SlideShare a Scribd company logo
1 of 83
1
Eng. El Sayed Amer
Well
drilling
Sequence of
Eng. El Sayed Amer
3
Eng. El Sayed Amer
Page 3
Schedule
Time frame managing
Exploration introduction
THE Drilling SITE
Drilling Rig
Running CSG
Casing CMT
Basic logging
4
Eng. El Sayed Amer
5
Eng. El Sayed Amer
6
Eng. El Sayed Amer
7
Eng. El Sayed Amer
Exploration and
Geophysics
8
Eng. El Sayed Amer
9
Eng. El Sayed Amer
10
Eng. El Sayed Amer
11
Eng. El Sayed Amer
Seismic survey
12
Eng. El Sayed Amer
13
Eng. El Sayed Amer
14
Eng. El Sayed Amer
15
Eng. El Sayed Amer
16
Eng. El Sayed Amer
Let the Story Begin
17
Eng. El Sayed Amer
THE Drilling SITE01
Once the location for the site has been established, the area is prepared for
drilling, with the following steps:
1. Site Preparation
2.Conductor-rathole-mousehole
3. Transporting Equipment
18
Eng. El Sayed Amer
THE Drilling SITE01
1. Leveling & site preparation
19
Eng. El Sayed Amer
THE Drilling SITE01
2. Cellar digging
• A dug-out area,
• located below the rig.
• The cellar serves as a cavity in
which the casing spool and casing
head reside.
20
Eng. El Sayed Amer
THE Drilling SITE01
2. Cellar digging
21
Eng. El Sayed Amer
THE Drilling SITE01
3. Mud pit digging
22
Eng. El Sayed Amer
THE Drilling SITE01
3. Mud pit digging
23
Eng. El Sayed Amer
THE Drilling SITE01
4. Conductor pipe hammering
Conductor Hole
A large diameter hole bored to facilitate steel pipe. May be cemented in place to allow
conventional oil and gas well drilling operations ,and also allows fluid returns to a mud
system when drilling surface hole.
CONDUCTOR PIPE INSTALLATION
30” OD x 1”. wall thickness has been selected and Affiliate’s standard for world-wide
exploration and development drilling activities
Pile Hammers
• Diesel pile hammers are used for surface driving operations of conductor pipe.
• The driving depth of the conductor pipe is a function of the sediments in the ground.
• The most common used system is a hammer weight of 18t
24
Eng. El Sayed Amer
THE Drilling SITE01
4. Conductor pipe hammering
25
Eng. El Sayed Amer
THE Drilling SITE01
4. Conductor pipe hammering Drive Shoe Technology
26
Eng. El Sayed Amer
THE Drilling SITE01
5. Rathole drilling
Conductor
pipe
Rat-hole mouth hole
27
Eng. El Sayed Amer
THE Drilling SITE01
5. Rathole drilling
• Rathole
A shallow bored hole under the derrick substructure in which the Kelly is
temporarily stored during tripping operations.
• Mouse Hole
A shallow bored hole under the derrick substructure in which a single drill
pipe joint is temporarily set to facilitate easier connections.
28
Eng. El Sayed Amer
THE Drilling SITE01
4. Conductor pipe hammering
29
Eng. El Sayed Amer
THE Drilling SITE01
4. Conductor pipe hammering
30
Eng. El Sayed Amer
1. Rig Move
Drilling Rig02
31
Eng. El Sayed Amer
1. Rig Move
Drilling Rig02
32
Eng. El Sayed Amer
1. Rig Move
Drilling Rig02
33
Eng. El Sayed Amer
2. Rig up
Drilling Rig02
34
Eng. El Sayed Amer
2. Rig up
Drilling Rig02
a. Mast Raising
35
Eng. El Sayed Amer
2. Rig up
Drilling Rig02
b. substructure Raising
36
Eng. El Sayed Amer
2. Rig up
Drilling Rig02
37
Eng. El Sayed Amer
2. Rig up
Drilling Rig02
38
Eng. El Sayed Amer
2. Rig up
Drilling Rig02
39
Eng. El Sayed Amer
3. Conductor connection
Drilling Rig02
Shaker line
40
Eng. El Sayed Amer
4. Rig Acceptance
Drilling Rig02
Rig acceptance checklist Rig accept
41
Eng. El Sayed Amer
5. Pipe rack
Drilling Rig02
42
Eng. El Sayed Amer
6. Drill Pipe Inspection
Drilling Rig02
43
Eng. El Sayed Amer
6. Drill Pipe Inspection
Drilling Rig02
Thread cleaning
44
Eng. El Sayed Amer
6. Drill Pipe Inspection
Drilling Rig02
Thread cleaning
45
Eng. El Sayed Amer
7. Stands make up
Drilling Rig02
46
Eng. El Sayed Amer
7. Stands make up
Drilling Rig02
• Single pipe
• Stand “ 3 singles “
47
Eng. El Sayed Amer
7. Stands make up
Drilling Rig02
48
Eng. El Sayed Amer
7. Stands make up
Drilling Rig02
49
Eng. El Sayed Amer
8. Rack back stands
Drilling Rig02
50
Eng. El Sayed Amer
9. BHA preparation
Drilling Rig02
BHA
• Run a 26" bit + 3 x 9" DC + HW-DP
• Run a 26" bit + float valve + 36" Hole
Opener + 1 x 9" Monel DC + 1 x 9"
Spiral DC + 5" HWDP + 5" DPs
Drill Bit
Drill Collers
Heavyweight
Drill pipe
Hole Opener
Bit sub
51
Eng. El Sayed Amer
9. BHA preparation
Drilling Rig02
52
Eng. El Sayed Amer
1. Preparing spud mud
Spud Mud03
• Spud mud
Mud used to drill a well from
surface to a shallow depth. Guar
gum or salt gel are commonly used
offshore as spud mud. Onshore
spud mud is usually a water-base
mud containing bentonite clay that
is flocculated with lime.
MUD SYSTEM SEAWATER & SPUD MUD
Mud Density 8.9 – 12.0 ppg
Rheology @ 120°F/49°C
PV 13 – 15 cps
YP 24 – 32 lb/100 sqft
Gels 11/15- 10/20 lb/100 sqft
53
Eng. El Sayed Amer
1. Preparing spud mud
Spud Mud03
54
Eng. El Sayed Amer
1. Preparing spud mud
Spud Mud03
Mixing
55
Eng. El Sayed Amer
1. Preparing spud mud
Spud Mud03
56
Eng. El Sayed Amer
2. Spud In
Spud Mud03
A large diameter hole is
drilled using a large
diameter drill bit. Drilling is
conducted by heavy duty
industrial strength drill bits.
The drill bits come in
different sizes according to
the diameter of the hole
being drilled.
57
Eng. El Sayed Amer
2. Spud In
Spud Mud03
• First, a large drill
bit is used to drill a
short interval of
hole.
58
Eng. El Sayed Amer
2. Spud In
Spud Mud03
59
Eng. El Sayed Amer
2. Spud In
Spud Mud03
60
Eng. El Sayed Amer
2. Spud In
Spud Mud03
1. Mud pumping
2. Mud cleaning
Mudreturnline
61
Eng. El Sayed Amer
2. Spud In
Spud Mud03
62
Eng. El Sayed Amer
2. Spud In
Spud Mud03
Drill to the depth of the first two joints using high viscosity mud (80-120 seconds Funnel
viscosity) and at a very slow pump rate,
63
Eng. El Sayed Amer
2. Mud Cleaning
Spud Mud03
64
Eng. El Sayed Amer
3. Continue drilling
Spud Mud03
26” conductor pipe 20” pit diameter
36” conductor pipe 30” pit diameter
65
Eng. El Sayed Amer
4. Hole Cleaning
Spud Mud03
1. Mud pumping
2. Mud cleaning
Mudreturnline
66
Eng. El Sayed Amer
5. Wiper trip for hole cleaning
Spud Mud03
At TD circulate the hole clean, displace the hole with gel mud
Eng. Elsayed Amer Eng. Elsayed Amer
67
Eng. El Sayed Amer
6. POOH
Running CSG04
68
Eng. El Sayed Amer
7. surface Casing Running
04 Running CSG
69
Eng. El Sayed Amer
7. surface Casing Running
Spud Mud0304 Running CSG
70
Eng. El Sayed Amer
71
Eng. El Sayed Amer
7. surface Casing Running
03
Float show and float coaller
04 Running CSG
72
Eng. El Sayed Amer
7. surface Casing Running
Spud Mud0304 Running CSG
73
Eng. El Sayed Amer
7. surface Casing Running
Spud Mud03
Surface casing
04 Running CSG
74
Eng. El Sayed Amer
75
Eng. El Sayed Amer
76
Eng. El Sayed Amer
77
Eng. El Sayed Amer
78
Eng. El Sayed Amer
79
Eng. El Sayed Amer
8. Casing Cementing
Spud Mud0305 Cementing
Cement functions
Provides zonal isolation.
Supports axial load of casing.
Protects casing against corrosion and erosion
1
2
3
Provides support to borehole in
plastic or unconsolidated formations
4
80
Eng. El Sayed Amer
8. Casing Cementing
Spud Mud0305 Cementing
Drilling
Fluid
Spacer Fluid
Bottom Plug
Shoe Joint
Top Plug
Cement
A B C
Float Shoe
Float
Collar
Bottom Plug
Ruptured
Top Plug
Released
Plug
Bumped
Displacement
Fluid
81
Eng. El Sayed Amer
9. Wait on cement
Spud Mud0305 Cementing
To suspend drilling operations while
allowing Cement slurries to solidify,
harden and develop compressive
strength
82
Eng. El Sayed Amer
10. Cement Job completion
Spud Mud0305 Cementing
83
Eng. El Sayed Amer
83
3. Connection casing head9. Wait on cement
Spud Mud0305 Cementing

More Related Content

What's hot

Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentationamrhaggag
 
Well control equipment
Well control equipmentWell control equipment
Well control equipmentSARWAR SALAM
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointElsayed Amer
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1Elsayed Amer
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssdElsayed Amer
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN Elsayed Amer
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and typesElsayed Amer
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wlegElsayed Amer
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveElsayed Amer
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsMohamed Elnagar
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdfDrilling Manual
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig componentsElsayed Amer
 

What's hot (20)

2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Well Control
Well ControlWell Control
Well Control
 
Tubing string
Tubing stringTubing string
Tubing string
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and types
 
Production packer
Production packerProduction packer
Production packer
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
 

Similar to Well Drilling Sequence and Process Guide

Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1Elsayed Amer
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputGaurav Singh Rajput
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil explorationDYPCET
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing wellRaja Rosenani
 
Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...chourasiya12345
 
nwosu chioma sylvia
nwosu chioma sylvianwosu chioma sylvia
nwosu chioma sylviachioma nwosu
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 
Presentation on boring
Presentation on boringPresentation on boring
Presentation on boringMital Damani
 
Technologies in The Oil and Gas Industry
Technologies in The Oil and Gas IndustryTechnologies in The Oil and Gas Industry
Technologies in The Oil and Gas IndustryThameemUv
 
Final project ppt
Final project pptFinal project ppt
Final project pptAkhil Vas
 
Alberta Energy : The Business of Oil and Gas
Alberta Energy : The Business of Oil and GasAlberta Energy : The Business of Oil and Gas
Alberta Energy : The Business of Oil and GasGordon M. Groat
 

Similar to Well Drilling Sequence and Process Guide (20)

Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
2 geology
2  geology2  geology
2 geology
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil exploration
 
Soil Exploration.pdf
Soil Exploration.pdfSoil Exploration.pdf
Soil Exploration.pdf
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...Casting process and moulding process file for trainning report complet trainn...
Casting process and moulding process file for trainning report complet trainn...
 
Summer training 2008
Summer training 2008Summer training 2008
Summer training 2008
 
Upstream process
Upstream processUpstream process
Upstream process
 
nwosu chioma sylvia
nwosu chioma sylvianwosu chioma sylvia
nwosu chioma sylvia
 
Field Development Plan
Field Development PlanField Development Plan
Field Development Plan
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Presentation on boring
Presentation on boringPresentation on boring
Presentation on boring
 
Technologies in The Oil and Gas Industry
Technologies in The Oil and Gas IndustryTechnologies in The Oil and Gas Industry
Technologies in The Oil and Gas Industry
 
Final project ppt
Final project pptFinal project ppt
Final project ppt
 
Drilling imp
Drilling impDrilling imp
Drilling imp
 
Oil Drilling
Oil DrillingOil Drilling
Oil Drilling
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
Soil comp.ppt
Soil comp.pptSoil comp.ppt
Soil comp.ppt
 
Alberta Energy : The Business of Oil and Gas
Alberta Energy : The Business of Oil and GasAlberta Energy : The Business of Oil and Gas
Alberta Energy : The Business of Oil and Gas
 

More from Elsayed Amer

5. Gas Dehydration.pdf
5. Gas Dehydration.pdf5. Gas Dehydration.pdf
5. Gas Dehydration.pdfElsayed Amer
 
Gas Processing.pdf
Gas Processing.pdfGas Processing.pdf
Gas Processing.pdfElsayed Amer
 
complete guide to process valves
complete guide to process valves complete guide to process valves
complete guide to process valves Elsayed Amer
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guideElsayed Amer
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellheadElsayed Amer
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selectionElsayed Amer
 
3. natural gas composition
3. natural gas composition3. natural gas composition
3. natural gas compositionElsayed Amer
 
6. phase separatation
6. phase separatation6. phase separatation
6. phase separatationElsayed Amer
 
2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procing2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procingElsayed Amer
 
3. a. natural gas composition 1
3. a. natural gas composition 13. a. natural gas composition 1
3. a. natural gas composition 1Elsayed Amer
 
1. natural gas overview
1. natural gas overview1. natural gas overview
1. natural gas overviewElsayed Amer
 

More from Elsayed Amer (12)

5. Gas Dehydration.pdf
5. Gas Dehydration.pdf5. Gas Dehydration.pdf
5. Gas Dehydration.pdf
 
Gas Processing.pdf
Gas Processing.pdfGas Processing.pdf
Gas Processing.pdf
 
Rig components
Rig componentsRig components
Rig components
 
complete guide to process valves
complete guide to process valves complete guide to process valves
complete guide to process valves
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guide
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selection
 
3. natural gas composition
3. natural gas composition3. natural gas composition
3. natural gas composition
 
6. phase separatation
6. phase separatation6. phase separatation
6. phase separatation
 
2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procing2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procing
 
3. a. natural gas composition 1
3. a. natural gas composition 13. a. natural gas composition 1
3. a. natural gas composition 1
 
1. natural gas overview
1. natural gas overview1. natural gas overview
1. natural gas overview
 

Recently uploaded

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Well Drilling Sequence and Process Guide

  • 1. 1 Eng. El Sayed Amer Well drilling Sequence of
  • 3. 3 Eng. El Sayed Amer Page 3 Schedule Time frame managing Exploration introduction THE Drilling SITE Drilling Rig Running CSG Casing CMT Basic logging
  • 7. 7 Eng. El Sayed Amer Exploration and Geophysics
  • 11. 11 Eng. El Sayed Amer Seismic survey
  • 16. 16 Eng. El Sayed Amer Let the Story Begin
  • 17. 17 Eng. El Sayed Amer THE Drilling SITE01 Once the location for the site has been established, the area is prepared for drilling, with the following steps: 1. Site Preparation 2.Conductor-rathole-mousehole 3. Transporting Equipment
  • 18. 18 Eng. El Sayed Amer THE Drilling SITE01 1. Leveling & site preparation
  • 19. 19 Eng. El Sayed Amer THE Drilling SITE01 2. Cellar digging • A dug-out area, • located below the rig. • The cellar serves as a cavity in which the casing spool and casing head reside.
  • 20. 20 Eng. El Sayed Amer THE Drilling SITE01 2. Cellar digging
  • 21. 21 Eng. El Sayed Amer THE Drilling SITE01 3. Mud pit digging
  • 22. 22 Eng. El Sayed Amer THE Drilling SITE01 3. Mud pit digging
  • 23. 23 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering Conductor Hole A large diameter hole bored to facilitate steel pipe. May be cemented in place to allow conventional oil and gas well drilling operations ,and also allows fluid returns to a mud system when drilling surface hole. CONDUCTOR PIPE INSTALLATION 30” OD x 1”. wall thickness has been selected and Affiliate’s standard for world-wide exploration and development drilling activities Pile Hammers • Diesel pile hammers are used for surface driving operations of conductor pipe. • The driving depth of the conductor pipe is a function of the sediments in the ground. • The most common used system is a hammer weight of 18t
  • 24. 24 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering
  • 25. 25 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering Drive Shoe Technology
  • 26. 26 Eng. El Sayed Amer THE Drilling SITE01 5. Rathole drilling Conductor pipe Rat-hole mouth hole
  • 27. 27 Eng. El Sayed Amer THE Drilling SITE01 5. Rathole drilling • Rathole A shallow bored hole under the derrick substructure in which the Kelly is temporarily stored during tripping operations. • Mouse Hole A shallow bored hole under the derrick substructure in which a single drill pipe joint is temporarily set to facilitate easier connections.
  • 28. 28 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering
  • 29. 29 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering
  • 30. 30 Eng. El Sayed Amer 1. Rig Move Drilling Rig02
  • 31. 31 Eng. El Sayed Amer 1. Rig Move Drilling Rig02
  • 32. 32 Eng. El Sayed Amer 1. Rig Move Drilling Rig02
  • 33. 33 Eng. El Sayed Amer 2. Rig up Drilling Rig02
  • 34. 34 Eng. El Sayed Amer 2. Rig up Drilling Rig02 a. Mast Raising
  • 35. 35 Eng. El Sayed Amer 2. Rig up Drilling Rig02 b. substructure Raising
  • 36. 36 Eng. El Sayed Amer 2. Rig up Drilling Rig02
  • 37. 37 Eng. El Sayed Amer 2. Rig up Drilling Rig02
  • 38. 38 Eng. El Sayed Amer 2. Rig up Drilling Rig02
  • 39. 39 Eng. El Sayed Amer 3. Conductor connection Drilling Rig02 Shaker line
  • 40. 40 Eng. El Sayed Amer 4. Rig Acceptance Drilling Rig02 Rig acceptance checklist Rig accept
  • 41. 41 Eng. El Sayed Amer 5. Pipe rack Drilling Rig02
  • 42. 42 Eng. El Sayed Amer 6. Drill Pipe Inspection Drilling Rig02
  • 43. 43 Eng. El Sayed Amer 6. Drill Pipe Inspection Drilling Rig02 Thread cleaning
  • 44. 44 Eng. El Sayed Amer 6. Drill Pipe Inspection Drilling Rig02 Thread cleaning
  • 45. 45 Eng. El Sayed Amer 7. Stands make up Drilling Rig02
  • 46. 46 Eng. El Sayed Amer 7. Stands make up Drilling Rig02 • Single pipe • Stand “ 3 singles “
  • 47. 47 Eng. El Sayed Amer 7. Stands make up Drilling Rig02
  • 48. 48 Eng. El Sayed Amer 7. Stands make up Drilling Rig02
  • 49. 49 Eng. El Sayed Amer 8. Rack back stands Drilling Rig02
  • 50. 50 Eng. El Sayed Amer 9. BHA preparation Drilling Rig02 BHA • Run a 26" bit + 3 x 9" DC + HW-DP • Run a 26" bit + float valve + 36" Hole Opener + 1 x 9" Monel DC + 1 x 9" Spiral DC + 5" HWDP + 5" DPs Drill Bit Drill Collers Heavyweight Drill pipe Hole Opener Bit sub
  • 51. 51 Eng. El Sayed Amer 9. BHA preparation Drilling Rig02
  • 52. 52 Eng. El Sayed Amer 1. Preparing spud mud Spud Mud03 • Spud mud Mud used to drill a well from surface to a shallow depth. Guar gum or salt gel are commonly used offshore as spud mud. Onshore spud mud is usually a water-base mud containing bentonite clay that is flocculated with lime. MUD SYSTEM SEAWATER & SPUD MUD Mud Density 8.9 – 12.0 ppg Rheology @ 120°F/49°C PV 13 – 15 cps YP 24 – 32 lb/100 sqft Gels 11/15- 10/20 lb/100 sqft
  • 53. 53 Eng. El Sayed Amer 1. Preparing spud mud Spud Mud03
  • 54. 54 Eng. El Sayed Amer 1. Preparing spud mud Spud Mud03 Mixing
  • 55. 55 Eng. El Sayed Amer 1. Preparing spud mud Spud Mud03
  • 56. 56 Eng. El Sayed Amer 2. Spud In Spud Mud03 A large diameter hole is drilled using a large diameter drill bit. Drilling is conducted by heavy duty industrial strength drill bits. The drill bits come in different sizes according to the diameter of the hole being drilled.
  • 57. 57 Eng. El Sayed Amer 2. Spud In Spud Mud03 • First, a large drill bit is used to drill a short interval of hole.
  • 58. 58 Eng. El Sayed Amer 2. Spud In Spud Mud03
  • 59. 59 Eng. El Sayed Amer 2. Spud In Spud Mud03
  • 60. 60 Eng. El Sayed Amer 2. Spud In Spud Mud03 1. Mud pumping 2. Mud cleaning Mudreturnline
  • 61. 61 Eng. El Sayed Amer 2. Spud In Spud Mud03
  • 62. 62 Eng. El Sayed Amer 2. Spud In Spud Mud03 Drill to the depth of the first two joints using high viscosity mud (80-120 seconds Funnel viscosity) and at a very slow pump rate,
  • 63. 63 Eng. El Sayed Amer 2. Mud Cleaning Spud Mud03
  • 64. 64 Eng. El Sayed Amer 3. Continue drilling Spud Mud03 26” conductor pipe 20” pit diameter 36” conductor pipe 30” pit diameter
  • 65. 65 Eng. El Sayed Amer 4. Hole Cleaning Spud Mud03 1. Mud pumping 2. Mud cleaning Mudreturnline
  • 66. 66 Eng. El Sayed Amer 5. Wiper trip for hole cleaning Spud Mud03 At TD circulate the hole clean, displace the hole with gel mud Eng. Elsayed Amer Eng. Elsayed Amer
  • 67. 67 Eng. El Sayed Amer 6. POOH Running CSG04
  • 68. 68 Eng. El Sayed Amer 7. surface Casing Running 04 Running CSG
  • 69. 69 Eng. El Sayed Amer 7. surface Casing Running Spud Mud0304 Running CSG
  • 71. 71 Eng. El Sayed Amer 7. surface Casing Running 03 Float show and float coaller 04 Running CSG
  • 72. 72 Eng. El Sayed Amer 7. surface Casing Running Spud Mud0304 Running CSG
  • 73. 73 Eng. El Sayed Amer 7. surface Casing Running Spud Mud03 Surface casing 04 Running CSG
  • 79. 79 Eng. El Sayed Amer 8. Casing Cementing Spud Mud0305 Cementing Cement functions Provides zonal isolation. Supports axial load of casing. Protects casing against corrosion and erosion 1 2 3 Provides support to borehole in plastic or unconsolidated formations 4
  • 80. 80 Eng. El Sayed Amer 8. Casing Cementing Spud Mud0305 Cementing Drilling Fluid Spacer Fluid Bottom Plug Shoe Joint Top Plug Cement A B C Float Shoe Float Collar Bottom Plug Ruptured Top Plug Released Plug Bumped Displacement Fluid
  • 81. 81 Eng. El Sayed Amer 9. Wait on cement Spud Mud0305 Cementing To suspend drilling operations while allowing Cement slurries to solidify, harden and develop compressive strength
  • 82. 82 Eng. El Sayed Amer 10. Cement Job completion Spud Mud0305 Cementing
  • 83. 83 Eng. El Sayed Amer 83 3. Connection casing head9. Wait on cement Spud Mud0305 Cementing