Permit To Work
2
What is Permit To Work System
• The PTW system is a formal written procedure used to
control access and activities of personnel in the
construction
• To ensure safety of personnel and to prevent damage
to equipment
• It also means of communication between site
management, supervisors and operators, who carry
out the work
• PTW normally implemented in a work activities near or
inside the operating facilities, there's buried or near
operational system or where the clients thinks that
PTW is deemed necessary
3
How is work controlled within the
Permit To Work System
Work is controlled by following various steps
detailed in the permit to work procedures and by
using special documents called WORK PERMIT.
Work permits are not simple permission to
carryout work, but they determine how the work
can be carried out safely.
4
Types of Permit To Work
• Hot Work Permit
• Confined Space Entry
Permit
• Electrical Permit
(Energizing and De-
energizing)
• Excavation Permit
• Radiography Permit
• Crane Critical Lifts
• Man-basket
Operation
• Cold Work Permit
5
Hot Work Permit
Classified as any type
of work which involves
actual or potential
sources of ignition and
which is done in an
area where there may
be a risk of fire or
explosion, or which
involve the emission of
toxic fumes from the
application of heat.
6
Logging
In
Confined Space Entry Permit
Is normally used to
specify the precautions
to be taken to
eliminate the hazards
of dangerous fumes,
gases liquids, or solids
of lack of oxygen,
harmful residues
radiation or moving
machinery from
confined space or from
any other source
before a person is
permitted to enter a
confined space.
7
Electrical Permit
(Including Energizing and De-energizing)
Is normally used to
cover any work on
electrical equipment
and precautions to be
taken to eliminate the
risk of electric shock /
electrocution to people
carrying out the work
or damaged to
property
8
Excavation Permit
• Is required for any work to be
carried out where existing lines or
services may be buried or
encountered.
• Any excavation deeper than 0.3
meter
• Excavation activities near existing
structures (i.e. Electrical post,
buildings, Permanent Equipments,
etc…)
• Excavation activities in area
classified as safe area for
excavation, a blanket permit
maybe requested for long duration
of time
9
Radiography Permit
Is normally used to
cover industrial
radiography – safe
working practice and
precautions to be
taken to eliminate the
risk associated with
radio active sources.
10
Crane Critical Lifts Permit
Permit is needed when
lifting requires Rigging
Study;
• Load is 40 Tones and
above
• Crane lifts is performed
in “High Risk
Environment”
• Load is too big/wide to
be lifted
• Lifting where 2 or more
cranes are required
11
Man-Basket Operation
• Prior to the use of any man-
basket suspended from a crane
for hoisting personnel, the highest
level of Project management
must determine and be sure that
conventional means is more
hazardous or impossible due to
structural design or worksite
conditions, approval must be
signed.
• A trial lift is required prior to
actual riding of personnel inside
the basket to make sure that
operator can safely position the
man-basket in the intended
location
12
Permit Issuer Responsibilities
In the case of operational plant, the Company normally has
its own permit system. The Operation Manager of the
affected section of the plant or his designated representative
shall be the permit issuer. In a non-operational area but
existing facilities are already in place, The Contractor Area
Construction Managers or Company Section head shall be
the issuers of the permits.
⚫ The Issuer has the sole authority to issue the permit.
⚫ The Issuer shall be fully aware of site conditions, the type of
work to be carried out and all the requirements stated in the
permit.
⚫ The Issuer shall conduct an onsite inspection jointly together
with the Receiver to ensure that site conditions are safe to
permit the work and all requirements stated in the permit are
implemented prior to the issuance of the permit.
⚫ The Issuer shall withhold the issuance of the permit if the
requirements are not met, or site conditions are not safe for
the work to carry out.
13
Permit Issuer Responsibilities
• The Issuer shall, if noticing the presence of any other
potential hazards, risks that may jeopardize the safety of
the worker, tools or equipment advice the Receiver of
appropriate countermeasures to be taken.
• The Issuer shall ensure that all required safety-
monitoring measurements are properly done and so
stated in the permit.
• The Issuer shall ensure all personnel involved in the
work are fully aware of Emergency procedures.
• Once informed the work is completed, the Issuer shall
visit the site jointly with the Receiver to ensure that the
work is ceased and the site is kept clean and tidy
without any smouldering exist.
14
Permit Receiver Responsibilities
Task supervisors who are directly responsible for the work
stated in the permit shall be the Receiver of the Permit. He
shall clearly define the job to be done, the exact location and
nature of the work. Also to ensure that the conditions on the
permit are met in full
⚫ The Receiver shall be fully aware of all requirements stated in
the permit and comply with them at all times.
⚫ The Receiver shall fully brief the work crew to ensure that
requirements are clearly understood by the crew under his
supervision.
⚫ The Receiver shall ensure the work is performed in
accordance with the conditions specified in the permit. He
shall remain at the work site to supervise the work.
⚫ The Receiver shall ensure that under no circumstances shall
by his own discretion or his crew change the original scope of
the work, which is described in the permit.
15
Permit Receiver Responsibilities
⚫ The Receiver shall request a new permit in the event a
change in the scope of the work becomes necessary.
⚫ Whenever site conditions are drastically changed, the
Receiver shall immediately stop the work and inform the
Issuer of the change for further instructionfrom him.
⚫ Upon the occurrence of an emergency the Receiver shall
immediately stop the work and shut down all equipment.
⚫ The Receiver shall report the completion of the work or the
expiration of the validity of
⚫ the permit to the Issuer and ensure that the site is kept clean
and tidy without any smouldering/ignition sources.
⚫ If the work in progress requires extending the validity stated in
the permit, the Receiver shall suspend the work and request
an issuance of new permit.
16
HSE Permit Coordinator
Responsibilities
⚫ The HSE Permit Coordinator designated by Area
Construction Managers is responsible for daily
coordination of the work permits.
⚫ He is responsible for full clerical control of the
system including retention of the closed out Work
Permits for one-month period.
⚫ Has the full overview of the planned, open and
suspended work permits on visual display in his
permit to work office.
17
Operational Procedures for the Work
Permit System
1. A Work Permit consists of a set of three pages. The White page
shall be kept by the Receiver and kept at the work location,
Yellow page shall be kept by the Issuer and Green page shall be
kept by the HSE Permit Coordinator.
2. The description of the work shall be a precise statement of the
planned activity, the location of the work by identification of the
area or equipment to be worked upon. Broad scopes of work of
a general nature are not acceptable.
3. Method Statements, Risk Assessments and/or Job Safety
Analyses will be produced for critical activities and shall be
attached to and form part of the permit. Such additional
documentation shall be attached to the original of the Permit.
18
Operational Procedures for the Work
Permit System
4. Whereadditional Permits or Certificates are required, they will
be attached to and form part of the Permit to Work.
5. The Receiver shall produce the permit to Contractorresponsible
personnel for the work requested in the permit for review and
verification by 15:00 hours a day prior to the commencement of
the work
6. As soon as the review and verification has been made, the
Receiver shall bring the verified permit to the HSE Permit
Coordinator.
7. The HSE Permit Coordinator shall scrutinize the permit including
safety precautions and requirements stated in the permit and
deliver it to the Receiver. The HSE Permit Coordinator should
consult HSE personnel for professional advice or suggestions
required to work safely.
19
Operational Procedures for the Work
Permit System
8. The Receiver shall bring the permit to the Issuer who shall
review the permit to ensure that all required safety precautionary
measures are stated and authorizes the permit.
9. On the day of the work, the Issuer in the person together with
the Receiver shall go to the site to ensure that all requirements
in the permit are met and hand over the permit to the Receiver
10. Issuance of the permit to the Receiver in the office shall not take
place.
20
Operational Procedures for the Work
Permit System
11. Upon receipt of the permit from the Issuer, the Receiver can
commence the work.
12. When no further work is to take place under a permit, the
Receiver shall sign off and return the permit to the Issuer to
close the permit.
13. Upon receipt of the permit, the Issuer and the Receiver shall
inspect the work site to ensure that no smouldering is present,
the work site is clean and tidy and equipment is left in a safe
condition.
The issuer shall return the invalid permit to the HSE Permit
Coordinator for file.
21
Revalidation of the Permit
⚫ When the work calls for any extension of the permit,
the Receiver shall suspend the work and request
an extension of the validity to the Issuer.
⚫ The Issuer is responsible for ensuring that all
precautions and requirements are still in place and
the conditions in the work site are maintained safe
for personnel and equipment.
⚫ If the issuer agrees to extend the permit he shall
define the time of the expiry and sign in the permit
to authorize the extension.
⚫ The Receiver returns the extended permit to the
work site and resumes the work.
22
Emergency Situation
⚫ When an emergency, such as a fire incident, Toxic
Gas Release, Natural calamities has taken place
the Receiver shall immediately stop all works and
shut down all equipment.
⚫ All permits shall be nullified and no work shall be
resumed unless new permits have been issued out
by the Issuer.
⚫ Prior to the issuance of a new permit, the Issuer
shall visit the work site to ensure that there is no
imminent hazard/risk present and that the work site
is safe for work.
23
Work Permit Flow Chart
Authorize Permit
Accept Permit
Review/Verify
Permit
Originate Permit
Issuer
HSE Permit
Coordinator
Permit
Receiver
Responsible
Supervisor
Carry OutWork Work Finished?
Re-Validate
Permit
Close Permit
File Permit
PermitReceiver
& Issuer
HSE Permit
Coordinator
Yes
No
24
Summary
⚫ The Permit to Work is designed to provide a safe
system of work that can be applied to works
identified by virtue of perceived risks.
⚫ This shall be applied to the Contractor controlled
Construction activities on the Project.
⚫ Permit requirements for activities other than those
mentioned in this procedure will be re-evaluated
especially for potentially hazardous activities where
an extra degree of work control is felt to be
appropriate.

More Related Content

What's hot

Work permit system
Work permit systemWork permit system
Work permit systemsmithgeigle
 
Permit to work system
Permit to work systemPermit to work system
Permit to work systemAsif Khan
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safetyPrudhvi raj
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.pptIrfanAwan25
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Industrial Safety Training by Author Stream
Industrial Safety Training by Author StreamIndustrial Safety Training by Author Stream
Industrial Safety Training by Author StreamAtlantic Training, LLC.
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentationLucy Reimer
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at heightsankarnagar
 
Conducting Hot Work Operations
Conducting Hot Work OperationsConducting Hot Work Operations
Conducting Hot Work OperationsAaron Johnson
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdfRafiullahKhan88
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meetingsssaravana
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 

What's hot (20)

Machinery Safety Training By OSHA
Machinery Safety Training By OSHAMachinery Safety Training By OSHA
Machinery Safety Training By OSHA
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safety
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Permit to work
Permit to workPermit to work
Permit to work
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Industrial Safety Training by Author Stream
Industrial Safety Training by Author StreamIndustrial Safety Training by Author Stream
Industrial Safety Training by Author Stream
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
Conducting Hot Work Operations
Conducting Hot Work OperationsConducting Hot Work Operations
Conducting Hot Work Operations
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meeting
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 

Similar to Permit to work training

010 Permit To Work.ppt
010 Permit To Work.ppt010 Permit To Work.ppt
010 Permit To Work.pptGamingHero6
 
HSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptHSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptGkMechanical
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfRazFazwan
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureHENRY EROMOSELE OIGIANGBE
 
PTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasPTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasKUNALKHANDELWAL44
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptxssuserb8f3fd2
 
Contractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptContractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptAndreAntWilliams
 
Heavy Equipment Inspection Report 03.01.2024.pptx
Heavy Equipment Inspection Report 03.01.2024.pptxHeavy Equipment Inspection Report 03.01.2024.pptx
Heavy Equipment Inspection Report 03.01.2024.pptxAdeniranIdris
 
Site management training july 2019
Site management training july 2019Site management training july 2019
Site management training july 2019MJ Conroy Group
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdfFESTUS RICHARD SIAME
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptGkMechanical
 
Seminar Cakna KKP - CONFINED SPACE Every Entry Shouldn't Be A One Way Trip
Seminar Cakna KKP - CONFINED SPACE Every Entry Shouldn't Be A One Way TripSeminar Cakna KKP - CONFINED SPACE Every Entry Shouldn't Be A One Way Trip
Seminar Cakna KKP - CONFINED SPACE Every Entry Shouldn't Be A One Way TripMoon Girl
 
Method_Statement_for_Excavation_and_Back.pdf
Method_Statement_for_Excavation_and_Back.pdfMethod_Statement_for_Excavation_and_Back.pdf
Method_Statement_for_Excavation_and_Back.pdfZaheer Ahmed
 

Similar to Permit to work training (20)

010 Permit To Work.ppt
010 Permit To Work.ppt010 Permit To Work.ppt
010 Permit To Work.ppt
 
HSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.pptHSE-BMS-010 Permit To Work.ppt
HSE-BMS-010 Permit To Work.ppt
 
Important of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdfImportant of issuing the PTW for safety .pdf
Important of issuing the PTW for safety .pdf
 
DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work Procedure
 
PTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of GasPTW for Infrastructure Distribution of Gas
PTW for Infrastructure Distribution of Gas
 
MODULE 4.pptx
MODULE 4.pptxMODULE 4.pptx
MODULE 4.pptx
 
Work Permit System.pptx
Work Permit System.pptxWork Permit System.pptx
Work Permit System.pptx
 
Contractor Safety Orientation by Sappi
Contractor Safety Orientation by SappiContractor Safety Orientation by Sappi
Contractor Safety Orientation by Sappi
 
Contractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptContractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.ppt
 
Heavy Equipment Inspection Report 03.01.2024.pptx
Heavy Equipment Inspection Report 03.01.2024.pptxHeavy Equipment Inspection Report 03.01.2024.pptx
Heavy Equipment Inspection Report 03.01.2024.pptx
 
Site management training july 2019
Site management training july 2019Site management training july 2019
Site management training july 2019
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Work permit system
Work permit systemWork permit system
Work permit system
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
Seminar Cakna KKP - CONFINED SPACE Every Entry Shouldn't Be A One Way Trip
Seminar Cakna KKP - CONFINED SPACE Every Entry Shouldn't Be A One Way TripSeminar Cakna KKP - CONFINED SPACE Every Entry Shouldn't Be A One Way Trip
Seminar Cakna KKP - CONFINED SPACE Every Entry Shouldn't Be A One Way Trip
 
ACT&RULE West Bengal.ppt
ACT&RULE West Bengal.pptACT&RULE West Bengal.ppt
ACT&RULE West Bengal.ppt
 
Method_Statement_for_Excavation_and_Back.pdf
Method_Statement_for_Excavation_and_Back.pdfMethod_Statement_for_Excavation_and_Back.pdf
Method_Statement_for_Excavation_and_Back.pdf
 

More from Karnav Rana

An introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfAn introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfKarnav Rana
 
40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdfKarnav Rana
 
5S Introduction .pdf
5S Introduction .pdf5S Introduction .pdf
5S Introduction .pdfKarnav Rana
 
cooling towers system .pdf
cooling towers system .pdfcooling towers system .pdf
cooling towers system .pdfKarnav Rana
 
pump calculation pdf .pdf
pump calculation pdf .pdfpump calculation pdf .pdf
pump calculation pdf .pdfKarnav Rana
 
Rotating equipment maintenance .pdf
Rotating equipment maintenance .pdfRotating equipment maintenance .pdf
Rotating equipment maintenance .pdfKarnav Rana
 
Steam ejector working principle
Steam ejector working principleSteam ejector working principle
Steam ejector working principleKarnav Rana
 
Rules of thumb for process engineer
Rules of thumb for process engineerRules of thumb for process engineer
Rules of thumb for process engineerKarnav Rana
 
Floating head heat exchanger components & maintenance
Floating head heat exchanger components & maintenanceFloating head heat exchanger components & maintenance
Floating head heat exchanger components & maintenanceKarnav Rana
 
Centrifugal pump formula
Centrifugal pump formulaCentrifugal pump formula
Centrifugal pump formulaKarnav Rana
 
Basics hazard-communication
Basics hazard-communicationBasics hazard-communication
Basics hazard-communicationKarnav Rana
 
Risk Management and Safety
Risk Management and SafetyRisk Management and Safety
Risk Management and SafetyKarnav Rana
 

More from Karnav Rana (20)

An introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdfAn introduction to Fired Heaters.pdf
An introduction to Fired Heaters.pdf
 
40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf
 
5S Introduction .pdf
5S Introduction .pdf5S Introduction .pdf
5S Introduction .pdf
 
cooling towers system .pdf
cooling towers system .pdfcooling towers system .pdf
cooling towers system .pdf
 
pump calculation pdf .pdf
pump calculation pdf .pdfpump calculation pdf .pdf
pump calculation pdf .pdf
 
ETP.pdf
ETP.pdfETP.pdf
ETP.pdf
 
PTW.pdf
PTW.pdfPTW.pdf
PTW.pdf
 
Rotating equipment maintenance .pdf
Rotating equipment maintenance .pdfRotating equipment maintenance .pdf
Rotating equipment maintenance .pdf
 
Steam traps
Steam trapsSteam traps
Steam traps
 
Steam ejector working principle
Steam ejector working principleSteam ejector working principle
Steam ejector working principle
 
Rules of thumb for process engineer
Rules of thumb for process engineerRules of thumb for process engineer
Rules of thumb for process engineer
 
Pid symbols
Pid symbolsPid symbols
Pid symbols
 
Heat exchangers
Heat exchangersHeat exchangers
Heat exchangers
 
Floating head heat exchanger components & maintenance
Floating head heat exchanger components & maintenanceFloating head heat exchanger components & maintenance
Floating head heat exchanger components & maintenance
 
Centrifugal pump formula
Centrifugal pump formulaCentrifugal pump formula
Centrifugal pump formula
 
Basics hazard-communication
Basics hazard-communicationBasics hazard-communication
Basics hazard-communication
 
Risk Management and Safety
Risk Management and SafetyRisk Management and Safety
Risk Management and Safety
 
carbon cycle
carbon cyclecarbon cycle
carbon cycle
 
ideal reactors
ideal reactorsideal reactors
ideal reactors
 
Nutrient cycles
Nutrient cyclesNutrient cycles
Nutrient cycles
 

Recently uploaded

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

Permit to work training

  • 2. 2 What is Permit To Work System • The PTW system is a formal written procedure used to control access and activities of personnel in the construction • To ensure safety of personnel and to prevent damage to equipment • It also means of communication between site management, supervisors and operators, who carry out the work • PTW normally implemented in a work activities near or inside the operating facilities, there's buried or near operational system or where the clients thinks that PTW is deemed necessary
  • 3. 3 How is work controlled within the Permit To Work System Work is controlled by following various steps detailed in the permit to work procedures and by using special documents called WORK PERMIT. Work permits are not simple permission to carryout work, but they determine how the work can be carried out safely.
  • 4. 4 Types of Permit To Work • Hot Work Permit • Confined Space Entry Permit • Electrical Permit (Energizing and De- energizing) • Excavation Permit • Radiography Permit • Crane Critical Lifts • Man-basket Operation • Cold Work Permit
  • 5. 5 Hot Work Permit Classified as any type of work which involves actual or potential sources of ignition and which is done in an area where there may be a risk of fire or explosion, or which involve the emission of toxic fumes from the application of heat.
  • 6. 6 Logging In Confined Space Entry Permit Is normally used to specify the precautions to be taken to eliminate the hazards of dangerous fumes, gases liquids, or solids of lack of oxygen, harmful residues radiation or moving machinery from confined space or from any other source before a person is permitted to enter a confined space.
  • 7. 7 Electrical Permit (Including Energizing and De-energizing) Is normally used to cover any work on electrical equipment and precautions to be taken to eliminate the risk of electric shock / electrocution to people carrying out the work or damaged to property
  • 8. 8 Excavation Permit • Is required for any work to be carried out where existing lines or services may be buried or encountered. • Any excavation deeper than 0.3 meter • Excavation activities near existing structures (i.e. Electrical post, buildings, Permanent Equipments, etc…) • Excavation activities in area classified as safe area for excavation, a blanket permit maybe requested for long duration of time
  • 9. 9 Radiography Permit Is normally used to cover industrial radiography – safe working practice and precautions to be taken to eliminate the risk associated with radio active sources.
  • 10. 10 Crane Critical Lifts Permit Permit is needed when lifting requires Rigging Study; • Load is 40 Tones and above • Crane lifts is performed in “High Risk Environment” • Load is too big/wide to be lifted • Lifting where 2 or more cranes are required
  • 11. 11 Man-Basket Operation • Prior to the use of any man- basket suspended from a crane for hoisting personnel, the highest level of Project management must determine and be sure that conventional means is more hazardous or impossible due to structural design or worksite conditions, approval must be signed. • A trial lift is required prior to actual riding of personnel inside the basket to make sure that operator can safely position the man-basket in the intended location
  • 12. 12 Permit Issuer Responsibilities In the case of operational plant, the Company normally has its own permit system. The Operation Manager of the affected section of the plant or his designated representative shall be the permit issuer. In a non-operational area but existing facilities are already in place, The Contractor Area Construction Managers or Company Section head shall be the issuers of the permits. ⚫ The Issuer has the sole authority to issue the permit. ⚫ The Issuer shall be fully aware of site conditions, the type of work to be carried out and all the requirements stated in the permit. ⚫ The Issuer shall conduct an onsite inspection jointly together with the Receiver to ensure that site conditions are safe to permit the work and all requirements stated in the permit are implemented prior to the issuance of the permit. ⚫ The Issuer shall withhold the issuance of the permit if the requirements are not met, or site conditions are not safe for the work to carry out.
  • 13. 13 Permit Issuer Responsibilities • The Issuer shall, if noticing the presence of any other potential hazards, risks that may jeopardize the safety of the worker, tools or equipment advice the Receiver of appropriate countermeasures to be taken. • The Issuer shall ensure that all required safety- monitoring measurements are properly done and so stated in the permit. • The Issuer shall ensure all personnel involved in the work are fully aware of Emergency procedures. • Once informed the work is completed, the Issuer shall visit the site jointly with the Receiver to ensure that the work is ceased and the site is kept clean and tidy without any smouldering exist.
  • 14. 14 Permit Receiver Responsibilities Task supervisors who are directly responsible for the work stated in the permit shall be the Receiver of the Permit. He shall clearly define the job to be done, the exact location and nature of the work. Also to ensure that the conditions on the permit are met in full ⚫ The Receiver shall be fully aware of all requirements stated in the permit and comply with them at all times. ⚫ The Receiver shall fully brief the work crew to ensure that requirements are clearly understood by the crew under his supervision. ⚫ The Receiver shall ensure the work is performed in accordance with the conditions specified in the permit. He shall remain at the work site to supervise the work. ⚫ The Receiver shall ensure that under no circumstances shall by his own discretion or his crew change the original scope of the work, which is described in the permit.
  • 15. 15 Permit Receiver Responsibilities ⚫ The Receiver shall request a new permit in the event a change in the scope of the work becomes necessary. ⚫ Whenever site conditions are drastically changed, the Receiver shall immediately stop the work and inform the Issuer of the change for further instructionfrom him. ⚫ Upon the occurrence of an emergency the Receiver shall immediately stop the work and shut down all equipment. ⚫ The Receiver shall report the completion of the work or the expiration of the validity of ⚫ the permit to the Issuer and ensure that the site is kept clean and tidy without any smouldering/ignition sources. ⚫ If the work in progress requires extending the validity stated in the permit, the Receiver shall suspend the work and request an issuance of new permit.
  • 16. 16 HSE Permit Coordinator Responsibilities ⚫ The HSE Permit Coordinator designated by Area Construction Managers is responsible for daily coordination of the work permits. ⚫ He is responsible for full clerical control of the system including retention of the closed out Work Permits for one-month period. ⚫ Has the full overview of the planned, open and suspended work permits on visual display in his permit to work office.
  • 17. 17 Operational Procedures for the Work Permit System 1. A Work Permit consists of a set of three pages. The White page shall be kept by the Receiver and kept at the work location, Yellow page shall be kept by the Issuer and Green page shall be kept by the HSE Permit Coordinator. 2. The description of the work shall be a precise statement of the planned activity, the location of the work by identification of the area or equipment to be worked upon. Broad scopes of work of a general nature are not acceptable. 3. Method Statements, Risk Assessments and/or Job Safety Analyses will be produced for critical activities and shall be attached to and form part of the permit. Such additional documentation shall be attached to the original of the Permit.
  • 18. 18 Operational Procedures for the Work Permit System 4. Whereadditional Permits or Certificates are required, they will be attached to and form part of the Permit to Work. 5. The Receiver shall produce the permit to Contractorresponsible personnel for the work requested in the permit for review and verification by 15:00 hours a day prior to the commencement of the work 6. As soon as the review and verification has been made, the Receiver shall bring the verified permit to the HSE Permit Coordinator. 7. The HSE Permit Coordinator shall scrutinize the permit including safety precautions and requirements stated in the permit and deliver it to the Receiver. The HSE Permit Coordinator should consult HSE personnel for professional advice or suggestions required to work safely.
  • 19. 19 Operational Procedures for the Work Permit System 8. The Receiver shall bring the permit to the Issuer who shall review the permit to ensure that all required safety precautionary measures are stated and authorizes the permit. 9. On the day of the work, the Issuer in the person together with the Receiver shall go to the site to ensure that all requirements in the permit are met and hand over the permit to the Receiver 10. Issuance of the permit to the Receiver in the office shall not take place.
  • 20. 20 Operational Procedures for the Work Permit System 11. Upon receipt of the permit from the Issuer, the Receiver can commence the work. 12. When no further work is to take place under a permit, the Receiver shall sign off and return the permit to the Issuer to close the permit. 13. Upon receipt of the permit, the Issuer and the Receiver shall inspect the work site to ensure that no smouldering is present, the work site is clean and tidy and equipment is left in a safe condition. The issuer shall return the invalid permit to the HSE Permit Coordinator for file.
  • 21. 21 Revalidation of the Permit ⚫ When the work calls for any extension of the permit, the Receiver shall suspend the work and request an extension of the validity to the Issuer. ⚫ The Issuer is responsible for ensuring that all precautions and requirements are still in place and the conditions in the work site are maintained safe for personnel and equipment. ⚫ If the issuer agrees to extend the permit he shall define the time of the expiry and sign in the permit to authorize the extension. ⚫ The Receiver returns the extended permit to the work site and resumes the work.
  • 22. 22 Emergency Situation ⚫ When an emergency, such as a fire incident, Toxic Gas Release, Natural calamities has taken place the Receiver shall immediately stop all works and shut down all equipment. ⚫ All permits shall be nullified and no work shall be resumed unless new permits have been issued out by the Issuer. ⚫ Prior to the issuance of a new permit, the Issuer shall visit the work site to ensure that there is no imminent hazard/risk present and that the work site is safe for work.
  • 23. 23 Work Permit Flow Chart Authorize Permit Accept Permit Review/Verify Permit Originate Permit Issuer HSE Permit Coordinator Permit Receiver Responsible Supervisor Carry OutWork Work Finished? Re-Validate Permit Close Permit File Permit PermitReceiver & Issuer HSE Permit Coordinator Yes No
  • 24. 24 Summary ⚫ The Permit to Work is designed to provide a safe system of work that can be applied to works identified by virtue of perceived risks. ⚫ This shall be applied to the Contractor controlled Construction activities on the Project. ⚫ Permit requirements for activities other than those mentioned in this procedure will be re-evaluated especially for potentially hazardous activities where an extra degree of work control is felt to be appropriate.