM  FIRE RESISTANT SYNTHETIC HYDRAULIC FLUID FYRQUEL – L MANUFACTURED BY “SUPRESTA” IS USED AS OPERATING FLUID.ITS SELF IGNITION TEMPERATURE IS ABOUT 740O C.  OPERATING PRESSURE IS APPROXIMATELY 50KSC.  OPERATING TEMPERATURE IS 45-55OC.  CONTROL OIL SUPPLY UNIT CNSISTS OF A RESERVOIR (10MAX10BB001)OF CAPACITY 7.0m3 ,2NOS.OIL COOLERS(10MAX10AC001,10MAX10AC002),DE-AERATOR,MESH FILTER,FINE FILTER(10MAX18AT001),DUPLEX FILTER(10MAX14AT001) AND 2 NOS. OF VERTICALLY MOUNTED CENTRIFUGAL PUMPS(10MAX11AP001,10MAX12AP001) DRIVEN BY AC MOTOR (1W+1S).EACH PUMP IS HAVING A CAPACITY OF 36m3 /h AND DISCHARGE PRESSURE IS 50KSC.  CONTROL FLUID RESERVOIR IS SEPERATED BY TWO NUMBERS OF TANDEM MESHES OF CELL SIZE 0.25mm INTO TWO SECTIONS ,DIRTY AND CLEAN. DE- AERATOR IS INSTALLED INSIDE THE RESERVOIR INFRONT OF MESHES AND IT CONSISTS OF SLOPING PLATE ASSEMBLY.  CF FINE FILTER FOR REMOVING MECHANICAL IMPURITIES IS INSTALLED IN RESERVOIR. DURING NORMAL OPERATION CF IS SUPPLIED TO THE FINE FILTER THROUGH AN ORIFICE OF DIAMETER 4mm FROM UNSTABILIZED PRESSURE LINE VIA VALVE 10MAX18AA501 . AFTER THAT IT IS DISCHARGED IN THE DIRTY CHAMBER OF THE RESERVOIR. WHEN TURBINE IS STOPPED CF IS SUPPLIED TO THE FINE FILTER WITH THE HELP OF ANOTHER PUMP (CF TRANSFER PUMP,10MAX19AP001,CAPACITY 4m3 /hr, AND DISCHARGE PRESSURE 25KSC) VIA VALVES 10MAX19AA503 AND10MAX19AA504 FOR FILTERING PURPOSE KEEPING MAIN PUMPS IN OFF CONDITION.
  • 27.  OIL PURIFICATION IS CONTINUOUS DUE TO FILTERING OF ITS PART VIA CONCURRENTLY MOUNTED WORKING FILTER CARTRIDGES INSTALLED INSIDE THE FINE FILTER HOUSING.  FILTER CARTRIDGES DESIGN ALLOWS USAGE OF DIFFERENT FILTERING MATERIAL.  METAL SEMI-PINCEBECK MESH WITH FILTERING DEGREE OF 70 MICRONS TO FLUSH SYSTEM AFTER INSTALLATION OR MAINTENANCE.  FILTER BELTING FABRIC WITH FILTERING DEGREE 30 – 40 MICRONS FOR PRIMARY REFINING DURING TURBINE OPERATION.  FILTERING ELEMENTS MANUFACTURED BY ”PALL” WITH FILTERING DEGREE 12 MICRONS FOR CONTINUOUS OIL FILTERING DURING TURBINE OPERATION.  OCCURRENCE OF PRESSURE OF 0.1 TO 0.3KSC IN FILTER HOUSING WITHIN 1-3 HOURS SHOWS CORRECT ASSEMBLY OF FILTER AND ITS PROPER OPERATION.  IT IS NECESSARY TO SWITCH OFF THE FINE FILTER AND REPLACE FILTERING ELEMENTS IF PRESSURE IN FILTER HOUSING RISES UPTO 2KSC.WHICH SHOWS CONTAMINATION OF FILTER FABRIC.  INSIDE FILTER HOUSING THERE IS A RELIEF VALVE BYPASSING FLUID BESIDES FILTER CARTRIDGES WHEN THEY ARE CONTAMINATED AND PRESSURE RISES UPTO 5KSC.  AN OIL LEVEL GAUGE WITH ALARM SYSTEM WHISKERS (10MAX10CL001,10MAX 10CL002) IS PROVIDED IN THE CLEAN SIDE OF THE RESERVOIR.  NORMAL OPERATING LEVEL IS 700mm FROM THE UPPER COVER (30 GRADUATION OF L.G.) AND THE AMOUNT OF CF IS 2.5m3
  • 28.  MAXIMUM ALLOWALABLE UPPER LIMIT (WITH CF PUMPS IN STOPPED CONDITION) IS 150mm FROM THE UPPER COVER (85 GRADUATION OF L.G.) AND MINIMUM OPERATING LEVEL IS 800mm (20 GRADUATON OF L.G.) FROM THE UPPER COVER.  CF PUMP STOPS AUTOMATICALLY INCASE OF RESERVOIR OIL LEVEL LOW-LOW.  FOR VISUAL OVSERVATION OF OIL LEVEL ,LEVELGLASSES HAVE BEEN PROVIDED IN THE BOTH SIDES (DIRTY AS WELL AS CLEAN).  DIFFERENTIAL PRESSURE SWITCH (10MAX10CP001) HAS BEEN PROVIDED TO WARN ABOUT INCREASE IN PRESSURE DIFFERENCE IN SIDE THE MESH FILTER. ALLOWABLE DIFFERENCE IN MESHES DOESNOT EXCEED 150mm.  THE STANDBY CF PUMP STARTS WHEN THE RUNNING ONE TRIPS OR SYSTEM PRESSURE DROPS TO 36KSC.  IT TAKES 2 MINS FOR THE SYSTEM TO GET PRESSURIZED.  IF SYSTEM PRESSURE DROPS TO 20KSC (10MAX14CP001) AND STOP VALVES START CLOSING ,THE OPEARTING PUMP WILL STOP AND NO SIGNAL WILL BE GENERATED TO START THE STAND BY PUMP (SENSING OIL LEAKAGE).  CF PUMP ALSO TRIPS ON FIRE PROTECTION.  DUPLEX FULL PASSAGE FILTER WITH FILTERING DEGREE 20-25MICRONS IS INSTALLED IN GENERAL PRESSURE COLLECTOR OF CONTROL SYSTEM.IF PRESSURE DIFFERENCE (10MAX14CP301,10MAX15CP301) ACROSS THE RUNNING FILTER REACHES 0.8KSC,THE STANDBY FILTER HAS TO BE TAKEN INTO SERVICE.
  • 29.  2 NOS.OF CF COOLERS (A&B) ARE INSTALLED IN THE CF SUPPLY LINE BEHIND THE DUPLEX FILTER. THESE COOLERS ARE DOUBLE PASS (BY WATER) SURFACE HEAT EXCHANGERS WITH TUBULAR DESIGN ,WATER STREAM FLOWS INSIDE THE TUBES AND CONSIST OF 148 TUBES OF SIZE 16X1500mm AND HEAT EXCHANGE AREA 25m2 .CF FLOWS FROM TO DOWNARD.  COOLERS ARE DESIGNED FOR A MAXIMUM COOLING WATER PRESSURE OF 10 ± 0.5KSC AND CF PRESSURE OF 68.7 ± 0.5KSC.CF FLOW RATE TO EACH COOLER IS 50m3 /hr AND PRESSURE DROP IS 0.2KSC. CW FLOW RATE TO EACH COOLER IS 80m3 /hr AND PRESSURE DROP IS 0.194KSC.  FOR HYDRODYNAMIC FLUSHING OF PIPELINES DURING MAINTENANCE,THERE IS A BYPASS VALVE (10MAX14AA501)TO THE COOLERS WHICH SHOULD BE CLOSED AND SEALED DURING ROUTINE OPERATION.  IN THE INPUT AND OUTPUT TO THE COOLERS CF LINE IS PROVIDED WITH TRIPLE-PASS SWITCHING OVER VALVES WHICH PREVENT FALSE ACTIVATION OF BOTH COOLERS.  CF TEMPERATURE IS MAINTAINED (48-52O C)BY COOLING WATER FLOW VARIATION WITH THE HELP OF A FLOW CONTROL STATION CONSISTING OF A PNEUMATIC CONTROL VALVE (10PGM20AA001) AND A BYPASS MOTORIZED CONTROL VALVE(10PGM20AA002).IN CASE TEMPERATURE RISES TO 55O C (10MAX14CT001,10MAX14CT002),MOTORIZED BYPASS VALVE OPENS TO MAINTAIN THE CF TEMPERATURE. THE MAXIMUM LIMIT OF CW TEMPERATURE AT COOLER INLET IS 37O C.IF CW TEMPERATURE IS BELOW 36O C ONE COOLER CAN BE PUT OUT OF OPERATION.
  • 30.  CF SUPPLY TO CONTROL UNITS IS CARRIED OUT BY TWO PRESSURE COLLECTORS OF STABILIZED AND UNSTABILIZED PRESSURE.  CF IS SUPPLIED TO UNSTABILIZED PRESSURE COLLECTOR THROUGH AN ORIFICE OF SIZE 22mm. STOP AND CONTROL VALVE ACTUATORS ARE FED FROM THIS COLLECTOR.  INTO STABILIZED PRESSURE COLLECTOR WHICH FEEDS OIL TO ALL CONTROL DEVICES,CF IS SUPPLIED FROM THE SECTION BETWEEN PUMPS AND THE ORIFICE.  DUE TO THE ARRANGEMENT MENTIONED ABOVE ,THE PRESSURE VARIATION IN UNSTABILIZED PRESSURE COLLEECTOR CAUSED BY INCREASE IN CF CONSUMPTION WITH OPEN ACTUATORS AFFECTS IN A LESS DEGREE PRESSURE VARIATION IN STABILIZED PRESSURE COLLECTOR.  SPRING-WEIGHT ACCUMULATOR (10MAX20BB001) IS CONNECTED TO UNSTABILIZED PRESSURE COLLECTOR TO PREVENT DECREASE IN FORWARD PRESSURE IN CASE OF LOSS AC SUPPLY TO THE PUMPS FOR 5-7SECS OR DURING PUMP CHANGE-OVER.  THE SETTING OF FLUID PRESSURE LEVEL (45KSC) TO BE ENSURED BY THE ACCUMULATOR IS DETERMINED BY A WEIGHT WHICH IS CONCRETE FILLED IN THE SITE.  ONE NRV IS INSTALLED IN THE LINE CONNECTING THE ACCUMULATOR TO THE UNSTABILIZED PRESSURE COLLECTOR. ACCUMULATOR IS FILLED WITH THE CF THROUGH AN ORIFICE OF SIZE 5mm INSTALLED IN THE BYPASS LINE OF THE NRV.  TWO EXHAUST FANS (1W+1S) ,10MAX21AN001,10MAX21AN002 (CAPACITY OF 3200m3 /hr AT A HEAD OF 5-20mm OF WATER COLUMN) ARE ALSO INSTALLED TO REMOVE CF VAPOUR FROM CF RESERVOIR AND SYSTEM.  THE EXHAUSTER SWITCHES ON AUTOMATICALLY WHEN CF PUMP STARTS AND SWITCHES OFF AUTOMATICALLY WITH 15mins TIME DELAY AFTER THE STOPPING OF CF PUMP AND CF SYSTEM PRESSURE DROPS BELOW 2.0KSC.
  • 31.  HYDRAULIC TEST OF PIPE LINES CARRIED OUT AT A PRESSURE OF 90KSC.HYDRAULIC TEST SHOULD BE CARRIED OUT AFTER ASSEMBLING,OVERHAUL AND INSPECTION.
  • 33. CONTROL FLUID SYSTEM  Isolation valves on pump suction & discharge side  Pump discharge pressure 50 Ksc  Capacity 41 TPH  Stabilized pressure header supply oil to servo motors of SV & CV  Un stabilized pressure header with 22 mm orifice  Accumulator in unstabilized pressure header  CF tank capacity 6.9 m3  Duplex filter  Control fluid transfer pump to empty the CF tank  CF Temperature control by control station in the ECW line
  • 34. COMPONENT OF GOVERNING SYSTEM 1. ELECTRO-HYDRAULIC CONVERTER – SUMMER – 8 NOS. 2. SUMMER – 8NOS. 3. ELECTRO-MECHANICAL CONVERTER – 8NOS. 4. GOVERNING BLOCK 1. CONTROLGEAR(AE001) – 1NO. 2. EMERGENCY GOVERNOR OR OVERSPEED GOVERNOR– 1NO. 3. TRIP SOLENOID (AA213,AA214)-2NOS. 4. TEST ELECTROMAGNETS(AA211,AA212) – 2NOS. 5. ROTATIONAL SPEED DETECTOR -3 NOS. 6. LIMITER OF PRESSURE (AA502) – 1NO. 7. SPEED TRANSDUCER – 1NO. 8. LEVER OF OVER SPEED GOVERNOR (AX201)– 1NO. 9. PILOT VALVE FOR SUPPLY (AX202) – 1NO. 5. ACCUMULATOR – 1NO. 6. OIL SUPPLY AND PURIFIER UNIT 7. SERVOMOTOR OF HPSV – 2NOS. 8. SERVOMOTOR OF HPCV – 4NOS. 9. SERVOMOTOR OF IPSV – 2NOS. 10. SERVOMOTOR OF IPCV – 4NOS. 11. SERVOMOTOR OF CRH NRV – 2NOS. 12. LOCKING PILOT VALVE (AA001,AA002,AB001,AB002)- 4NOS. 13. EX.STOP VALVE SERVOMOTOR OR ESV (10LBQ10AA101)– 1NO.
  • 35. DIFFERENT TYPES OF OIL 1. HEAD PRESSURE LINE (STABILIZED,50KSC,10MAX15) 2. HEAD PRESSURE LINE ( NON-STABILIZED,50KSC,10MAX15) 3. LINE OF PROTECTION (50KSC,10MAX51) 4. LINE TO COCK THE OVERSPEED GOVERNOR SLIDE VALVE (50KSC) 5. CONTROL OIL LINE TO STOP VALVE SERVOMOTORS (50KSC,10MAX16) 6. CONTROL LNE TO SUMMATORS (35KSC,10MAX17)
  • 36.
  • 37. TURBINE PROTRCTIONS 1. OUT OF TOLERANCE ROTOR OVERSPEED : ALARM AT 3300RPM AND TRIPPING AT 3360RPM 2. OUT OF TOLERANCE AXIAL DISPLACEMENT OF ROTOR:  TOWARDS FRONT BEARING BY 0.6mm (-0.6mm) -ALARM.  TOWARDS FRONT BEARING BY 1.2mm (-1.2mm) - TRIPPING.  TOWARDS GENERATOR BY 1.4mm (+1.4mm)A- ALARM.  TOWARDS GENERATOR BY 2.0mm (+2.0mm) - TRIPPING. 1. LUBRICATING OIL PRESSURE DROP: ALARM AT 0.70KSC AND TRIPPING AT 0.30KSC WITH 3SECS TIME DELAY. 2. PRESSURE RISE IN CONDENSER:ALARM AT 0.15KSC abs. AND TRIPPING AT 0.20KSC abs. PROTECTION IS INTRODUCED AUTOMETICALLY AT UNIT START-UP AFTER PRESSURE DROP IN CONDENSER LOWER THAN 0.15KSC abs. OR AT TURBINE SPEED INCREASE OVER 1500RPM. PROTECTION IS IN OPERATION UNTIL STOP VALVES ARE OPEN 3. INCREASE OF BEARING VIBRATION: ALARM SOUNDS AT INCREASE OF VERTICAL OR TRANSVERSE OR AXIAL COMPONENT OF VIBRATION ON ANY BEARING OF TG SET REACHES 4.5mm/s .TRIPPING OCCURS WITH 2 SECS TIME DELAY AT INCREASE OF VERTICAL OR TRANSVERSE COMPONENT OF VIBRATION OVER 11.2mm/s ON ANY TWO BEARINGS OF TG SET.
  • 38. 6. RISE IN STEAM TEMPERATURE AT HPT OUTLET: 7. LIVE STEAM TEMPERATURE BEFORE TURBINE FALLS BELOW 470O C: 8. LIVE STEAM TEMPERATURE BEFORE TURBINE RISES ABOVE 565O C: 9. STEAM TEMPERATURE BEFORE IV FALLS BELOW 500O C: 10. STEAM TEMPERATURE BEFORE IV RISES ABOVE 593O C: 11. MOT LEVEL LOW-LOW: 12. DRIP LEVEL HIGH-HIGH IN ANY HPH: 13. ANY FAILURE IN TURBNE CONTROL SYSTEM ELECTRONICS: 14. GENETERATOR PROTECTION: 15. FIRE PROTECTION OPERATED: 16. EPB PRESED.
  • 39. TURBINE LUBE OILSYSTEM  LUBRICATION OIL SYSTEM IS DESIGNED TO SUPPLY OIL TO TURBINE AND GENERATOR BEARINGS IN ALL TURBINE PLANT OPERATION MODES AND ALSO TO PROVIDE ROTOR JACKING OIL SYSTEM AND GENERATOR SEAL OIL SYSTEM WITH OIL.  LUBRICATION OIL IS ISO VG 32 TYPE WITH FOLLOWING PROPERTIES:  ABSOLUTE VISCOCITY : 16.7CENTIPOISE  KINEMATIC VISCOSITY : 32CENTISTOKE  SPECIFIC GRAVITY : 0.89  SPECIFIC HEAT : 0.459Kcal/Kg Deg.C  FLASH POINT : 180O C  FIRE POINT : 240O C  DEGREE OF CLEANLINESS : 16/13 ISO 4406  PERMISSIBLE SUSPENDED PARTICLE SIZE : 25 MICRON  WATER CONTENT : <10PPM  LUBE OILTANK IS MADE OF STAINLESS STEEL AND HAVING A CAPACITY OF 58m3 . PROVISION IS MADE FOR OIL TREATMENT INSIDE THE TANK BY PROVIDING TWO ROWS OF FLAT GRIDS WITH MESH DIMENSIONS 0.25mm LOCATED INSIDE THE TANK WHICH DIVIDES THE TANK INTO DIRTY AND CEAN COMPARTMENTS. THE AIR SEPARATOR CONSISTING OF TILTED METAL PLATES SET IS INSTALLED TO SEPARATE THE AIR DISSOLVED IN OIL.  THE OIL TANK HAS ATTACHMENTS FOR OIL DRAINING TO OIL TREATMENT PLANT FOR SLUDGE DRAIN AND TO EMERGENCY TANK INCASE OF FIRE.
  • 40.  NORMAL OPERATING LEVEL IS 600mm FROM TANK TOP COVER.ALARM IS AT 500mm AND TURBINE TRIP IS THERE AT 400mm.  4 NOS OF LUBE OIL PUMPS (SINGLE STAGE CENTRIFUGAL) ARE INSTALLED VERTICALLY ABOVE THE TANK .2 PUMPS (AUXILLIARY OIL PUMP) ARE ac MOTOR DRIVEN AND 2 PUMPS ARE dc (EMERGENCY OIL PUMP) MOTOR DRIVEN.  ONE PUMP WITH ac MOTOR IS CONTINUOUS RUNNING AND OTHER IS KEPT STANDBY.  EACH ac PUMP IS HAVING A DISCHARGE CAPACITY OF 300m3 /hr A DISCHARGE PRESSURE OF 4.3KSC.  EOP WLL START IN CASE OF LOSS OF AC.EACH EOP IS HAVING A DISCHARGE CAPACITY OF 250m3 /hr AND A DISCHARGE PRESSURE OF 2 KSC.FOR HIGHIER RELIABILITY EOP DELIVERS OIL DIRECTLY TO THE BEARING BYPASSING COOLER AND THROTTLE VALVE.
  • 41. TG LUBE OIL SUPPLY SYSTEM
  • 42. TG LUBE OIL SYSTEM
  • 43. TG LUBE OIL SYSTEM  Turbine oil is ISO VG 32  KV 20-23 CST at 500 C  Acidity Number < 0.05 mg KOH/r  Viscosity index > 90  Bearings  HPT Front N1  HPT Rear N2  IPT Front (TB) N3  IPT Rear N4  LPT-1 Front N5  LPT-1 Rear N6  LPT-2 Front N7  LPT-2 Rear N8  Generator Front N9  Generator Rear N10  Exciter Front N11  Exciter Rear N12
  • 44. TG LUBE OIL SYSTEM • DC Lube oil pump 1 No. Equipment Capacity (m3 /hr) Head (Ksc) AC Lube oil pump 300 4.3 DC Lube oil pump 250 2.0 • NRV & Isolation valve in each Lube oil pump discharge line • Oil first goes to duplex filter instead of cooler • Coolers Bypass line with isolating valve • Hydraulic Pressure control valve maintains the pressure at the center shaft level at 1.2 Ksc • PCV Bypass with throttling orifice which provides lubrication even at fully closed control valve
  • 45. TG LUBE OIL SYSTEM  Oil is first delivered to bearing brasses through emergency tanks located on bearing cap  Emergency tanks capacity in m3  N1 0.43  N2 0.35  N3 0.75  N4 0.44  N5 0.44  N6 0.44  N7 0.44  N8 0.44  N9 0.5  N10 0.44  N11 0.1  N12 0.1
  • 46. TG LUBE OIL SYSTEM  Lube oil temperature control by control station in the ECW inlet line to Lube oil coolers  View glasses in the oil return line from each bearing  MOT Capacity 58 m3  Duplex filters fineness 25 µm  Provision is made for oil cleaning by delivering a portion of oil from the oil pressure pipe to the oil tank through the fine cleaning filter with fineness of 12-15 µm  Fresh oil is filled through the above filter only  Oil recirculation pump to purify the oil  Electrical oil heater of 152 KW capacity is provided for the preliminary oil warming in the lubrication oil tank before turbine start up by running the oil recirculation pump  Oil draining to Emergency lube oil tank in case of emergency with MOV
  • 47. TG LUBE OIL SYSTEM  Oil trap at the suction of the vapor extractor fans  Oil trap drain to lubrication oil tank  Jacking oil pumps suction also given from lube oil discharge header after coolers & before control valve
  • 48. TG JACKING OIL AND BARRING GEAR SYSTEM
  • 49. Barring gear & Jacking oil system  Automatic barring gear engagement at the rotor stop and barring gear disengaging at the start-up  High pressure oil supply for bearing inserts oil jacking  Barring speed 1.05 rpm  Motorized barring gear  Torque transfer from the barring gear motor to the turbine shaft is carried out via three stage reducer and free wheel clutch  Reduction gear first stage shaft end mounts special handle for hand barring  Normal source for jacking oil pumps suction is from lube oil pumps discharge header after coolers  JOP discharge pressure: 120 Ksc
  • 50. Barring Gear & Jacking oil system  Dozing devices at each bearing of the Turbine & Generator which contain strainer, NRV, orifice & isolation valve  Bearing jacking oil is supplied via separate lines for oil jacking of inserts of bearing no: 4-9  Stand-by bearing insert oil jacking pump is not provided as the system is designed to realize auxiliary functions at turbine start-up. If this pump does not start when it is required then also the turbine can be operated normally without any bearing damage and disturbance of turbine operation  Each bearing insert jacking oil line is equipped with orifice only  Both pumps cut in/cut out is 1500/1500  Barring gear cut in/cut out is 1500/1500
  • 51. Barring Gear & Jacking oil system  Bearing Insert Oil Jacking Pump is started automatically, if the rotor neck displacement becomes more than 0.1 mm relative to the insert of any of bearings No. 4,…9 provided that the oil pressure to rotor jacking is higher than 45 kg/cm2 or the turbine rotor rotational speed is higher than 1500 rpm  Pump is stopped automatically, with time delay of 30 seconds, if the rotor neck displacement is less than 0.1 mm relative to the insert of bearings No. 4-9
  • 53. GENERATOR SEAL OIL SYSTEM  Seal oil pumps suction from MOT  No Hydrogen side seal oil pump  Pumps re-circulation line directly to MOT  Coolers bypass valve  Magnetic filters 2 No. (1W+1SB)  NRV in the seal oil line after filters  DPR  DPR bypass manual control valve
  • 54. GENERATOR SEAL OIL SYSTEM  Damper tanks 2 No.: 1 for TE & 2 for EE, designed for oil supply to front and back generator shaft seals with drop, specified by the height of damper tank installation, and also to seal at short-time interruption in oil supply, at the moment of automatic transfer from working pump to standby and at generator runback with generator shaft seal pumps switched off  View glasses in return oil lines  Float hydraulic seal functions as SOT  Hydraulic seal overflows in to return oil header  No SOST  Provision of trap upstream of fans  Fans suction is from return oil header
  • 55. GENERATOR STATOR WATER COOLING SYSTEM
  • 56.  Water tank not on the generator  Ejector to make vacuum over the water tank to prevent air ingress  Ejector cooling by auxiliary cooling water  Air venting of Generator through Gas trap connected from winding inlet and outlet headers  Gas trap to determine hydrogen present which will be extracted from trap cap to gas analyzer  Coolers bypass valve  Ion exchanger-1 contains anion & cat ion in H-OH form to maintain conductivity  Ion exchanger-2 contains anion & cat ion in Na-OH form to maintain Ph if it decreases below 8  Ion exchanger-1 first will be put in to service for reducing dissolved oxygen below 5.0 µs/cm and then it will be put out of service. Then Ion exchanger-2 will be put in to service to increase the Ph value. If conductivity increases above 12.5 µs/cm, Ion exchanger-2 to be stopped STATOR WATER COOLING SYSTEM
  • 57. STATOR WATER COOLING SYSTEM  Control valves at the inlet of individual Ion exchanger circuits  DM water flow through ion exchanger is 1.5 to 2.0 m  No NAOH dozing system  Ion exchangers separate bypass lines  Mechanical filter at the inlet of Ion exchanger circuit  Dissolved oxygen analyzer & Ph analyzer  Winding inlet valve for flow adjustment  Winding outlet valve for pressure adjustment  Normal make up from DM make up line & emergency make up line from CST  Filter in the common make up line  Control station in the common make up line
  • 59. GENERATOR GAS SUPPLY SYSTEM  Two Hydrogen manifolds to connect 16 cylinders each  Direct acting Pressure regulator installed on cylinder connecting line to Manifold header to reduce the Hydrogen pressure from 175 Ksc to 10 Ksc  Total Pressure regulators 32  Safety valve on each manifold header which operates when the Hydrogen pressure in the manifold exceeds 10.5 Ksc  MOV & NRV in each manifold header  Three CO2 manifolds to connect 17 cylinders each  Each manifold header contains MOV, NRV & Isolation valve  MOV with manual bypass valve at the inlet of CO2 heater  CO2 heater is steam heated  Steam source is from auxiliary steam system  Steam parameters: 15 Ksc & 210 0 C  MOV in the steam inlet line  Steam exhaust will go to FWSV Dish flash tank  Manifold header pressure is 175-20 Ksc  Control station with Pressure regulator provided D/S of heater to maintain a pressure of 2.0-2.2 Ksc with manual bypass valve  SV installed D/S of pressure regulator operates if the pr > 5.0 Ksc  Capacity of one cylinder 50 lit
  • 60. GENERATOR GAS SUPPLY SYSTEM  One Hydrogen manifold is in operation under normal operating conditions  If the pr decreases below < 10 Ksc, an alarm will come and operator connects the standby manifold and disconnects the first manifold  Two CO2 manifolds are in operation under normal operating conditions  If the pr decreases below < 20 Ksc, an alarm will come and operator connects the standby manifold and disconnects the first manifold  Provision is given for emergency removal of hydrogen from generator itself by providing a line with one manual isolating valve & 2 No. MOV
  • 61. FLASH TANKS  DRAINS FROM THE TURBINE AND STEAM LINES ARE REMOVED TO TWO HP DRAIN FLASH TANKS - A (10MAL10BB001) AND B (10MAL20BB001) AND ONE LP DRAIN FLASH TANK (10MAL30BB001)  BOTH THE HP FLASH TANKS ARE HAVING A CAPACITY OF 2.6m3 . LP DRAIN FLASH TANK IS ALSO HAVING A CAPACITY OF 2.6m3.
  • 62. CONDENSER  Design LMZ  Design CW Flow 64000 m3 /hr  Vacuum 77 mm Hg (abs) at 33 0 C 89 mm Hg (abs) at 36 0 C  No. of passes 1  Total no. of tubes 22.225 (OD)x0.71 (t) - 29920 22.225 (OD)x1.00 (t) - 2080  Tube material ASTM A-249 TP 304  Rated TTD 3.40 C  DT of CW 100 C
  • 63. CONDENSATE EXTRACTION PUMP  Design flow rate 238.75 Kg/s  Discharge pressure 32.15 Ksc  Shut off head 395 m  Pump speed 1480 rpm  Power input 972.3 KW  No. of stages 6  Type of first stage impeller double entry  Depth 7.43 m
  • 64. DE-AERATOR Design Pressure 13 Ksc No. of trays 896 Spray valves 132 Design temp for D/A 395 0 C Design temp for FST 250 0 C
  • 65. DRIP PUMP  Design flow rate 324.509 TPH  Discharge pressure 43 ata  Shut off head 306.7 m  Pump speed 1486 rpm  Power input 310.1 KW  No. of stages 5  Type of first stage impeller centrifugal, single entry  Depth 1090 mm
  • 66. MDBFP  Pump flow 769.950 TPH  Suction temp 186.2 0 C  BP Suction pr. 14.05 ata  BFP Suction pr. 21.01 ata  BFP Discharge pr. 335.78 ata  BFP Discharge temp. 187.9 0 C  BP Discharge pr. 22.01 ata  Shut off head 4830 m  BFP Speed 6275 rpm  BP Speed 1490 rpm  Normal R/C flow 220 TPH  HC Rated O/P Speed 6505 rpm  Outer casing type barrel  No. of stages 7  BFP warm up flow 15 TPH
  • 67. TDBFP  Pump flow 1283.14 TPH  Suction temp 186.2 0C  BP Suction pr. 14.10 ata  BFP Suction pr. 28.24 ata  BFP Discharge pr. 335.83 ata  BFP Discharge temp. 187.8 0C  BP Discharge pr. 29.06 ata  Shut off head 4580m  BFP Speed 4678 rpm  BP Speed 2098rpm  Normal R/C flow 365 TPH  HC Rated O/P Speed 6505rpm  Outer casing type barrel  No. of stages 7  BFP warm up flow 20 TPH
  • 69. GOVERNING SYSTEM  PARTS OF GOVERNING SYSTEM  Hydraulic Accumulator (HA)  Remote switch (RS)  Lubrication system pressure relay (LSPR)  Trip Gear (TG)  Stop valve (SV)  Governor valve 1 (GV1)  Governor valve 2 (GV2)  Cut off pilot valve (COPV)  Electro mechanical converter (EMC)  Electro mechanical converter position transducer (ECPT)  Electronic control part (ECP)  Servo motor (S)  Governor valves position transducer (GVPT)
  • 70. TDBFP TURBINE  Number of stages 9  Casing Split  Steam admission Dual  Steam pressure at inlet 20.82 ata  Steam temperature at inlet 469 0 C  Turbine operating speed 4678 rpm  Steam consumption 61.4 TPH  Steam pressure at exhaust 0.128 ata  Turning gear speed 15 rpm  Type of governing system Electro-Hydraulic  Over speed type trip Centrifugal + electrical  JOP Not required  Lube oil tank capacity 10.97 m3  Lube oil Same as main turbine
  • 71. TDBFP CONDENSER  CW flow 3000 TPH  Vacuum in the condenser 0.128 Ksc (abs)  Total no. of tubes 3312  Tube OD and thickness 22.225x1.06 mm  No. of water passes 2  Tube material ASTM A-249 TP321
  • 72. TDBFP LUBE OIL SYSTEM
  • 76. ACW SYSTEM  Suction header is from all the 4 CW inlet lines to condensers  MOV at Suction header from CW line  MOV at SCS inlet  MOV at PHE inlet & outlet  Supply to  Ejector of Stator water cooling system  TDBFP vacuum pumps (4 No.)  Main turbine vacuum pumps (1 No. extra)  MOV at return header to CW line
  • 85. LP DOZING & OXY TREATMENT SYSTEM