Visit To Building
Construction Site
By: Maliha Mehar
Hajira Shah
(1st semester)
Building Site
• The building we chose for site visit was a Plaza. We went their once and
observed everything, asked different questions from the workers and the
owner.
• Type of building: A triple story building with a Parking.
• Location: ………………..
• Architect: …………….
• Structural Engineer: …………….
• Date of visit: 16-December-2018.
Building Views
Front View Side View
Building Materials
• We observed and asked questions about various building materials:
1- Bricks
2-Aggregates
3-Cement
4-Mortar
5-Cocrete Mix
6-Bars
1.Bricks
- Bricks are most widely used building materials.
-On the basis of strength, they’re classified into 1st, 2nd, 3rd
and 4th class.
Brick Test: We tested the bricks by striking 2 bricks, it gave
a sharp metallic sound and no scratch was produced by nail.
Class of bricks: 1st class bricks.
Mark/Company: 755 and T.
2.Aggregates
• Aggregates are the materials mixed with binding materials like cement,
mortar and in the preparation of concrete.
Question: Which coarse aggregate is it?
Answer: It is aggregate of 4 soot.
1 soot = 1/8”NOTE
3.Cement
-Cement is the binding material used to bind various construction materials
such as bricks, stones concrete blocks, etc.
Name of company: Cements of 2 companies were being used, Lucky cement
and Falcon cement.
Type: Ordinary Portland Cement.
Weight per bag: 50 kg.
Strength: 28 days strength up to 10,000 psi.
Cost per bag: The cost of Lucky cement was 575 Rs. and for Falcon cement it
was 625 Rs.
Question: What is the water to cement ratio?
Answer: We can’t tell the proper/fixed amount, we add water by estimation.
We understand the enough/needed amount spontaneously when practically
adding water into cement.
4.Mortar
• It is the mixture of cement, fine aggregate (sand) and water in specific
proportions.
• Mortar being used at the construction site was “Cement mortar”.
Question: Ratio of cement to sand in mortar?
Answer: We take sand of volume 2 and half wheelbarrows (2.5 * 35 liters/80
kg) for every 1 packet (50kg) of cement.
5.Concrete Mix
• Concrete is the mixture of coarse aggregate, fine aggregate, sand and water.
• As we observed, plain concrete cement (PCC) and reinforced concrete cement
(RCC) was being used at the site.
• We asked about the ratio of concrete mix and they told us about the quantity of
components with approximate volume, we did not know about the specific volumes
of the drums being used.
• As well as we could not find out the exact water to cement ratio.
Question: What is the ratio of concrete mix?
Answer: We use 2 drums of coarse aggregates, 1.5 drum of fine aggregate and 0.45
packet of cement.
6.Reinforcement Bars
• In construction site, different rebars were used for different purpose.
• The bars being used were Twisted bars.
Question: Which bar sizes are being used in slab, column, beams and in
rings?
Answer: In slab, bars of 4 soot were used.
-In columns and beams, bars of 6 soot.
-In rings bars of 3 soot.
-Stirrup ends were bent inwards at a 90°
angle rather than 45°.
45° bend is prefered as it gives
better grip. For dynamic state of loading such
as earthquake, their response is find better.
-Concreting of columns and beams was
already done up to 2nd floor.
NOTE
Bend angle in stirrups
Building Details
• The building being constructed was a
three story building with a parking.
• It was a plaza containing 21 flats in total.
• 7 flats in each floor.
Construction Progress
Ground floor:
-Beams, columns were given and some brick
work was also done.
-Making of partition walls was in progress.
-Frame for doors was also given.
First floor:
-Only beams and columns were given
and very little brick work was done at
the boundaries.
-No partition walls were given.
-Shuttering/Formwork of beams and
columns was removed.
-Shuttering of some portions of slab was
not removed till that time.
First floor
Second floor:
-Little brick work at the boundaries.
-Beams and columns were given,
-Complete slab was not installed.
-Shuttering of beams and columns was
removed.
-Slab formwork was not removed from
some portions.
Second Floor
Building Design
• The building was “Frame Structure”.
• We came to this conclusion by observing the structure, positions of columns
and beams.
• Also because the sizes of columns and beams were different.
• Columns were not given at each corner.
Plans Of Building
Flat 3 Details
• Almost all the flats had the same design.
• Flats were connected through corridors.
• We observed Flat 3.
• Its total area was 1300 ft.
• It consisted of 2 Bedrooms, a Drawing room, a Kitchen, a Lounge, 3
Bathrooms, a dressing, 2 voids/ducts and a lobby.
Sizes
Bedroom-1: 11’-0’’x13’-0’’
Bathroom: 8’-4.5’’x4’-0’’
Bedroom-2: 14’-0’’x11’-0’’
Bathroom: 4’-0x8-7.5’’
Drawing room: 11’-0’’x12’-0’’
Bathroom: 4’-0’’x5’-0’’
Dressing: 4’-0’’x4’-0’’
Lounge: 13’-0’’x10-0’’
Lobby: 5’-4.5’’x11’
Void-1: 4’-0’’x8’-7.5’’
Void-2: 4’-0’’x7’-0’’
-Room sizes were according to the standards, but bathrooms and kitchen sizes
were a bit smaller than the standard sizes.
-Sizes of rooms and other areas were according to the plan given, we
confirmed the sizes from the labors present.
Entrance
• The flat started with a corridor leading to the Lounge
and Drawing room.
• From Lounge, there was another lobby leading to the
two bedrooms.
Guestroom/Drawing Room
• Guest room had a dressing, a bath and a duct in it.
Lounge And Kitchen
• Kitchen was in the Lounge.
• It was an open kitchen.
• There was a duct for ventilating
both the Lounge and Kitchen.
Rooms
• There were 2 bedrooms in the flat.
• Both similar in design.
• Only a single duct was given for the ventilation of both the rooms and the
attached baths in them.
• Both rooms had attached bathrooms.
• Single window from duct was given for ventilation in both the rooms.
Bedrooms
Lobby leading to bedrooms Room Design
Single duct ventilating 2 rooms and 2 bathrooms
Kitchen and Bath floors
• Kitchen and bathroom floors were below than the floor level of rooms,
about 9 inches.
Question: Why the floors of bathrooms and kitchen is below than the
room level?
Answer: After plumbing installation, again concreting would be done.
Door and Window sizes
• Door size: Approximate height was 6.5ft and width varies with 2.5ft for
bathrooms and 3.5ft for other doors.
• Window sizes: Various sizes.
• Ventilators sizes for baths: Approximately 4.5’*5.5’
Stairs
• Stairs were according to the standards.
• Dog legged stairs were provided.
• Riser: 4-4.5 inches.
• Tread: Length was approx. 3.5 ft and
width was 9 inches.
Parking
• Underground parking was also provided.
Question: What is the capacity of Parking?
Answer: Approximately 50 cars.
Ramp Down for Parking
• Servant Quarters were constructed in parking
area.
• Stairs leading to ground floor.
Servant Quarters
Final looks of building
• The owner of the building had shown us the final design of the his another
building constructed with the same design.
THANK YOU

More Related Content

What's hot

What's hot (20)

Mode of measurements
Mode of measurementsMode of measurements
Mode of measurements
 
Stairs Ppt
Stairs PptStairs Ppt
Stairs Ppt
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
Curing of concrete
Curing of concreteCuring of concrete
Curing of concrete
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
Planning of residential buildings
Planning of residential buildingsPlanning of residential buildings
Planning of residential buildings
 
Building construction
Building constructionBuilding construction
Building construction
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
 
Industrial building
Industrial buildingIndustrial building
Industrial building
 
Building materials
Building materialsBuilding materials
Building materials
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Doors and Windows
Doors and WindowsDoors and Windows
Doors and Windows
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
 
Manholes, by mayank agrawal
Manholes, by mayank agrawalManholes, by mayank agrawal
Manholes, by mayank agrawal
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
TYPES OF Foundation
TYPES OF FoundationTYPES OF Foundation
TYPES OF Foundation
 
Foundation ppt
Foundation pptFoundation ppt
Foundation ppt
 

Similar to Construction Site Visit

Various materials used in completing kardan university structure
Various materials used in completing kardan university structureVarious materials used in completing kardan university structure
Various materials used in completing kardan university structure
Sameer Nawab
 
2016 DEID Madagascar Post Implementation Report
2016 DEID Madagascar Post Implementation Report2016 DEID Madagascar Post Implementation Report
2016 DEID Madagascar Post Implementation Report
Dylan Kaiser
 
DOC-20221217-WA0011.(1).pptx
DOC-20221217-WA0011.(1).pptxDOC-20221217-WA0011.(1).pptx
DOC-20221217-WA0011.(1).pptx
OmGudghe
 

Similar to Construction Site Visit (20)

Construction & Management
Construction & ManagementConstruction & Management
Construction & Management
 
Ferrouscementhouse 2
Ferrouscementhouse 2Ferrouscementhouse 2
Ferrouscementhouse 2
 
Various materials used in completing kardan university structure
Various materials used in completing kardan university structureVarious materials used in completing kardan university structure
Various materials used in completing kardan university structure
 
Building construction materials - brick
Building construction materials  - brick Building construction materials  - brick
Building construction materials - brick
 
Building maintenance
Building maintenance Building maintenance
Building maintenance
 
5.2 brick and stone MASONRY.pptx
5.2 brick and stone MASONRY.pptx5.2 brick and stone MASONRY.pptx
5.2 brick and stone MASONRY.pptx
 
Brickwork and plastering
Brickwork and plasteringBrickwork and plastering
Brickwork and plastering
 
Peter zumthor
Peter zumthorPeter zumthor
Peter zumthor
 
2016 DEID Madagascar Post Implementation Report
2016 DEID Madagascar Post Implementation Report2016 DEID Madagascar Post Implementation Report
2016 DEID Madagascar Post Implementation Report
 
Brick Masonry
Brick MasonryBrick Masonry
Brick Masonry
 
General Specifications (Architecture)
General Specifications (Architecture)General Specifications (Architecture)
General Specifications (Architecture)
 
Fire bricks and sand lime bricks
Fire bricks and sand lime bricksFire bricks and sand lime bricks
Fire bricks and sand lime bricks
 
CHECKLIST FOR BRICK WALL CONSTRUCTION
CHECKLIST FOR BRICK WALL CONSTRUCTIONCHECKLIST FOR BRICK WALL CONSTRUCTION
CHECKLIST FOR BRICK WALL CONSTRUCTION
 
BRICK MASONRY.pptx
BRICK MASONRY.pptxBRICK MASONRY.pptx
BRICK MASONRY.pptx
 
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
 
Finishing work,Construction workshop.
Finishing work,Construction workshop.Finishing work,Construction workshop.
Finishing work,Construction workshop.
 
Brick Masonry
Brick MasonryBrick Masonry
Brick Masonry
 
Concrete, The perfect concrete
Concrete, The perfect concreteConcrete, The perfect concrete
Concrete, The perfect concrete
 
DOC-20221217-WA0011.(1).pptx
DOC-20221217-WA0011.(1).pptxDOC-20221217-WA0011.(1).pptx
DOC-20221217-WA0011.(1).pptx
 
Bricks & Plastering
Bricks & PlasteringBricks & Plastering
Bricks & Plastering
 

More from Maliha Mehr

More from Maliha Mehr (20)

Types of bonds in brick masonry
Types of bonds in brick masonryTypes of bonds in brick masonry
Types of bonds in brick masonry
 
Interlocking Bricks
Interlocking BricksInterlocking Bricks
Interlocking Bricks
 
Types of Concrete
Types of ConcreteTypes of Concrete
Types of Concrete
 
Types of Paint with Application
Types of Paint with ApplicationTypes of Paint with Application
Types of Paint with Application
 
Types of deep foundation
Types of deep foundationTypes of deep foundation
Types of deep foundation
 
Arrays in C++
Arrays in C++Arrays in C++
Arrays in C++
 
Recursion in C++
Recursion in C++Recursion in C++
Recursion in C++
 
Labor Problems, Their Prevention and Settlement
Labor Problems, Their Prevention and Settlement Labor Problems, Their Prevention and Settlement
Labor Problems, Their Prevention and Settlement
 
Buoyancy and Flotation
Buoyancy and FlotationBuoyancy and Flotation
Buoyancy and Flotation
 
Rotameter
Rotameter Rotameter
Rotameter
 
Rectangular and Circular underground water tank
Rectangular and Circular underground water tank Rectangular and Circular underground water tank
Rectangular and Circular underground water tank
 
Concrete blocks and their types
Concrete blocks and their typesConcrete blocks and their types
Concrete blocks and their types
 
Types of Stairs
Types of StairsTypes of Stairs
Types of Stairs
 
Geological Subsurface Maps
Geological Subsurface MapsGeological Subsurface Maps
Geological Subsurface Maps
 
Subsurface Mapping
Subsurface MappingSubsurface Mapping
Subsurface Mapping
 
Seismic Refraction Test
Seismic Refraction TestSeismic Refraction Test
Seismic Refraction Test
 
Topography and Topographical Maps
Topography and Topographical Maps Topography and Topographical Maps
Topography and Topographical Maps
 
Metamorphic rocks
Metamorphic rocks Metamorphic rocks
Metamorphic rocks
 
HVAC System (Heating, Ventilation and Air Conditioning)
HVAC System (Heating, Ventilation and Air Conditioning)HVAC System (Heating, Ventilation and Air Conditioning)
HVAC System (Heating, Ventilation and Air Conditioning)
 
Issues arising due to lack of project management
Issues arising due to lack of project managementIssues arising due to lack of project management
Issues arising due to lack of project management
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 

Construction Site Visit

  • 1. Visit To Building Construction Site By: Maliha Mehar Hajira Shah (1st semester)
  • 2. Building Site • The building we chose for site visit was a Plaza. We went their once and observed everything, asked different questions from the workers and the owner. • Type of building: A triple story building with a Parking. • Location: ……………….. • Architect: ……………. • Structural Engineer: ……………. • Date of visit: 16-December-2018.
  • 4. Building Materials • We observed and asked questions about various building materials: 1- Bricks 2-Aggregates 3-Cement 4-Mortar 5-Cocrete Mix 6-Bars
  • 5. 1.Bricks - Bricks are most widely used building materials. -On the basis of strength, they’re classified into 1st, 2nd, 3rd and 4th class. Brick Test: We tested the bricks by striking 2 bricks, it gave a sharp metallic sound and no scratch was produced by nail. Class of bricks: 1st class bricks. Mark/Company: 755 and T.
  • 6. 2.Aggregates • Aggregates are the materials mixed with binding materials like cement, mortar and in the preparation of concrete. Question: Which coarse aggregate is it? Answer: It is aggregate of 4 soot. 1 soot = 1/8”NOTE
  • 7. 3.Cement -Cement is the binding material used to bind various construction materials such as bricks, stones concrete blocks, etc. Name of company: Cements of 2 companies were being used, Lucky cement and Falcon cement. Type: Ordinary Portland Cement. Weight per bag: 50 kg. Strength: 28 days strength up to 10,000 psi. Cost per bag: The cost of Lucky cement was 575 Rs. and for Falcon cement it was 625 Rs.
  • 8. Question: What is the water to cement ratio? Answer: We can’t tell the proper/fixed amount, we add water by estimation. We understand the enough/needed amount spontaneously when practically adding water into cement.
  • 9. 4.Mortar • It is the mixture of cement, fine aggregate (sand) and water in specific proportions. • Mortar being used at the construction site was “Cement mortar”. Question: Ratio of cement to sand in mortar? Answer: We take sand of volume 2 and half wheelbarrows (2.5 * 35 liters/80 kg) for every 1 packet (50kg) of cement.
  • 10. 5.Concrete Mix • Concrete is the mixture of coarse aggregate, fine aggregate, sand and water. • As we observed, plain concrete cement (PCC) and reinforced concrete cement (RCC) was being used at the site. • We asked about the ratio of concrete mix and they told us about the quantity of components with approximate volume, we did not know about the specific volumes of the drums being used. • As well as we could not find out the exact water to cement ratio. Question: What is the ratio of concrete mix? Answer: We use 2 drums of coarse aggregates, 1.5 drum of fine aggregate and 0.45 packet of cement.
  • 11. 6.Reinforcement Bars • In construction site, different rebars were used for different purpose. • The bars being used were Twisted bars. Question: Which bar sizes are being used in slab, column, beams and in rings? Answer: In slab, bars of 4 soot were used. -In columns and beams, bars of 6 soot. -In rings bars of 3 soot.
  • 12. -Stirrup ends were bent inwards at a 90° angle rather than 45°. 45° bend is prefered as it gives better grip. For dynamic state of loading such as earthquake, their response is find better. -Concreting of columns and beams was already done up to 2nd floor. NOTE Bend angle in stirrups
  • 13. Building Details • The building being constructed was a three story building with a parking. • It was a plaza containing 21 flats in total. • 7 flats in each floor.
  • 14. Construction Progress Ground floor: -Beams, columns were given and some brick work was also done. -Making of partition walls was in progress. -Frame for doors was also given.
  • 15. First floor: -Only beams and columns were given and very little brick work was done at the boundaries. -No partition walls were given. -Shuttering/Formwork of beams and columns was removed. -Shuttering of some portions of slab was not removed till that time.
  • 17. Second floor: -Little brick work at the boundaries. -Beams and columns were given, -Complete slab was not installed. -Shuttering of beams and columns was removed. -Slab formwork was not removed from some portions.
  • 19. Building Design • The building was “Frame Structure”. • We came to this conclusion by observing the structure, positions of columns and beams. • Also because the sizes of columns and beams were different. • Columns were not given at each corner.
  • 21. Flat 3 Details • Almost all the flats had the same design. • Flats were connected through corridors. • We observed Flat 3. • Its total area was 1300 ft. • It consisted of 2 Bedrooms, a Drawing room, a Kitchen, a Lounge, 3 Bathrooms, a dressing, 2 voids/ducts and a lobby.
  • 22. Sizes Bedroom-1: 11’-0’’x13’-0’’ Bathroom: 8’-4.5’’x4’-0’’ Bedroom-2: 14’-0’’x11’-0’’ Bathroom: 4’-0x8-7.5’’ Drawing room: 11’-0’’x12’-0’’ Bathroom: 4’-0’’x5’-0’’ Dressing: 4’-0’’x4’-0’’ Lounge: 13’-0’’x10-0’’
  • 23. Lobby: 5’-4.5’’x11’ Void-1: 4’-0’’x8’-7.5’’ Void-2: 4’-0’’x7’-0’’ -Room sizes were according to the standards, but bathrooms and kitchen sizes were a bit smaller than the standard sizes. -Sizes of rooms and other areas were according to the plan given, we confirmed the sizes from the labors present.
  • 24. Entrance • The flat started with a corridor leading to the Lounge and Drawing room. • From Lounge, there was another lobby leading to the two bedrooms.
  • 25. Guestroom/Drawing Room • Guest room had a dressing, a bath and a duct in it.
  • 26. Lounge And Kitchen • Kitchen was in the Lounge. • It was an open kitchen. • There was a duct for ventilating both the Lounge and Kitchen.
  • 27. Rooms • There were 2 bedrooms in the flat. • Both similar in design. • Only a single duct was given for the ventilation of both the rooms and the attached baths in them. • Both rooms had attached bathrooms. • Single window from duct was given for ventilation in both the rooms.
  • 28. Bedrooms Lobby leading to bedrooms Room Design
  • 29.
  • 30. Single duct ventilating 2 rooms and 2 bathrooms
  • 31. Kitchen and Bath floors • Kitchen and bathroom floors were below than the floor level of rooms, about 9 inches. Question: Why the floors of bathrooms and kitchen is below than the room level? Answer: After plumbing installation, again concreting would be done.
  • 32.
  • 33. Door and Window sizes • Door size: Approximate height was 6.5ft and width varies with 2.5ft for bathrooms and 3.5ft for other doors. • Window sizes: Various sizes. • Ventilators sizes for baths: Approximately 4.5’*5.5’
  • 34. Stairs • Stairs were according to the standards. • Dog legged stairs were provided. • Riser: 4-4.5 inches. • Tread: Length was approx. 3.5 ft and width was 9 inches.
  • 35. Parking • Underground parking was also provided. Question: What is the capacity of Parking? Answer: Approximately 50 cars. Ramp Down for Parking
  • 36. • Servant Quarters were constructed in parking area. • Stairs leading to ground floor. Servant Quarters
  • 37. Final looks of building • The owner of the building had shown us the final design of the his another building constructed with the same design.