Well completion
In Field operations
S e q u e n c e o f
Eng. Elsayed Amer
2
Eng.Elsayed Amer
P
A
G
E
2
Well
completion
Schedule
Well completion Sequences
Well life Cycle and well handover
Completion types and design criteria
Well clean up and completion fluid switch over
Perforation, Gamma ray CCL depth correlation
Running completion string
Running completion string
Nipple Up X-mass tree
Nipple Up X-mass tree
3
Eng.Elsayed Amer
P
A
G
E
3
Well
completion
Well Life Cycle
General
4
Eng.Elsayed Amer
P
A
G
E
4
Well
completion
Wellhead flange welding
Well Drilling
• Surface Casing well be cut and leveled by cold cutter.
5
Eng.Elsayed Amer
P
A
G
E
5
Well
completion
Wellhead flange welding
Well Drilling
• Wellhead flange attached to the first cemented surface casing .
• Flange is to be attached to the casing by welding, threaded or set screws.
6
Eng.Elsayed Amer
P
A
G
E
6
Well
completion
Wellhead flange welding
Well Drilling
7
Eng.Elsayed Amer
P
A
G
E
7
Well
completion
Wellhead flange welding
Well Drilling
8
Eng.Elsayed Amer
P
A
G
E
8
Well
completion
Nipple up BOP
Well Drilling
A
S
B
P
P
• BOP is in place connected to surface casing.
• Drilling operation is in progress.
9
Eng.Elsayed Amer
P
A
G
E
9
Well
completion
P/U & M/U CSG string
Well Drilling
▪ Pull up casing pipes to rig floor
▪ Make-up string pipes together.
▪ RIH with casing string to require depth to
cover the borehole.
10
Eng.Elsayed Amer
P
A
G
E
10
Well
completion
M/U CSG string
Well Drilling
Elevator
Rotary Table
Master Bushings
Slips
11
Eng.Elsayed Amer
P
A
G
E
11
Well
completion
Eng.Elsayed Amer
Elevator
Rotary Table
Master Bushings
M/U CSG string
Well Drilling
12
Eng.Elsayed Amer
P
A
G
E
12
Well
completion
Eng.Elsayed Amer
Elevator
Rotary Table
Master Bushings
M/U CSG string
Well Drilling
13
Eng.Elsayed Amer
P
A
G
E
13
Well
completion
Eng.Elsayed Amer
Elevator
Rotary Table
Master Bushings
M/U CSG string
Well Drilling
14
Eng.Elsayed Amer
P
A
G
E
14
Well
completion
Eng.Elsayed Amer
Elevator
Rotary Table
Master Bushings
M/U CSG string
Well Drilling
15
Eng.Elsayed Amer
P
A
G
E
15
Well
completion
Eng.Elsayed Amer
Elevator
Rotary Table
Master Bushings
M/U CSG string
Well Drilling
16
Eng.Elsayed Amer
P
A
G
E
16
Well
completion
Eng.Elsayed Amer
Casing centralization
Well Drilling
17
Eng.Elsayed Amer
P
A
G
E
17
Well
completion
Eng.Elsayed Amer
Casing in hole
Well Drilling
Surface
casing
18
Eng.Elsayed Amer
P
A
G
E
18
Well
completion
Eng.Elsayed Amer
Elevator
Rotary Table
Master Bushings
Connect cement head
Well Drilling
19
Eng.Elsayed Amer
P
A
G
E
19
Well
completion
Hanger landing 9 5/8” Casing
Well Drilling
• Hanger landing.
• Set Casing Hanger & space out.
• Suspends intermediate or production casing string
• Centers the casing string in the head (or spool)
• Seals off the casing annulus
20
Eng.Elsayed Amer
P
A
G
E
20
Well
completion
Eng.Elsayed Amer
Cement pumping
Well Drilling
Elevator
Cement Truck
Cement Head
21
Eng.Elsayed Amer
P
A
G
E
21
Well
completion
Eng.Elsayed Amer
Cement pumping
Well Drilling
Elevator
Cement Truck
Cement Head
22
Eng.Elsayed Amer
P
A
G
E
22
Well
completion
Eng.Elsayed Amer
Elevator
Cement Head
Cement Truck
Cement pumping
Well Drilling
23
Eng.Elsayed Amer
P
A
G
E
23
Well
completion
Eng.Elsayed Amer
Cement pumping
Well Drilling
24
Eng.Elsayed Amer
P
A
G
E
24
Well
completion
Eng.Elsayed Amer
Cement Integrity
Well Drilling
▪ Cementing is the process of mixing and placing a cement slurry in the annular space
between the casing and the borehole.


Borehole
Cement
casing
Borehole
Open hole
Cement
Casing
25
Eng.Elsayed Amer
P
A
G
E
25
Well
completion
Eng.Elsayed Amer
Wait on cement
Well Drilling
WOC
▪ To suspend drilling operations while allowing Cement slurries to solidify, harden and
develop compressive strength
26
Eng.Elsayed Amer
P
A
G
E
26
Well
completion
Casing 9 5/8” cementing
Well Drilling
• Carry out cementing job for the casing
• Wait on cement.
27
Eng.Elsayed Amer
P
A
G
E
27
Well
completion
Cement bond log CBL
Well Drilling
◉ Sonic Path in Cased Hole
◉ CBL measures casing to cement bond
◉ Bond logs are run to determine:
1. Cement to casing relationship
2. Cement to formation relationship
3. Evaluate cement conditions:
• Channeling
• Compromised cement (i.e. gas cut, dehydrated, etc.)
• Cement stages
• Cement top
• Micro annulus
28
Eng.Elsayed Amer
P
A
G
E
28
Well
completion
Cement bond log CBL
Well Drilling
29
Eng.Elsayed Amer
P
A
G
E
29
Well
completion
Cement bond log CBL
Well Drilling
30
Eng.Elsayed Amer
P
A
G
E
30
Well
completion
Last well status
Well Drilling
◉ BOP stack N/U on intermediate CSG
◉ Well is cased hole.
◉ Well is filled with Mud.
31
Eng.Elsayed Amer
P
A
G
E
31
Well
completion
7” hole drilling
Well Drilling
1. Mud pumping
2. Mud cleaning
Mud
return
line
32
Eng.Elsayed Amer
P
A
G
E
32
Well
completion
Open hole logging
Well Drilling
A well log is the record of one or more
physical measurements as a function of
depth in a borehole.
Well logs are recorded by instruments
(sondes or tools) carrying sensors,
which are lowered into a well bore by a
cable (wire line logs) or directly connected
to the drilling pipes (while drilling logs).
◉ Well logging
33
Eng.Elsayed Amer
P
A
G
E
33
Well
completion
Open hole logging
Well Drilling
1. Open hole log
2. Cased hole log
◉ Well logging
To estimate Hydrocarbon
potential of a reservoir, we need
to know :
• Porosity
• Permeability
• Water Saturation
34
Eng.Elsayed Amer
P
A
G
E
34
Well
completion
Open hole logging
Well Drilling
Caliper
Gamma ray Bulk Density
+.25
-.25 0
Correction
Grams/CC
Grams/CC
Hole diam. in inches
Depths
API units
6 16
10
0 3.0
2.0 2.5
Mud Wt. 10 lb/gal
35
Eng.Elsayed Amer
P
A
G
E
35
Well
completion
Seven layers of protections
Well Drilling
36
Eng.Elsayed Amer
P
A
G
E
36
Well
completion
Seven layers of protections
Well Drilling
Eng.Elsayed Amer
P
A
G
E
37
Well
completion
Preparing well for
completion
W e l l c o m p l e t i o n
02
Eng.Elsayed Amer
Eng.Elsayed Amer
P
A
G
E
38
Well
completion
Well Completion
Completion cost
Well Completion
£
£
£
£
€
€
€
€
Completion fluid additives,
completion liner and tubing
wellhead equipment completion and perforating crews
pumping equipment rentals
completion costs generally fall in the
range of $2.9 MM to $5.6 MM per well
Eng.Elsayed Amer
P
A
G
E
39
Well
completion
Well Completion
Well Handover
Well Completion
• Drilling Engineer handed over the well to
Completion Engineer Handover
Eng.Elsayed Amer
P
A
G
E
40
Well
completion
Well Completion
Casing Program
Well Completion
Eng.Elsayed Amer
P
A
G
E
41
Well
completion
Well Completion
Wellhead program
Well Completion
Eng.Elsayed Amer
P
A
G
E
42
Well
completion
Well Completion
Completion operation
Well Completion
Well Completion
✘ The objective of a completion is to convey fluids from the
reservoir to the surface, in a safe and efficient manner.
Process include:
✘ The design, Selection and installation of tubular, tools and
equipment, located in the wellbore, for the purpose of
conveying, pumping or controlling production (or injection)
fluids.
◈ Protect the Casing and Contain the Reservoir fluids
Eng.Elsayed Amer
P
A
G
E
43
Well
completion
Well Completion
Completion Design
Well Completion
44
Eng.Elsayed Amer
P
A
G
E
44
Well
completion
7
Drilling Mud
Casing
Corrosion inhibitor
Completion Fluid
BOP
X-mass tree
Tubing
Oil formation Oil formation
Perforations Packer
Eng.Elsayed Amer
P
A
G
E
45
Well
completion
Well Completion
Wellbore CLEAN UP
Well Completion
• Run a bit and scraper to bottom to clean
casing from mill scale and cement.
❑ A bit and scraper assembly to be RIH.
• The purpose of this trip is to clean
out any excess cement within the
casing, and particularly to remove
any cement that may be on the
casing wall at the packer setting
depth.
CASING
SCRAPER
Eng.Elsayed Amer
P
A
G
E
46
Well
completion
Well Completion
Wellbore CLEAN UP
Well Completion
Eng.Elsayed Amer
P
A
G
E
47
Well
completion
Well Completion
Circulating the well bottom up
Well Completion
• The quality of the fluid used during a
completion and workover operation
should be guaranteed to avoid any
problem during production phase.
• Displace all drilling fluid with a completion fluid
(brine) after cementing production casing
or liner.
Eng.Elsayed Amer
P
A
G
E
48
Well
completion
Well Completion
Circulating the well bottom up
Well Completion
❑ A clear, solids free fluid that is displaced
into the hole prior to running the
completion.
❑ They differ from normal drilling muds in
minimizing the formation damage to the
production zone but at the same time
maintain circulating capacity and well
control.
❑ Brine (salts: KCl, NaCl, MgCl2, CaBr2, ZnBr2,
etc)
Eng.Elsayed Amer
P
A
G
E
49
Well
completion
Well Completion
Completion Fluids
Well Completion
❑ The primary performance requirement for a completion fluid is hydrostatic
pressure control.
❑ The density must be sufficient to produce a hydrostatic pressure in the
wellbore to control formation pressures.
Eng.Elsayed Amer
P
A
G
E
50
Well
completion
Well Completion
Completion Fluids
Well Completion
• Completion Fluids functions
▪ Maintain over balance well control
“ hydrostatic pressure”.
▪ Remove wellbore solids to surface.
▪ minimize formation damage.
Eng.Elsayed Amer
P
A
G
E
51
Well
completion
Well Completion
NTU measurement
Well Completion
Eng.Elsayed Amer
P
A
G
E
52
Well
completion
Well Completion
NTU measurement
Well Completion
Eng.Elsayed Amer
P
A
G
E
53
Well
completion
Well Completion
Clean-Out BHA
Well Completion
1. 6’’ bit - DEA
2. 7’’ scraper – Baker Oiltools
3. 7’’ junk basket – Baker Oiltools
4. 7’’ string magnet – Baker Oiltools
5. 7’’ brushes – Baker Oiltools
6. 1 x 3 ½’’ DP – Rig 94
7. 7’’ Halliburton RTTS Test packer – Halliburton
8. Circ. Valve – Halliburton
9. 4 ¾’’ DC – Rig 94
10. X-O – BakerOiltools ?? / WOOD International ?? NC35 Pin x 4 ½’’ PH6 Box
11. 4 ½’’ PH6 Tbg. – Wood International
12. X-O – BakerOiltools ?? / WOOD International ?? 4 ½’’ PH6 Pin X 4 ½’’ IF Box
Eng.Elsayed Amer
P
A
G
E
54
Well
completion
Well Completion
Clean-Out BHA
Well Completion
Wellbore Cleanup BHA
Description
Conn.
Up
Conn.
Dwn.
O.
D.
I.
D.
Tool
Length
Top
of
Tool
Bottom
of Tool
RIG Drill Pipes BH6 BH6 4 1/2'' 3 1/2'' 2692.75 0.62 2693.37
RIG Cross Over BH6 3 1/2'' IF P 1 2693.37 2694.37
BAKER Flex Sub 3 1/2'' IF B 3 1/2'' IF P 4 3/4'' 1 3/4'' 0.605 2694.37 2694.97
BAKER 9-5/8" Multi-Task Wellbore Filter 3 1/2'' IF B 3 1/2'' IF P 6'' 1 5/8'' 5.855 2694.97 2700.83
BAKER 9-5/8" Ultra-Clean Casing Brush 3 1/2'' IF B 3 1/2'' IF P 6''' 1 1/2'' 3.145 2700.83 2703.97
BAKER 9-5/8" Grabitz Magnet 3 1/2'' IF B 3 1/2'' IF P 6'' 2'' 3.544 2703.97 2707.52
BAKER 7'' Non Rotating Scrapper 3 1/2'' IF B 3 1/2'' IF P 6'' 1 5/8'' 3.145 2707.52 2710.66
BAKER Bit Sub 3 1/2'' IF B 3 1/2'' Reg. B 4 3/4'' 1 5/8'' 0.425 2710.66 2711.09
BAKER Junk Mill 3 1/2'' Reg / 5 7/8'' 1 1/2'' 0.915 2711.09 2712.00
Eng.Elsayed Amer
P
A
G
E
55
Well
completion
Well Completion
Circulating the well bottom up
Well Completion
➢ RIH with string
➢ Pumping completion fluid
and check return flow NTU
Return flow and check
NTU < 25
Eng.Elsayed Amer
P
A
G
E
56
Well
completion
Well Perforation
W e l l c o m p l e t i o n
03
Eng.Elsayed Amer
Eng.Elsayed Amer
P
A
G
E
57
Well
completion
Well Completion
Perforation
Well Completion
❑ Using a gun to make a
punch or hole penetrating
the casing and cement
into the reservoir rock “
formation “ to facilitate
the production from these
holes.
Casing
Cement
Formation
Perf
Eng.Elsayed Amer
P
A
G
E
58
Well
completion
Well Completion
Perforation Gun
Well Completion
Eng.Elsayed Amer
P
A
G
E
59
Well
completion
Well Completion
Perforation Gun
Well Completion
Eng.Elsayed Amer
P
A
G
E
60
Well
completion
Well Completion
Perforation Gun
Well Completion
Eng.Elsayed Amer
P
A
G
E
61
Well
completion
Well Completion
Perforation Charges
Well Completion
Big Hole charges in a loading tube prior to loading in a scalloped hollow
carrier gun.
Eng.Elsayed Amer
P
A
G
E
62
Well
completion
Well Completion
Perforation techniques
Well Completion
• There are currently three standard methods of perforating a well using
shaped charges:
• Casing gun perforating (run on wireline)
• Through-tubing perforating (TTP) (run on wireline)
• Tubing-conveyed perforating. (TCP) (run on tubing)
Eng.Elsayed Amer
P
A
G
E
63
Well
completion
Well Completion
Perforation techniques
Well Completion
Eng.Elsayed Amer
P
A
G
E
64
Well
completion
Well Completion
Perforation techniques
Well Completion
Eng.Elsayed Amer
P
A
G
E
65
Well
completion
Well Completion
Perforation Gun assembly
Well Completion
Eng.Elsayed Amer
P
A
G
E
66
Well
completion
Well Completion
Gamma ray CCL depth correlation
Well Completion
Eng.Elsayed Amer
P
A
G
E
67
Well
completion
Well Completion
Gamma ray CCL depth correlation
Well Completion
Eng.Elsayed Amer
P
A
G
E
68
Well
completion
Well Completion
Pip tag
Well Completion
Pip tag
A radioactive tag in a sub is installed in the string
within the proximity of the packer.
This sub is used as a marker when performing the
GR/CCL. If the formation has little GR character,
radioactive collars can also be included in the casing
string for definitive depth control.
Eng.Elsayed Amer
P
A
G
E
69
Well
completion
Well Completion
Perforation running
Well Completion
Oil zone
Gas zone
Water zone
Eng.Elsayed Amer
P
A
G
E
70
Well
completion
Well Completion
Well Completion
Eng.Elsayed Amer
P
A
G
E
71
Well
completion
Well Completion
Running completion string
Well Completion
◉ Completion string The primary conduit
through which reservoir fluids are
produced to surface. The production
string is typically assembled with tubing
and completion components in a
configuration that suits the wellbore
conditions and the production method.
Eng.Elsayed Amer
P
A
G
E
72
Well
completion
Well Completion
Running completion string
Well Completion COMPLETION STRING FACILITIES
01 02
Upper completion equipment
Sample Text
01
Lowe completion equipment
Sample Text
02
Eng.Elsayed Amer
P
A
G
E
73
Well
completion
Well Completion
Completion string materials
Well Completion
Completion materials
Material CostRatio
Cast Iron
Carbon steel
Low alloy Steel
CRAs2
Stainless steel
-
1
3
special
5
30
Eng.Elsayed Amer
P
A
G
E
74
Well
completion
Well Completion
Completion Equipment
Well Completion
Upper
completion Sliding Side Door
Landing Nipple
Retrievable Packer
Perforated Joint
Landing Nipple
Landing Nipple
Mule Shoe Guide
Protection Joint
Tubing Hanger
SCSSV
Side Pocket Mandrel
Side Pocket Mandrel
Tubing
Flow Coupling
Flow Coupling
Tubing
lower
completion
Eng.Elsayed Amer
P
A
G
E
75
Well
completion
Well Completion
Completion Equipment
Well Completion
Completion
Tubing Packer Accessories
Sliding Side Door
Landing Nipple
Retrievable Packer
Perforated Joint
Landing Nipple
Landing Nipple
Mule Shoe Guide
Protection Joint
Eng.Elsayed Amer
P
A
G
E
76
Well
completion
Well Completion
Completion Equipment
Well Completion
◉ Production packer
◉ sub-surface tool used to provide a seal
between the Tubing and Casing
◉ thus preventing the movement of fluids
past this sealing point.
Eng.Elsayed Amer
P
A
G
E
77
Well
completion
Well Completion
Completion Equipment
Well Completion
Applications
▪ sub-surface tool used to provide a seal between the Tubing and Casing
▪ thus preventing the movement of fluids past this sealing point.
Functions
1. Protect casing from bursting
2. Protect casing from corrosion
3. Provide better well control.
4. Prevent fluid movement between pay zones.
5. Isolate zones of bad cement Perforation
Tail pipe
Packer
Annulus
With
packer fluid
Casing
Eng.Elsayed Amer
P
A
G
E
78
Well
completion
Well Completion
Completion Equipment
Well Completion
Eng.Elsayed Amer
P
A
G
E
79
Well
completion
Well Completion
Packer Components
Well Completion
Slips
Packing
element
Casing
“Steel pipe”
Seal element
“Prevent fluid flow”
Slips anchor
“Prevent packer movement”
Eng.Elsayed Amer
P
A
G
E
80
Well
completion
Well Completion
Packer Components
Well Completion
Components
◉ Production packer
Slips
01
• Tooth-like parts of the packer
• Forced outward by sitting action
• Top slips to prevent up-motion and bottom for down-motion
Packing elements
02
Slips
Packing element
• Nitrile-rubber for moderate temperature and normal pressure
or Elastomers for HTHP
• Provide seal between CSG and TBG
Eng.Elsayed Amer
P
A
G
E
81
Well
completion
Well Completion
Packer Components
Well Completion
Types
◉ Production packer
Permanent
01
• Permanently set
• Cannot be retrieved except by milling
Retrievable
02
• RIH on wireline or tubing
• Has bi-directional slips prevent debris from setting on bottom
• Main advantage is retrieving without destroying
Eng.Elsayed Amer
P
A
G
E
82
Well
completion
Well Completion
Packer Types
Well Completion
Five common types of packers
Mechanical set Hydraulic-
set
Permane
nt
Service Bridge plug
Eng.Elsayed Amer
P
A
G
E
83
Well
completion
Well Completion
Packer Types
Well Completion
Eng.Elsayed Amer
P
A
G
E
84
Well
completion
Well Completion
Packer Setting Mechanism
Well Completion
Mechanical
01
• Rotation
• Compression
• Tension
Electrical
02
• Mechanical setting mechanism using wireline setting tool.
Hydraulic
03
• Pressure applied to tubing or annulus ± 3500 PSI
• Differential pressure acts on setting tool.
• Preferred method for deep / deviated wells
• Straight pull release
Eng.Elsayed Amer
P
A
G
E
85
Well
completion
Eng.Elsayed Amer
Mechanical set
01
Packer Setting Mechanism
Well Completion
Eng.Elsayed Amer
P
A
G
E
86
Well
completion
Eng.Elsayed Amer
Packer Setting Mechanism
Well Completion
Hydraulic set
02
Eng.Elsayed Amer
P
A
G
E
87
Well
completion
Eng.Elsayed Amer
Packer Setting Mechanism
Well Completion
Hydraulic set
02
Eng.Elsayed Amer
P
A
G
E
88
Well
completion
Eng.Elsayed Amer
Packer Setting Mechanism
Well Completion
Electrical set
03
Eng.Elsayed Amer
P
A
G
E
89
Well
completion
Eng.Elsayed Amer
No bore – bridge plug
Single Bore
Duel Bore
◎ Used to isolate casing or tubing
◎ Used as cement retainers
◎ Used when other plugs fail to set (last resort!)
◎ Used for single completions
◎ Used for dual completions
Packer Setting Mechanism
Well Completion
Eng.Elsayed Amer
P
A
G
E
90
Well
completion
Eng.Elsayed Amer
Packer Setting Mechanism
Well Completion
Packer Types
Single Bore Duel Bore ESP Packer
single-bore, hydraulic-
set packer with a dual
head
Eng.Elsayed Amer
P
A
G
E
91
Well
completion
Eng.Elsayed Amer
Packer Setting Mechanism
Well Completion
Inflatable Packer
✓ A type of packer that uses an inflatable bladder to expand
the packer element against the casing or wellbore.
Eng.Elsayed Amer
P
A
G
E
92
Well
completion
Eng.Elsayed Amer
Production tubing
Well Completion
Eng.Elsayed Amer
P
A
G
E
93
Well
completion
Eng.Elsayed Amer
Tubing Functions
Well Completion
Casing
Tubing
No-Go
Nipple.
Perfs
• A wellbore tubular used to produce
reservoir fluids. Production tubing
is assembled with other completion
components to make up the
production string.
Eng.Elsayed Amer
P
A
G
E
94
Well
completion
Eng.Elsayed Amer
Tubing Hanging
Well Completion
◎ Tubing is hanged at well by :
1. Hanger from the top wellhead ,
2. Production packer from downhole
Eng.Elsayed Amer
P
A
G
E
95
Well
completion
Eng.Elsayed Amer
Tubing Specifications
Well Completion
◎ Tubing is specified by :
1. grade,
2. outer diameter,
3. weight,
4. connection.
Eng.Elsayed Amer
P
A
G
E
96
Well
completion
Eng.Elsayed Amer
Tubing Specifications
Well Completion
Tubing Grade
Term used to describe the type of metal alloy of which the pipe is made.
Selection of tubing grade is based on:
▪ Physical strength
▪ Design life
▪ Chemical Properties (resistance to H2S, CO2, water etc.)
▪ Availability and standardization at customer
▪ Cost
Eng.Elsayed Amer
P
A
G
E
97
Well
completion
Eng.Elsayed Amer
Tubing Specifications
Well Completion
Tubing Grade
Steel grade: there are mainly two different types of steel used to manufacture tubing:
▪ API standard steels J55, C75, L80, N80, C90 and P105.
1. The letter represent the chemical composition and sometimes the thermal treatment.
2. The number following the letter is the minimum body yield stress in 1000 psi and it is
the minimum body yield stress guaranteed by the manufacturer’s.
Eng.Elsayed Amer
P
A
G
E
98
Well
completion
Eng.Elsayed Amer
Tubing Specifications
Well Completion
Tubing Grade
Steel grade: there are mainly two different types of steel used to manufacture tubing:
▪ Stainless steel, alloys, and special pipe When carbon dioxide and/or hydrogen sulfide
are part of the produced fluids, it could necessary to use stainless steel, alloys, and special
pipe.
▪ For Example
• 9 Cr is used for H2S applications.
• 13 Cr for CO2: 13% chromium is selected when there is no H2S in addition to
the CO2.
• 22 Cr for CO2 + H2S: 22-25% chromium steel when the H2S partial pressure
is not too high (some psi).
Eng.Elsayed Amer
P
A
G
E
99
Well
completion
Production Tubing
Tubing Grade
Eng.Elsayed Amer
P
A
G
E
100
Well
completion
Production Tubing
Tubing Diameter
Refers to the outside diameter (in inches or millimeters)
Tubing is measured by the OUTSIDE DIAMETER (O.D.), specified in inches (e.g., 1.250) or
fraction of an inch (eg. 1-1/4″).
The most used sizes are: 2-⅜”, 2-⅞”, 3-½” and 4-½”
Nominal Size
(inches)
Weight
per foot
ID
(inches)
Drilling Drift
(inches)
Wireline Drift
(inches)
2 3/8 4.70 1.995 1.901 1.875
2 7/8 6.50 2.441 2.347
2.313
3 1/2 9.30 2.992 2.867 2.750
4 1/2 12.75 3.958 3.883 3.813
5 1/2 15.50 4.919 4.825 4.750
Eng.Elsayed Amer
P
A
G
E
101
Well
completion
Production Tubing
Tubing Diameter
Eng.Elsayed Amer
P
A
G
E
102
Well
completion
Production Tubing
Tubing weight
is the average weight of the tubing, connection included.
Expressed in lb/ft.
It determines the tubing wall thickness, Corrosion/erosion resistance, Strength, Cost
The most common nominal weights are:
Eng.Elsayed Amer
P
A
G
E
103
Well
completion
Tubing are screwed together through connections,
which could be:
1. by means of integral joint, the most
common type of connection on small
diameter pipe.
Production Tubing
Tubing Connections
Eng.Elsayed Amer
P
A
G
E
104
Well
completion
Tubing are screwed together through connections,
which could be:
2. by using a coupling (the most common
connection), a collar with internal
threads used to join two sections of
threaded pipe.
Production Tubing
Tubing Connections
Eng.Elsayed Amer
P
A
G
E
105
Well
completion
PI tapered triangular threaded connections
There are two types of thread connection:
▪ API
▪ Premium
Production Tubing
Tubing Connections
Premium
API
Eng.Elsayed Amer
P
A
G
E
106
Well
completion
Production Tubing
Tubing Connections
The types of pipe threads specified by the API for casing
and tubing include:
• NEW VAM
• VAM TOP
• Hydril
• Short Thread Coupled (STC)
• Long Thread Coupled (LTC)
• Buttress Thread Coupled (BTC)
• Line Pipe (LP)
• External Upset End (EUE)
• Non-Upset End (NUE)
Eng.Elsayed Amer
P
A
G
E
107
Well
completion
Production Tubing
Tubing Connections
Non-upset
(8 round) Connection
External Upset Connection EUE Integral
Connection
Hydril
Integral Connection
Eng.Elsayed Amer
P
A
G
E
108
Well
completion
Production Tubing
Tubing Connections
Eng.Elsayed Amer
P
A
G
E
109
Well
completion
Production Tubing
Tubing Design
Design of production tubing should satisfy the following criteria:
1. Minimizing pressure drop
2. High strength for suspension of tubing joints
3. High internal pressures for fluids flow
4. High external pressures (between annulus & tubing)
5. Resistant to chemical corrosion
Eng.Elsayed Amer
P
A
G
E
110
Well
completion
Production Tubing
Tubing Design
Tubing Connection Make up Torque
1. Under torque ------------------ leakage
2. Over torque ------------------thread failure & damage to seal
Eng.Elsayed Amer
P
A
G
E
111
Well
completion
Production Tubing
Tubing Design
◉ Under torque
• Leakage
◉ Over torque
• Thread failure
• Damage to seal
I. Recommended torque values
are applied by manufactures .
Eng.Elsayed Amer
P
A
G
E
112
Well
completion
Production Tubing
Tubing Length
II. Length:
Tubulars are manufactured in lengths termed joints
✓ range 1 : 20 to 24 feet;
✓ range 2 : 28 to 32 feet;
✓ range 3 : 32 to 48 feet
Pup joints or spacers are used for shorter lengths.
Tubing Ranges
Range 1 (feet) Range 2 (feet) Range 3 (feet)
20-24 28-32 38-42
Eng.Elsayed Amer
P
A
G
E
113
Well
completion
Production Tubing
Pup Joint
Pup joints or spacers are short tubing joints
that give flexibility in attaining a desired
tubing length
Eng.Elsayed Amer
P
A
G
E
114
Well
completion
Production Tubing
Cross over
Eng.Elsayed Amer
P
A
G
E
115
Well
completion
Eng.Elsayed Amer
Completion Accessories
Well Completion
Completion Accessories
Eng.Elsayed Amer
P
A
G
E
116
Well
completion
Landing Nipples
Applications
▪ A landing nipple is a short length of pipe with a profile cut
on the inside of the pipe.
▪ Provide a location for wireline tools to be hanged in place in
locations which are carefully considered during installation
Types
X Selective Nipples XN No-go nipples
Eng.Elsayed Amer
P
A
G
E
117
Well
completion
Landing Nipples
X Selective Nipples
XN No-go nipples
Eng.Elsayed Amer
P
A
G
E
118
Well
completion
Landing Nipples
Applications
▪ Plug the tubing for:
• Removing the wellhead or surface equipment
• Pressure testing
• Setting hydraulic set packers
• Zonal isolation
▪ Installing downhole chokes, regulators, SSVs, etc.
▪ landing off bottom hole pressure recorders.
Eng.Elsayed Amer
P
A
G
E
119
Well
completion
Landing Nipples
No – go nipple XN
• XN®, RN®, Nipples (N = no-go) contain a restriction in the profile
which prevents the Slickline plug from passing through.
• Only 1 no-go nipple of a particular size is used in a well and
usually it will be placed at or near the bottom of the well below
other landing nipples.
Eng.Elsayed Amer
P
A
G
E
120
Well
completion
Landing Nipples
A typical Slickline ‘plug’ consists of 3 components:
• 1. Lock mandrel
• 2. Equalizing sub
• 3. Flow control device (prong)
OTIS R®
Locking
Mandrel
OTIS R®
Landing
Nipple
Eng.Elsayed Amer
P
A
G
E
121
Well
completion
Landing Nipples
Eng.Elsayed Amer
P
A
G
E
122
Well
completion
Landing Nipples
R & RN - Key
X®
Landing Nipple
XN® R®
Landing Nipple
& Lock mandrel
RN®
Landing Nipple &
Locking Mandrel
Eng.Elsayed Amer
P
A
G
E
123
Well
completion
Landing Nipples
R & RN - Key
Eng.Elsayed Amer
P
A
G
E
124
Well
completion
Landing Nipples
• The most notable manufacturers are
▪ Baker
▪ CAMCO
▪ Halliburton/Otis
▪ Weatherford CPS / Petroline
Manufacturers
Eng.Elsayed Amer
P
A
G
E
125
Well
completion
Landing Nipples
Design Specifications
LOCK PROFILE XN
SIZE 2.813 INCH
MAXIMUM OD 3.919 INCH
MINIMUM NO-GO ID 2.666 INCH
LENGTH 17.71 INCH
MATERIAL Alloy/9CR / 13CR
SERVICE H2S/CO2/ STD
CONNECTION 3 ½” Vam Top B * P
PRESSURE RATING 9300 PSI
CN05527
Max OD: 3.898”
Packing Bore ID: 2.813”
Min ID: 2.813”
Nipple Profile: X
Length: 18.50”
Top Thread: 3 1/2-9.2 FOX-K Box
Bottom Thread: 3 1/2-9.2 FOX-K Pin
Material: 13Cr
Service: Std
Pres. Rating: 9300 psi
Eng.Elsayed Amer
P
A
G
E
126
Well
completion
Landing Nipples
Installation
LOCK
MANDREL
FISH NECK
LANDING NIPPLE
GR PULLING TOOL
Jar
Down KEYS LOCKED IN
NIPPLE PROFILE
• To Move Equalizing Valve Off
Sea t (If Installed)
• To Break Packing Bond
•Loosen Lock Mandrel
Jar
Up
• To Unlock Lock
Mandrel
• To Remove Lock
Mandrel and
Accessory from
Landing Nipple
Eng.Elsayed Amer
P
A
G
E
127
Well
completion
Landing Nipples
Monolock plug
Eng.Elsayed Amer
P
A
G
E
128
Well
completion
Eng.Elsayed Amer
B. Flow Coupling.
Well Completion
▪ Flow couplings are short sections of thicker
walls than the production tubing.
▪ designed to protect the tubing string from
excessive wear and premature failure.
▪ Added protection against internal erosion
▪ above and below cross-overs,
▪ above and below a landing nipple, SSSV
nipple, etc.
Eng.Elsayed Amer
P
A
G
E
129
Well
completion
Eng.Elsayed Amer
C. Blast Joint.
Well Completion
Applications
▪ Located in the tubing string in front of to perforations (ID same as
tubing).
▪ Blast joints are heavy wall tubular accessories that are typically run in
sections of the string design where oil or gas returns in the tubing will
encounter turbulence. They provide an increased wall thickness to
prevent failures caused by turbulent erosion in the ID of the tubing.
1. Tungsten
2. Rubber
3. Ceramic
Eng.Elsayed Amer
P
A
G
E
130
Well
completion
Eng.Elsayed Amer
Flow Coupling V.S Blast Joint
Well Completion
Eng.Elsayed Amer
P
A
G
E
131
Well
completion
Eng.Elsayed Amer
C. Blast Joint.
Well Completion
Eng.Elsayed Amer
P
A
G
E
132
Well
completion
Eng.Elsayed Amer
D. Side Sliding Door SSD
Well Completion
◉ Application:
known as Sliding Sleeves
Allows communication from the
annulus to the tubing.
Used for Circulation of casing to
inside tubing incase of well killing
or production.
Sliding Side
Door (SSD)
Eng.Elsayed Amer
P
A
G
E
133
Well
completion
Eng.Elsayed Amer
D. Side Sliding Door SSD
Well Completion
Sliding (inner)
Sleeve
Seals
Ports
Seals
Inner Ports
OPEN CLOSED
◉ Application:
Fluid displacement
Well killing (by fluid circulation)
Kicking off wells (gas lift)
Chemical injection.
Commingled production.
Eng.Elsayed Amer
P
A
G
E
134
Well
completion
Eng.Elsayed Amer
E. Subsurface Safety Valves SCSSSV
Well Completion
Piper Alpha tragedy
Piper Alpha was an oil production platform in
the North Sea.
on 6 July 1988, killing 167 people.
Catastrophic platform accident due to
explosion in process facility and release of gas
in pipeline.
Almost all of the wells controlled below seabed
with SC-SSSVs!.
Only well that burnt was being worked over –
no SSSV in place.
Eng.Elsayed Amer
P
A
G
E
135
Well
completion
Eng.Elsayed Amer
E. Subsurface Safety Valves SCSSSV
Well Completion
Kuwait oil well fires
• Persian Gulf War. 1991
• The Kuwaiti oil fires were caused
by Iraqi military forces setting fire
to a reported 605 to 732 oil wells
Eng.Elsayed Amer
P
A
G
E
136
Well
completion
Eng.Elsayed Amer
E. Subsurface Safety Valves SCSSSV
Well Completion
Eng.Elsayed Amer
P
A
G
E
137
Well
completion
Eng.Elsayed Amer
E. Subsurface Safety Valves SCSSSV
Well Completion
◉ Application
A shutdown valve installed at the
upper wellbore for emergency
shutdown
To prevent uncontrolled release of
hydrocarbons from the well if
something catastrophic occurs at
surface.
Eng.Elsayed Amer
P
A
G
E
138
Well
completion
Eng.Elsayed Amer
E. Subsurface Safety Valves SCSSSV
Well Completion
Eng.Elsayed Amer
P
A
G
E
139
Well
completion
Eng.Elsayed Amer
E. Subsurface Safety Valves SCSSSV
Well Completion
Eng.Elsayed Amer
P
A
G
E
140
Well
completion
Eng.Elsayed Amer
E. Subsurface Safety Valves SCSSSV
Well Completion
Subsurface Safety Valves SCSSSV
Setting Depth
❖ Offshore
Normally installed 200 to 300 ft below
seabed or as deep as possible
❖ Onshore
The SCSSV is located a minimum of 100 ft
below the mudline.
Eng.Elsayed Amer
P
A
G
E
141
Well
completion
SCSSSV
❖ Shallow set valves reduce the exposed hydrocarbon inventory.
❖ Deep-set valves have less opportunity to be affected by catastrophic events
❖ Safety valves should not be placed in areas exposed to continuous scaling, wax
or hydrate formation.
Recommended minimum setting depth
Eng.Elsayed Amer
P
A
G
E
142
Well
completion
SCSSSV
Annulus SV
Tubing SV
Application
Eng.Elsayed Amer
P
A
G
E
143
Well
completion
SCSSSV
Running W/L Retrievable Tub. Retrievable
Eng.Elsayed Amer
P
A
G
E
144
Well
completion
SCSSSV
Running W/L Retrievable Tub. Retrievable
WLRSV
TRSV
Eng.Elsayed Amer
P
A
G
E
145
Well
completion
SCSSSV
Running Wireline retrievable (WLRSV) Tubing Retrievable (TRSV)
▧ General application: where
intervention by wireline is
available
▧ High pressure gas wells
▧ Deployed on a wireline
running tool to be installed in
an appropriate landing nipple.
▧ Advantage: can be replaced by
wireline
▧ Disadvantage: a significant
restriction in flow path.
▧ General application: where
larger flow area is desired for
the tubing size
▧ Advantage: maximum
opening and minimum
restriction to flow. Allows
some wireline and CT access
capability.
▧ Disadvantage: must pull
tubing to repair.
Eng.Elsayed Amer
P
A
G
E
146
Well
completion
SCSSSV
TR Safety Valve Landing Nipple
Top Sub
Functional Sub-
assembly
Bottom Sub
LOCK
MANDREL
SAFETY
VALVE
Eng.Elsayed Amer
P
A
G
E
147
Well
completion
SCSSSV
Activation Mechanism
Sub-S Controlled Surface Controlled
Eng.Elsayed Amer
P
A
G
E
148
Well
completion
SCSSSV Annulus SV
W/L Retrievable Tub. Retrievable
Surface Controlled
Hydraulic
Control line
Tubing SV
W/L Retrievable Tub. Retrievable
Surface Controlled
Sub-S Controlled
Hydraulic
Wireless
Cable
Control line
Annulus
Electric
Excess flow Pressure drop
Ball Flapper
Application
Running
Means of Activation
Communication route
Open & Close Element Poppet
Eng.Elsayed Amer
P
A
G
E
149
Well
completion
Subsurface Safety Valves SCSSSV
Control line
• The hydraulic control line, also known as a
chemical injection line, is a small-diameter
line, usually ⅛ in. (32 mm) or ⅝ in. (16 mm)
• Used to execute tool recovery, perform
chemical injection, and operate downhole
completions equipment such as surface-
controlled subsurface safety valves (SCSSV).
Eng.Elsayed Amer
P
A
G
E
150
Well
completion
SCSSSV
Control line connection to downhole safety valve
• A 1/4″ inch stainless steel control line is attached
• It may be necessary to keep as much as 4000 to
5000 psi on the control line to keep the valve open.
Eng.Elsayed Amer
P
A
G
E
151
Well
completion
Subsurface Safety Valves SCSSSV
WHCP
Eng.Elsayed Amer
P
A
G
E
152
Well
completion
SCSSSV Open & Close Element
Eng.Elsayed Amer
P
A
G
E
153
Well
completion
SCSSSV
Flapper Types
• Initially, flapper / seat combinations are capable of
sealing 15,000 psi + (bubble tight).
• hydraulic pressure from the surface opposes the
mechanical spring pressure and holds the valve open
• The flapper valve can further be divided in flat,
contoured and curved flappers,
Eng.Elsayed Amer
P
A
G
E
154
Well
completion
Production Tubing
Tubing Hanger
Eng.Elsayed Amer
P
A
G
E
155
Well
completion
Production Tubing
Tubing Hanger
Eng.Elsayed Amer
P
A
G
E
156
Well
completion
Production Tubing
Tubing Hanger
Eng.Elsayed Amer
P
A
G
E
157
Well
completion
Production Tubing
Tubing Hanger
Eng.Elsayed Amer
P
A
G
E
158
Well
completion
Production Tubing
Tubing Hanger
Eng.Elsayed Amer
P
A
G
E
159
Well
completion
Production Tubing
Tubing Hanger
Eng.Elsayed Amer
P
A
G
E
160
Well
completion
Tubing Head Adapter
❖ The tubing head adaptor provides a transition
from the tubing head to the Christmas tree.
Eng.Elsayed Amer
P
A
G
E
161
Well
completion
Eng.Elsayed Amer
Run completion string
Eng.Elsayed Amer
P
A
G
E
162
Well
completion
Eng.Elsayed Amer
Run completion string
Eng.Elsayed Amer
P
A
G
E
163
Well
completion
Eng.Elsayed Amer
Run completion string
Eng.Elsayed Amer
P
A
G
E
164
Well
completion
Eng.Elsayed Amer
N/D BOP & N/u X-mass tree
It is time to dismantle (N/D) BOP to install Christmas tree
on the well head
A
S
B
P
P
Eng.Elsayed Amer
P
A
G
E
165
Well
completion
Eng.Elsayed Amer
N/D BOP & N/u X-mass tree
It is time to dismantle (N/D) BOP to install Christmas tree
on the well head
Eng.Elsayed Amer
P
A
G
E
166
Well
completion
Tubing Head Adapter
❖ The tubing head adaptor provides a transition
from the tubing head to the Christmas tree.
Eng.Elsayed Amer
P
A
G
E
167
Well
completion
Tubing Head Adapter
Eng.Elsayed Amer
P
A
G
E
168
Well
completion
Eng.Elsayed Amer
N/u X-mass tree
Install tubing head adaptor & N/U Christmas tree on the
well head
Eng.Elsayed Amer
P
A
G
E
169
Well
completion
Eng.Elsayed Amer
N/u X-mass tree
Eng.Elsayed Amer
P
A
G
E
170
Well
completion
Major manufacturers, suppliers, and vendors of wellhead equipment and X-mass trees
are:
C o m p a n i e s w o r l d w i d e
Manufacturing
FMC
Tharwa Brada
Cameron
Wood group
Hercules
GE
Eng.Elsayed Amer
P
A
G
E
171
Well
completion
T e r m i n o l o g y
Working Pressure
Wellhead equipment that meets API Specification 6A (equivalent to ISO 10423) is
available in standard pressure increments:
• 2000 psi
• 3000 psi
• 5000 psi
• 10,000 psi
• 15,000 psi
• 20,000 psi
• 30,000 psi
Eng.Elsayed Amer
P
A
G
E
172
Well
completion
T e r m i n o l o g y
Working Temperature
❑ Conventional operations span -60
to 121⁰C in 8 ranges (K, L, P, R,
S, T, U,V). K and U are the largest
and overlap the other ranges.
❑ Elevated temperature operations
span -18 to 345⁰C in 2 ranges (X,
Y). Y has the highest temperature
rating.
Standard temperature ratings are defined by an operating range.
Eng.Elsayed Amer
P
A
G
E
173
Well
completion
T e r m i n o l o g y
Material Class
Defines the corrosion resistance required by all components wetted by the
retained fluid.
❑ The seven material classes range from AA (General service: carbon or low
alloy steel) to HH (Sour service: corrosion resistant alloys).
❑ All sour service materials must conform to ANSI/NACE MR0175/ISO 15156
(NACE International provides control standards related to corrosion
protection).
Eng.Elsayed Amer
P
A
G
E
174
Well
completion
Product Specification Levels (PSL)
PSL Decision Tree
Eng.Elsayed Amer
P
A
G
E
175
Well
completion
C o n n e c t i o n S e a l s
Seals Technology
Connection Seals
Ring Gaskets
❖ provides the actual seal in
any flanged or studded
connection,
❖ The ring gasket is
machined, metal seal
designed to fit the
grooves on each flange or
hub face.
Eng.Elsayed Amer
P
A
G
E
176
Well
completion
C o n n e c t i o n S e a l s
Seals Technology
R Ring Gasket
RX Ring Gasket
BX (face-to-face contact)
CF Ring Gasket
API
Connection Seals
Eng.Elsayed Amer
P
A
G
E
177
Well
completion
Eng.Elsayed Amer
X-Mass tree Components
Eng.Elsayed Amer
P
A
G
E
178
Well
completion
Eng.Elsayed Amer
Christmas Tree
The Christmas tree is pressure
control system located at the
well head.
A Xmas Tree is an assembly of
valves, all with specific
functions, used to control flow
from the well and to provide
well intervention access for
well maintenance or reservoir
monitoring.
X-Mass tree Components
Eng.Elsayed Amer
P
A
G
E
179
Well
completion
Eng.Elsayed Amer
X-Mass tree Components
Eng.Elsayed Amer
P
A
G
E
180
Well
completion
Eng.Elsayed Amer
X-Mass tree Components
Eng.Elsayed Amer
P
A
G
E
181
Well
completion
Eng.Elsayed Amer
Lower Master Valve
Normally kept in the open
condition and is only closed in
the event that all the other
valves fail.
X-Mass tree Valves
Kill Wing Valve
Production Wing
Valve
Choke Valve
Eng.Elsayed Amer
P
A
G
E
182
Well
completion
Eng.Elsayed Amer
Upper Master Valve
Usually operated to open and
close the wellbore. This valve is
often fitted with an actuator so
that the valve can be
controlled remotely.
X-Mass tree Valves
Kill Wing Valve
Production Wing
Valve
Choke Valve
Eng.Elsayed Amer
P
A
G
E
183
Well
completion
Eng.Elsayed Amer
Swab Valve
kept closed during flowing of
the well and is opened to allow
access into the tubing string
when maintenance of the
tubing string is required.
X-Mass tree Valves
Kill Wing Valve
Production Wing
Valve
Choke Valve
Eng.Elsayed Amer
P
A
G
E
184
Well
completion
Eng.Elsayed Amer
Production wing Valve
Used in conjunction with the
upper master valve in
controlling the well. This valve
is normally fitted with an
actuator similar to that of the
upper master valve so that the
valve can be controlled
remotely.
X-Mass tree Valves
Kill Wing Valve
Production Wing
Valve
Choke Valve
Eng.Elsayed Amer
P
A
G
E
185
Well
completion
Eng.Elsayed Amer
Kill wing Valve
Used when the well has to be
killed. The size of this valve
may be smaller than other
valves.
X-Mass tree Valves
Kill Wing Valve
Production Wing
Valve
Choke Valve
Eng.Elsayed Amer
P
A
G
E
186
Well
completion
Eng.Elsayed Amer
Tree Cap
a cap or plug that is removed
to allow access for service
tools.
X-Mass tree Valves
Kill Wing Valve
Production Wing
Valve
Choke Valve
Eng.Elsayed Amer
P
A
G
E
187
Well
completion
Eng.Elsayed Amer
Choke Valve
Attached to the downstream
side of the flowline wing valve,
the choke is used to control or
regulate the flow of produced
fluids.
The choke can be of varying
styles, positive, adjustable or
multi-orifice and in some
instances may be fitted with a
remote actuator.
X-Mass tree Valves
Kill Wing Valve
Production Wing
Valve
Choke Valve
Eng.Elsayed Amer
P
A
G
E
188
Well
completion
Eng.Elsayed Amer
Christmas tree testing
X-Mass tree Valves
Eng.Elsayed Amer
P
A
G
E
189
Well
completion
Tubing Hanger
Back pressure valves
Seal
Handling
Thread
Hanger
Thread
Valve Spring
Valve
Stem
BPV TWC
What is it used for?
Back pressure valves are installed in the tubing
hanger to hold pressure from below during the
following operations:
1. Nipple down and up the drilling BOP stack.
2. Nipple up or down Christmas tree.
3. Test the Christmas tree (2-way check).
4. Replace the master valve.
Eng.Elsayed Amer
P
A
G
E
190
Well
completion
Tubing Hanger
Back pressure valves
The most common types of BPV are the
Cameron Type ‘H’ BPV and Petroline ‘ABC’.
Eng.Elsayed Amer
P
A
G
E
191
Well
completion
Eng.Elsayed Amer
Christmas tree testing
X-Mass tree Valves
Eng.Elsayed Amer
P
A
G
E
192
Well
completion
Eng.Elsayed Amer
Christmas tree
X-Mass tree Valves

More Related Content

What's hot

Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1Elsayed Amer
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wlegElsayed Amer
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selectionElsayed Amer
 
Tubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryTubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryPE Mahmoud Jad
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellheadElsayed Amer
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveElsayed Amer
 
One day gas lift system course
One day gas lift system course One day gas lift system course
One day gas lift system course Giuseppe Moricca
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniquesvelMurugan260
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEAmir Rafati
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation kaleem ullah
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1Elsayed Amer
 

What's hot (20)

Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selection
 
Tubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryTubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industry
 
Ssd spm
Ssd   spmSsd   spm
Ssd spm
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
 
One day gas lift system course
One day gas lift system course One day gas lift system course
One day gas lift system course
 
WELL COMPLETIONS.pptx
WELL COMPLETIONS.pptxWELL COMPLETIONS.pptx
WELL COMPLETIONS.pptx
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
Production packer
Production packerProduction packer
Production packer
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Wellhead
WellheadWellhead
Wellhead
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1
 
Well Workover
Well Workover Well Workover
Well Workover
 

Similar to 1. completion sequance

Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1Elsayed Amer
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED
 
Water shut off ppt
Water shut off pptWater shut off ppt
Water shut off pptAdjei Sephen
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfLokmanDridah
 
Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfAbdallahTayea99
 
REPAIR OF THE SPILLWAY AT PANDOH DAM
REPAIR OF THE  SPILLWAY AT PANDOH DAM REPAIR OF THE  SPILLWAY AT PANDOH DAM
REPAIR OF THE SPILLWAY AT PANDOH DAM Hemant Thakur
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER) Arez Luqman
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxodiliagilby
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 
CV6314_Lect_1_excavation_4slides_2012.pdf
CV6314_Lect_1_excavation_4slides_2012.pdfCV6314_Lect_1_excavation_4slides_2012.pdf
CV6314_Lect_1_excavation_4slides_2012.pdfjclimkanghai
 
Groundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingGroundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingMartin Preene
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete Sreekutty S
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptAndresRios87791
 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailraceRakesh Sunari Magar
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation dilip patidar
 

Similar to 1. completion sequance (20)

Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
Water shut off ppt
Water shut off pptWater shut off ppt
Water shut off ppt
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
 
Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdf
 
REPAIR OF THE SPILLWAY AT PANDOH DAM
REPAIR OF THE  SPILLWAY AT PANDOH DAM REPAIR OF THE  SPILLWAY AT PANDOH DAM
REPAIR OF THE SPILLWAY AT PANDOH DAM
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
 
2022-07-13.pptx
2022-07-13.pptx2022-07-13.pptx
2022-07-13.pptx
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
Cementation
CementationCementation
Cementation
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
CV6314_Lect_1_excavation_4slides_2012.pdf
CV6314_Lect_1_excavation_4slides_2012.pdfCV6314_Lect_1_excavation_4slides_2012.pdf
CV6314_Lect_1_excavation_4slides_2012.pdf
 
Groundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingGroundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft Sinking
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete
 
cavern(1)
cavern(1)cavern(1)
cavern(1)
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.ppt
 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailrace
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
 
Cementation
CementationCementation
Cementation
 

More from Elsayed Amer

5. Gas Dehydration.pdf
5. Gas Dehydration.pdf5. Gas Dehydration.pdf
5. Gas Dehydration.pdfElsayed Amer
 
Gas Processing.pdf
Gas Processing.pdfGas Processing.pdf
Gas Processing.pdfElsayed Amer
 
complete guide to process valves
complete guide to process valves complete guide to process valves
complete guide to process valves Elsayed Amer
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guideElsayed Amer
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN Elsayed Amer
 
3. natural gas composition
3. natural gas composition3. natural gas composition
3. natural gas compositionElsayed Amer
 
6. phase separatation
6. phase separatation6. phase separatation
6. phase separatationElsayed Amer
 
2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procing2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procingElsayed Amer
 
3. a. natural gas composition 1
3. a. natural gas composition 13. a. natural gas composition 1
3. a. natural gas composition 1Elsayed Amer
 
1. natural gas overview
1. natural gas overview1. natural gas overview
1. natural gas overviewElsayed Amer
 

More from Elsayed Amer (11)

5. Gas Dehydration.pdf
5. Gas Dehydration.pdf5. Gas Dehydration.pdf
5. Gas Dehydration.pdf
 
Gas Processing.pdf
Gas Processing.pdfGas Processing.pdf
Gas Processing.pdf
 
Rig components
Rig componentsRig components
Rig components
 
complete guide to process valves
complete guide to process valves complete guide to process valves
complete guide to process valves
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guide
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN
 
3. natural gas composition
3. natural gas composition3. natural gas composition
3. natural gas composition
 
6. phase separatation
6. phase separatation6. phase separatation
6. phase separatation
 
2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procing2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procing
 
3. a. natural gas composition 1
3. a. natural gas composition 13. a. natural gas composition 1
3. a. natural gas composition 1
 
1. natural gas overview
1. natural gas overview1. natural gas overview
1. natural gas overview
 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 

Recently uploaded (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 

1. completion sequance